European Thematic Network on Assistive Information andCommunication Technology
Fourth Workshop Ontology of Resources
Linz, Austria, July 9-11, 2012
Johannes Kepler Universität Linz
Index of the presentation
Overview of the ETNA progressThe Annual Review and our responseThe Ontology issue: a revised approach
Workpackage 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
1 Network coordination & impl.
(FDGCO)2 Mapping information needs
(FDGCO)3 Mapping existing resources
(AIAS)4 Ontology of products
(HMI)5 Ontology of components
(CERTH)6 Unified access to all resources
(FDGCO)7 Field test, validation and launch
(HZ)8 Experiences exchange
(FDGCO)
Timing and milestones
workshops
deliverables
webinars
Meetings
DoneKick-off meeting (Webinar, Jan 14, 2011)1st Workshop (Milano, Mar 24-25, 2011)2nd Workshop (Maastricht, Aug 29-30, 2011)3rd Workshop (Taastrup, Jan 25-26, 2012)
In progress4th Workshop (Linz, Jul 10, 2012)
Planned5th Workshop (Milano, Feb 2013: 21-22 ?), with ATIS4All6th Workshop (Portugal, satellite AAATE 2013, 19-22 Sep 2013)
ETNA progress 9.7.2012
DoneDel 1.1 > ETNA dissemination brochure (due 31.03 done 31.03)Del 1.2 > Thematic network website 1st rel (due 31.03 done 31.03)Del 2.1 > Proceedings of the WP2 workshop (due 30.06 done 13.05)Del 2.2 > Synopsis of the information needs (due 30.06 done 17.06)Del 3.1 > Proceedings of the WP3 workshop (due 31.12 done 20.10)Del 3.2 > Synopsis of the existing resources (due 31.12 done 06.12)Del 1.3 > Thematic network website 2nd rel (due 31.12 done 09.03)Del 1.4 > Annual Report #1 (due 31.12 done 09.03)Del 8.1 > Archive of the ETNA Webinars #1 (due 31.12 done 09.03)Del 4.1 > Preparatory material for the ETNA ontology (due 31.03 done 07.06)
Coming soonDel 1.5 > Search engine and interface specs (due 30.06)Del 4.2 > Ontology of resources (due 31.08)Del 5.1 > Prep.mat.for ontology management tool (due 30.09)
ETNA progress 9.7.2012 - Deliverables
DoneExperience of FDG and AIAS (June 8, 2011)Experience of CNR and TUKE (September 14, 2011)Experience of TECNALIA and SU/DART (December 14, 2011)Experience of DLF and TNTU (February 8, 2012)Experience of DN and JKU (March 14, 2012)Experience of IWKOELN and FAIDD (April 11, 2012)Experience of THL and EASPD (May 9, 2012)Experience of HZ and CEAPAT (June 13, 2012)
PlannedExperience of ... (September 12, 2012) HMI ACEExperience of ... (October 10, 2012) JGILL CERTHExperience of ... (November 14, 2012) FTB HACAVIE
ETNA progress 9.7.2012 - Webinars
Milestones
AchievedMS1 > Map of information needs (due June 30, 2011)MS2 > Map of existing resources (due December 31, 2011)
NextMS3 > Ontology of “products” (due August 31, 2012)MS4 > Ontology of “components” (due December 31, 2012)MS5 > EASTIN 2.0 Portal, 1st release (due December 31, 2012)MS6 > EASTIN 2.0 Portal, 2nd release (due December 31, 2012)MS6 > EASTIN 2.0 Portal, 3rd release (due December 31, 2012)
ETNA progress 9.7.2012
Assembly and Board
Assembly of partners (twice a year)AP1 > Kick-off webinar Jan 14, 2011AP2 > Maastricht Aug 30, 2011AP3 > Taastrup Jan 26, 2012
Board (four times a year)MC1 > coinciding with Kick-off Jan 14, 2011MC2 > Milan, Mar 24, 2011MC3 > Maastricht, Aug 30, 2011MC4 > Webinar, Dec 21, 2011MC5 > Webinar, May 14, 2012
ETNA progress 9.7.2012
External relationsDone
ATIS4All Workshop 1 (Madrid, Mar 14-15, 2011)ATIS4All Workshop 2 (Prague, Sep 8-9, 2011)ETNA/ATIS4All Technical Meeting (Madrid, Sep 21, 2011)AEGIS Conference (Brussels, Nov 29-30, 2011)ATIS4All Workshop 3 (Madrid, 12-13 Mar 2012)ETNA/ATIS4All Technical Meeting (Milano, May 31, 2012)EU Seminar on AT SDS (Copenaghen 21-22 May 2012)ICCHP 2012 Conference (Linz 11-13 Jul 2012)
Coming soonATIS4All Workshop 4 (Madrid, 18-19 Sep 2012)ETNA/ATIS4All Technical Meeting (...)
