Designing an Ethylene Plant Control Roomand
Operator User Interface Using Best Practices
J. ErringtonNOVA Chemicals Inc.
I. NimmoUser Centered Design Services
Prepared for presentation at 2001 Annual Meeting, Houston, Texas.
Copyright Jamie Errington, NOVA Chemicals Corp, Joffre, AB and Ian Nimmo, User Centered Design Services
78F
2 01/03/20Copyright
Acknowledgements The authors wish to acknowledge the support of:
– Tim DeMaere - NOVA Chemicals Inc.
– Peter Bullemer - Honeywell Technology Center
3 01/03/20Copyright
Objective & Outline Objective:
– Outline the design process and results of NOVA Chemicals’ E3 Manufacturing Building and User Interface
Presentation Outline– Background
– Overview of ASM (Abnormal Situation Management) and Best Practices
– E3 Manufacturing Center• Building Location
• Building Design
– E3 User Interface
4 01/03/20Copyright
Background Ethylene 3
– 2.8 Blbs/y - ethane cracker
– project kick-off 1997
– mid-2000 startup
– located in Joffre Alberta, Canada
– joint venture between NOVA Chemicals and Union Carbide
Designing for Abnormal Situation Management– AIChE paper presented in 1998 at New Orleans
– Described how NOVA Chemicals was applying ASM Best Practices information to the design of new facilities
5 01/03/20Copyright
Joffre Opportunity in 1998 Concurrently Building New Facilities
– Utilities Plant Expansion
– Ethylene 3
– Polyethylene 2 Training Simulators
– E3
– PE2 Exposure to ASM - AEGIS Prototype Management Support of ASM program
6 01/03/20Copyright
ASM - Abnormal Situation Management Consortium of companies and university affiliates:
– NOVA Chemicals, Exxon/Mobil, BP/Amoco, Shell, Chevron, Texaco, Celanese, Union Carbide, Phillips
– Honeywell (IAC, HTC)
– BAW
– Purdue, Ohio State, University of Toronto NOVA Chemicals joined in 1994
7 01/03/20Copyright
Goals of the ASM Consortium Reduce preventable process upsets by 90% Understand the problem
– Site Surveys Develop better methods for aiding operators during process
disruptions– AEGIS prototype
Improve other Supporting Systems– Collateral Studies
– Other technology Deliverables
Not by Technology alone!
8 01/03/20Copyright
ASM Best Practices Compiled from extensive site reviews across a wide spectrum
including:– Training
– Procedures
– Tracking and Reporting
– Communication Systems
– Work Context and Environment
9 01/03/20Copyright
Control Centre Location Goal
– “to build a control center that will enhance the human performance in and around the control room”
Location Design Process– literature survey
– multi-discipline team examined alternative locations
– evaluated on cost, impact on people, safety implications, business issues Review Solutions
– remote - centralized control building - multiple plants
– centralized control building within battery limits
– individualized distributed control buildings Selection
– individual distributed control buildings Driving forces
– communications within unit
– higher personnel safety
10 01/03/20Copyright
Manufacturing Building Goal
– to enhance how the manufacturing team (Operations, Maintenance and Technical) control system works together in and around the control system
Building Design Process– Created design vision for the building
– Interviewed primary users at adjacent Joffre units for needs and requirements
– Iterative process to refine key elements and share vision Key components
– control room was the center of focus
– communication patterns in the control room and the building
– determined adjacency matrix• prioritized the layout and size of rooms
• task segregation (permitting, meetings, etc.)
• traffic flow patterns
– control console layout
12 01/03/20Copyright
User Interface The goal of the User Interface Design is to improve operator access to
information thereby improving plant performance. Principal design aspects which have been considered in the design
were:– Navigation
– Visual Coding
– Alarm Information• live alarms
• AOA design information
– Control Information• cascades
• critical / redundant instrumentation
– Trend Information
– On-line Documentation
13 01/03/20Copyright
User Interface
Level 3
SP
TagName
Status ViewAlarmSummary
Level 1
PV
OP
Level 2
Level 4
Operations View
14 01/03/20Copyright
User Interface Status View
– Level 1 - Area Overview
– Alarm Summary Operations View
– Level 2 - Unit Summary
– Level 3 - Sub-unit
– Level 4 - Group Displays
17 01/03/20Copyright
Task- and System-based model integration Research Project
– University of Toronto / Honeywell/ NOVA and ASM Consortium Task Modelling
– focus on the user’s tasks, plans and goals System Modelling
– functional structure of the plant or system
– captures the physical and chemical principles