dpr qualifications package
Post on 21-Jan-2018
347 Views
Preview:
TRANSCRIPT
DPR Exists to Build Great Things.
Great Projects. Great Relationships.
Greater Value.
DPR Construction is a unique technical builder
with a passion for results. Ranked in the top
50 general contractors, DPR is a national
commercial contractor and construction
manager that has grown with customers by
delivering measurably more value. Whether
a multi-million-dollar technical facility or a
single conference room renovation, every
project is approached as an opportunity to
help customers successfully realize their vision
and goals, and build enduring relationships.
www.dpr.com
DPR Construction
DPR CORE MARKETS
• Advanced Technology
• Corporate Office
• Healthcare
• Higher Education
• Life Sciences
DPR EXPERTISE
• Collaborative Virtual Building/ Building Information Modeling
• Preconstruction
• Safety
• Self Perform Work
• Special Services Group
• Sustainable Construction
FOCUSED MARKETS. FOCUSED RESULTS.Completing a project that meets the quality standards of you and your end users on time and within budget is the baseline. Streamlining the process to increase efficiency and eliminate waste, while offering greater predictability,
is how we define and deliver value. When you work with DPR, you can rest assured that our experienced, bullet-smart builders will do their very best. We promise nothing less.
DPR Construction
GREEN PROJECT AWARD WINNER VIRTUAL DESIGN& CONSTRUCTION
SELF PERFORMWORK
SPECIALSERVICES GROUP ZERO DEFECTS INTEGRATED
PROJECT DELIVERY
www.dpr.com
DPR Construction | Mid-Atlantic
Comprised of nearly 200 employees and an
annual revenue of approximately $300
million, DPR’s mid-Atlantic region serves
customers up and down the East Coast from
New Jersey and Pennsylvania to Virginia.
Customer focus and employee empowerment.
These concepts are at the core of our business
philosophy in the mid-Atlantic region. Employees
are empowered to serve our customers –
anticipating what you want and acting
appropriately to deliver what you need. This
mentality has led to a 90% repeat customer rate
across our region. We are a team of strong
technical builders and will continue to build upon
our reputation for delivering great results.
DPR Construction | Mid-Atlantic
YOUR LOCAL CONTRACTOR
DPR CORE MARKETS
• Advanced Technology
• Corporate Office
• Healthcare
• Higher Education
• Life Sciences
LOCAL OFFICE LOCATIONS
• Washington, DC
• Richmond, VA
• Baltimore, MD
Our mid-Atlantic region, supported by our nationwide
depth and experience, offers you the best of both worlds.
Nationally, we are equipped with vast resources and
historical best-in-class information to assist with anything
that should arise on your project.
Locally, our Mid-Atlantic region has talented builders that
live here, are entrenched in this market, and have built
long-standing relationships with the local subcontractors.
We have teams in place to execute on all project sizes
and types, successfully delivering jobs ranging from
$5,000 to more than $130 million.
Advanced Technology: Mission Critical
Speed to market, increased efficiency,
sustainability and reliability are all
elements of successful mission
critical facilities that demand a highly
specialized, experienced team.
Consistently ranked a top data center
builder in the nation, DPR Construction
brings seasoned in-house estimators, MEP
specialists, and program, design and
construction managers and engineers to
every job—providing a single point of
contact to help you meet and exceed the
needs and goals of your project.
www.dpr.com
QUALITY DELIVERY THE FIRST TIMEEach project is an interlocking sequence of events that must take place to ensure that facilities are ready to ramp up to full capacity immediately upon completion and continue to run without failure. DPR’s proven systematic approach begins with a deep understanding of your goals and developing a project-specific
procurement, start-up and commissioning, and close-out plan during preconstruction. Our building specialists are constantly looking ahead to identify and address potential issues early on to maximize construc-
tibility and expedite delivery.
Advanced Technology: Mission Critical
SERVICESDPR’s mission critical experts offer the leadership and experience needed to get the job done, while continuously finding ways to build smarter and deliver greater value with comprehensive services including:
• Site Selection and Analysis
• Peer Review
• Programming and Design Management
• Capacity Analysis
• Single Point-of-Failure Identification
• Future Additions and Infrastructure Upgrading
SELECTED CLIENTS365 MAIN | DIGITAL REALTY | E*TRADE | EMC | EQUINIX | FACEBOOK | FORTUNE DATA CENTERS | INTUIT | KAISER PERMANENTE | MICROSOFT | MORGAN STANLEY | UNIVERSITY OF TEXAS AT AUSTIN | YAHOO!
