• 2 stories + basement• 1,200 finished SF• 2 bedrooms• 1 bath• 5 people

Prior Airport Noise Retrofit

Windows with Storms

Mechanicals

AirtightnessInitial Test8.5 ACH50 [2,100 CFM50]

Pre-Existing Conditions

• Structure ✓• Weather Barrier?• Insulation ✗• Airtightness ✗• Moisture Management ✓• Ventilation/ Air Quality ✗• Comfort ✗ ✗• Daylight ✗• Durability (30 years?)• Design (Sign of the Times)

So, Where Are We?

Where do we go?

Image Source: Wikipedia

what we need

• + 3 Bedrooms• + 2 Baths• + Mudroom• Better kitchen• Better living areas• Homeschool room• Safe stairs• Weather-tight envelope• Durable structure• Healthy interiors• Comfort & daylight• Low operating cost• Energy performance

The List

EnerPHit: Certification criteria for retrofits, 25.04.2012 1 / 15 © Passive House Institute 2012; excerpts and use only permitted in an unchanged form with complete citing of the source

Passive House Institute Dr. Wolfgang Feist Rheinstraße 44/46 64283 Darmstadt Germany www.passivehouse.com

EnerPHit and EnerPHit+i

Certification Criteria for Energy Retrofits with Passive House Components

If an energy retrofit of an existing building meets Passive House criteria (for new builds), it, too, can be certified as a Certified Passive House.

It is, however, often difficult to feasibly achieve the Passive House Standard in older buildings for a variety of reasons. Passive House technology for relevant building components in such buildings does, nevertheless, lead to considerable improvements with respect to thermal comfort, structural longevity, cost-effectiveness over the building lifecycle and energy use.

Buildings that have been retrofitted with Passive House components and, to a great extent, with exterior wall insulation can achieve EnerPHit certification as evidence of both building quality and fulfilment of specific energy values. The EnerPHit+i designation is applied if more than 25 % of the opaque exterior wall surface has interior insulation.

The certification criteria for both standards are described below.

How do we get there?

Holistic Energy Reduction Retrofit ≠

Weatherization

Sports car?

• Set goals for performance and design• Overlay architectural program• Make the home safe for people (code compliance)• Control temperature, air, and moisture• Add ventilation• Make the envelope air- and weather-tight• Add continuous insulation to meet the energy goals• Assess moisture transfer through shell• Implement robust climate zone-appropriate assemblies• Reduce energy demand by 2/3 and air-leakage 10X to

meet Passive House retrofit standard (EnerPHit)

The Plan for Success

The Concept

REPLACE GLASS BLOCKW/ EGRESS WNDWS

DEMO GLASS BLOCK& FILL TO MATCH

FND. WALL

PERIMETER OF STRUCTURE ABOVE

CHIMNEY ABOVE

DEMO STAIR

DEMO AND REPLACELOAD BEARING WALL

& FOUNDATIONTEMP. BRACE FLOOR

UP

2x10s@ 16" O.C.

2x10s@ 16" O.C.

UNEXCAVATED

DEMO FLOOR SLAB& EXCAVATE FOR NEWASSEMBLY

LAUNDRY ROOM WORKOUT ROOM

BATH- DEMO & SALVAGE FIXTURES

Basement

1. Homeschool Room 2. Mechanical 3. Unexcavated

3

1 2 3

UP

Basement

REPLACE GLASS BLOCKW/ EGRESS WNDWS

DEMO GLASS BLOCK& FILL TO MATCH

FND. WALL

PERIMETER OF STRUCTURE ABOVE

CHIMNEY ABOVE

DEMO STAIR

DEMO AND REPLACELOAD BEARING WALL

& FOUNDATIONTEMP. BRACE FLOOR

UP

2x10s@ 16" O.C.

2x10s@ 16" O.C.

