European DataGrid Project status and plans
Peter Kunszt, CERN
DataGrid, WP2 Manager
Peter.Kunszt@cern.ch
ACAT, Moscow – 26 June 2002 - n° 2
Outline
EU DataGrid Project
EDG overview Project Organisation
Objectives
Current Status overall and by WP
Plans for next releases and testbed 2
Conclusions
ACAT, Moscow – 26 June 2002 - n° 3
The Grid vision
Flexible, secure, coordinated resource sharing among dynamic collections of individuals, institutions, and resource
From “The Anatomy of the Grid: Enabling Scalable Virtual Organizations”
Enable communities (“virtual organizations”) to share geographically distributed resources as they pursue common goals -- assuming the absence of…
central location,
central control,
omniscience,
existing trust relationships.
ACAT, Moscow – 26 June 2002 - n° 4
Grids: Elements of the Problem
Resource sharing Computers, storage, sensors, networks, …
Sharing always conditional: issues of trust, policy, negotiation, payment, …
Coordinated problem solving Beyond client-server: distributed data analysis, computation,
collaboration, …
Dynamic, multi-institutional virtual orgs Community overlays on classic org structures
Large or small, static or dynamic
ACAT, Moscow – 26 June 2002 - n° 5
EU DataGrid Project Objectives DataGrid is a project funded by European Union whose objective is to
exploit and build the next generation computing infrastructure providing intensive computation and analysis of shared large-scale databases.
Enable data intensive sciences by providing world wide Grid test beds to large distributed scientific organisations ( “Virtual Organisations, VO”)
Start ( Kick off ) : Jan 1, 2001 End : Dec 31, 2003
Applications/End Users Communities : HEP, Earth Observation, Biology
Specific Project Objetives: Middleware for fabric & grid management
Large scale testbed
Production quality demonstrations
To collaborate with and complement other European and US projects
Contribute to Open Standards and international bodies
( GGF, Industry&Research forum)
ACAT, Moscow – 26 June 2002 - n° 6
DataGrid Main Partners
CERN – International (Switzerland/France)
CNRS - France
ESA/ESRIN – International (Italy)
INFN - Italy
NIKHEF – The Netherlands
PPARC - UK
ACAT, Moscow – 26 June 2002 - n° 7
Research and Academic Institutes•CESNET (Czech Republic)•Commissariat à l'énergie atomique (CEA) – France•Computer and Automation Research Institute, Hungarian Academy of Sciences (MTA SZTAKI)•Consiglio Nazionale delle Ricerche (Italy)•Helsinki Institute of Physics – Finland•Institut de Fisica d'Altes Energies (IFAE) - Spain•Istituto Trentino di Cultura (IRST) – Italy•Konrad-Zuse-Zentrum für Informationstechnik Berlin - Germany•Royal Netherlands Meteorological Institute (KNMI)•Ruprecht-Karls-Universität Heidelberg - Germany•Stichting Academisch Rekencentrum Amsterdam (SARA) – Netherlands•Swedish Research Council - Sweden
Assistant Partners
Industrial Partners•Datamat (Italy)•IBM-UK (UK)•CS-SI (France)
ACAT, Moscow – 26 June 2002 - n° 8
Project Schedule
Project started on 1/Jan/2001
TestBed 0 (early 2001)
International test bed 0 infrastructure deployedGlobus 1 only - no EDG middleware
TestBed 1 ( now )
First release of EU DataGrid software to defined users within the project:HEP experiments (WP 8), Earth Observation (WP 9), Biomedical applications (WP 10)
Successful Project Review by EU: March 1st 2002
TestBed 2 (October 2002)
Builds on TestBed 1 to extend facilities of DataGrid
TestBed 3 (March 2003) & 4 (September 2003)
Project stops on 31/Dec/2003
ACAT, Moscow – 26 June 2002 - n° 9
EDG Highlights
The project is up and running! All 21 partners are now contributing at contractual level total of ~60 man years for first year
All EU deliverables (40, >2000 pages) submitted in time for the review according to the contract technical annex
First test bed delivered with real production demos
All deliverables (code & documents) available via www.edg.org http://eu-datagrid.web.cern.ch/eu-datagrid/Deliverables/default.htm
requirements, surveys, architecture, design, procedures, testbed analysis etc.
