dewind one-pass trenching - records collections · 2020. 12. 2. · dewind cutoff walls are in-situ...

Post on 01-Jan-2021

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

(617) 918‐1243   

                              

                                

         

          

               

                             

From: Owens, James T. Sent: Tuesday, December 09, 2014 9:56 AM To: Newton, David; Olson, Bryan Subject: FW: James‐ Remedy Review: Peterson/Puritan, Inc. Superfund Site: Hydraulic Barrier Walls by DeWind‐ Deep Trenching, No Open Excavation

Please respond on my behalf

Sent from my Windows Phone

From: Lis Smith Sent: 12/9/2014 9:20 AM To: Owens, James T. Subject: James‐ Remedy Review: Peterson/Puritan, Inc. Superfund Site: Hydraulic Barrier Walls by DeWind‐ Deep Trenching, No Open Excavation

Good Morning James,

I saw you listed as a contact for the Remedy Review: Peterson/Puritan, Inc. Superfund Site (hydraulic barriers). I thought you might want to be aware of DeWind. Below is some information for future reference: Feel free to share my message.

DeWind One-Pass Trenching specializes in the installation of groundwater collection, containment and remedial systems using our custom built Deep One-Pass Trenchers (in-situ mixed soil-bentonite/cement-bentonite walls, prb walls, groundwater/product recovery trenches...) all installations are completed in a single pass, no open excavation. We are based in West Michigan but work all over North America (over 25 years in business).

These one-of-a-kind trenching machines are not for sale.

2

����� �� ��������� �������� �������������� �� ����� ������� ��������

���� ��������� �� ���������������������� ��� � ����� ����

������� �������� ����

����������� � ����������

���������� ����������� �������� ����

������� �������� ��������������������������

��������� � � ������� ��� ����������

������ ��� ������� �������������� � �������� ��� ��������� �����

��������� ���������

DeWind Cutoff Walls are In-Situ mixed: Homogenized Top to Bottom

Soil Bentonite / Cement Bentonite Walls Up to 85 feet deep

INSTALLATION RATE OF: 300 - 500 Linear feet per day!

Lis Smith DeWind One-Pass Trenching 9150 - 96th Ave. Zeeland, MI 49464 P: (616) 875-7580 F: (616) 875-7334 www.dewindonepasstrenching.com Skype: lis.smith1521

www.linkedin.com/pub/lis-smith/1a/577/955

file:///C|/Users/cmarti04/AppData/Local/Microsoft/Windows/Temporary Internet Files/Content.Outlook/MJNY49PM/ATT00001.htm[12/16/2014 11:20:02 AM]

• With our trenching process, multi-step installations are condensed into a single-pass operation •

Depth Capabilities:

- In-situ mixed soil-bentonite/soil-cement-bentonite cutoff walls up to 80/85 feet deep

- Groundwater/product recovery trenches up to 40/45 feet deep

- PRB walls up to 40/45 feet deep

* Installation Rate: Hundreds of Feet Per Day *

Animated Videos: • Soil-Bentonite & Cement Bentonite Cutoff Walls: www.koibeach.com/Dewind_slurry

• Groundwater Collection/Product Recovery Trench: www.koibeach.com/Dewind

file:///C|/Users/cmarti04/AppData/Local/Microsoft/Windows/Temporary Internet Files/Content.Outlook/MJNY49PM/ATT00002.htm[12/16/2014 11:19:26 AM]

Nice Mix / Tight Site / In-Situ Mixed Soil Bentonite Wall:

file:///C|/Users/cmarti04/AppData/Local/Microsoft/Windows/Temporary Internet Files/Content.Outlook/MJNY49PM/ATT00003.htm[12/16/2014 11:21:28 AM]

NATIVE FILE TARGET SHEET US EPA New England

Superfund Document Management System

To view the attached files, open the “Attachment Panel” by clicking on the paper clip icon in the left side panel of this window.

File Type(s) attached:Example: .jpg, .xls

.TIFF, .JPG, .GIF

Description or Comments:

Please Note: To view attachments the software corresponding with the specified file type is necessary.

For any additional assistance please contact the EPA New England Office of Site Remediation and Restoration Records and Information Center

617-918-1440

CMARTI04
Typewritten Text
CMARTI04
Typewritten Text

top related