Engineering & Construction Risk Institute

London 2012 Update + Lessons

Olympic

Delivery

Authority

Infrastructure Design &

ConstructionTransport

LOCOG

BOA

GLA

GOVT

LOCOG

IOC

Olympic

Board

Delivery structure

Role of the Delivery Partner

Delivery

Partner

Contractor

ODA

Contract

Delivering the venues and infrastructure

• Six Phases of the Project:

• Planning (up to Spring 2007)

• Demolish, Dig Design (up to • Beijing Games)

• Big Build (up to summer 2011)

• Test Events (to Games 2012)

• 2012 Olympic and Paralympic • Games

• Games Legacy (post 2012)

Construction

Commitments

• Design quality

• Health and safety

• Sustainability

• Commitment to people

• procurement

Design Quality

• Excellence with innovation.

• Designing for the Games and

legacy together

• Inclusive design

Health and Safety

Healthy and Safe by Design

Worker Engagement

Leadership

Current Initiatives include:

• Healthier to eat Breakfast - led

by the occupational health teams

• Park Health and Village Health

• Protection of Buried Services

• Encouragement of near miss

reporting

• Awards scheme – to recognise

and reward excellent

performance

Sustainability

Sustainable Venue design

Green Transport

Green energy

Reuse of materials

Sustainable sourcing

Commitment to

People

30,000 people forecasted to work on Olympic Park and Olympic

Village during lifetime of project

20% local community in workforce

trainee, apprenticeships and

work placements

One stop shop to a job – 0845 155

2012

ODA Employment & Skills

Managers support new entrants on

Olympic Park with contractors

Procurement

Value not price

Balanced

Scorecard

Contract

Framework

• NEC Contract

• Fair terms and conditions

• Dispute avoidance

• Private equity arrangements

Supply Chain

management

Competefor

UK Business benefits

• Over 1400 suppliers

working for the ODA

• Value over £5bn

• 1000s companies

working in the 2012

supply chain

Change – Olympic Park, March 2010