NORTH EAST TRANSMISSION COMPANY LIMITED(NETC) Incorporated in December 2008
Corporate Office Ambience Corporate Tower , Ambience Mall , Ambience Island NH-8
Gurgaon-121001
NETCJV OF OTPC, POWERGRID & NER
STATES OF TRIPURA, ASSAM, MIZORAM
AND MANIPUR.
Scope of Work of NETC Construction of 661 Km of 400 kV D/C interstate transmission line between Pallatana GBCCPP and Bongaigaon passing through the states of Tripura Meghalaya and Assam The line route passes through Hilly Terrain (300 km),Reserved Forests(130km) as well as Cultivated Land.Crossing of major rivers . Viz. Brahamputra, Barak and Champabati involved
Salient Features of the Project
Pallatana- Silchar 400 kV D/C line (246 Km, 675 locations )
Situated in heaviest wind zone (WZ-6, 55 m/s)
Hilly terrain 96 Km (39%)Forest involvement (35%)
Tripura -- 81 Km , 372 ha, 200 locations
Assam – 04 Km, 18.4 ha, 8 locations
Salient Features of the Project
Silchar- Bongaigaon 400 kV D/C line ( 415 Km, 1125 locations)
Situated in heavy wind zone (WZ-5, 50 m/s) Hilly terrain 208 Km (50%) Forest involvement (11%)
Meghalaya -- 25 Km, 115.8 ha, 55 locationsAssam – 22 Km, 101.2 ha, 65 locations
Involve Major River Crossings Brahmaputra river – 2 well foundations and 1 pile
foundation Champabati river – 1 pile foundation Barak river – River crossing towers on banks .
STATUS OF
PALLATANA- SILCHAR -BONGAIGAON 400 KV D/C
TRANSMISSION LINES
ESTIMATED COST OF PROJECT
Total cost of Project: Rs. 1770 Cr
Equity: Rs. 354 Cr (148* Cr)
Debt : Rs. 1416 Cr (599* Cr)
* Position as on 31st March 2011)
EQUTIY PATTERN
Name Equity Pattern
EquityShare allotted/
Approved for allocation (as on 31/03/2011)
In Rs. crore
In %
OTPC 35% 35 29
POWERGRID 26% 30 25
ASSAM 13% 15 12
TRIPURA 10% 10.4 9
Mizoram 10% 10.5 9
Manipur 6% 20 16
TOTAL 100% 120.9 100
Equity Pattern Based On Share Application Money Received Till Date
Name Equity Pattern
Equity Pattern Based on Total Share
Application Money Received up to 17/03/2011
In Rs. crore In %
OTPC 35% 52.59 36
POWERGRID 26% 39.1 26
ASSAM 13% 15 10
TRIPURA 10% 10.4 7
Mizoram 10% 10.5 7
Manipur 6% 20 14
TOTAL 100% 120.9 100
Physical Progress of Pallatana- Silchar 400 kV D/C TL(25th April2011)
Sl No Description
Total Quantity
Quantity as per L2
schedule
Quantity completed
% with reference toL2 schedule
1 Survey (Km)
246 246 246 100%
2 Foundations (Nos.)
675 625 495 ~79%
3 Tower erection (Nos.)
675 582 286 ~49%
4 Stringing (Km)
246 179 32 ~18%
Physical Progress of Silchar- Bongaigon 400 kV D/C TL (25th April 2011)
Sl No Description
Total Quantity
Quantity as per L2
schedule
Quantity complet
ed
% with reference toL2 schedule
1 Survey (Km)
415 415 415 100%
2 Foundations (Nos.)
1125 966 582 ~59%
3 Tower erection (Nos.)
1125 876 299 ~34%
4 Stringing (Km)
415 296 22 ~7%
Physical Progress of Pallatana- Bongaigon
400 kV D/C TL TL (25th April 2011)Sl. No
.
