REGULATORY NFORMATION DISTRIBUTION SY 'TEM (RIDS)
'~ ACCESSION NBR: 8003110662 DOC ~ DATE: 80/01/29 NOTARIZED! NO DOCKETFACIL:50 250 Turkey Point Planti Unit 3E Florjda Power and fight C 05000250
50-251 Turkey Point PlantE Unit QE Florida Power andWight C 05000251AUTHRNAME AUTHOR AFFILIATION
ONCAVAGEEM~ P, OncavageEMarkRECIP ~ NAME RECIPIENT AFFILIATION
EISENHUTED ~ G ~ Division of Operating Reactor s
SUBJECT: Comments on documents reviewed indicating steam generatorsto be in advanced stage of degradation. Recently completedjnsp 8 maint program produced discovery of metal ft'agmentsin Generators 3B 8 3C.Requests NRC hearing in Miami,
DISTRIBUTION CODE: AQQIS COPIES RECEIVED:LTR, L ENCL A SIZE:TITLE: General Distribution for after Issuance of Operating Lic
O'9 ~OTESQ
RECIPIENTID CODE/NAME
ACTIONS 05 BC gg (INTERNAL 1 REG
17 ENGR BR19 PLANT SYS BR21 EFLT TRT SYSOELD
EXTERNAL! 03 LPDRACRS
COPIESL'TTR ENCL
1
21
1
1
1
1
16 1
RECIPIENTID CODE/NAME
02 NRC PDR15 CORE PERF BR18 REAC SFTY BR20 EEBEPB DORSTS GROUP LEAOR
04 NSIC
COPIESLTTR ENCL
TOTAL NUMBER OF COPIES REQUIRED: LTTR 38 ENCL
n i m
h,
'. ~59 FLORIDIANS UNITED for SAFE ENERGYFebruary 29, 1980
OFFICERSJerry Stews, Ph.D.Presrdent
Norms E, Wsllins, Ph 0.Vice President
Tturmrs W. 8 rot tSecretory Tressurer
Aicherd A, Merstrerl, Jr.Generel Counsel
Mr. Darrell G- EisenhutActing DirectorDivision of Operating ReactorsU. S. Nuclear Regulatory CommissionWashington, D. C. '0555
CITIZENRNTERVENER
Dear Kr. Eisenhut:
Recently, a letter addressed to you, from Dr. Robert E.
Uhrig of'lorida Power and Light Co., dated January 23, 1980
was filed in the local PDR.
Dr. Uhrig justifies his request f'r an extension of time
between steam generator inspections basically on economic
grounds with rather tenuous safety arguments presented.. As the intervenor in the matter of'urkey Point Steam.
generator Repairs, the documents I have reviewed, the Steam
Generator ~Re air ~Re ort, the ~Safet Evaluation, and the~ 'l~Iu~l'u t th t 1 tto be in an advanced stage of degradation. The EIA estimates
that Unit No. 4 will be derated in the Fall of 1980 due tothe lack of adequate heat transfer area. Xt f'urther statesthat Unit No. 3 may be derated in the Fall of 1981 for the
same reasons.
Table 4.2 in the EIA indicates that in 1976, radioactivenoble gases released f'rom Turkey Point were 213 5 higherthan PES estimates and the 1977 noble gas release was 328 gf
hidher than the estimate. As the tube degradation increases, IICOI
%j=-<~ re
8 oo»~o ~P.O. Box 161018, Miami, Florida 33116 / 305.667-1227
~ 1 l
i
0
~ ~
I feel that the steam generators should come under greaterscrutiny rather than lesser.
Additionally, the recently completed inspection and
maintenence program on Unit No. 3 has produced the startlingdiscovery of shattered metal fragments found in steam
generators 3B'nd 3C.
The preventative tube plugging program instituted by the
NRC may be the only means by which a severe incident isforestalled.
