East Side Lands Wastewater Servicing Class EA
Public Consultation Centre November 8, 2016
5:00pm ~ 7:30pm
g Deer Ridge Golf Club200 Deer Ridge Drive, Kitchener
CONESTOGA PKWY
KITC
HEN
ER
BIS
HO
P S
T N
FOU
NTAIN
ST N
BLAIR R
D
KING ST E
HOMER W
ATSON BLVD LACK
NER BLVD
KR
AM
P R
D
HW
Y #7
RID
ER R
D
VANC
E RD
LERC
H R
D
FIFE RD
HO
PEWELL C
REEK R
D
KO
SS
UTH
RD
CHILLIGO RD HESPELER RD
BRID
GE ST E
EBYCREST RD
MEN
NO
ST
LON
SDALE R
D
COBER RD
FOUNTAIN ST N
CHERRY B
LOS
SO
M R
D
HWY #401
FAIRWAY RD N
OTTAW
A ST N
VICTO
RIA ST N
RIVER RD
WO
OLW
ICH
RIVERBANK DR
CA
MB
RID
GE
HOMH
R
HOMER
East Side LandsThe East Side Lands is an area of grow
th in the Region of W
aterlooprim
arily for employm
ent development w
ith some residential grow
th.W
astewater servicing is required to support this planned developm
ent
EAST SID
E LAN
DS
BO
UN
DA
RYRE
GIO
N O
F WA
TER
LOO
INTE
RN
ATIO
NA
LA
IRP
OR
T
STAG
E 1 (MESP)
EA STU
DY
PRIM
AR
Y FOC
US
ALLE
ND
ALE
RD
MID
DLE
BLO
CK
RD
MO
HA
WK
RD
HESPELER
WW
TP
BEAVERDALE RD
DE
ER
RID
GE
SU
BD
IVIS
ION
KITC
HEN
ERW
WTP
EA
GLE
ST
PRESTO
N W
WTP
PRESTO
N W
WTP
Project Overview What is this project about? Determining the long-term wastewater servicing solution to support growth in the East Side Lands.
What is the short term strategy? To make the best use of existing infrastructure until the long term solution is needed. Initially, wastewater from the East Side Lands will be treated at the Preston Wastewater Treatment Plant (WWTP).
What is the long term strategy? Ultimately, wastewater from the East Side Lands will be treated at the Kitchener WWTP.
What is the focus of this study? How the wastewater flows will reach the Kitchener WWTP.
We would like your input on the proposed wastewater servicing strategy
problem and inventory of
EA Planning Process
Identify the Identify the problem and problem and complete an complete an
existing conditions
Develop alternative alternative
Select a complete an inventory of inventory of
Develop alternative solutions
Evaluate the Evaluate the alternatives
Select a preferred preferredpreferred solution
Stakeholderr Consultation
This study is being completed as a Schedule ‘B’ Class EA. It builds on the previous work of the East Side Lands
Master Environmental Servicing Plan (MESP).
Project Approach The project approach is to divide the servicing strategy into two parts:
Part 1: Route Considers the alignment of the sanitary servicing infrastructure (pipeline) from the East Side Lands to the Kitchener Wastewater Treatment Plant (WWTP)
Part 2: Wastewater Transfer Considers options for gravity or pumped wastewater flows
- and
Options for crossing the Grand River to reach the Kitchener WWTP.
Evaluation Evaluation Factors Scoring of Options
Good
Poor
A preferred solution for the sewer pipe route was identified first (Part 1), then a preferred solution for transferring wastewater was identified (Part 2).
