ePermitting Roofing System. Boris Sursky LEED AP BD + C 786-315-2050 sky@miamidade.gov. The e-Roofing Permitting System is the WINNER of the prestigious NATIONAL ROOFING CONTRACTORS ASSOCIATION 2003 GOLD CIRCLE AWARD for service to industry. - PowerPoint PPT Presentation

TRANSCRIPT

ePermitting Roofing System

Boris Sursky LEED AP BD + C 786-315-2050 sky@miamidade.gov

The e-Roofing Permitting System is the WINNER of the prestigious NATIONAL ROOFING CONTRACTORS ASSOCIATION 2003 GOLD CIRCLE AWARD for service to industry.

The e-Roofing Permitting System is the WINNER of the 2004 NATIONAL ASSOCIATIONS OF COUNTIES AWARD FOR INTEGRATING PROCESSES AND SERVICE: ROOFING/STORM PANEL PERMITTING AND SERVICES SYSTEM

The e-Roofing Permitting System provides progressive and improved customer service through the use of advanced technology.

The e-Roofing Permitting System is an revolutionary permitting application process, with tens of thousands of Roofing permits issued since 2004.

The e-Roofing Permitting System was put to the test after Hurricane Wilma which occurred in 2005, when over 12,000 e-Roofing permits were issued in a 12 month period using this system.

CLICK HERE

CLICK HERE

CLICK HERE

CLICK HERE

CLICK HERE

CLICK HERE

ENTER TRADESMAN NUMBER

Contact Contractor’s Section for assistancewith Tradesman Number.

CREATE USER PROFILE

CLICK HERE

CLICK HERE

Enter: Roofing (CCC) Contractor License Number

2 units required for duplexes

Use total ft² “NOT 2 Roofing Squares”

CLICK HERE

Select Low Slope Manufacturer

Do Not Use Fractions

Minimum 2/12” ROOF SLOPE required for shingles

ROOF MEANHEIGHTS CAN NOT EXCEDE 33 FT.

Note: Prescriptive fastener spacing

Note: Online Review was not approved. This happens after 2 code related rejections

An example of a code related rejection, would be an incorrect roof slope or roof mean height.

All Dispositions required to be approved prior to paying for permit

Note: Provide a completed Owner’s Notification Form at the jobsite to be collected by the inspector and submitted to Micro-Film as part of the permit record.

Print completed roofing application forms for jobsite inspections

ePermitting NO NO’s• Use total ft² on permit application, do

not use roofing squares (1=100 s.f.)• No Florida Product Approvals

allowed, only use current Miami-Dade County Product Approvals with the ePermitting System

ePermitting NO NO’s• Do not use fractions when inputting

data, use only decimal numbers• Use correct slope for specific roof

system types, for example a minimum 4/12 slope is required for mechanically attached tiles

ePermitting NO NO’s• NO CHANGES CAN BE MADE TO

the “ePermitting System generated Uniform Permit forms.

• Changes to system generated forms require a permit revision.

ePermitting NO NO’sDO NOT SHARE YOUR PASSWORD TO

ACCESS THE “ePermitting” SYSTEMWITH ANY ONE YOU DO NOT TRUST!

PERMITS CAN BE OBTAINED WITHOUT YOUR KNOWLEDGE!

REQUIRED DOCUMENTS FOR JOB SITE INSPECTION

• A completed Section 1524 Owner’s Notification Form to be collected by Inspector and placed in Micro-Film

REQUIRED DOCUMENTS FOR JOB SITE INSPECTION

• Completed Section A & B page including a roof plan diagram. Total roof area to be field verified by inspector & shall match paid permit fees.

• The completed roof plan diagram shall included dimensions, roof sections, levels and roof types.

REQUIRED DOCUMENTS FOR JOB SITE INSPECTION

• Printed copy of the “ePermitting” system generated Uniform Roof Permit Form for the types of roof systems to be installed.–Category 92 Low Slope BUR–Category 95 Shingles–Category 107 Tile

REQUIRED DOCUMENTS FOR JOB SITE INSPECTION

• One copy of the Miami-Dade NOA Product Approval for the proposed roof system(s) to be installed

REQUIRED DOCUMENTS FOR JOB SITE INSPECTION

• Low Slope BUR NOA Approval including–Cover Page, System Page(s),

Limitation Page(s)• Class “A” Fire Directory Listing

for the Low Slope BUR

REQUIRED DOCUMENTS FOR JOB SITE INSPECTION

• Tile NOA Product Approval• Tile Underlayment NOA Product

Approval• Tile Adhesive or Mortar NOA

Product Approval

“ePermitting” ImprovementsCATEGORY 107 TILE ROOF

SYSTEMS

New Tile Underlayment Selections

• Prescriptive 30/90 hot mopped• Modified Bitumen hot mopped with

a required NOA Product Approval for tile underlayment

• Self Adhered Modified Bitumen with a required NOA Product Approval for tile underlayment

Select Tile Mechanical Attachment Method

Select Mortar Attachment Type

Select Adhesive Attachment Type

Adhesive Type Selected,Note Exposure Category Selected

EXPOSURE CATEGORY D IS TYPICALLY OCEAN LINE

Select Roof Deck Type

Select Base Sheet Type

Prescriptive Tile UnderlaymentSelected

Modified Bitumen Hot Mopped Tile Underlayment

Self Adhered (S/A) Underlayment

I Agree Statement

SAMPLE NOA LIMITATIONS

SAMPLE NOA LIMITATIONS

SAMPLE NOA LIMITATIONS

SAMPLE NOA LIMITATIONS

Tile Roof System Shall comply with RAS 118, 119, 120

CLICK HERE

Self Adhered Underlayment Selected

Note: Yes “I AGREE” STATEMENT SELECTED

Note: Attachment Method

Note: That the calculated attachment resistance in P3 is greater than attachment resistance found in the NOA

Note: Attachment Method

Note: That the calculated attachment resistance for all roof zones are LESS than the attachment resistance found in the Tile NOA.

Submit Review if Application is Complete