District Support Operations Building 2222 Alamo St. Planned Occupancy: Nov./Dec. 2018

One DSO Building – Over 500 Employees

• All DSO Employees • Except for those managing regional and other centers; or performing student services at

college locations • 537 current employees plus flex space for growth

• RFP being issued to surplus existing buildings • University Center • Sheridan St. • Houston St. • Various Pat Booker properties

• 300 person Conference Ctr/Board Room and numerous collaboration areas • New Food Service, Wellness Center, UPS Store

DSO Teams • Chancellor, Ethics, Legal, Internal Audit, Institutional Advancement • Vice Chancellor Teams:

• Academic Success (VCAS) - including new Online team • Student Success (VCSS) • Planning, Perf., and Info. Tech. (VCPPIS) – including IT Data Center • Economic & Workforce Dev. (VCEWD) • Finance & Administration (VCFA)

• Department of Public Safety (DPS) – including Dispatch Center • Facilities • Human Resources & Organizational Dev (HR/OD) and Risk Management • Finance & Fiscal Services (FFS) and Purchasing • Student Financial Aid (SFA) • Project Facilitation • Student Call Center

Timeline

• Board approved Building Schematic Design • Validated Employee counts with VCs • Prepared Interior Design/Dept. placement • VC employee workspace assignment layouts • Furniture options reviewed and finalized • Ongoing Communications Plan • Surplus current properties/negotiate vacating

date to match move in to DSO Building • Planned Move-in

• Nov. 2016 • Summer 2017 • Spr/Sum 2017 • Spring 2018 • Spring 2018 • Ongoing • Spring/Fall ‘18

• Nov/Dec 2018

SITE PLAN

A

B C

D

E

MAIN ENTRY FROM NORTH ALAMO STREET

MAIN ENTRY AT LOBBY & CAFE

N

VIEW OF AMPHITHEATRE FROM 2ND FLOOR

VIEW SOUTH FROM 3RD FLOOR

CAMPUS AT NIGHT LOOKING NORTH

WEST ELEVATION

SOUTH BUILDING AT NIGHT

ENTRY TO PARKING OFF JOSEPHINE ST.

1st FLOOR OVERALL

1st FLOOR NORTH HALF

1st FLOOR SOUTH HALF

2nd FLOOR OVERALL

2nd FLOOR NORTH HALF

2nd FLOOR SOUTH HALF

3rd FLOOR OVERALL

3rd FLOOR NORTH HALF

3rd FLOOR SOUTH HALF

top related