Draft Chesapeake Bay TMDL Action PlanPublic Meeting
December 14 and 15, 20161
Draft Chesapeake Bay TMDL Action Plan
Key Definitions and Acronyms• MS4 – Municipal Separate Storm Sewer System
– Area draining to stormwater outfalls owned or operated by the County that discharge to surface waters
– Subject to an MS4 permit under state and federal law– Issued for five-year terms, although may be administratively extended; the most recent permit was
issued April 1, 2015• Impaired Waterbody
– A waterbody that does not meet water quality standards based on monitoring data– Listed in accordance with Section 303(d) of the federal Clean Water Act
• TMDL – Total Maximum Daily Load– The maximum amount of a pollutant that a waterbody can receive and still meet water quality
standards– A TMDL generally establishes the existing load and the target load. It then allocates the load
reduction among sources– The allocation is divided into a load allocation (LA) and a wasteload allocation (WLA)
• TMDL Action Plan– The MS4 permit requires the County to develop plans for how it intends to achieve the required
pollutant load reductions
2
Draft Chesapeake Bay TMDL Action Plan
Example MS4 Components
3
1 Downspout2 Untreated runoff
5 Stormwater outfall6 Urban stream
3 Storm drain4 Sewer system
4
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Bay TMDL Background – A Long, Winding Road
• Voluntary interstate effort formalized by 1983 Chesapeake Bay Agreement
• Shift from voluntary to regulatory – lawsuit and 2010 Chesapeake Bay TMDL
• Pollutants of Concern (POCs): nitrogen, phosphorus, and sediment
• Means and methods in place to clean up the Bay by 2025
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Impacts of Nutrients and Sediment on the Bay
5
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Algae Bloom Caused by Excess Nutrients
6
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Sediment from Hurricane Isabel
7
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Chesapeake Bay TMDL
“The TMDL – the largest ever developed by EPA – identifies the necessary pollution reductions of nitrogen, phosphorus and sediment across Delaware, Maryland, New York, Pennsylvania, Virginia, West Virginia and the District of Columbia and sets pollution limits necessary to meet applicable water quality standards in the Bay and its tidal rivers and embayments.”
8
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Virginia’s Plan for the Chesapeake Bay
• Virginia Watershed Implementation Plan (WIP) Phase I and II• Allocates POC reduction targets based on the Bay Model:
– Wastewater– Agriculture– Urban/suburban stormwater– Onsite wastewater (septic systems)– Forest lands– Resource extraction– Federal facilities
• Virginia’s challenge – it can only require reductions for entities subject to permits or regulations.
9
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Fairfax County’s Two-Pronged Approach
• Meet the MS4 permit requirements:– Delineate MS4 service area as of 2009 (base year for reductions)– Delineate impervious and pervious surfaces within the service area– Use information to calculate required POC reductions
• WIP milestones: 5% of reduction targets by 2020; 40% by 2025 and 100% by 2030
10
11Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Fairfax County’s MS4
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Bottom Line – Required POC Reductions
12
Nitrogenlbs/year
Phosphoruslbs/year
Sedimentlbs/year
5% by 2020 2,959.42 323.42 263,865.57
40% by 2025 23,675.36 2,587.36 2,110,924.56
100% by 2030 59,188.4 6,468.4 5,277,311.4
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Before there were specific Bay TMDL requirements…
• Fairfax County developed watershed management plans for each of the County’s 30 watersheds
• Plans identify and address issues affecting water quality
• Include policies and projects• Many of projects in the plans
have been leveraged to meet the Chesapeake Bay TMDL
• Plans can be found at www.fairfaxcounty.gov/dpwes/watersheds/
13
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Key Components of the Action Plan
• Detailed guidance provided by the Virginia Department of Environmental Quality (DEQ Guidance Memo 15-2005)
• New development:– No net increase in phosphorus load:
Fairfax County Stormwater Management Ordinance (July 1, 2014)
– Address increases from 2009 to 2014– Make up for increases from
grandfathered projects• Means and methods to reduce POCs
from existing development
14
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
2009-2014 Development – A funny thing happened…
• MS4 permit requirement – offset increase over 16% impervious cover (0.45 lbs/phosphorus/acre/year)
• County requirements during this time period:– 40% phosphorus removal for new development County-wide– 50% for new development in the Water Supply Protection Overlay District– 10% for redevelopment County-wide– Exemptions for large lot subdivisions and infill development
• What does that all mean?
15
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Increase from New Impervious Cover 1,202.69 174.30 81,782.93Reduction from Stormwater Facilities 1,610.69 404.12 196,603.22Net Reduction (Credit) 408.00 229.82 114,820.29Percent Total (Year 2030) Target 0.7% 3.5% 2.2%
16
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Means and Methods – Key Considerations• The County has been preparing for a while!