ACAT, Moscow – 26 June 2002 - n° 10
Working Areas
Applications
Middleware
Infrastructure
Man
ag
em
en
tTest
bed
The DataGrid project is divided in 12 Work Packages distributed in four Working Areas
ACAT, Moscow – 26 June 2002 - n° 11
Work PackagesWP1: Work Load Management System
WP2: Data Management
WP3: Grid Monitoring / Grid Information Systems
WP4: Fabric Management
WP5: Storage Element
WP6: Testbed and demonstrators
WP7: Network Monitoring
WP8: High Energy Physics Applications
WP9: Earth Observation
WP10: Biology
WP11: Dissemination
WP12: Management
ACAT, Moscow – 26 June 2002 - n° 12
Objectives for the first year of the project
Collect requirements for middleware
Take into account requirements from application groups
Survey current technology
For all middleware
Core Services testbed
Testbed 0: Globus (no EDG middleware)
First Grid testbed release
Testbed 1: first release of EDG middleware
WP1: workload
Job resource specification & scheduling
WP2: data management
Data access, migration & replication
WP3: grid monitoring services
Monitoring infrastructure, directories & presentation tools
WP4: fabric management
Framework for fabric configuration management & automatic sw installation
WP5: mass storage management
Common interface for Mass Storage Sys.
WP7: network services
Network services and monitoring
ACAT, Moscow – 26 June 2002 - n° 13
DataGrid Architecture
Collective ServicesCollective Services
Information &
Monitoring
Information &
Monitoring
Replica ManagerReplica
ManagerGrid
SchedulerGrid
Scheduler
Local ApplicationLocal Application Local DatabaseLocal Database
Underlying Grid ServicesUnderlying Grid Services
Computing Element Services
Computing Element Services
Authorization Authenticatio
n and Accounting
Authorization Authenticatio
n and Accounting
Replica CatalogReplica Catalog
Storage Element Services
Storage Element Services
SQL Database Services
SQL Database Services
Fabric servicesFabric services
ConfigurationManagement
ConfigurationManagement
Node Installation &Management
Node Installation &Management
Monitoringand
Fault Tolerance
Monitoringand
Fault Tolerance
Resource Management
Resource Management
Fabric StorageManagement
Fabric StorageManagement
Grid
Fabric
Local Computing
Grid Grid Application LayerGrid Application Layer
Data Management
Data Management
Job Management
Job Management
Metadata Management
Metadata Management
Object to File
Mapping
Object to File
Mapping
Service Index
Service Index
ACAT, Moscow – 26 June 2002 - n° 14
EDG Interfaces
Collective ServicesCollective Services
Information & MonitoringInformation
& MonitoringReplica ManagerReplica Manager
Grid Scheduler
Grid Scheduler
Local ApplicationLocal Application Local DatabaseLocal Database
Underlying Grid ServicesUnderlying Grid Services
Computing Element Services
Computing Element Services
Authorization Authentication and Accounting
Authorization Authentication and Accounting
Replica CatalogReplica Catalog
Storage Element Services
Storage Element Services
SQL Database Services
SQL Database Services
Fabric servicesFabric services
ConfigurationManagement
ConfigurationManagement
Node Installation &Management
Node Installation &Management
Monitoringand
Fault Tolerance
Monitoringand
Fault ToleranceResource
ManagementResource
ManagementFabric StorageManagement
Fabric StorageManagement
Grid Application LayerGrid Application Layer
Data Management
Data ManagementJob
ManagementJob
ManagementMetadata
ManagementMetadata
ManagementObject to File
MappingObject to File
Mapping
Service Index
Service Index
Computing Computing ElementsElements
SystemSystemManagersManagers
ScientiScientistssts
OperatingOperatingSystemsSystems
FileFile SystemsSystems
StorageStorageElementsElementsMassMass Storage Storage
SystemsSystemsHPSS, CastorHPSS, Castor
UserUser AccountsAccounts
CertificateCertificate AuthoritiesAuthorities
ApplicatiApplicationonDevelopeDevelopersrs
BatchBatch SystemsSystemsPBS, LSFPBS, LSF
ACAT, Moscow – 26 June 2002 - n° 15
WP1: Work Load Management
Goals Maximise use of resources by efficient
scheduling of user jobs