Advanced Technology
Confidential Leading Web Host Client DC10 Data Center TI, Phase 1 and 2 ASHBURN, VIRGINIA
Quick facts: $37 million
152,000 sq. ft.
10 months (Completed October 2012)
LEED-CI Silver
Architect: Herring & Trowbridge Architects; Randall-Paulson Architects
Advanced Technology
Confidential Leading Web Host Client DC11 Data Center, Phase 1 ASHBURN, VIRGINIA
Quick facts: $59 million
230,000 sq. ft.
14 months (Completed August 2013)
LEED-NC Gold
Architect: Sheehan Partners Architects
Morgan StanleyData Center, Phase ISOMERSET, NJ
Quick facts: $25 million
400,000 sq. ft.
7 months (Completed May 2010)
GMP contract
Self perform 15,000 manhoursof drywall, doors/frames and carpentry
Targeting LEED®-NC Silvercertification
Architect: Highland AssociatesEngineer: Thornton Tomasetti
Advanced Technology
Advanced Technology
Confidential Client Financial Institution Enterprise Data Center BARRIE, ON, CANADA
Quick facts: $141 million
180,000 sq. ft.
22 months (Completed October 2012)
LEED® NC-Platinum Certified
Architect: WZMH
Advanced Technology
CyrusOne, Inc. Data Center Conversion, Phase 1 CARROLLTON, TEXAS
Quick facts: $25 million
40,000 sq. ft.
8 months (Completed September 2012)
Critical Load: 2.5 MW
Architect: Corgan Associates
Advanced Technology
Facebook Prineville Data Center PRINEVILLE, OR
Quick facts: $327 million
684,592 sq. ft.
42 months (Completed June 2013)
LEED-NC Gold
Architect: Sheehan Partners; Engineer: Alfatech
Corporate Office
Whether working on a single-office
remodel or a large corporate campus,
we understand that every company needs
its own unique working environment.
To meet customers’ needs, DPR
Construction provides tailored design
development, cost analysis and scheduling
services to bring even the most demanding
projects to a close on time and within
budget. We pay attention to all the
little details and finishes to deliver the
highest quality product that meets and
exceeds customer expectations.
www.dpr.com
BUSINESS AS USUALDPR has proven success in building challenging and fast-paced corporate office projects that demand a high level of detail, finish and quality. Our expertise ranges from complete start to finish design-build construction of high profile corporate headquarters buildings to the build-out of architecturally demanding interiors in
occupied buildings with restricted operating environ-ments. Our intense attention-to-detail, vast experience and ability to work in occupied spaces ensure that all elements come together for optimal performance.
Corporate Office
EXPERTISEDPR’s national corporate office experience includes:
• Sustainability Projects
• Tenant Improvement
• Corporate Office
• Satellite Office
• Common Area
• Corporate Campus
• Security and Trading Floors
SELECTED CLIENTSAFLAC | AUTODESK, INC. | BANK OF AMERICA | BARCLAYS GLOBAL INVESTORS | CB RICHARD ELLIS | INTUIT | PACKARD FOUNDATION | PIXAR ANIMATION STUDIOS | TOYOTA | US GREEN BUILDING COUNCIL | VMWARE | WACHOVIA
Corporate Office
Confidential Client Digital Lab VIENNA, VIRGINIA
Quick facts: $2.6 million
24,000
4 months (Completed December 2013)
Architect: OTJ Architects
Corporate Office
Confidential Client Innovation Lab ARLINGTON, VA
Quick facts: $1 million
7,500 sq. ft.
3 months (Completed July 2012)
Architect: OTJ Architects
VMwareCorporate CampusPhases I and IIPALO ALTO, CA
Quick facts: $150 million
460,000 sq. ft.
23 months(Completed February 2009)
Architect: William McDonough+ Partners; Form 4 Architects
Corporate Office
Corporate Office
Visa InternationalVisa San Francisco Tenant ImprovementSAN FRANCISCO, CA
Quick facts: $9 million
45,000 sq. ft.
5 months (Completed November 2009)
GMP contract
Achieved LEED®-CI Silver certification
Architect: IA Interior Architects
DPR ConstructionRegional Office BuildingPHOENIX, AZ
Quick facts: $4.5 million
16,533 sq. ft.