GR
AN
D R
IVE
R
GRAND RIVER
GRAND RIVER
GRA
ND R
IVER
GRAND RIVER
GRAND RIVER
GRAND RIVER
GRAND RIVER
GRAND RIVER
RAILWAY LINE
RAILWAY LINE
RAILW
AY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LI
NE
RAILWAY LINE
CAM
BRID
GE
CAM
BRID
GE
KITC
HENE
R
KITC
HENE
R
CAMBRIDGE
CAMBRIDGE
KITCHENER
KITCHENER
CAMBRIDGE
CAMBRIDGE
KITCHENER
KITCHENER
CAMBRIDGE
CAMBRIDGE
KITCHENER
KITCHENER
CAMBRIDGE
CAMBRIDGE
KITCHENER
KITCHENER
GRA
ND R
IVER
GRA
ND R
IVER
FOU
NTA
IN S
T N
CHERRY
BLOSSOM RD
HWY #8
KING ST
PIONEER TOWER RD
HWY #8
SPORTSWORLD D
R
KITCHENER
CAMBRIDGE
Part 1 - Route OptionsFive options were evaluated for the route of the sewer pipe
FREEPORT PS Future North-South Collector Road ALLENDALE RD (Exact alignment to be
determined) KITCHENERKITCHENER
CAMBRIDGECAMBRIDGE
MAPLE GROVE RD
DEER RIDGE DR
PIONEER
LOO
KO
UT
LAN
ETOWER PS
KITCHENER WWTP
ROUTE OPTIONS ROUTE 'A'
ROUTE 'B'
ROUTE 'C'
ROUTE 'D'
ROUTE 'E'
Part 1 Evaluation of Routes
Pipeline Route B is currently the preferred option Key advantages include:
Shortest overall length (and therefore cost) Avoids impacts to important natural features Mostly located within existing public utility corridors and roads to minimize impacts to the community
Part 2 Wastewater Transfer Options
Option 1 Option 2 Option 3 Gravity sewer and pumping Gravity sewer and pumping Gravity sewer only
station in the Deer Ridge station at Kitchener Wastewater with a dedicated service bridge Subdivision Treatment Plant across the Grand River
Three wastewater transfer options were evaluated
t t t t
Part 2 - Evaluation of Wastewater Transfer Options
Option 3 is currently the preferred solution • Key advantages include:
No pumping station required Lower capital and operating cost Lower risk of impacts to the Grand River
OO tii 33 ii tll thh ff dd ll tii
GR
AN
D R
IVE
R
GRA
ND R
IVER
GRAND RIVER
GRAND RIVER
GRAND RIVER
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
RAILWAY LINE
CAMBRIDGE
CAMBRIDGE
KITCHENER
KITCHENER
CAMBRIDGE
CAMBRIDGE
KITCHENER
KITCHENER
CAMBRIDGE
CAMBRIDGE
KITCHENER
KITCHENER
H
KING ST
PIONEER TOWER RD
HWY #8
SPORTSWORLD D
R
Preferred Solution Future North-South Collector Road
E EEDEER RIDGE DR
PIONEER TOWER PS
KITCHENER WWTP
KO
KLO
OK
OU
T LA
NE
Crossing the Grand River
A new service bridge across the Grand River is proposed to carry the sewer pipe to the treatment plant.
View from Kitchener Wastewater Treatment Plant Aerial view looking west
-
-PublPu
Proposed Timing
Finalize the Finalize the Environmental EnvironmentalEnvironmental Study Report
RequestRequest Council CouncilCouncil
Approval
30300 Day 3300 ayDaDPublic Public PP icblPub
Review ReviewReview Period
Finalize Finalize thethethe
Class EA
Complete the Complete the Wastewater WastewaterWastewater Treatment TreatmentTreatment
Master Plan
Construct the Construct the East Side Lands East Side LandsEast Side Lands
Long Term Long Term Long Term Servicing Solution
Fall 2016 Winter 2017 Fall 2017 Future
(to be confirmed)
Public Input Public Input Public Input
Factors Affecting Timing
The timing for construction will depend on: • rate of population growth; and • wastewater flows
The Wastewater Treatment Master Plan is currently underway to estimate the timing for construction of the long term solution
Thank You for Participating Please deposit your comment sheet in the box provided or forward to the Region.
For more information, please contact:
Jorge Cavalcante, M.Sc., P.Eng. Duane Lindner, P.Eng. Manager, Water Services Project Manager Region of Waterloo Associated Engineering jcavalcante@regionofwaterloo.ca lindnerd@ae.ca 519–575-4412 226-214-3187 ext. 5301 150 Frederick Street 508 Riverbend Drive Kitchener ON N2G 4J3 Kitchener ON N2K 3S2
top related