where Design has a new Dimension
Designer Shades
Have they not observed all things that Allah hath created, how their shadows incline to the right and to the left, making prostration unto Allah, and they are lowly? Surat An-Naĥl (The Bee) , Ayah 48
Ramcon is a contracting and engineering resource entity.
Registered with Pakistan Engineering Council in Category C-3.
We have prequalification with various department such as NHA, CDA, CWO, SCO, PCB
in civil work categories. We are also providing services in a few defense related
authorities.
We are pioneers in Tensile Fabric Structures in Pakistan. First
designed built membrane structure built in F-9 Park was a
mosque followed by other projects.
We are supported by:
Ramcon is a quality conscious organization and we believe
in quality products & on time job accomplishment.
Mehler
Tex-nologies Germany Covertex China Gale Pacific
Australia
Registration With The Income Tax Registration With
Pakistan Engineering Council
EXECUTED PROJECTS
MOSQUE Structure ,F-9 Park
Project: Prayer Space 1400 sq ft.
Material: Mehler, Typ3, Mehatop F.
Supported Fabrication : Covertex China.
Design Concept: The canopy top is angled
towards QIBLAH depicting the holy perception of
a prayer space & providing shade with respect
to the solar study.
Execution Phase
Client: Tollink Pakistan
Project: CDA IJP Toll Plaza
The 3500 square feet toll
plaza welcomes thousands of
people entering into the city.
IJP Toll Plaza
Toll Plaza Rawat
Client: Tollink Pakistan
Client: Capital Development Authority Islamabad
Material: Mehler, Typ3, Mehatop F
Fabrication Support: Covertex China
Location: Rawal Lake Promenade
Mosque ,Promenade
Ring Road Project
Ring Road Project, Rawal Pindi
LMKR Project, Shade Structure for Swimming Pool
Client:
CDA Islamabad
Project:
Food Court.
Material: Mehler, Type3,
Mehatop F
Fabrication Support:
Covertex China
Location:
Rawal Lake Promenade
Food Court, Promenade, Rawal lake
Installation of the
Structure
Final Form
CARPORTS
Residential Carport in Westridge Rawalpindi
Structure for Dr. Aslam’s Residence ,Rawalpindi
NPL (Nishaat Power Limited) , Lahore Consultants : SRDW
NPL (Nishaat Power Limited) , Lahore Consultants : SRDW
Foreign Office, Islamabad
Entrance Khyber Teaching Hospital,(Khyber Medical College) , Khyber Pakhtoonkhwa
Swimming Pool, Jacaranda Club, DHA Islamabad
Façade Elevation
Side Pool Covers
Juice Bar at Jacaranda Club
Façade Elevation
Execution
Fijji’s Grill , Entrance Shade Structure, Blue Area
Nadia Textile, Lahore
Installation Phase
Nespak Era Shade Structure for Walkways, Islamabad
Beacon House Entrance & Car Park Shade, Lahore
Umbrellas for Gloria Jeans
FWO Car Parking
CWE , Muzaffarabad ,Azad Kashmir
Consultant : Nespak Era
Client: CWE (China Water & Electrical Works)
PROPOSED PROJECTS
New Airport Car parking
Proposed Prayer Space at Rawat Toll Plaza,
Islamabad
Ashiana Restaurant, Shakarparian, Islamabad
Islamabad Airport Shade Structures
Ashiana Restaurant, Shakarparian, Islamabad
Swimming Pool , ACES
Marriage Halls
Bar b que Area, Grand Hayyat Hotel, Near Convention Centre
Proposed Motorized Retractable Shade for Ashra Mobashara Mosque Rawalpindi
Proposed Pedestrian Bridge for NHA M2
Mess GIK I NSTITUTE, Project Dugout
Proposed Prayer Space at Rawat Toll Plaza,
Islamabad
Proposed Prayer Space at Rawat Toll Plaza,
Islamabad
DGKC Entry Gates
Proposed Prayer Space at Rawat Toll Plaza,
Islamabad
Shade Structure for Cafeteria on the Landscape Company’s Office, KARACHI
Proposed Prayer Space at Rawat Toll Plaza,
Islamabad
Shade Structure on Courtyard, Girls College , Jhelum
Proposed Structure for Marquee for TOPI RAKH in Ayub Park , Rawalpindi
Service Procedure
we
Follow
Client Name:
Consultant: Ali Umar
Our Rep: Imtiaz Ahmed
' 12 2012
8/1 2012
8/20 9/8 9/27 10/16 11/4 11/23 ' 12
Handover 9/12/12
Checking QC Approval 2/12/12
Installation 10/10/12
Site Logistics 5/10/12
Fabrication 25/8/12
Procurement 5/8/12
Design 1/8/12
Handover 9/12/12 - 11/12/12
Checking QC Approval 2/12/12 - 5/12/12
Construction 10/10/12 - 1/12/12
Site Logistics/ Delivery to site 5/10/12 - 9/10/12
Purchase of Steel/ Fabrication 25/8/12 - 11/9/12
Order Fabrics from abroad + store 5/8/12 - 3/10/12
Design Review + Working Drawings 1/8/12 - 20/8/12
Mob Date: 08/01/2012
Expected date of Completion:
12/09/2012
TIMELINE FOR CLIENT
SOLAR STUDY
SITE ANALYSIS
GRAPHICAL PRESENTATIONS
Sun
Wind
Views
FABRICATION PHASE (Workshop)
EXECUTION PHASE (Site)