4 months(Completed October 2011)
Targeting Net Zero energy
Targeting LEED®-NC Platinum
certification
Architect: SmithGroupJJR
Corporate Office
Corporate Office
DPR Construction San Francisco Regional Office SAN FRANCISCO, CALIFORNIA
Quick facts: $4.6 million
24,000 sq. ft.
5 months (Completed May 2014)
Pursuing LEED v4 Platinum certification
Targeting Net-Zero Energy Building certification
Design-build
Architect: FME Architecture + Design
Clif BarEmeryTech HeadquartersEMERYVILLE, CA
Quick facts: $8.6 million
115,000 sq. ft.
6 months(Completed September 2010)
Targeting LEED®-CI Platinum
certification
Architect: Zimmer GunsulFrasca Partnership
Corporate Office
AutodeskOne Market Office and Customer Briefing CenterSAN FRANCISCO, CA
Quick facts: $9 million
45,000 sq. ft.
5.5 months(Completed July 2008)
Achieved LEED®-CI Platinum certification
Integrated Project Delivery approach
Architects: HOK Anderson Anderson Architecture; McCall Design Group
Corporate Office
Healthcare
In the complex world of healthcare
construction, it is the fundamentals
that drive successful project delivery:
experience, teamwork, communication
and genuine care.
Ranked one of the nation’s top healthcare builders,
DPR Construction has successfully delivered
more than 1,400 healthcare projects, ranging
from miscellaneous JCAHO repairs and MEP
upgrades to new medical centers. Our proven
teams understand the unique requirements
and application of the intricate systems that
are the lifeline of healthcare facilities.
www.dpr.com
SELECTED CLIENTSBANNER HEALTH | CITY OF HOPE | DIGNITY HEALTH| HCA | KAISER PERMANENTE | SCOTT & WHITE |STANFORD UNIVERSITY MEDICAL CENTER | SUTTER HEALTH | UCSF MEDICAL CENTER | VANGUARD HEALTH SYSTEMS
EXPERTISEDPR’s diverse national healthcare experience includes:
• Acute-Care Hospitals
• Academic Medical Centers
• Medical Office Buildings
• Medical Research Facilities
• Specialty Hospitals
• Cancer Centers
• Heart Centers
• Women’s and Children’s Centers
• Ambulatory Surgery
• Assisted Living
• Data Centers
Healthcare
INTEGRATED TEAMSDPR combines a deep knowledge of healthcare construction with a highly integrated approach that leverages the experience and abilities of all team members to lower costs, enhance quality and improve schedule. We take Virtual Design and Construction and Building Information Modeling (BIM) a step further than
most other general contractors, including model-based estimating for rapid cost feedback, multi-trade tracking, and BIM-based supply chain management. Based on your specific project goals and objectives, we incorporate the latest tools and technologies to provide greater predictability.
Healthcare
Kaiser Foundation Hospitals Largo Medical Center LARGO, MD
Quick facts: $53 million
144,000 sq. ft.
34 months (Completed June 2014)
Architect: AECOM
Kaiser PermanenteCapitol Hill Medical CenterWASHINGTON, DC
Quick facts: $40.8 million
177,000 sq. ft.
10 months(Completed December 2010)
GMP
Green Guide for Healthcare
Architect: HawleyPeterson Snyder
Healthcare
Healthcare
UVA Medical Center Hospital Renovations CHARLOTTESVILLE, VIRGINIA
Quick facts: $35 million
60,000 sq. ft.
22 months (Completed August 2011)
LEED-CI Silver
Architect: Perkins Eastman & HKS Architects, Inc.
Healthcare
Universal Health Services Temecula Hospital Campus TEMECULA, CALIFORNIA
Quick facts: $152 million
177,508 sq. ft.
38 months (Completed July 2013)
Integrated Project Delivery
Lean Principles
OSHPD
Architect: HMC Architects
UCSF Medical CenterUCSF Medical Center at Mission BaySAN FRANCISCO, CA
Quick facts: $1.5 billion
878,000 sq. ft.
44 months (Scheduled for completion in August 2014)
GMP contract
Targeting LEED®-NC Gold certification
Architect: Anshen+Allen, part of Stantec Architecture
Healthcare
Healthcare
Lucile Packard Children's Hospital Hospital Expansion PALO ALTO, CALIFORNIA
Quick facts: $510 million
521,000 sq. ft.
56 months (Completed February 2017)
OSHPD
Targeting LEED® Gold certification
Architect: HGA / Perkins + Will
Healthcare
Inova Health Care Services Ashburn Healthplex ASHBURN, VIRGINIA
Quick facts: $15.9 million
50,000 sq. ft.
