Environmental, Safety,
and Occupational Health
(ESOH)
Programmatic Risk Tool
Aeronautical Systems CenterAeronautical Systems Center
Amy Mercado VinceASC/RAPDSN 785-2412amy.vince@wpafb.af.mil
Dominant Air Power: Design For Tomorrow…Deliver Today
2
Birthplace, Home and Future of Aerospace
Overview
• New Acquisition Program Guidance
• ASC’s Response to New Guidance: ESOH Programmatic Risk Tool
• Benefits, Teaming, and Summary
• Questions/Comments
3
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk ToolBackground
Requirement: ASC should more effectively manage ESOH-related risk, keep program managers informed of ESOH issues, and comply with new direction in DoDI 5000.2
Purpose: - To inform you of the tool ASC is developing to address this requirement- To show you what to expect from your ESOH professionals with respect to the systems engineering process
4
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk ToolSystems Engineering Application
12 Sep 04 USD (AT&L) Policy Memo, Defense Acquisition System Safety, requires PMs to:
1) Use MIL-STD-882 to integrate ESOH risk management into SE
2) Report status of residual risk acceptance decisions at technical and program reviews
DoDI 5000.2, in concert with the application of the MIL-STD-882 system safety methodology, make up the DoD's systems engineering (SE) approach for eliminating ESOH hazards or minimizing ESOH risks across the entire system life cycle.
5
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk ToolSystems Engineering Application
Q: Why Establish an ESOH program early?
A: Reduces program risk
•Reduces costs: – Improves system design early – Reduces cost of implementing needed changes (i.e.,
technical manuals and training)•Reduces schedule risk:
– Lowers potential for major redesign – Lowers potential for additional testing
•Reduces performance constraints: – Minimizes operational limitations – Avoids environmental restrictions
6
Birthplace, Home and Future of Aerospace
DoD Acquisition Process
PESHE: A living management/decision making document that guides identification and management of ESOH risks.
A PESHE is the ONLY DoD-required ESOH document!
PESHE
Concept Refinement
Concept Decision
System Development & Demonstration
Design Readiness Review
Production & Deployment
FRP DecisionReview
Operations & Support
Technology Development
A B C FOCIOC
Start
Initial Completion
Update Required
Starts as a planning document
ESOH Risks
Becomes an ESOH Risk Management Tool
7
Birthplace, Home and Future of Aerospace
Overview
• New Acquisition Program Guidance
• ASC’s Response to New Guidance: ESOH Programmatic Risk Tool
• Benefits, Teaming, and Summary
• Questions/Comments
8
Birthplace, Home and Future of Aerospace
Past ESOH Metrics/Standards ReportingASC Reconnaissance Wing, CY 2000
EnvironmentalQuality Perf. Indicators (EQPIs)
CurrentNote: RAP and Sr. Year will be combined for the next EWG
EnvironmentalQuality Perf. Indicators (EQPIs)
CurrentNote: RAP and Sr. Year will be combined for the next EWG
NEPA Doc. ODS Elim. HRASenior Yr. Green Green GreenDet 3 Green Green GreenRAB Green Green GreenRAJ Green Green GreenRAV Green Yellow GreenRAP Green Green GreenRAI Green Green Green
Prg. Doc. (Rev.) Prg. Doc. (Inp.) ESH Plan. ESH Integ. ESH TrainingSenior Yr. Green Green Green Green GreenDet 3 Green Green Green Green GreenRAB Green Green Green Green GreenRAJ Green Green Green Green YellowRAV Yellow Green Green Yellow YellowRAP Green Green Green Green YellowRAI Green Green Green Green Green
Program Ofc.
