espro automation company profile espro elektrik elektronik otomasyon taahhüt ve makina san. tic....

Post on 01-Apr-2015

237 Views

Category:

Documents

6 Downloads

Preview:

Click to see full reader

TRANSCRIPT

ESPRO AUTOMATION COMPANY PROFILE

ESPRO Elektrik Elektronik Otomasyon Taahhüt ve Makina San. Tic. Ltd. Şti.http://www.esprootomasyon.com.tr info@esprootomasyon.com.tr

Kazım Dirik Mah. Universite Cad No:98 Bornova / İZMİRTel: (0 232) 449 96 79/80 Faks: (0 232) 457 43 88

TURNKEY SOLUTIONS

AUTOMATION EXPERT

ESPRO

FOUNDATION

• 2011• Location:İzmir-TURKEY

EMPLOYEE

S

• Engineer : 8• Technician : 12 TOTAL : 22• Other : 2

PRODUCTION

• 400 m2 closed production area for L/V panel production • Our technical staff satisfactorily complete commisioning

processes.

DCS-PLC Automation

RTU Monitoring and Reporting Systems

Electrical Panel Production

Project-Turnkey Contracting

SERVICES

ESPRO

ESPRO

WE OFFER OUR SERVICES MAINLY TO FOLLOWING SECTORS

Mine Processing Plants Iron Steel Plants Power Plants Cement Plants Chemical Plants Petrochemical Plants Food and Beverage Plants Energy Monitoring and Reporting

Systems Paper and Sellulose Plants Water and Waste Water Treatment

Plants Tunnel and Metro Signalization

ESPRO

• To meet our clients’ needs on-time in parallel with national and international standards,

• To become always confident

• Continual improvement

• Arrangement of training activities to incerase competence level of staff

• To cooperate with suppliers matching our quality policy

QUALITY POLICY

EXPERIENCE

• 20 YEAR EXPERIENCE AND KNOWLEDGE

ENGINEERING SKILLS

• PROFESSIONAL TECHNICAL STAFF

QUALITY MANAGEMENT

• ISO 9001• OHSAS 18001

Success Keys

OUR PROFESSIONAL TEAM CAPABLE TO SOLVE YOUR PROBLEMSSEEKING SOLUTIONS FOR YOUR

PROBLEMS ?

WHY ESPRO?

WHENEVER YOU NEEDREACHABLE COMPANY

WHY ESPRO ?

TARGET : CUSTOMER AND EMPLOYEE SATISFACTIONMANAGEMENT ACCORDING TO INTERNATIONAL QUALTY STANDARDS

WHY ESPRO ?

OUR WORLD LEADING SUPPORTERS

WHY ESPRO?

AND OUR REFERENCES......

We got 19 projects during our first foundation yearWe honored to receive more projects than the previousyear in line with our targets

WHY ESPRO ?

REFERENCES

COMPLETED PROJECTS

COMPLETED PROJECTS

1- Bodrum-Milas Airport -Waste Water Treatment Plant Turnkey2- Adıyaman Samsat -Drinking Water Supply and Treament Plant Turnkey3- Özkan Iron Still Mill -Relay Motor Unit Automation 4- Saadet Gıda -Anaaerobic Waste Water Plant Turnkey5- Bekaert Fan Motors Frequency Converters Automation6- Eti Maden (Mining) Continous Reactor and Crystallization Unit Automation 7- Erdemir Ereğli -Coke Oven Battery Automation 8- İzmir Water and Severage Administration– Drinking Water Pump Station Automation9- Turkish Petroleum Co.- West Kozluca Production Site Automation10- Eldorado Gold Tüprag Gold Mine Efemçukuru Premise- Waste Water Treatment 11- Eti Maden (Mining) Glassy Boron Oxide Production Plant Turnkey12- Tüpraş (Turkish Petroleum Refineries Co.) İzmir Refinery -Lighting Automation 13- Pepsi Co Water Preperation Unit Automation14- Efes Pilsen Production Line Conveyor Programming15- Tüprag Gold Mine Kışladağ Plant –Leach Pump Station Automation 16- İzmit Water and Sewerage Kandıra – Drinking Water Treatment Plant Turnkey

COMPLETED PROJECTS

17- Ege Çelik(Steel)- Havuzlar Scada System Project18- Irak Bismayah City – Water Supply,Drinking Water and Waste Water Tratment Plant Automation 19- Antalya Industrial Zone – Pump Station and Storage Level Control Automation20- Adana Hacı Ömer Sabancı Industrial Zone– Waste Water Treatment Plant (turnkey)21- Tokat Turhal Sugar Factory 180 Ton Boiler Automation22- Datça Waste Water Treatment Project23- Batıçim -315kw Fan Motor Frequency Converter Panel24- İzmir Water and Severage Administration- Menemen Pump Station 355kw Pump Motor Frequency Converter Panel25- Bionorm Pharmaceutical – Carcinogenic Active Material Production Reactor Automation26- İzenerji Power Plant Cooling Towers- Instrumentation and Controsl System Cabling 27- Işık Teknoloji – Azerbaidjan Baku Jazz Club Water Hardness Automation28- Konya Industrial Zone– Potable Water Preparation Plant

REFERENCES

ONGOING PROJECTS

ONGOING PROJECTS

1- Enka/Lukoil Irak- West Qurna Natural Gas Cycle Deminerilisation Plant Automation

2- Zorlu Enerji Meta Nikel Gördes Plant- Desenilasyon Project

3- Çanakkale Municipality – Waste Water Treatment and Pumping Station

4- Samsun Municipality – Waste Water Treatment Inlet Structure Automation

5- Atlas Enerji Power Plant-Deminerilisation Plant Automation

6- Eti Maden (Mining) Boraks Plant - Pneumatic Conveying Plant

7- Eti Maden (Mining) Değirmenözü – Warehouse and Packaging Plant

PICTURES FROM PROJECTS

PICTURES FROM PROJECTS

ENKA LUKOIL BASRA

PICTURES FROM PROJECTS

ETI MINING GLASSY BOROXIDE PLANT

PANELS

PICTURES FROM PROJECTS

PICTURES FROM PROJECTS

TURHAL SUGAR FACTORY

PICTURES FROM PROJECTS

THANKS

Feb, 2014

top related