esr isolation curb rt-7 floor - kinetics noise · 2020. 5. 20. · rt-7 panels rt-7 panels...

Post on 02-Feb-2021

8 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-ESSR / RT-7JMP3/26/20SS-11

    ESR ISOLATION CURB

    ESR ISOLATION CURB

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    RT-7 FLOOR

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-FCBO / RT-7JMP3/26/20SS-11

    FACTORY CURB

    FACTORY CURB(BY OTHERS)

    (CURB DESIGN MAY VARY)

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    RT-7 FLOOR

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-KSR / RT-7JMP3/26/20SS-11

    KSR ISOLATION RAIL

    FACTORY CURB(BY OTHERS)(CURB DESIGN MAY VARY)

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    RT-7 FLOOR

    KSR ISOLATION RAIL

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-KIP / RT-7JMP3/26/20SS-11

    KIP-RT ISOLATION STRIPS

    FACTORY CURB(BY OTHERS)(CURB DESIGN MAY VARY)

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    RT-7 FLOOR

    KIP-RT ISOLATION STRIP

  • DRAWN BYLAST DATEREVISED DRAWING NO.

    SS-KSCR / RT-7JMP3/26/20SS-11

    KSCR ISOLATION CURB

    ROOFOPENING

    RT-7 PANELS

    RT-7 PANELS

    Transmission Loss dB

    Frequency Hz

    Calculated TL

    63

    16*

    125

    24

    250

    26

    500

    32

    1000

    42

    2000

    56

    4000

    62

    8000

    59*

    STC

    37

    *ASHRAE HANDBOOK 2017, CHAPTER 8, EQUATION 39

    NOTE: UNLESS OTHERWISE NOTED,FLOOR PANELS ARE TO BE FIELDINSTALLED, AFTER ESR CURB ASSEMBLY.

    RT-7 FLOOR

    KSCR ISOLATION CURB

top related