14 months (Completed September 2015)
Architect: HOK & Architecture, Inc.
Healthcare
Palomar Health Palomar Medical Center ESCONDIDO, CA
Quick facts: $642 million
740,000 sq. ft.
45 months (Completed April 2012)
Hybrid IPD
Architect: CO Architects
Healthcare
Sutter Health Eden Medical Center CASTRO VALLEY, CALIFORNIA
Quick facts: $320 million
220,000 sq. ft.
36 months (Completed June 2013)
Integrated Project Delivery contract
LEED Silver Certified
Architect: Devenney Group Ltd.
Healthcare
Kaiser Foundation Hospitals, Inc. Tysons Corner Medical Center MCLEAN, VIRGINIA
Quick facts: $77 million
241,175 sq. ft.
16 months (Completed August 2012)
Architect: Stantec, Inc.
Banner HealthBanner MD AndersonCancer CenterGILBERT, AZ
Quick facts: $56 million
133,000 sq. ft.
19 months (Completed June 2011)
GMP
180,000 self perform hours
Architect: Cannon Design
Healthcare
Higher Education
www.dpr.com
Drawing upon DPR Construction’s
broad-based technical expertise, we
provide the best methods and systems
for efficiently completing projects
of all sizes and complexities.
How facilities are designed and built can
have a major impact. Using approaches
such as design-build, CM-at-risk and
integrated project delivery, combined with
the latest technology, DPR works to build
collaborative environments and offer greater
predictability in the development of world-
class facilities for leading institutions.
Higher Education
EXPERTISEDPR’s national higher education experience includes:
• Research and Science Laboratories
• Teaching Hospitals
• Mission Critical Infrastructure
• Academic and Lecture Facilities
• Engineering Buildings
SELECTED CLIENTSARIZONA STATE UNIVERSITY | CLEMSON UNIVERSITY | FLORIDA INTERNATIONAL UNIVERSITY | MARYMOUNT COLLEGE | SOUTHERN POLYTECHNIC STATE UNIVERSITY | STANFORD UNIVERSITY | UNIVERSITY OF TEXAS | UNIVERSITY OF CALIFORNIA
A HIGHER DEGREE OF SERVICE AND QUALITYCollaborative teaming greatly reduces misunderstand-ings, errors and omissions that can lead to costly changes and delays. Accustomed to working in occupied spaces—from corporate campuses to R&D laboratories and healthcare facilities—we also take proactive
measures to create safe environments for faculty, staff and students and to ensure that the educational process continues without disruption, even within the most aggressive timeframes.
University of Virginia FoundationSheridan G. Snyder Translational Research BuildingCHARLOTTESVILLE, VA
Quick facts: $38 million
85,000 sq. ft.
22 months(Completed February 2008)
Completed under budget, ahead of schedule and with Zero Defects
350,000 manhours without a lost-time incident
Architect: Perkins+Will
Higher Education
Higher EducationUniversity of Virginia Old Jordan Hall Mechanical Renovation CHARLOTTESVILLE, VIRGINIA
Quick facts: $27 million
260,000 sq. ft.
27 months (Completed December 2012)
Completed ahead of schedule
BIM including 4D scheduling
Architect: RMF Engineering, Inc.
Higher Education
Florida InternationalUniversityScience Classroom ComplexMIAMI, FL
Quick facts: $43.5 million
137,000 sq. ft.
17 months (Scheduled for completionin February 2013)
Targeting LEED®-NC Gold certification
Architect: Perkins+Will
Higher Education
Arizona Board of RegentsArizona State University Polytechnic Academic ComplexMESA, AZ
Quick facts: $77.9 million
17 months (Completed June 2008)
CMAR
LEED®-NC Gold certification
Architect: RSP Architects, LTD and Lake | Flato Architects
Higher Education
Clemson UniversityLife Sciences BuildingCLEMSON, SC
Quick facts: $40 million
100,000 sq. ft.
20 months (Scheduled for completion in October 2012)
Targeting LEED®-NC Silver certification
Architect: Perkins+Will
Life Sciences: Research and Development
www.dpr.com
There’s a reason why the nation’s
top five biotechnology and top
five pharmaceutical companies
work with DPR. The bottom line
is we get the job done.
From quick-hitting laboratory renovations
and upgrades to multi-million-dollar
biocontainment and manufacturing
facilities and everything in between, DPR
Construction’s unique range of expertise
provides customers with a seasoned driver to
plan, coordinate, build and validate projects
of all sizes and complexities.