ASC’s old metric and reporting system
• Issues could be masked in the roll up within topics
ASC’s old metric and reporting system
• Issues could be masked in the roll up within topics
9
Birthplace, Home and Future of Aerospace
ASC’s Plan ESOH Programmatic Risk Tool
• Provide program managers an assessment of the “health” of their ESOH program(s)
• Quantify and qualify the ESOH programmatic risks
• Facilitate development of the PESHE
• Provide program managers an assessment of the “health” of their ESOH program(s)
• Quantify and qualify the ESOH programmatic risks
• Facilitate development of the PESHE
• Provide a ready means of addressing the ESOH-related regulatory requirements
• Provide reports to highlight issues
• Make more effective ESOH programmatic decisions
• Provide a ready means of addressing the ESOH-related regulatory requirements
• Provide reports to highlight issues
• Make more effective ESOH programmatic decisions
Goals
Bottom line: Give Program Managers a tool to effectively manage ESOH risks and resources
10
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk Tool
– Uses reverse failure tree analysis to assess program’s management effectiveness
– Applies 5M model construct– Weighted questions developed from Success Tree
Three Primary Components:
Success Tree, ESOH Risk Manager, and PESHE Template
Program Assessment
11
Birthplace, Home and Future of Aerospace
ESOH Programmatic SuccessTool Work Breakdown Structure
ESOH Program Success(Planning & Management
Template)
Man(Team)
Organic ESOHProfessionals
IPTs/WorkingGroup
FunctionalTeam
Support
MissionSuccess
Goals/Objectives/
Targets
Management (Guidance,Procedures Standardization,
& Enforcement
Machine(Tools)
Media
Legal/Regulatory
Reqmts/Stds
PESHEProcess
AcquisitionStrategy
Integration
ContractorESOH Staff
Regulators/Stakeholders
Results/Actions
SystemSupport
ESOHInformation,
Data, Reports
Responsibil-ities/
AuthoritiesFunding
Techniques
Coordination
ManagementOversight/
Audit
ESOH SystemEngineeringIntegration
ESOHCompliance
P2/HAZMATReduction
NEPAProcess
Life CycleCost
Identification
ESOH RiskMin/MgtProcess
DEMILIntegration
Hazard I MgtProcedures
ProgressTracking
OSS&E
HazardAnalysis
12
Birthplace, Home and Future of Aerospace
Mission Program Success
Three Primary Components:
Success Tree, ESOH Risk Manager, and PESHE Template
– Extracts answers from questionnaire to formulate risk– Uses the six ORM Steps– Identifies benefits associated with addressing risks– Program management tool for ESOH issues
ESOH Risk Manager
13
Birthplace, Home and Future of Aerospace
Identifying & Assessing Risk
Questions provide basis to evaluate compliance with ESOH requirements and implement ORM process
Questions provide basis to evaluate compliance with ESOH requirements and implement ORM process
14
Birthplace, Home and Future of Aerospace
Mitigation Plans/Tracking Progress
Mitigation plans can be built to achieve compliance for all required actions
Mitigation plans can be built to achieve compliance for all required actions
Allows continuous review process to mitigate risks, make decisions, and keep progress on track
16
Birthplace, Home and Future of Aerospace
4.3 Preliminary Risk Assessment4.4 Design Analysis4.6 Part and Material Selection4.7 Concept Studies and Analysis4.19 Design for Assembly6.11 NEPA Schedule10.3 Occupational Health Issue10.4 Technical Risk Assessment10.7 Air Conformity Issues10.10 HAZMAT Issues
Impact
0.90.70.50.30.0100%
Low Risk80%
60%
Medium Risk40%Compliance
20%
High Risk0%
Impact
0.90.70.50.30.0100%
Low Risk80%
60%
Medium Risk40%Compliance
20%
High Risk0%
Com
plia
nce
. 4.3
. 4.4
. 4.6
. 6.11
. 4.19
. 10.4
.10.3
. 10.10
. 10.7
. 4.7
Risk Matrix ReportExample
17
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk Tool
ESOH Programmatic Risk Tool
5M Model--Assess Program & Identify Risks
Man Media
Machine
Management
Goals/Thresholds/Objectives
Results/Analysis/Actions
MISSION
Goals/Thresholds/Objectives
Results/Analysis/Actions
Goals/Thresholds/Objectives
Results/Analysis/Actions
Operational Mission
5M Model Implementation
The ESOH Program Success portion is based in part on the 5M Model
The ESOH Program Success portion is based in part on the 5M Model
The 5-M model includes Man, Machine, Media, Management, and Mission
• Man, Machine, and Media interact to produce a successful Mission
• Management provides the policies and procedures to govern the interactions between Man, Machine, and Media
• Management is often the controlling factor in operational success or failure