ETNA progress 9.7.2012
Consortium
Confirmed willingness to continueAll partners
Changes Fundacion Fatronik > TecnaliaDanish Centre for Assistive Technology > SocialstyrelsenACE > ACE North
ETNA progress 9.7.2012
Timing and participantsBrussels, Mar 28, 2012FDCCO + CERTH, HZ, EASPD
Main outcomesOverall successful (“continue without modifications”)10 recommendations 4 urgent (deadline Jun 15, 2012) incl. resubmission of D1.3
More technical info on the Eastin architectureIndicators of partners’ performanceIndicators of project performance
6 not urgent (deadline: next annual review)
Annual Review 2011 – ETNA Project
R1: technical work has to be properly documentedWill be done in D1.6
R2: a dissemination plan has to be developedStart discussion in Linz
R2: reschedule WP7 (validation)Start discussion in Linz
R4: ETNA website has to be fully accessibleDone: now XHTML 1.0 Strict and CSS 3.0 compliant
R5: coehrent methodology is needed for ontology developmentDone: redefinition of WP4 and WP5 scope
ETNA Review: recommendations/responses
R6: resubmit D2.2 (more detailed analysis of search behaviour) Will be done in Month 24
R7: resubmit D1.3 with addendumDone May 10, 2012
R8: each partner should elaborate an exploitation planStart discussion in Linz, then everybody’s homework
R9: more joint work with ATIS4all5th workshop to be be organised jointly, in Milano February 2013As far as possible, joint dissemination plan
R10: involve other stakeholders, inside and outside EUShould be addressed in the dissemination plan
ETNA Review: recommendations/responses
Timing and participantsBrussels, Mar 27, 2012FDGCO, TECNOSITE
Main outcomesOverall successful (“continue without modifications”) 4 recommendations (not urgent)
Increase clusteringDesign functionalities that encourage user inputCoordinate forthcoming workshopsImprove user rating functionality (harmonisation of products identifiers; products rating interface; multilingual issues)
Annual Review 2011 – ETNATIS Cluster
Two introductory questionsQ1: How long have you been actually using this assistive product?Q2: What is the term that best describes your perspective with this assistive product?
Three core questionsQ3: How satisfied are you with how effective this assistive device is (the degree to which it meets your needs) ?Q4: How satisfied are you with how easy is it to use this assistive product ?Q5: How satisfied are you with the ease in adjusting (fixing, fastening, configuring, etc.) of this assistive product ?
Five additional core questions, in case of products having hardwareQ6: How satisfied are you with the dimensions (size, length, height, width, etc.) of this assistive product ? Q7: How satisfied are you with the weight of this assistive product ?Q8: How satisfied are you with how safe and secure this assistive product is ? Q9: How satisfied are you with the durability (endurance, resistance to wear, etc.) of your assistive product ?Q10: How satisfied are you with how comfortable this assistive product is ?
User Rating Tool: 10 questions
User rating prototype
items judged by the rater as “non‐applicable” for this product are
displayed with empty stars, and the statement “non applicable”
Personal profile
I have been using this product formore than one week
I look at this product mainly as a professional in health care, social services or education
(not satisfied at all)(not satisfied at all)(very satisfied) (quite satisfied)(more or less satisfied)(not satisfied at all)(very satisfied)(not very satisfied)
Old WP4 scope (DoW)Ontology of products > ontology of “items that stand alone as assistive solutions”.
Old WP5 scope (DoW)Ontology of components > ontology of “items that don’t stand alone but can be assembled to other items to become assistive or e-accessibility solutions”
New WP4 scopeOntology of all ETNA resources > taxonomies to be used in building up the ontology
New WP5 scopeOntology management tools > tools that convert such taxonomies into a proper ontology and allow its maintenance over time
The ontology issue
What do we expect from this workshop
To finalise the taxonomies (WP4)D5.1 (preparatory material for the ETNA ontology)WG1 (basic data set for all resources) > Instrumentum LaborisWG2 (detailed description ICT AT products) > Instrumentum Laboris
To start design of the ontology tools (WP5)CERTH DEMOWG3 (technical implementation issues)
To set the ground for successSession 5: validation, dissemination, sustainability, exploitation
To better frame the project within a wider contextSession 1: ATIS4All, EASTIN, EASTIN-CL, CLOUD4All..