UNEXCAVATED

DEMO FLOOR SLAB& EXCAVATE FOR NEWASSEMBLY

LAUNDRY ROOM WORKOUT ROOM

BATH- DEMO & SALVAGE FIXTURES

UP

1. Retrofit 2. Reconstruction 3. Addition

Basement

SOFFIT

BRICK CHIMNEY,SEAL AIRTIGHT

DEMO EXIST. SOFFIT

REMOVE AND SALVAGEWNDWS, TYP.

REMOVE AND SALVAGEDOORS AS INDICATED

DEMO LANDING

DEMO STAIRS,UP AND DOWN

UPDN

DN

DN

DN

2x10sV.I.F.

2x10sV.I.F.

2x V.I.F

.LIVING ROOM

KITCHEN- DEMO ALL BUILT-INS- DEMO & SALVAGE EQUIPMENT

DINING ROOM

KID'S ROOM

ENTRY VEST.

DEMO FLOOR SYSTEMABOVE SLAB

DEMO FLOOR SYSTEMABOVE SLAB

First Floor

REF

D W

1. Entry 2. Powder room 3. Mud room/ laundry 4. Living room 5. Kitchen 6. Dining area 7. Family area 8. Covered entry 9. Rear entry 10.Patio

1 2 3

4 5

7

8 9

106

First Floor

SOFFIT

BRICK CHIMNEY,SEAL AIRTIGHT

DEMO EXIST. SOFFIT

REMOVE AND SALVAGEWNDWS, TYP.

REMOVE AND SALVAGEDOORS AS INDICATED

DEMO LANDING

DEMO STAIRS,UP AND DOWN

UPDN

DN

DN

DN

2x10sV.I.F.

2x10sV.I.F.

2x V.I.F

.LIVING ROOM

KITCHEN- DEMO ALL BUILT-INS- DEMO & SALVAGE EQUIPMENT

DINING ROOM

KID'S ROOM

ENTRY VEST.

DEMO FLOOR SYSTEMABOVE SLAB

DEMO FLOOR SYSTEMABOVE SLAB

1. Retrofit 2. Reconstruction 3. Addition

REF

D W

First Floor

BRICK CHIMNEY

DEMO STAIR &LANDINGS

DEMOBALCONY

REMOVE AND SALVAGEWNDWS, TYP.

REMOVE AND SALVAGEDOORS AS INDICATED

DN

DN

DN

DN

MASTER BEDROOM BEDROOM

BATH- DEMO & SALVAGE FIXTURES

OFFICEDEMO ROOF SYSTEMABOVE ENTRY

Second Floor

1. Bedroom 1 2. Bedroom 2 3. Master Bedroom 4. Master Closet. 5. Master Bath 6. Bedroom 3 7. Kid’s Bath 8. Toilet Room

1

7

8

2

36

5

4

Second Floor

BRICK CHIMNEY

DEMO STAIR &LANDINGS

DEMOBALCONY

REMOVE AND SALVAGEWNDWS, TYP.

REMOVE AND SALVAGEDOORS AS INDICATED

DN

DN

DN

DN

MASTER BEDROOM BEDROOM

BATH- DEMO & SALVAGE FIXTURES

OFFICEDEMO ROOF SYSTEMABOVE ENTRY

1. Retrofit 2. Reconstruction 3. Addition

Second Floor

PASSIVESOLARHEATGAINS(WINTER)

SOLAR

SHADING

(SUMMER)

HEAT-RECOVERY

VENTILATION&

SMALLHEATER

AIR-INTAKE

EXHAUST

LARGE"ACTIVE"

MECHANICALSYSTEM

-FURNACEORBOILER

EXISTINGCONDITION

-INSUFFICIENTINSULATION

-LOW-PERFORMANCE

WINDOWSANDDOORS

-AIRLEAKAGE

-NOVENTILATION

EXTRACTAIR

SUPPLYAIR

INTERNAL

HEATGAINS

-PEOPLE

-EQUIPMT.