Achievements Analysis of work-load management system
requirements & survey of existing mature implementations Globus & Condor (D1.1)
Definition of architecture for scheduling & res. mgmt. (D1.2)
Development of "super scheduling" component using application data and computing elements requirements
Issues Integration with software from other WPs Advanced job submission facilities
Components
Job Description Language
Resource Broker
Job Submission Service
Information Index
User Interface
Logging & Bookkeeping Service
Collective ServicesCollective Services
Information & Monitoring
Information & Monitoring
Replica ManagerReplica Manager
Grid Scheduler
Grid Scheduler
Local ApplicationLocal Application Local DatabaseLocal Database
Underlying Grid ServicesUnderlying Grid Services
Computing Element Services
Computing Element Services
Authorization Authentication and Accounting
Authorization Authentication and Accounting
Replica CatalogReplica Catalog
Storage Element Services
Storage Element Services
SQL Database Services
SQL Database Services
Fabric servicesFabric services
ConfigurationManagement
ConfigurationManagement
Node Installation &Management
Node Installation &Management
Monitoringand
Fault Tolerance
Monitoringand
Fault ToleranceResource
ManagementResource
ManagementFabric StorageManagement
Fabric StorageManagement
Grid Application LayerGrid Application Layer
Data Management
Data ManagementJob
ManagementJob
ManagementMetadata
ManagementMetadata
ManagementObject to File
MappingObject to File
Mapping
Service IndexService Index
ACAT, Moscow – 26 June 2002 - n° 16
WP2: Data Management Goals
Coherently manage and share petabyte-scale information volumes in high-throughput production-quality grid environments
Achievements Survey of existing tools and technologies for data
access and mass storage systems (D2.1) Definition of architecture for data management
(D2.2) Deployment of Grid Data Mirroring Package (GDMP)
in testbed 1 Close collaboration with Globus, PPDG/GriPhyN &
Condor Working with GGF on standards
Issues Security: clear methods handling authentication and
authorization Data replication - how to maintain consistent up to
date catalogues of application data and its replicas
Components
GDMP
Replica Catalog
SpitFire
Collective ServicesCollective Services
Information & Monitoring
Information & Monitoring
Replica ManagerReplica Manager
Grid Scheduler
Grid Scheduler
Local ApplicationLocal Application Local DatabaseLocal Database
Underlying Grid ServicesUnderlying Grid Services
Computing Element Services
Computing Element Services
Authorization Authentication and Accounting
Authorization Authentication and Accounting
Replica CatalogReplica Catalog
Storage Element Services
Storage Element Services
SQL Database Services
SQL Database Services
Fabric servicesFabric services
ConfigurationManagement
ConfigurationManagement
Node Installation &Management
Node Installation &Management
Monitoringand
Fault Tolerance
Monitoringand
Fault ToleranceResource
ManagementResource
ManagementFabric StorageManagement
Fabric StorageManagement
Grid Application LayerGrid Application Layer
Data Management
Data ManagementJob
ManagementJob
ManagementMetadata
ManagementMetadata
ManagementObject to File
MappingObject to File
Mapping
Service IndexService Index
ACAT, Moscow – 26 June 2002 - n° 17
WP3: Grid Monitoring Services
Goals Provide information system for
discovering resources and monitoring status
Achievements Survey of current technologies (D3.1) Coordination of schemas in testbed 1 Development of Ftree caching backend based
on OpenLDAP (Light Weight Directory Access Protocol) to address shortcoming in MDS v1
Design of Relational Grid Monitoring Architecture (R-GMA) (D3.2) – to be further developed with GGF
GRM and PROVE adapted to grid environments to support end-user application monitoring
Components
MDS/Ftree
R-GMA
GRM/PROVE
Collective ServicesCollective Services
Information &
Monitoring
Information &
Monitoring
Replica ManagerReplica Manager
Grid Schedule
r
Grid Schedule
r
Local Application
Local Application
Local Database
Local Database