I am interested to know what criteria are used in grantingor denying such requests as made by Dr. Uhrig. I would
appreciate: the opportunity to address these issues at an
NRC Staff hearing in Miami or if an amendment to the Operating
License is at issue, I would like this letter to serve as a
"PETITION FOR IZ<AVZ TO INTERVENE"
Very trul yours,
Mark P. Oncavage
cc: Steven Goldberg, Esq.NRC Staff Counsel
'te 4 ~ ~
1
'I
P
,,4 e*, +
V
UNITED STATESNUCLEAR REGULATORY COMMISSION
WASHINGTON, O.C. 20555
January 18, 1980
'ISTRIBUTIONDocket File 50-25 /251CSParrishORBl ReadingMGrotenhuis
Docket No. 50-25050»251
SEE ATTACHED LIST
Subject: FLORIDA POllER AND LIGHT COMPANY
(Turkey Point Plant, Unit Nos. 3 and 4)
The following documents concerning our review of the subject facilityare transmitted for your information:
Cl Notice of Receipt of Application.
Draft/Final. Environmental Statement, dated
Safety Evaluation, or Supplement No. ~ dated
Notice of Hearing on Application for Construction Permit.
Notice of Consideration, of Issuance of Facility Operating License.
Application and Safety Analysis Report. Vol.
Amendment No. to Application/SAR, dated
Construction Permit No. CPPR-
Facility Operating License No. DPR-
dated
, NPF- , dated
Amendment No. to CPPR- or DRR- . dated
X Other: c ber 26 1979 Order Relatin to Licensee's t<otion
for Extension of Time
merce o5ucIear keacror%gufakfon
Enclosures:As stated
CC:
OFFICE iSURNAME i
oATE
NRC 21 (6 761
DOR:ORB1
CSParrish:jb01/18/80
rh 4
S'
Jf
I'p'h f'
s'I
~''
II
C,) 8 'I
IL
sl"U
II
astati~lk I ~ 5
'Florida Power and Light Company
CC: Honorable Dewey KnightCounty Manager of Metropolitan
Dade CountyMiami, Florida 33130
Bureau of Intergovernmental Relations660 Apalachee ParkwayTallahassee, Florida 32304
Mr. Jack ShreveOffice of the Public CounselRoom 4, Holland BuildingTallahassee, Florida 32304
Dr. David B. Hall400 Circle DriveSanta Fe, New Mexico 87501
Michael A. Bauser, EsquireLowenstein, Newman, Reis,
Axelrad and Toll1025 Connecticut Avenue, N.W.Washington, D. C. 20036
Mr. Mark P. Oncavage12200 S.W. 110th AvenueMiami, Florida 33176
Normal A. Coll, EsquireSteel, Hector and Davis1400 S.E. First National Bank BuildingMiami, Florida 33131
Dr. Oscar H. ParisAtomic Safety and Licensing BoardU. S. Nuclear Regulatory CommissionWashington, D. C. 20555
Counsel for NRC StaffOffice of the Executive Legal DirectorU. S. Nuclear Regulatory CommissionWashington, D. C. 20555
UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSION
~O~>~yeu~
B'efore the Atomic'afet and L'icensin Bo'ar
Elizabeth S. Bowers, ChairmanDr. Oscar H. Paris, MemberDr. Emmeth A. Luebke, Member
In the Matter of ))
FLORIDA POWER & LIGHT COMPANY ))
(Turkey Point Nuclear Generating )Units 3 and 4) )
Docket Nos. 50-250-SP50-251-SP
(Proposed Amendments toFacility Operating Licenseto Permit Steam GeneratorRepairs)
ORDER RELATING TO LICENSEE'S MOTIONFOR EXTENSION OF TIME
On December 17, 1979, Licensee filed a document entitled"Licensee's Responses and Objections to Interrogatories to, and
Request for the Production of Documents from Licensee, Florida
Power and Light Company". In a response filed the same day, the
Intervenor requested that the
tain interrogatories to which
Board compel Licensee to answer cer-
Licensee had objected.
On December 21, 1979, Licensee filed a motion advising
that it wished to respond to Intervenor's December 17 filing and
requesting an extension of time in which to respond, to January 14,
1979. Licensee said that it planned to withdraw some of itsobjections, but its determination of which objections to withdraw
would require recommendations from technical personnel who would
not be available during the upcoming holiday season. Licensee
represented that counsel for Intervenor stated that he had no
objection to the extension of time, and counsel for the NRC Staff
likewise has stated that he does not object.
