DUNE Architecture Considerations: Facilities,Infrastructure, and PracticalitiesTheresa ShawDAQ WorkshopOctober 31, 2017

Content• Dune Locations

- Above ground

- Underground

• Infrastructure and Detector Grounding Plan

• Detector Racks

• Power Envelopes

• Fiber Plant

• Central Utility Cavern Control Room Study

• Slow Control

31OCT2017 T. Shaw | DUNE Architecture Considerations2

Location

31OCT2017 T. Shaw | DUNE Architecture Considerations3

Location

31OCT2017 T. Shaw | DUNE Architecture Considerations4

Sanford Lab Homestake Visitor Center

31OCT2017 T. Shaw | DUNE Architecture Considerations5

The Yates Shaft

31OCT2017 T. Shaw | DUNE Architecture Considerations6

31OCT2017 T. Shaw | DUNE Architecture Considerations7

Small DAQ Control Room

Overall site layout

31OCT2017 T. Shaw | DUNE Architecture Considerations8

Ross ShaftYates Shaft

Underground Excavation

31OCT2017 T. Shaw | DUNE Architecture Considerations9

Infrastructure Grounding Plan

31OCT2017 T. Shaw | DUNE Architecture Considerations10

Infrastructure Grounding – Docdb 285

31OCT2017 T. Shaw | DUNE Architecture Considerations11

• Objectives

- To create an ‘isolated’ detector ground system consisting of the Cryostat (membrane and steel containment vessel), Detector Electronics racks (located on top of the cryostat) and the electronics resident in those racks or inside the vessel.

- This ‘isolation’ keeps building noise sources off of the detector’s sensitive electronics.

- A “safety” ground is implemented through a saturable inductor connecting the detector ground and “earth/building” ground. The inductor provides a DC path for fault currents and a resistive AC path for noise sources.

Infrastructure Grounding – Docdb 285

31OCT2017 T. Shaw | DUNE Architecture Considerations12

31OCT2017 T. Shaw | DUNE Architecture Considerations13

Location of DAQ equipment• Ideally, we would like to keep as many sources of fast switching

currents off detector ground.- Consider locating most DAQ electronics in the Central Utility Cavern

(CUC), where it will be distant and on “building” ground.

- Only Optical fiber connections between the CUC and the detector are allowed.

- There may have to be space/power/cooling trade-offs made between the CUC and detector racks.

31OCT2017 T. Shaw | DUNE Architecture Considerations14

Detector Racks

31OCT2017 T. Shaw | DUNE Architecture Considerations15

Racks• Rough Draft of POSSIBLE detector rack layouts – based off

emails and ProtoDUNE found in https://docs.dunescience.org:440/cgi-bin/ShowDocument?docid=4499

• Detector Racks will be (3 rows of 25) or (3 rows of 35); at least one rack per vertical APA pair feedthrough.

31OCT2017 T. Shaw | DUNE Architecture Considerations16

Detector Rack Cooling• Two options being looked at

- Air Cooling (fans)

- Water Cooling

31OCT2017 T. Shaw | DUNE Architecture Considerations17

One Rack per APA pair

31OCT2017 T. Shaw | DUNE Architecture Considerations18

Three Racks per 6 APAs

31OCT2017 T. Shaw | DUNE Architecture Considerations19

Power Envelopes

31OCT2017 T. Shaw | DUNE Architecture Considerations20

DUNE Power Requirement Envelope – Docdb 208

31OCT2017 T. Shaw | DUNE Architecture Considerations21

Detector Power

Small above ground control room

Possible onsite large above ground control room

Underground CUC Control Room

Fiber Plant

31OCT2017 T. Shaw | DUNE Architecture Considerations22

Fiber Optic Paths

31OCT2017 T. Shaw | DUNE Architecture Considerations23

Fiber Requirements – Docdb 112

31OCT2017 T. Shaw | DUNE Architecture Considerations24

Central Utility Cavern Control Room Study

31OCT2017 T. Shaw | DUNE Architecture Considerations25

LBNF/DUNE Control Room Study Workshop on Dec 15-16, 2015 • Report from Workshop https://docs.dunescience.org:440/cgi-

bin/RetrieveFile?docid=937

Conclusions and RecommendationsFrom the workshop and information provided, the team has established designboundaries and room functions for the control facilities. The originalrequirements were developed into representative layouts to be further developedthe design team. The surface or underground control facility has different driversand it is considered that the underground control facility is the initial priority as itwill be needed to commission the experiment. Whereas the surface is envisionedas a more accessible and long term solution. The final desk configuration shouldnot be determined until the technology is chosen.

31OCT2017 T. Shaw | DUNE Architecture Considerations26

Control Room Study Workshop• Starting Point

31OCT2017 T. Shaw | DUNE Architecture Considerations27

Underground Control Room Study Workshop

• Results of Workshop identified 5 area types (Not all these spaces were later translated into Requirements!)- Control Space

- Conference/Meeting Space

- DAQ Space

- Flexible/Temporary Workspace

- Eating Facility

31OCT2017 T. Shaw | DUNE Architecture Considerations28

Control Space

31OCT2017 T. Shaw | DUNE Architecture Considerations29

Conference/Meeting Space

31OCT2017 T. Shaw | DUNE Architecture Considerations30

DAQ Space

31OCT2017 T. Shaw | DUNE Architecture Considerations31

Flexible/Temporary Workspace and Eating Facility

31OCT2017 T. Shaw | DUNE Architecture Considerations32

What was Translated into Engineering Requirements

31OCT2017 T. Shaw | DUNE Architecture Considerations33

• NOTE: Not all spaces identified from Workshop were translated into requirements

• https://docs.dunescience.org:440/cgi-bin/ShowDocument?docid=112

Slow Control

31OCT2017 T. Shaw | DUNE Architecture Considerations34

DAQ Requirements – Docdb 112

31OCT2017 T. Shaw | DUNE Architecture Considerations35

Slow Control and Monitoring Functions included in DAQ scope.  Lots of issues here as well:Equipment location, power, grounding, low noise …

Conclusion• Lots of work to be done defining details as the DAQ design

matures!

31OCT2017 T. Shaw | DUNE Architecture Considerations36