RETROFITCONDITION

-WATERPROOFING

ANDMANAGEMENT

-ADDEDINSULATION

-MITIGATIONOF

THERMALBRIDGES

EXISTINGCONDITION

-NOWATERPROOFING

ANDMANAGEMENT

-NOINSULATIONATAND

BELOWGRADE

-THERMALBRIDGES

TYPICALEXISTINGBUILDING(BEFORE)DEEPENERGYREDUCTIONRETROFIT(AFTER)

OPTIONALSOLARTHERMAL

ORSOLARPHOTOVOLTAIC

RETROFITCONDITION

-ADVANCEDWINDOWS

ANDDOORS

-AIR-TIGHTNESSLAYER

-CONTINUOUSINSULATION

PACKAGE

Retrofit Concept

PASSIVESOLARHEATGAINS(WINTER)

SOLAR

SHADING

(SUMMER)

HEAT-RECOVERY

VENTILATION&

SMALLHEATER

AIR-INTAKE

EXHAUST

LARGE"ACTIVE"

MECHANICALSYSTEM

-FURNACEORBOILER

EXISTINGCONDITION

-INSUFFICIENTINSULATION

-LOW-PERFORMANCE

WINDOWSANDDOORS

-AIRLEAKAGE

-NOVENTILATION

EXTRACTAIR

SUPPLYAIR

INTERNAL

HEATGAINS

-PEOPLE

-EQUIPMT.

RETROFITCONDITION

-WATERPROOFING

ANDMANAGEMENT

-ADDEDINSULATION

-MITIGATIONOF

THERMALBRIDGES

EXISTINGCONDITION

-NOWATERPROOFING

ANDMANAGEMENT

-NOINSULATIONATAND

BELOWGRADE

-THERMALBRIDGES

TYPICALEXISTINGBUILDING(BEFORE)DEEPENERGYREDUCTIONRETROFIT(AFTER)

OPTIONALSOLARTHERMAL

ORSOLARPHOTOVOLTAIC

RETROFITCONDITION

-ADVANCEDWINDOWS

ANDDOORS

-AIR-TIGHTNESSLAYER

-CONTINUOUSINSULATION

PACKAGE

Retrofit Concept

EX

IST.

WA

LL

RE

TRO

FIT

WA

LL

20"

10 3/4"

5 1/

2"

± 9

1/4"

1 1/

2"

9 1/

4"7"

24"

+1'-8"

0'-0"

-0'-3"

+0'-0 1/2"

EXIST. ROOF FRAMINGTO BE DEMO'D

SNOW GUARDS PER MANUF.

INSECT SCREEN

VENT CHUTES

GUTTER

MAINTAIN CONT. AIR BARRIER W/ SIGABRAND TAPE AT SHEATHING TO TOP PLATE

MAINTAIN CONT. AIR BARRIER W/ SIGABRAND TAPE AT SHEATHING TO TOP PLATE

CONT. VENTING

BACKFILL

TYPICAL ABOVE GRADE RETROFIT (R-44)

ASSUMED EXISTING WALL ASSEMBLYINTERIOR• PLASTER• WALLBOARD• 2X4 FRAMING, DENSE-PACK WITH CELLULOSE INSULATION (ADDED) 3.5 LBS/ CU FT• EXTERIOR SHEATHING

RETROFIT WALL ASSEMBLY• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ EXIST. STUDS WITH DENSE-PACK CELLULOSE INSULATION, 3.5 LBS/ CU FT• 1/2" FIBERBOARD SHEATHING (BILDRITE OR SIM.)• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR

TYPICAL BELOW GRADE RETROFIT (R-40)