«ti
For good cause shown, and there having been no objections,
Licensee's motion is granted.
IT IS SO ORDERED
FOR THE ATOMIC SAFETY ANDLICENSING BOARD
(MA/ 4 pgw'>g NAvu~OR: gaza et . owers, C airman
Dated in Bethesda, Maryland,
this 21st day of December, 1979.
Docket No. 50-25050-251
UNITED STATESNUCLEAR REGULATORY COMMISSION
WASHINGTON, O.C. 20555
January 18, l980
TRIBUTIet Fi 'es 50-25
an -251CSParrishORBl ReadingMGrotenhuis
SEE'TTACHED LIST
Subject: FLORIDA POWER AND LIGHT COMPANY(Turkey Point 3 Had 4)
The following documents concerning our.review of the subject facilityare transmitted foryour information:
Notice of Receipt of Application.
Draft/Final Environmental Statement, datedr
Safety Evaluation, or Supplement No., dated4
. Notice of Hearing on Application for Construction Permit.
Notice of Consideration of issuance of Facility Operating License.
Application and Safety Analysis Report, VOL
Amendment No. to Application/SAR, dated
Construction Permit No. CPPR- . dated
Facility Operating License No. DPR- , NPF- , datedr
Amendment No, to CPPR- or DRR-, dated
X Other.' em e 30 979 de el tfor Additional Time
Niice o~PiIIaolear IIKitlirIIlgKMSIr "
Enclosures:As stated
CC:
OFFICE y 8 e-Ol%
CSParrish: jbSURNAME y
01/18/800A1E
NRC 21 I6 76)
.0 0
A'
1
Dr. Robert E; UhrigFlorida Power and Light Company
cc: Honorable Dewey KnightCounty Manager of Metropolitan
Dade CountyMiami, Florida 33130
Bureau of Intergovernmental Relations660 Apalachee ParkwayTallahassee, Florida 32304
Mr. Jack ShreveOffice of the Public CounselRoom 4, Holland BuildingTallahassee, Florida 32304
Dr. David B. Hall400 Circle DriveSanta Fe, New Mexico 87501
Michael A. Bauser, EsquireLowenstein, Newman, Reis,
Axelrad and Toll1025.Connecticut Avenue, N.W,Washington, D. C. 20036
Mr. Mark P. Oncavage12200 S.W. 110th AvenueMiami, Florida 33176
Normal A. Coll, EsquireSteel, Hector and Davis1400 S.E. First National Bank BuildingMiami, Florida 33131
Dr. Oscar H. ParisAtomic Safety and Licensing BoardU. S. Nuclear Regulatory CommissionWashington, D. C. 20555
Counsel for NRC StaffOffice of the Executive Legal DirectorU. S. Nuclear Regulatory CommissionWashington, D. C. 20555
UNITED STATES OF AMERICA D
NUCLEAR REGULATORY COMMISSION
~op go S~THE ATOMIC SAFETY AND LICENSING BOARD L
'b
In the Matter of
FLORIDA POLI'ER AND LIGHT COMPANY
(Turkey Point Nuclear GeneratingUnits Nos.'3 and 4)
Docket Nos. 50-25050-251
(Proposed Amendments toFacility Operating Licensesto Permit Steam GeneratorRepair)
ORDER RELATIVE TO INTERVENOR'SREQUEST FOR ADDITIONALTIME
The Board ordered the Intervenor to respond by November 13,
1979, to objections by FPL to his discovery requests. On
November 13, 1979, the Hoar d received a motion from the Inter-venor requesting additional time of ten days from the receiptof,the Board's order ruling on the motion for the reasons stated.
The Board. reminded. the other parties in its order of November 15,
1979, of their obligation to respond to the motion in accordance
with 10 CFR 52.730.
On November 19, 1979, FPL responded that it had no objec-
tion to the motion for the additional, time but expressed concern
that matters proceed expeditiously toward resolution. On
November 27, 1979, the NRC Staff responded that it had no objec-
tion to the motion.
The motion is granted.
IT IS SO ORDERED.
FOR THE ATOhfIC SAFETY ANDLICENSING BOARD
Dated at Bethesda, hiarylandthis 30th day of November 1979.
Eli beth S. Bowers, Chairman