Description Total Quantit
y
Quantity as per L2
schedule
Quantity complete
d
% with reference toL2 schedule
1 Survey (Km)
661 661 661 100%
2 Foundations (Nos.)
1800 1591 1077 ~68%
3 Tower erection (Nos.)
1800 1458 585 ~40%
4 Stringing (Km)
661 475 54 ~11%
Pallatana- Silchar 400 kV D/C Transmission Line – Critical issues
Forest Clearance: Approximately 208 locations are falling within forest area (Tripura:81 Km, 200
loc.) and (Assam:4km, 8 loc.). Second stage forest clearance for Assam is yet to be obtained. Replies to queries
raised by MoEF to Assam on 04.10.2010 were forwarded to MoEF on 19th February 2011. The MoEF vide their letter dated 15th April 2011 to Assam Forest department sought further details in respect of the scheme for plantation of dwarf trees and compliance to Forest Rights Act (2006).
Second stage forest clearance for Tripura has been obtained in August 2010 only i.e. approximately 13 months after award of construction contract. Tree felling and construction of line in the forest stretches are in progress. Meanwhile case submitted on 4th March 11 for additional 3 locations falling in forest near GBCCP gantry for which fresh clearance is required.
Only one month is left in the working season
Non-availability of adequate no. of trained gangs for deployment at site by the contractors
Silchar- Bongaigaon 400 kV D/C Transmission Line – Critical issues
Forest Clearance Approximately 104 locations are falling within forest area (Meghalaya 55) and (Assam
65). Second stage forest clearances for Meghalaya ( 25 Km approx.) & Assam(22 Km
approx.) is yet to be obtained even after 13 months since award of Construction Contract.
Replies to queries raised by MoEF to Meghalaya on 24.12.2010 and to Assam on 04.10.2010 have been forwarded by them to MoEF on 16th & 19th February 2011 respectively. The MoEF vide their letter dated 15th April 2011 to Assam Forest department sought further details in respect of the scheme for plantation of dwarf trees and compliance to Forest Rights Act (2006). The MoEF also sought additional details regarding compliance to Forest Rights Act (2006) from Meghalaya state Forest Department vide their letter dated 18th April 2011.
Only one month is left in the working season before the scheduled completion of the line and delay in obtaining second stage forest clearance is adversely affecting the project.
Non-availability of adequate number of trained gangs for deployment at site by the contractors.
Involvement of pile & well foundations in Champabati, Barak and Brahmaputra rivers.
COMPELETION TARGETS
Sl. No.
Name of line Scheduled date of completion
Anticipated date of completion
1 Pallatana-Silchar November 2011
November 2011
2 Silchar- Bongaigaon
November 2011
June 2012
THANK YOU
PHYSICAL PROGRESS OF 400 kV D/C TRANSMISSION LINES (As on 31/01/11)
Line Check Survey Foundation Tower Erection Stringing
Total Qty. Actual Total
Qty. ActualTotalQty. Actual
TotalQty. Km
Actual
Pallatana- Silchar.Ant Compln Nov’11
245 245 674 371 674 183 24511.291
Silchar -Bongaigaon.Ant Compln Jun 12
418 418 1125 390 1125 125 418 1.64
TOTAL 663 663 1799 761 1799 308 663 13
PHYSICAL PROGRESS OF 400 kV D/C TRANSMISSION LINES (As on 15/03/11)
Line Check Survey Foundation Tower Erection Stringing
Total Qty. Actual Total
Qty. ActualTotalQty. Actual
TotalQty. Km
Actual
Pallatana- Silchar.Ant Compln Nov’11
246 246 675 415 675 238 246 24
Silchar -Bongaigaon.Ant Compln Jun 12
415 415 1125 505 1125 217 415 8
TOTAL 661 661 1800 920 1800 455 661 32
PHYSICAL PROGRESS OF 400 kV D/C TRANSMISSION LINES (As on 31/03/11)
Line Check Survey Foundation Tower Erection Stringing
Total Qty. Actual Total
Qty. ActualTotalQty. Actual
TotalQty. Km
Actual
Pallatana- Silchar.Ant Compln Nov’11
246 246 675 460 675 261 246 28.188
Silchar -Bongaigaon.Ant Compln Jun 12
415 415 1125 551 1125 261 415 14.264
TOTAL 661 661 1800 1011 1800 522 661 42.452