Underlying Grid ServicesUnderlying Grid Services
Computing
Element Services
Computing
Element Services
Authorizat ion Authentication and Accounting
Authorizat ion Authentication and Accounting
Replica CatalogReplica Catalog
Storage Element Services
Storage Element Services
SQL Database Services
SQL Database Services
Fabric servicesFabric services
Configuration
Management
Configuration
Management
Node Installation
&Manageme
nt
Node Installation
&Manageme
nt
Monitoringand
Fault Tolerance
Monitoringand
Fault Tolerance
Resource Manageme
nt
Resource Manageme
nt
Fabric Storage
Management
Fabric Storage
Management
Grid Application LayerGrid Application Layer
Data Managem
ent
Data Managem
entJob
Management
Job Managem
ent
Metadata Managem
ent
Metadata Managem
ent
Object to File
Mapping
Object to File
Mapping
Service Index
Service Index
ACAT, Moscow – 26 June 2002 - n° 18
WP4: Fabric Management Goals
manage clusters (~thousands) of nodes
Achievements Survey of existing tools, techniques and
protocols (D4.1) Defined an agreed architecture for fabric
management (D4.2) Initial implementations deployed at several
sites in testbed 1
Issues How to install reference platform and
EDG software on large numbers of hosts with minimal human intervention per node
How to ensure the node configurations are consistent and handle updates to the software suites
Components
LCFG
PBS & LSF info providers
Image installation
Config. Cache Mgr
Collective ServicesCollective Services
Information & Monitoring
Information & Monitoring
Replica ManagerReplica Manager
Grid Scheduler
Grid Scheduler
Local ApplicationLocal Application Local DatabaseLocal Database
Underlying Grid ServicesUnderlying Grid Services
Computing Element Services
Computing Element Services
Authorization Authentication and Accounting
Authorization Authentication and Accounting
Replica CatalogReplica Catalog
Storage Element Services
Storage Element Services
SQL Database Services
SQL Database Services
Fabric servicesFabric services
ConfigurationManagement
ConfigurationManagement
Node Installation &Management
Node Installation &Management
Monitoringand
Fault Tolerance
Monitoringand
Fault ToleranceResource
ManagementResource
ManagementFabric StorageManagement
Fabric StorageManagement
Grid Application LayerGrid Application Layer
Data Management
Data ManagementJob
ManagementJob
ManagementMetadata
ManagementMetadata
ManagementObject to File
MappingObject to File
Mapping
Service IndexService Index
ACAT, Moscow – 26 June 2002 - n° 19
WP5: Mass Storage Management Goals
Provide common user and data export/import interfaces to existing local mass storage systems
Achievements Review of Grid data systems, tape and disk
storage systems and local file systems (D5.1) Definition of Architecture and Design for
DataGrid Storage Element (D5.2) Collaboration with Globus on GridFTP/RFIO Collaboration with PPDG on control API First attempt at exchanging Hierarchical Storage
Manager (HSM) tapes
Issues Scope and requirements for storage element Inter-working with other Grids
Components
Storage Element info. providers
RFIO
MSS staging
Collective ServicesCollective Services
Information & Monitoring
Information & Monitoring
Replica ManagerReplica Manager
Grid Scheduler
Grid Scheduler
Local ApplicationLocal Application Local DatabaseLocal Database
Underlying Grid ServicesUnderlying Grid Services
Computing Element Services
Computing Element Services
Authorization Authentication and Accounting
Authorization Authentication and Accounting
Replica CatalogReplica Catalog
Storage Element Services
Storage Element Services
SQL Database Services
SQL Database Services
Fabric servicesFabric services
ConfigurationManagement
ConfigurationManagement
Node Installation &Management
Node Installation &Management
Monitoringand
Fault Tolerance
Monitoringand
Fault ToleranceResource
ManagementResource
ManagementFabric StorageManagement
Fabric StorageManagement
Grid Application LayerGrid Application Layer
Data Management
Data ManagementJob
ManagementJob
ManagementMetadata
ManagementMetadata
ManagementObject to File