The 5-M model includes Man, Machine, Media, Management, and Mission
• Man, Machine, and Media interact to produce a successful Mission
• Management provides the policies and procedures to govern the interactions between Man, Machine, and Media
• Management is often the controlling factor in operational success or failure
AcqESOH
Mission
18
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk Tool
Three Primary Components:
Success Tree, Risk Manager, and PESHE Template
– Award-winning “cookbook” format that reduced PESHE development cycle time and cost by 97%
– Achieves format and content standardization across ASC
19
Birthplace, Home and Future of Aerospace
Overview
• New Acquisition Program Guidance
• ASC’s Response to New Guidance: ESOH Programmatic Risk Tool
• Benefits, Teaming, and Summary
• Questions/Comments
20
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk Tool Benefits
Supports resource allocation: funding, manpower, schedule
Assesses ESOH program health through planning and execution phases
Quantifies programmatic ESOH risks
Assesses regulatory compliance
Provides reports to highlight issues
Builds mitigation plans
Provides progress tracking methodology
Measures performance: ESOH goals/objectives/standards
Will promote detailed understanding of ESOH requirements to facilitate decision making
21
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk Tool Benefits
Promotes standardization across Acq Program Offices– Greater E, S, and OH synergy – Facilitates system life cycle updates by crossfeeding information to
PESHE
Provides examples of risk minimization and acceptance benefits and burdens from similar weapon systems– E.g., HAZMAT substitution success; NEPA issue
Ensures compliance with DoDI 5000.2 and MIL STD 882– Provides a solid risk mitigation and tracking mechanism– Records decision making process: lessons learned will result in fewer
ESOH burdens
Will enhance the Acquisition and Operational missions
22
Birthplace, Home and Future of Aerospace
Teaming
• Strong support from Pentagon: SAF/AQRE, SAF/IEE, AF/ILEV
• Space and Missiles Center and Missile Defense Agency joined ASC’s team– Space and missiles requirements will be incorporated into work
breakdown structure and questions
– Alpha phase will include Space-Based Space Surveillance, Patriot, and Airborne Laser programs plus select ASC programs
– Kickoff team meeting planned for May in DC
• Electronic Systems Center and Air Armament Center will be invited to participate in beta testing
• Army and Navy will be invited
23
Birthplace, Home and Future of Aerospace
Milestones
• Initiate teaming with other centers• Initiate teaming with other centers
• Beta Test– Open to all program offices– Populate and assess tool and users’ guide
• Beta Test– Open to all program offices– Populate and assess tool and users’ guide
• Alpha Test– Train users & populate the tool– Assess effectiveness
• Alpha Test– Train users & populate the tool– Assess effectiveness
• Refine tool and user’s guide• Refine tool and user’s guide
• Finalize tool, user’s guide, and deploy (ECD Spring 06)• Finalize tool, user’s guide, and deploy (ECD Spring 06)
• Pre-Alpha Evaluation– Evaluate/rate the templates/questions
• Pre-Alpha Evaluation– Evaluate/rate the templates/questions
24
Birthplace, Home and Future of Aerospace
Summary
• Historically, PESHE used for ESOH management resource decisions
• ASC has defined, documented results based upon PESHE application
• ASC’s response to new DoDI 5000.2 and MIL STD 882 guidance will result in a more hard-hitting, meaningful evaluation processes based on risk, integral to the systems engineering process
• Alpha and beta testing with new team members will refine program
25
Birthplace, Home and Future of Aerospace
Overview
• New Acquisition Program Guidance
• ASC’s Response to New Guidance: Acquisition Mission Program Success and PESHE Template
• Benefits, Teaming, and Summary
• Questions/Comments
29
Birthplace, Home and Future of Aerospace
1. Identifythe Hazards
2. Assessthe Risks
3. Analyze Risk Control
Measures
4. MakeControl
Decisions
5. Risk ControlImplement
6. Superviseand Review
AFPAM 91-215, Section A, Figure 2
The ORM 6-step Model
30
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk ToolSystems Engineering Application
12 May 03, DoDI 5000.2, Operation of the Defense Acquisition System:
Requires Program Managers (PMs) to provide a Programmatic Environment, Safety, and Occupational Health Evaluation (PESHE). Required at Milestones B & C and Full-Rate Production Decision Review.
