c.s.i.r. & m.c.d. abhimanyu dalal architects 20 th may, 2011 0 chandni chowk redevelopment plan...
Post on 18-Dec-2015
326 Views
Preview:
TRANSCRIPT
C.S.I.R. & M.C.D. ABHIMANYU DALAL ARCHITECTS20th May, 2011
1
CHANDNI CHOWK REDEVELOPMENT PLANRED FORT TO FATEHPURI MASJID ROAD STRETCH
Municipal Corporation of Delhi and
Council of Science & Industrial Research
C.S.I.R. & M.C.D. ABHIMANYU DALAL ARCHITECTS20th May, 2011
2AREA OF INTERVENTION
N
1.34 KM
CHANDHI CHOWK : SPECIAL STREET (DISTRIBUTARY STREET)
CHANDHI CHOWK
KHARI BAOLI
CHANDHI CHOWK
HC SEN MARG
DEEWAN HALL RD
ESPLANADE ROAD NS MARG
C.S.I.R. & M.C.D. ABHIMANYU DALAL ARCHITECTS20th May, 2011
3
10- 11 M WIDE CARRIAGE WAY
10- 11 M WIDE CARRIAGE WAY
3.5 M FOOTPATH
3M FOOTPATH
MEDIAN
SITUATION
N
EXISTING PLAN OF TYPICAL STREET STRETCH
EXISTING CONDITION
C.S.I.R. & M.C.D. ABHIMANYU DALAL ARCHITECTS20th May, 2011
4DESIGN PROPOSAL
N
•CREATE AN UNIQUE CULTURALLY SIGNIFICANT DESTINATION PUBLIC URBAN SPACE
•CREATING A PEDESTRIAN FRIENDLY WITH USER FRIENDLY PUBLIC TRANSPORT.
•CHANDNI CHOWK AS AN OVERLAY OF HISTORICAL PERIODS INCLUDING THE CONTEMPROARY ACTIVITY
•RESTATING THE PHYSICAL, VISUAL AND HISTORIC LINKAGES.
•USE OF ENVIORNMENTAL FRIENDLY MATERIALS AND TECHNOLOGY.
• CARS MOVEMENT TO BE RESTRICTED FROM 9:00 AM TO 9:00 PM
•PARKING CAPACITIES TO BE INCREASED AT PARADE GROUND & AT N.S. MARG METRO STATION.
• ALL SERVICES TO BE MADE UNDERGROUND AND BSES HAS GIVEN A BUDGET OF APPROXIMATELY 12 CRORE FOR ALL MAJOR SHAHAJANABAD ROADS.
FATEHPURI MASJID
CHOWK
TOWN HALL
CHOWK
FOUNTAIN
CHOWK
RED FORT
PLAZA
C.S.I.R. & M.C.D. ABHIMANYU DALAL ARCHITECTS20th May, 2011
5OPTION C- DESIGN PROPOSAL- 8.50 MT WIDE TYPICAL STREET STRETCH
3.9 MT WIDE NMV LANE 6.50 MT FOOTPATH 2.30 MT WIDE BUS LANE
15 MT WIDE FOOTPATH
C.S.I.R. & M.C.D. ABHIMANYU DALAL ARCHITECTS20th May, 2011
6TYPICAL SECTION- 8.5 MT WIDE STRETCH
N 6.50 MT FOOTPATH8.5 MT CARRIAGE WAY15 M FOOTPATH
EXISTING ROAD SECTION
8-9 MT8.5 MT15 MT
PROPOSED SECTION
C.S.I.R. & M.C.D. ABHIMANYU DALAL ARCHITECTS20th May, 2011
7PROPOSED VIEW- 8.5 MT WIDE CARRIAGE WAY
FOOTPATH
LANDSCAPE
STREETFURNITURE
TABLE TOPCROSSING
2.3 MT WIDEBUS LANE
3.9 MT WIDENMV LANE
C.S.I.R. & M.C.D. ABHIMANYU DALAL ARCHITECTS20th May, 2011
8UTILITY SERVICE TUNNEL
DRY SERVICES LINESLIKE- TELEPHONE, INTERNET, ELECTRICITY
WET SERVICES LINESLIKE- SEWAGE, WATER SUPPLY ETC
MOVEMENT CORRIDOR
•BETTER PERFORMANCE OF INDIVIDUAL SUPPLY PIPES/ CABLE LIFE.
•CONTROL ON LEAKAGE IN WET SYSTEMS.
• FAR LESS CHEAPER EXPANSION, RENEWAL, REPLACEMENT COSTS
• FAR LESS PREVENTION FROM DAMAGE FROM EXTERNAL INFLUENCE
C.S.I.R. & M.C.D. ABHIMANYU DALAL ARCHITECTS20th May, 2011
9
THANK YOU
top related