MappingObject to File
Mapping
Service IndexService Index
ACAT, Moscow – 26 June 2002 - n° 20
WP7: Network Services Goals
Review the network service requirements for DataGrid
Establish and manage the DataGrid network facilities
Monitor the traffic and performance of the network Deal with the distributed security aspects
Achievements Analysis of network requirements for testbed 1 &
study of available network physical infrastructure (D7.1)
Use of European backbone GEANT since Dec. 2001 Initial network monitoring architecture defined
(D7.2) and first tools deployed in testbed 1 Collaboration with Dante & DataTAG Working with GGF (Grid High Performance
Networks) & Globus (monitoring/MDS)
Issues Resources for study of security issues End-to-end performance for applications depend on
a complex combination of components
Components
network monitoring tools:
PingER
Udpmon
Iperf
Collective ServicesCollective Services
Information & Monitoring
Information & Monitoring
Replica ManagerReplica Manager
Grid Scheduler
Grid Scheduler
Local ApplicationLocal Application Local DatabaseLocal Database
Underlying Grid ServicesUnderlying Grid Services
Computing Element Services
Computing Element Services
Authorization Authentication and Accounting
Authorization Authentication and Accounting
Replica CatalogReplica Catalog
Storage Element Services
Storage Element Services
SQL Database Services
SQL Database Services
Fabric servicesFabric services
ConfigurationManagement
ConfigurationManagement
Node Installation &Management
Node Installation &Management
Monitoringand
Fault Tolerance
Monitoringand
Fault ToleranceResource
ManagementResource
ManagementFabric StorageManagement
Fabric StorageManagement
Grid Application LayerGrid Application Layer
Data Management
Data ManagementJob
ManagementJob
ManagementMetadata
ManagementMetadata
ManagementObject to File
MappingObject to File
Mapping
Service IndexService Index
ACAT, Moscow – 26 June 2002 - n° 21
WP6: TestBed Integration Goals
Deploy testbeds for the end-to-end application experiments & demos
Integrate successive releases of the software components
Achievements Integration of EDG sw release 1.0 and
deployment Working implementation of multiple Virtual
Organisations (VOs) s & basic security infrastructure
Definition of acceptable usage contracts and creation of Certification Authorities group
Issues Procedures for software integration Test plan for software release Support for production-style usage of the testbed
Components
Globus packaging & EDG config
Build tools
End-user documents
Collective ServicesCollective Services
Information &
Monitoring
Information &
Monitoring
Replica ManagerReplica Manager
Grid Schedul
er
Grid Schedul
er
Local Application
Local Application
Local Database
Local Database
Underlying Grid ServicesUnderlying Grid Services
Computing
Element Services
Computing
Element Services
Authorization Authentication and Accounting
Authorization Authentication and Accounting
Replica CatalogReplica Catalog
Storage Element Services
Storage Element Services
SQL Database Services
SQL Database Services
Fabric servicesFabric services
Configuration
Management
Configuration
Management
Node Installation
&Manageme
nt
Node Installation
&Manageme
nt
Monitoringand
Fault Tolerance
Monitoringand
Fault Tolerance
Resource Manageme
nt
Resource Manageme
nt
Fabric Storage
Management
Fabric Storage
Management
Grid Application LayerGrid Application Layer
Data Managem
ent
Data Managem
entJob
Management
Job Managem
ent
Metadata Managem
ent
Metadata Managem
ent
Object to File
Mapping
Object to File
Mapping
Service Index
Service Index
WP6 additionsto Globus
GlobusEDG release
ACAT, Moscow – 26 June 2002 - n° 22
Software Release Procedure Coordination meeting
Gather feedback on previous release
Review plan for next release
WP meetingTake basic plan and clarify effort/people/dependencies
Sw developmentPerformed by WPs in dispersed institutes and run unit tests
Software integrationPerformed by WP6 on frozen sw
Integration tests run
http://edms.cern.ch/document/341943
Acceptance testsPerformed by Loose Cannons et al.