A PESHE is the ONLY DoD-required ESOH document!
31
Birthplace, Home and Future of Aerospace
New PESHE Guidance
DoDI 5000.2 revised and released in May ’03
Provided new Program Environmental Safety Health Evaluation (PESHE) requirements and direction.
A PESHE is the ONLY DoD-required ESOH document!
DoDI 5000.2
PESHE format• Risk Management• Acquisition Strategy
Summary Report
PESHE format• Risk Management• Acquisition Strategy
Summary Report
Stresses:
• Documented Risk Management Process: ASC uses Operational Risk Management (ORM)
• National Environmental Policy Act (NEPA) scheduling
• ESOH Integration into Systems Engineering
• Less prescriptive in format
Stresses:
• Documented Risk Management Process: ASC uses Operational Risk Management (ORM)
• National Environmental Policy Act (NEPA) scheduling
• ESOH Integration into Systems Engineering
• Less prescriptive in format
32
Birthplace, Home and Future of Aerospace
PESHE History
Original guidance in DoD 5000.2-R
– Detailed explanation of PESHE format
– Liberal guidance on risk tracking and reporting
Original guidance in DoD 5000.2-R
– Detailed explanation of PESHE format
– Liberal guidance on risk tracking and reporting
The PESHE: A single, live document summarizing the Single Manager’s ESOH strategy
The PESHE: A single, live document summarizing the Single Manager’s ESOH strategy
DoDI 5000.2-RDoDI 5000.2-R
33
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk ToolThree Primary Components
ESOH Program Success Tree Questionnaire
ESOH Program Success Tree Questionnaire
ESOH Risks
ESOH Risk Manager
ESOH Risk Manager
ESOH Risk Management
• Apply ORM
• Reports
• Action Plans
PESHEPESHE
ESOH Grade Card
• Program Integration
• System & Health Safety
• NEPA• Compliance• HAZMAT• P2
34
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk Tool’s Software Platform
TRIMS: Technical Risk Identification and Mitigation System (US Navy)
• Process-oriented tool– Evaluate ESOH requirements– Identify hazards– Assess risks– Analyze risk control
measures– Make control decisions– Risk control implementation– Supervise and review– Assign responsibilities– Integrate with PESHE
• Windows application software
• Process-oriented tool– Evaluate ESOH requirements– Identify hazards– Assess risks– Analyze risk control
measures– Make control decisions– Risk control implementation– Supervise and review– Assign responsibilities– Integrate with PESHE
• Windows application software
35
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk ToolModel Development and Tailoring
Categories: Process StepsCategories: Process Steps
Templates: Sub-processes where risk levels are assigned
Templates: Sub-processes where risk levels are assigned
Questions: Methodology to accomplish ORM:
• Compliance and risk level determination
• Responsibility assignment • Mitigation plans and
progress tracking
Questions: Methodology to accomplish ORM:
• Compliance and risk level determination
• Responsibility assignment • Mitigation plans and
progress tracking
36
Birthplace, Home and Future of Aerospace
Template/Question Development for TRIMS
We are finalizing the weighting
QuestionsReference/ Source
Document Why it is important/otherQuestion Weight (1 to 10)
1.Has the PM, in concert with systems engineering and associated system safety professionals, determined what system safety effort is necessary to meet program and regulatory requirements?
