European Workgroup
European Workgroup
5th June 2014
Code Status Update
Code Current Status Implementation date
Congestion Management (CMP)
Implemented 1st October 2013 (Fixed)
Capacity Allocation Mechanism (CAM)
CAM approved for EU wide implementation at relevant EU IPs. 1st November 2015 (Fixed)
Gas Balancing (BAL)
BAL approved for EU wide implementation 26th March 2014 (Commission Regulation (EU) No 312/2014 establishing a Network Code on Gas Balancing of Transmission Networks.)
1st Oct 2015 (subject to NRA approval for additional 12 months) (Fixed)
Interoperability & Data Exchange (INT)
In comitology. Comitology meetings postponed from 28 th April and 11th July 2014, now to take place July and September/October 2015 (dates TBC).
Q4 2015 (Estimated)
Tariffs Under development. Code to be submitted 31st December 2014. Estimated earliest mid January 2017. Applicable from October 2017.
Incremental Capacity
Under development. Incremental Capacity to be introduced via combination of new articles in CAM Network Code and via Tariffs Network Code. Code amendment to be submitted 31st December 2014.
Applicable from March 2017
Gas Codes Timeline
Status of Development of European Gas Network Codes
Future dates are subject to change KEY
Dates shown in italics are best approximations based on current understanding. Activities undertaken by ACER
It has been necessary to 'round' some dates for the benefits of the diagram Activities undertaken by ENTSOG
Activities undertaken by European Commission
TODAYM
ar
Ap
r
May
Jun
Jul
Au
g
Sep
Oct
No
v
Dec
Jan
Feb
Mar
Ap
r
May
Jun
Jul
Au
g
Sep
Oct
No
v
Dec
Jan
Feb
Mar
Ap
r
May
Jun
Jul
Au
g
Sep
Oct
No
v
Dec
Jan
Feb
Mar
Ap
r
May
Jun
Jul
Au
g
Sep
Oct
No
v
Dec
Jan
Feb
Mar
Ap
r
May
Jun
Jul
Au
g
Sep
Oct
No
v
Dec
Stakeholder Workgroups
ACER Develops Framework
Guidelines on Interoperability & Data Exchange
Interoperability & Data Exchange
Tariffs
Go
Liv
e
Balancing
ACER Review
Post-Comitology Capacity Allocation Mechanisms (CAM)
ENTSOG Drafting
Consultatio
n
Network Code / Guideline
Congestion Management Principles (CMP)
Next Step
Implementation of CMP obligations for 1st October
2013
Comitology
2014
Finalise drafting
Comitology
2012 2013
ACER Review
ENTSOG revision of Code
Initial draftin
g
ACER Review
Go
Liv
e (
?)
FG Extension
20162015
Go
Liv
e
Consultation
Finalise drafting
Comitology Phase
ACER Develops Framework
Guidelines on Tariffs
ACER ReviewComitology
ENTSOG Drafting
Initial draftingConsultation
Go
Liv
e (
?)
Go
Liv
e
ENTSOG Drafting
ACER Review
Finalise drafting
Comitology(duration unknown)
Comitology(duration unknown)
Initial drafting
Road Map
Notes: 1) Long term capacity auctions may need to be delivered in conjunction with short term auctions
CAM & Bacton UNC Modifications
First Modification Development Workgroup held 3 June 2014
Key principles CAM Mod 500
Key principles Bacton split Mod 501
Next Workgroup planned for early July 2014 (date to be confirmed)
8
Consultation on Capacity Booking Platforms
ENTSOG press release 16th May 2014
ENTSOG launched consultation on Capacity booking platforms
The consultation started 19 May 2014 and will be open until 30 June 2014
ENTSOG website can be found at http://www.entsog.eu/
9
EU Tariff Code update
Draft TAR NC completed and approved by ENTSOG Board 28th May
Draft Code and supporting document published end May
http://www.entsog.eu/publications/tariffs
Public Consultation on the draft TAR NC will take place from the end of May to the end of July
Next Stakeholder Workshop – 25th June
EU Incremental Amendment update
Draft INC Amendment now completed and approved by ENTSOG Board 28th May.
