Prepared by A.G. Coombs Projects Pty Ltd (A member of the A.G. Coombs Group of Companies)

Thursday, 2nd August 2012

Design to Fabrication Workflow

BIM MEP AUS workflow and add-in software

– Improve productivity

– Target zero re-work

Introduce new skills to existing drafting team

9 Networked Design Suite Ultimate (July 2012)

22 CADmep licences nationally

Implementation Plan

“........The single most devastating consequence of modernism has been the embrace of a process that segregates designers from makers.”

Design Shop

Drawing

Utilise and leverage the Design models

Create a constructible Revit Model using BIM MEPAus

Fully coordinate and construct in the Virtual world

Leverage the model for BIM-to-Field

Construction sequencing (4D)

Estimating & Procurement

Objectives

Phase 1 – Design into Constructible Revit

Consultants BIM MEPAus model

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Consultants BIM MEPAus model

Clash detection – First pass

Phase 1 – Design into Constructible Revit

Navisworks Manage

Fire

Mechanical

Electrical Hydraulic

Architectural

Structural

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Consultants BIM MEPAus model

Clash detection – First pass

Engineering / Coordination / Safety in design

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Consultants BIM MEPAus model

Clash detection – First pass

Engineering / Coordination / Safety in design

Report design changes

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Consultants BIM MEPAus model

Clash detection – First pass

Engineering / Coordination / Safety in design

Report design changes

Clash detection – Second pass

Phase 1 – Design into Constructible Revit

Phase 1 – Design into Constructible Revit

Consultants BIM MEPAus model

Clash detection – First pass

Engineering / Coordination / Safety in design

Report design changes

Clash detection – Second pass

Constructible Revit model

Export from Revit

Import into FABmep

Apply A.G. Coombs duct & pipe specifications

Substitute design content for manufactures

Add hangers

Save as .maj

Phase 2 - Conversion

Phase 2 – Exporting

Final clash detection - hangers

Phase 3 – Construction / Fabrication

Phase 3 – Construction / Fabrication

Final clash detection - hangers

Export hanger points for positioning pre-cast hangers on top deck

Phase 3 – Construction / Fabrication

Phase 3 – Construction / Fabrication

Phase 3 – Construction / Fabrication

Final clash detection - hangers

Export hanger points for positioning pre-cast hangers on top deck

Detail drawings

Phase 3 – Construction / Fabrication

Phase 3 – Construction / Fabrication

Final clash detection - hangers

Export hanger points for positioning pre-cast hangers on top deck

Detail drawings

Issue drawings and coordinated fabrication model

Construction sequencing (4D)

Phase 3 – Construction / Fabrication

Phase 3 – Construction / Fabrication

Final clash detection - hangers

Export hanger points for positioning pre-cast hangers on top deck

Detail drawings

Issue drawings and coordinated fabrication model

Construction sequencing (4D)

Procurement

Phase 3 – Construction / Fabrication

Proven the workflow

Project needs to commit to full BIM, not partial or lonely BIM

BIM MEPAus standards and Add-in enable the workflow benefits

Manufacturer’s content is key

Real leveraging of BIM goes well beyond clash coordination

BIM execution plans are the key

Model management/ distribution is critical

Much more knowledgeable

6-9 month implementation / perseverance

Lessons Learnt

BIM deliverable to the project construction team – preferably using BMA Add-in

BIM Execution Plan for collaborative development of the Design Model through to Constructible Model

Support manufacturer’s content development

Establishment of Robotic Layout System

Programme needs to be adjusted to suit the BIM based workflow and BIM to Field

Communicate & understand