MIL-STD 882d, para A.4.3
Before formally documenting the system safety approach, the program manager, in concert with systems engineering and associated system safety professionals, must determine what system safety effort is necessary to meet program and regulatory requirements.AFI 92-202, para 9.2 also reads, “The PM shall ensure that system safety engineering is an integral part of the systems engineering process and receives proper management attention.”
2. Has the program chief engineer incorporated a robust systems engineering program, including configuration management to attain OSS&E assurance?
MIL-STD 882d, para 11.5, subpara 7
37
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk Tool Process
ManagementReports
PESHE Data &
Information
ESOH Program Success
ESOH Risk Manager
Program Mgt Assessment
Concept Refinement
Risks
Ops & Spt Risk
Prod & Deploy Risk
Sys Dev & Demo Risk
Tech Devel Risk
ORM Process
ESOH Programmatic Risk Tool
Benefits of ESOH Risk Min
Success
Costs of ESOH Risk Min Failure
ESOH Pgm Plan & Mgt
ManagementAction Plans
40
Birthplace, Home and Future of Aerospace
ESOH Programmatic Risk ToolResource Benefit
How will the Program enhance/sustain resources?
Identifies ESOH risks
Identifies ESOH risks
Provides tools for managing risks
Provides tools for managing risks
Identifies potential solutions
Identifies potential solutions
The Program should enable management to find cost effective solutions in less time
Identifies Life Cycle Costs
Identifies Life Cycle Costs
Facilitates Risk vs. Cost Decisions
Facilitates Risk vs. Cost Decisions
47
Birthplace, Home and Future of Aerospace
Sample Question with
Why is this important? Screen in TRIMS
48
Birthplace, Home and Future of Aerospace
Mitigation Plans/Tracking Progress
Mitigation plans can be built to achieve compliance for all required actions
Mitigation plans can be built to achieve compliance for all required actions
Allows continuous review process to mitigate risks, make decisions, and keep progress on track
49
Birthplace, Home and Future of Aerospace
Generated Reports
Summary Report
Summary Report
A graphical depiction of risk levels
Detailed Report
Detailed Report
Data from TRIMS’ questions and mitigation plans
Risk Matrix Report
Risk Matrix Report
A conventional probability vs. consequence risk matrix
Data in these reports can be tailored to provide managers the information necessary to make decisions
50
Birthplace, Home and Future of Aerospace
Example NEPA Issue
• A major aircraft program planned part of its OT&E at an Army test range -- It was believed an existing test range EIS on the would cover the aircraft OT&E
• It was determined that a new EIS was required on the test range to support the OT&E
– This determination was ascertained 7 months before certification and 9 months out from start of testing
– A new EIS would have taken at least one year
– The program's OT&E plan was restructured to eliminate the need for that test range
• This example shows how external forces can affect a weapon system program and that continual attention to ESOH issues minimized the adverse impacts on the program
Source: PESHE Development Guide for PMs, Dec 03, ESC
51
Birthplace, Home and Future of Aerospace
HAZMAT Substitution Success
• Aircraft Radome Chemical Depainting involved MEK, an EPA-listed chemical solvent
• Searched for alternative process• Selected a chemical alternative, compatible with the radome
materials & capable of removing the protective coatings– Solvent is a blend of dibasic esters [DBE] w/ low vapor pressure and
low toxicity
• Benefits– Easy to use– Goes further [less expensive to use]– Compatible with radome materials– Not an EPA-listed material -- Environmentally compliant– Lowers health risks to workforce– $0 implementation cost and Reduces operating costs by $30K– Reduces HAP emissions by 78,000 lbs– Eliminates abatement requirements [$2M]