Roll-outPresent sw to application groups
Deploy on testbed
Coord. meeting
ReleasePlan++
Release feedback ReleasePlan
WP meetings
WP1 WP3 WP7
Component 1 Component n
Globus
EDG release
Distributed EDG release
Software release Plan
http://edms.cern.ch/document/333297Roll-out. meeting
testbed 1:Dec 11 2001
~100 participants
ACAT, Moscow – 26 June 2002 - n° 23
Grid aspects covered by EDG testbed 1
VO servers LDAP directory for mapping users (with certificates) to correct VO
Storage Element Grid-aware storage area, situated close to a CE
User Interface Submit & monitor jobs, retrieve output
Replica Manager Replicates data to one or more CEs
Job Submission Service
Manages submission of jobs to Res. Broker
Replica Catalog Keeps track of multiple data files “replicated” on different CEs
Information index Provides info about grid resources via GIIS/GRIS hierarchy
Information & Monitoring
Provides info on resource utilization & performance
Resource Broker Uses Info Index to discover & select resources based on job requirements
Grid Fabric Mgmt Configure, installs & maintains grid sw packages and environ.
Logging and Bookkeeping
Collects resource usage & job status
Network performance, security and monitoring
Provides efficient network transport, security & bandwidth monitoring
Computing Element Gatekeeper to a grid computing resource
Testbed admin. Certificate auth.,user reg., usage policy etc.
ACAT, Moscow – 26 June 2002 - n° 24
TestBed 1 Sites Status
Web interface showing status of servers at testbed 1 sites
ACAT, Moscow – 26 June 2002 - n° 25
DataGrid Testbed
Dubna
Moscow
RAL
Lund
Lisboa
Santander
Madrid
Valencia
Barcelona
Paris
Berlin
LyonGrenoble
Marseille
BrnoPrague
Torino
Milano
BO-CNAFPD-LNL
Pisa
Roma
Catania
ESRIN
CERN
HEP sites
ESA sites
IPSL
Estec KNMI
(>40)
Francois.Etienne@in2p3.fr - Antonia.Ghiselli@cnaf.infn.it
Testbed Sites
ACAT, Moscow – 26 June 2002 - n° 26
Physicists from LHC experiments submit jobs with their application software that uses:
User interface (job submission language etc.)
Resource Broker & Job submission service
Information Service & Monitoring
Data Replication
Initial testbed usage
Add lfn/pfnto
Rep Catalog
GenerateRaw events
on local diskRaw/dst ?
Job argumentsData Type : raw/dstRun Number :xxxxxxNumber of evts :yyyyyyNumber of wds/evt:zzzzzzRep Catalog flag : 0/1Mass Storage flag : 0/1
Write logbookOn client node
raw_xxxxxx_dat.log
dst_xxxxxx_dat.log
Read raw eventsWrite dst events
Get pfnfrom
Rep Catalog
Add lfn/pfnto
Rep Catalog
MS
MS
Move toSE, MS ?
Write logbookOn client node
pfn local ? ny
raw_xxxxxx_dat.log
Copy raw data From SE toLocal disk
Generic HEP application flowchart
SEMove to SE, MS?
SE
[reale@testbed006 JDL]$ dg-job-submit gridpawCNAF.jdl
Connecting to host testbed011.cern.ch, port 7771
Transferring InputSandbox files...done
Logging to host testbed011.cern.ch, port 1
5830
=========dg-job-submit Success ============
The job has been successfully submitted to the Resource Broker.
Use dg-job-status command to check job current status. Your job identifier (dg_jobId) is:
https://testbed011.cern.ch:7846/137.138.181.253/185337169921026?testbed011.cern.ch:7771
========================================
[reale@testbed006 JDL]$ dg-job-get-output https://testbed011.cern.ch:7846/137.138.181.253/185337169921026?testbed011.cern.ch:7771
Retrieving OutputSandbox files...done
============ dg-get-job-output Success ============
Output sandbox files for the job:
- https://testbed011.cern.ch:7846/137.138.181.253/185337169921026?testbed011.cern.ch:7771
have been successfully retrieved and stored in the directory:
/sandbox/185337169921026
First simulated ALICE event generated by using the DataGrid Job Submission Service
ACAT, Moscow – 26 June 2002 - n° 27
Biomedical applications
Data mining on genomic databases (exponential growth)
Indexing of medical databases (Tb/hospital/year)
Collaborative framework for large scale experiments (e.g. epidemiological studies)
Parallel processing for Databases analysis
Complex 3D modelling
ACAT, Moscow – 26 June 2002 - n° 28
Earth Observations
ESA missions:
• about 100 Gbytes of data per day (ERS 1/2)
• 500 Gbytes, for the next ENVISAT mission (launched March 1st)
EO requirements for the Grid:
• enhance the ability to access high level products
• allow reprocessing of large historical archives
• improve Earth science complex applications (data fusion, data mining, modelling …)
ACAT, Moscow – 26 June 2002 - n° 29
Development & Production testbeds
Development Initial set of 5 sites will keep small cluster of PCs for development
purposes to test new versions of the software, configurations etc.