EXPERTISEDPR has completed a wide range of projects for pharmaceutical, biotech, institutional, research and biofuel customers, totaling more than $4.2 billion, including:
• R&D Laboratories
• Biocontainment Laboratories
• Pilot Plants
• cGMP Manufacturing
• cGMP Sterile Filling
• cGMP Packing and Support
• Solid Dose Manufacturing
• Institutional Laboratories
• Data Centers
SELECTED CLIENTSABBOTT LABORATORIES | CHIRON CORPORATION | CITY OF HOPE | EDWARDS LIFESCIENCES CORPORATION | GENENTECH, INC. | NATIONAL INSTITUTES OF HEALTH | THE SCRIPPS RESEARCH INSTITUTE | UNITED THERAPEUTICS | U.S. PHARMACOPEIA
BUILDING GREAT THINGS FOR LIFEAfter achieving Zero Defects on a $3 million laboratory build-out, DPR led a final walk through with end users. With three days until move-in, the scientists requested additional utility and exhaust drops—work that would require piping regulators with a standard six-week lead time. The solution? DPR located the necessary
regulators in existing unused laboratories on campus and, working 12 hours a day for three days, met the scientists’ needs without delaying move-in. Regardless of size and scope, DPR has the experience and ability to meet your unique project needs—helping you build great things for life.
Life Sciences: Research and Development
U.S. PharmacopeiaHeadquarters ConsolidationROCKVILLE, MD
Quick facts: $68 million
320,000 sq. ft.
25 months(Completed July 2007)
Self performed drywall
2008 Washington Building Congress Craftsmanship Award
Mid-Atlantic Construction Magazine Best of 2007 Award of Merit – Institutional Projects
Architect: HOK
Life Science
Life Sciences
United Therapeutics Phase 2B Headquarters SILVER SPRING, MARYLAND
Quick facts: $56 million
108,000 sq. ft.
18 months (Completed March 2012)
LEED-NC Gold
Architect: Ewing Cole
United TherapeuticsSolid Dose Manufacturing FacilityRESEARCH TRIANGLE PARK, NC
Quick facts: $83 million
203,000 sq. ft.
22.5 months (Completed January 2009)
187,500 Self Perform hours
Architect: O’Neal, Inc.
Life Sciences
Max PlanckFlorida InstituteResearch FacilityJUPITER, FL
Quick facts: $48 million
101,000 sq. ft.
20 months (Completed April 2012)
Targeting LEED®-NC Gold
certification
Architect: Zimmer Gunsul Frasca
Life Science
Life Sciences
Scripps FloridaResearch CampusJUPITER, FL
Quick facts: $160 million
352,000 sq. ft.
22 months (Completed November 2008)
GMP with Fixed GC contract
Architects: Bohlin Cywinski Jackson; Zeidler Partnership Ltd.
Arizona Board of RegentsThe Biodesign Institute at Arizona State University, Building ATEMPE, AZ
Quick facts: $53 million
172,000 sq. ft.
23 months (Completed November 2004)
AAALAC Accredited Facility
CMAR
LEED®-NC Gold certification
Architect: Gould Evans Associates and Lord, Aeck & Sargent Architecture
Life Science
Arizona Board of RegentsThe Biodesign Institute at Arizona State University, Building BTEMPE, AZ
Quick facts: $56 million
175,000 sq. ft.
21 months (Completed November 2005)
AAALAC Accredited Facility
CMAR
LEED®-NC Platinum certification
Architect: Gould Evans Associates and Lord, Aeck & Sargent Architecture
Life Science
Life Sciences
Appian Realty AdvisorsDepartment of Forensic Science and Office of the Chief Medical ExaminerMANASSAS, VA
Quick facts: $49.5 million
106,000 sq. ft.
20 months (Completed April 2009)
Lump Sum contract
Achieved LEED®-NC Silver certification
Architect: McKinney & Company
Life Sciences
Covance Laboratories, Inc.Research and Development CenterCHANDLER, AZ
Quick facts: $122 million
288,000 sq. ft.
19 months (Completed January 2009)
Architect: Reynolds, Smith & Hills, Inc.
Life Sciences
University of California, San FranciscoRegeneration Medicine BuildingSAN FRANCISCO, CA
Quick facts: $123 million
68,500 sq. ft.
24 months (Completed September 2010)
Design-Build Lump Sum contract
Targeting LEED®-NC Gold certification
Architects: Rafael Viñoly Architects; SmithGroup
top related