INTERIOR• 5/8" WALL BOARD• 3-1/2" STEEL FRAMING @ 24" O.C. WITH MIN. 2" CLOSED CELL SPRAY FOAM INSULATION VAPOR BARRIER & AIRTIGHTNESS LAYER• EXIST. CONCRETE WALL• (2) 3" EXTERIOR GRADE EPS INSULATION (EIFS)• STO FLEXYL (EIFS) WEATHER RESISTANT BARRIER & FINISH (TIE TO FACE OF FOOTING)EXTERIOR

TYPICAL SLAB RETROFIT (R-25)

NOTE: REMOVE EXISTING SLAB & EXCAVATE TOACCOMODATE RETROFIT ASSEMBLY

INTERIOR• 4" CONCRETE SLAB WITH RADIANT IN-FLOOR HEATING SYSTEM• 6-MIL POLY VAPOR BARRIER & AIRTIGHTNESS LAYER SEAL AIRTIGHT AT ALL JOINTS AND PROTRUSIONS• 6" BELOW GRADE EPS INSULATION BOARD, COMPRESSIVE STRENGTH PER SE• MIN. 2" GRAVELEXTERIOR

TYPICAL VENTED COLD ROOF ASSEMBLY (R-77)

NOTE: REMOVE EXISTING ROOF STRUCTURE,BUILD PERIMETER KNEE WALL AND SET NEWTRUSSED HIP ROOF PER STRUCTURAL DRAWINGS

EXTERIOR• STANDING SEAM METAL ROOFING @ 16" O.C.• GRACE ICE & WATER SHIELD HT ROOFING UNDERLAYMENT, WEATHER RESISTANT BARRIER• 3/4" PLYWOOD STRUCTURAL SHEATHING• ATTIC AIRSPACE, OR VENT CHUTES• STRUC. TRUSSES @ 24" O.C. WITH MIN. 20" CELLULOSE INSULATION• 5/8" OSB SHEATHING, SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 6" INSTALLATION CAVITY WITH SUSPENSION SYSTEM• 5/8" WALLBOARD CEILINGINTERIOR

WEATHER RESISTANT BARRIER (WRB)

AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR)

RETROFIT FRAMING

EXIST. WALLTR

US

S B

EA

RIN

G

210

T.O. KNEEWALL

T.O. EXISTING WALL

T.O. EXISTING R.O.

T.O. ADDITION R.O.s

CLE

AR

@ O

UTS

IDE

OF

STU

DW

ALL

7-1/2" TRIM

TYPICAL ABOVE GRADE WALL RETROFIT (R-44)

INTERIOR• EXISTING WALLBOARD & FINISH• EXISTING FRAMING WITH 3-1/2" DENSE PACK INSULATION, 3.5 LBS/ CU FT• EXISTING SHEATHING• 5/8" OSB SHEATHING: SEAL JOINTS AIRTIGHT VAPOR BARRIER, AIRTIGHTNESS LAYER• 9-1/2" I-JOIST FURR FRAMING @ 24 O.C. WITH DENSE-PACK CELLULOSE INSULATION, 3.5 LBS/ CU FT• 1/2" BUILDRITE SHEATHING• WINDWASH BARRIER WEATHER RESISTANT BARRIER• 3/4" VENT SPACE (1X FRAMING)• CEMENT BOARD LAP SIDINGEXTERIOR

CONTINUOUS 5/8" SHEATHINGCONNECTS EXISTING AND NEW CONSTRUCTIONVAPOR BARRIER & AIRTIGHTNESS LAYER

• Walls a/ grade: R-10 to R-44• Walls b/ grade: R-1 to R-30+• Roof: R-20 to R-77• Slab: R-1 to R-25

Assemblies

SHEET TITLE

DESCRIPTION

PROJECT NO:MODEL FILE:DRAWN BY:CHK'D BY:COPYRIGHT

EPH-01 Brazelton for Presentation.pln

MARK DATE

A-5.1

TE Studio, Ltd.