Production More stable environment for use by application groups
• more sites• more nodes per site (grow to meaningful size at major centres)• more users per VO
Usage already foreseen in Data Challenge schedules for LHC experiments
• harmonize release schedules
ACAT, Moscow – 26 June 2002 - n° 30
Planned intermediate release schedule
TestBed 1: November 2001
Release 1.1: January 2002
Release 1.2: July 2002
Release 1.3: internal release only
Release 1.4: August 2002
TestBed 2: October 2002
Similar schedule will be made for 2003 Each release includes
feedback from use of previous release by application groups
planned improvements/extension by middle-ware WPs
more use of WP6 software infrastructure
feeds into architecture group
Plans for 2002 Extension of testbed
more users, sites & nodes-per-site
split testbed into development and production sites
investigate inter-operability with US grids
Iterative releases up to testbed 2
incrementally extend functionality provided via each Work Package
better integrate the components
improve stability
Testbed 2 (autumn 2002) extra requirements
interactive jobs
job partitioning for parallel execution
advance reservation
accounting & Query optimization
security design (D7.6)
. . .
ACAT, Moscow – 26 June 2002 - n° 31
Release Plan details
Current release EDG 1.1.4
Deployed on testbed under RedHat 6.2
Finalising build of EDG 1.2
GDMP 3.0
GSI-enabled RFIO client and server
EDG 1.3 (internal)
Build using autobuild tools – to ease future porting
Support for MPI on single site
EDG 1.4 (august) Support RH 6.2 & 7.2
Basic support for interactive jobs
Integration of Condor DAGman
Use MDS 2.2 with first GLUE schema
EDG 2.0 (Oct) Still based on Globus 2.x (pre-
OGSA)
Use updated GLUE schema
Job partitioning & check-pointing
Advanced reservation/co-allocation
See http://edms.cern.ch/document/333297 for further details
ACAT, Moscow – 26 June 2002 - n° 32
Issues
Support for production testbed
Effort for testing
Software Release Procedure: Integrated testing
CA explosion, CAS introduction and policy support
Packaging & distribution
S/W licensing
Convergence on Architecture Impact of OGSA
ACAT, Moscow – 26 June 2002 - n° 33
Issues - Actions
Support for production testbed – support team and dedicated site
Effort for testing – test team
Software Release Procedure: Integrated testing – expand procedure
CA explosion, CAS introduction and policy support – security group’s security design
Packaging & distribution – ongoing
S/W licensing – has been addressed, see http://www.edg.org/license
Convergence on Architecture – architecture group Impact of OGSA – design of OGSA services in WP2, WP3
ACAT, Moscow – 26 June 2002 - n° 34
Future Plans
Expand and consolidate testbed operations Improve the distribution, maintenance and support process Understand, refine Grid operations
Evolve architecture and software on the basis of TestBed usage and feedback from users
GLUE Converging to common documents with PPDG/GriPhyN OGSA interfaces and components
Prepare for second test bed in autumn 2002 in close collaboration with LCG
Enhance synergy with US via DataTAG-iVDGL and InterGrid
Promote early standards adoption with participation to GGF and other international bodies
Explore possible Integrated Project within FP6
ACAT, Moscow – 26 June 2002 - n° 35
Learn more on EU-DataGrid
For more information, see the EDG website http://www.edg.org/
EDG Tutorials at ACAT: Tuesday 15.00-17.00
Wednesday 17.30-19.30
EDG Tutorials at GGF5 in Edinburgh 25.7.2002 – see http://www.gridforum.org/
Cern School of Computing Vico Equense, Italy, 15-28 September 2002
Programme includes Grid Lectures by Ian Foster and Carl Kesselman and a hands-on tutorial on DataGrid, http://cern.ch/CSC/