– Stormwater retrofits since 2009– Stream restorations since 2010
• Credit for past actions not captured in the Bay Model– 2006 to 2009 stormwater facilities
• Credit for going above regulatory minimums– Nutrient management plans– Single family residential development under one acre
• Project selection process:– Watershed management plans and other inputs– Technical feasibility– Community support– Ability to address local impairments– Cost-benefit ratio
• MOU with Herndon and Vienna
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Historic BMPs – 2006 to 2009
17
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Net Reduction (Credit) 5,705.48 670.27 577,628.02Percent Total (Year 2030) Target 9.6% 10.3% 10.9%
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Stormwater Retrofit Projects
18
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Net Reduction (Credit) 6,229.76 602.23 722,129.86Percent Total (Year 2030) Target 10.5% 9.3% 13.7%
Stormwater Management
Click icon to add picture
Draft Chesapeake Bay TMDL Action Plan
Stream Restoration
19
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Net Reduction (Credit) 17,446.58 5,438.31 1,832,406.33Percent Total (Year 2030) Target 29.4% 84.0% 34.7%
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Land Use Change
20
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Net Reduction (Credit) 37.27 0.54 207.31Percent Total (Year 2030) Target 0.1% <0.1% <0.1%
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
In-Lake Forebay Projects
21
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Net Reduction (Credit) 5,423.87 341.31 149,689.15Percent Total (Year 2030) Target 9.2% 5.3% 2.8%
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Redevelopment
22
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Net Reduction (Credit) Coming Soon Coming Soon Coming SoonPercent Total (Year 2030) Target NA NA NA
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Single Family Residential Under One Acre
23
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Net Reduction (Credit) 135.32 22.09 11,977.54Percent Total (Year 2030) Target 0.2% 0.3% 0.2%
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Septic Conversion
24
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Net Reduction (Credit) 1,806.85 -- --Percent Total (Year 2030) Target 3.0% 0.0% 0.0%
Stormwater Management
Draft Chesapeake Bay TMDL Action Plan
Nutrient Management Plans
25
Pollutant TN(lbs/year)
TP(lbs/year)
TSS(lbs/year)
Net Reduction (Credit) 89.58 1.82 --Percent Total (Year 2030) Target 0.2% <0.1% 0.0%
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Other Means and Methods
• Additional means and methods that the County may take credit for in the future:– Parking lot sweeping– Off-site nutrient credits (purchased or transferred from wastewater
treatment facilities)– Home owner practices such as downspout disconnection, tree planting,
rainwater harvesting, nutrient management plans, etc.
26
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Current Permit Compliance Snapshot
27
Total Nitrogen (lbs/year)
Total Phosphorus (lbs/year)
Total Suspended Solids (lbs/year)
Required Reductions from Existing Sources 2,959.42 323.42 263,865.57+ Required New Source
Offsets -408.00 -229.82 -114,820.29+ Required Grandfathered
Offsets 56.27 8.11 3,727.09= Total Required Reductions and Offsets for Current Permit Cycle
2,607.69 101.71 152,772.37
- Means and Methods from Section 5 36,874.71 7,076.57 3,294,038.21
= Reductions Remaining for Current Permit Cycle -34,267.02 -6,974.86 -3,141,265.84Credit Applied to Next Permit Cycle 34,267.02 6,974.86 3,141,265.84
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Total Compliance – Year 2030 Target
28
TN
TP
TSS
0.0% 20.0% 40.0% 60.0% 80.0% 100.0% 120.0%Structural Retrofits Stream Restoration 2006-2009 Redevelopment SFR 2009-2014
SFR Post 2014 PL 566 Dams Septic Conversion Off-Site Credits NMPs
Land Use Change Other New Source Credits
63.0%
112.8%
64.6%
203020252020
Cost To-Date = ~$79 Million
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Uncertainties, Challenges, and Next Steps
• Remaining POC Reductions– Still must achieve additional ~40% reduction in nitrogen and sediment– Several projects in-design or being scoped– Fewer easily accessible stream restoration projects
• 2017 Mid-Term Assessment and WIP Phase III– Changes in POC reduction targets?– Changes in target dates?
• Local TMDL Action Plans for Sediment– Higher local reduction targets– Bull Run, Difficult Run, and Popes Head Creek
• Project Maintenance– Credits will expire if projects are not maintained
29
30
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Next Steps
• Public comment period will run through January 23, 2017• Draft plan and responses to comments will be presented to
the Board of Supervisors’ Environmental Committee on February 7, 2017
• Plan must be submitted to the Virginia Department of Environmental Quality by March 31, 2017
• Draft plan is available at: http://www.fairfaxcounty.gov/dpwes/stormwater/chesapeake-bay-tmdl.pdf
Additional Information and Comments
For additional information or to submit comments
www.fairfaxcounty.gov/dpwes
31
Draft Chesapeake Bay TMDL Action Plan
Stormwater Management
Kate Bennett, MS4 Program Coordinator(703) 324-5500