9/7/12 Date printed

A-201101

BID SET6/13/116/29/11 PERMIT SET

/Use

rs/ti

mei

an/D

ropb

ox/T

E St

udio

Sha

re/P

roje

cts/

A-20

1012

01 B

raze

lton/

EPH-

01 B

raze

lton

for P

rese

ntat

ion.

pln

CLIENTSDesiree and Paul Brazelton612-208-8197

WINDOW DETAILS

BRAZELTONRESIDENCE

TE STUDIO, LTD.3429 BENJAMIN ST. NEMINNEAPOLIS, MN 55418

612-246-4670 office612-605-3200 fax

testudio.com

Holistic design for sustainable homes.

PROJECT ADDRESS5605 Bloomington AveMinneapolis, MN 55418

CONSULTANTS

TE S

tudi

o pr

ints

on

recy

cled

post

-con

sum

er p

aper

. Ple

ase

recy

cle.

4"4"5

1/2"

ROUGH OPENING

WINDOW SET POINT

OPT. 2X4

L-SECTION SILL END CAP

EXTERIOR ALUMINUM SILL

INTERIOR WOOD SILL

EPS FOAM STRIP

PLYWOOD STRIP

FILL VOID WITH EPS FOAM

8 7/8" (225 MM)

4" 5 1/2"

RO

UG

H O

PE

NIN

GR

OU

GH

OP

EN

ING

EPS WEDGE

EPS INFILL

AIRTIGHTCONNECTION

AIRTIGHTCONNECTION

COMPRESSIONTAPE

DRIP EDGE

OPT. 2X4

L-SECTIONEND CAP

3-1/2" TRIM

5-1/

2" T

RIM

7-1/4" TRIM

DC260

7" (180 MM)

RO

UG

H O

PE

NIN

G

AIRTIGHTCONNECTION TERRACE DOOR

SILL

L-SECTIONEND CAP

COMPRESSIONTAPE

CRIPPLE WALL WITHDENSEGLASS GOLDSHEATHING

INT.

JA

MB

EX

TEN

SIO

N

EX

T. J

AM

B

EXT. STEP

MIN

. 1-3

/8"

1 3/4"

EXIST. ROUGH OPENING

WINDOW SET POINT

1" POLYISOCYANURATE FOAM BOARD

3/4" PLYWOOD BUCK

STO GUARD WET-FLASHING SYSTEM

STO FINISH PROFILE

AIR TIGHT CONNECTIONDOUBLE SIDED BUTYL TAPEPER MANF.

RETROFIT ROUGH OPENING

REFERENCE DETAILS:- STO W 425-1- STO W 501

NOTE:VERIFY DIMENSIONSWITH ACTUAL PRODUCT

INTERIOR

EXTERIOR

8 7/8" (225 MM)

1 3/

4"3/

4"

STO FINISH PROFILE

STO DRIP EDGE

WINDOW R.O.

BLOCK R.O.

EXIST. R.O.WINDOW R.O.

U-SECTIONEND CAP

REFERENCE DETAILS:- STO W 710- STO W 425-2

SCALE: 3" = 1'-0"3 TYPICAL WINDOW JAMB

SCALE: 3" = 1'-0"2 TYPICAL WINDOW HEAD & SILLSCALE: 3" = 1'-0"1 TYPICAL EXTERIOR WINDOW ELEVATION

SCALE: 3" = 1'-0"4 TYP. TERRACE DOOR SILLSCALE: 3" = 1'-0"6 TYPICAL WINDOW JAMB, BASEMENT

SCALE: 3" = 1'-0"5 TYPICAL WINDOW HEAD & SILL, BASEMENT

TDE

WEATHER RESISTANT BARRIER (WRB)

AIRTIGHTNESS LAYER & VAPOR RETARDER (AB & VR)

OPTIWIN, PEAK BP, JCC, PG

Details

• Boiler (existing, replaced)

• In-floor heat (existing, reused and expanded)

• Ventilation system (new)

• Domestic hot water system (new plumbing)

MEP Systems