Draft Code and supporting document published end May
http://www.entsog.eu/publications/incremental-capacity
Public Consultation on the draft INC amendment will take place from the end of May to the end of July
Next Stakeholder Workshop – 24th June
For further information, please contact Colin Hamilton colin.j.hamilton@nationalgrid.com, 07971 760360)
Phase 2 UNC ModificationsPotential Timescales
EU Network Code Area of change Panel Submission Workgroup Development
UNC Consultation
Gas Balancing (BAL) Information Provision March 2014 2 Months June 2014
SMP Buy & Sell April 2014 1 Month June 2014
Nomination Process at IP’s April 2014 6 - 9 Months Q4 -2014
Capacity Allocation (CAM)
CAM / CMP Compliant Capacity Auctions
Q2 - 2014 6 - 9 Months Q4 - 2014
Interoperability & Data Exchange (INT)
OBAs / allocations Jul/Aug 2014 6 Months Q1 - 2015
Interconnection Agreements/Contract Changes(facilitating Modification )
Q1 - 2015 3 Months Q2 - 2015
Data Exchange Q3 - 2014 3 Months Q4 - 2014
Draft Tariff Code – Walk ThroughColin Hamilton
ENTSOg publishing document Friday 30th May therefore not available until Monday 2nd June
REMIT
Insider InformationWholesale Energy Market
TransactionsTransparency
Standard ContractsJan 2015
NG’s Spectron etc
Data feed to ACERJan 2015
Non Standard ContractsJun 2015
NG’s OM Contracts
Primary Capacity TradesJan 2015
NG’s & others Xoserve
Secondary Capacity TradesJan 2015
Market Participants Buybacks ( Xoserve on behalf of
market participants)
Balancing ServicesApril 2017
NG’s & othersNon Xoserve
Fundamental DataJan 2015
Nomination DataNG or Xoserve
REMIT: Secondary Trade Reporting
TSOs not obligated to provide secondary capacity trading data - we are not one of the counter-parties and therefore do not hold the relevant data.
Those trading on the secondary market need to provide this data.
However, NG are very happy to work with market participants to find an effective solution to provide this data to ACER.
We suggest that one solution could be for Xoserve to become the delivery agent for secondary data in much the same way as it will become for primary data as per the NG project. NG is now beginning work with Xoserve on designing the IT systems to
provide primary data to ACER. We offer shippers and traders an opportunity to collaborate with our REMIT reporting project such that it could become a solution to secondary reporting requirements for GB markets participants.
However, Xoserve would need the price data which it does not currently hold.
If market participants wanted Xoserve to provide this REMIT data service on their behalf, they may need to formally contract Xoserve to do so. Confidentially assurances on how Xoserve would deal with and store the relevant price data may be needed.
Bridge to 2025 and GTM
Bridge to 2025 Bridge to 2025 consultation closes 16 June 2014
Consultation can be found here:
http://www.acer.europa.eu/Media/Events/Launch-of-Energy-Regulation-A-Bridge-to-2025/default.aspx
Final bridge paper to be published September 2014
Gas Target Model (GTM) update Comments on GTM invited now
Latest slides and updates from 15 May workshop can be found here:
http://www.acer.europa.eu/Media/Events/3rd-Gas-Target-Model-Stakeholders-Workshop/default.aspx
Final GTM to be published September / October 2014
EU Gas Quality Harmonisation
CEN has issued its draft gas quality standard for public consultation to national standardising bodies
BSI has published the standard on its website at https://drafts.bsigroup.com/Home/Details/53031
BSI committee GSE/4 will co-ordinate GB comments on the standard
BSI deadline for comments is 31st August 2014
CEN deadline for BSI to send GB comments is 8th October 2014
The EC are proposing to hold a Gas Quality workshop in Brussels on 1st July 2014
For further information, please contact philip.hobbins@nationalgrid.com (01926 653432)
top related