construction of gogol primary school at … for quotation - construction of...project location:...
Post on 23-Mar-2020
1 Views
Preview:
TRANSCRIPT
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: Cover
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
Client: Jubaland State of Somalia.
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: Drawing index.
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
DRAWING INDEX.
Page No Description Remarks01/19
Drawing index
Site location
Existing plan
Proposed site layout
Foundation plan
Floor plan and section
Elevation ViewPublic toilet floor plan and section
Public toilet Elevation View
Staff toilet floor and section
Staff toilet elevation view.
3D-01
3D-02
3D-03
3D-04
3D-05
3D-06
3D-07
02/19
03/19
04/19
05/19
06/19
07/19
08/19
09/19
10/19
11/1912/19
13/19
14/19
15/1916/19
17/19
18/19
19/19
Cover
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: Site location
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
Client:Jubaland State of Somalia.
GSPublisherVersion 0.0.100.100
4.600
19.5
00
23.100
46.7
50
Proposedwashrooms
Septic tank WC
Existing classrooms(to remain)
Existingoffice
Exis
ting
iron
shee
t cla
ssro
oms
(to b
e do
mili
shed
)
Existingground
water tank
Existingdestroyed
toilets
Existing Boundarywall to remain
Access Road
Drawing Scale
As ShownLayout ID
cc.1:2.64 d.d1:5.02
aa. 1:4.58
0. Ground Floor 1:269.59
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: Existing Plan
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
GSPublisherVersion 0.0.100.100
5.55
05.
450
5.00
05.
450
5.55
0
0.60
00.
900
2.25
01.
500
1.45
00.
600
0.90
02.
250
1.50
01.
450
0.60
00.
900
2.25
01.
500
1.45
00.60
00.
900
2.25
01.
500
1.65
0
1.20
06.
700
6.70
06.
700
6.90
05.400 1.400
5.05
06.
000
1.80
03.
700
46.7
50
23.1005.400 1.400
3.000 6.600 2.300 4.000 2.200 2.200 2.400
Wes
t Ele
vatio
n
South Elevation
Eas
t Ele
vatio
n
North Elevation
Class
Class
Class
Class
Existing Classes
Septic tank WC
LadiesGents.
Drawing Scale
As ShownLayout ID
cc.1:2.64 d.d1:5.02
aa. 1:4.58
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: Site Layout
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
GSPublisherVersion 0.0.100.100
E E
D D
C C
B B
A A
1
1
2
2
3
3
1
1
2
2
3
3
A A
B B
C C
1
1
2
2
AA
BB
27.8
00
5.910 1.290
7.36
96.
747
6.69
76.
988
6.50
00.
600
6.10
00.
600
6.10
00.
600
6.10
0
5.002 0.600 0.598 0.400
7.36
96.
747
6.69
76.
988
0.60
0
0.600
7.200
5.002
6.5000.600
6.1000.600
6.1000.600
6.100
0.60
00.
600
2.0002.500
1.500
2.40
0
2.90
13.
400
0.5000.500
3.40
02.
901
2.40
0
1.5000.500 0.500
2.0002.500
7.200
0.5003.000
0.5002.700
0.500
3.522 3.190
0.50
01.
200
0.50
01.
600
0.50
0
3.522 3.1907.200
0.5001.400
0.5001.100
0.5001.100
0.5001.100
0.500
0.50
01.
200
0.50
01.
600
0.50
0
1.74
32.
051
4.30
0
1.74
32.
051
4.30
0
Class
Class
Class
Class
STUDENTS TOILETS
STAFF TOILET
Drawing Scale
As ShownLayout ID
cc.1:2.64 d.d1:5.02
aa. 1:4.58
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: Foundation Plan
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
CONSTRUCTION OF GOGOLPRIMARY SCHOOL AT
GARBAHAREY DISTRICT-NOVEMEBER-2018, Funded by
IOM_RDS_MIDNIMO.
Date 20-Nov-2018
GSPublisherVersion 0.0.100.100
E E
D D
C C
B B
A A
1
1
2
2
3
3
6.50
06.
500
6.50
0
5.45
5.45
05.
005.
455.
45
5.40 1.70
6.800
5.400 1.400
2.70
1.50
2.60
2.60
1.50
2.60
2.60
1.50
2.60
2.60
1.50
2.70
6.80
6.70
6.70
6.80
0.60
00.
900
2.25
01.
500
1.54
70.
503 0.
900
2.25
01.
500
1.55
10.
500.
900
2.25
01.
500
1.55
90.
491 0.
900
2.25
01.
500
1.65
0
5.45
5.45
5.00
05.
450
5.45
A A
E-01
E-02 E-
03E-04
Class
Class
Class
Class
1 2 3
5.400 1.400
0.80
0 0.45
01.
000
1.20
00.
800
FOUNDATION SPECIFICATION- Floor tiling works should be 300X300mm.
-A42 BRC mesh.-100mm thick slab concrete
- 1000 guage polythene sheeting as DampProof membrance.
- 200mm thick ground beam laid on rublestone.
- Compacted hardoce fill.-400mm thick rubble stone.
-50mm thick palin concrete under the rubblestone.
-Excavation depth should be 800mm.
ROOF SPECIFICATION.- Pitch 20 degree five profile 28 guage
roofing with blue color.- 100X75mm wall plate.
-100X50mm rafter at 600mm c/c 50X50m.-200mm with fascia board.
-All timber to be cured and painted with 2paint coats of painted.
12mm thick clipboard celling.-300mm thick concrete ring beam.
-200mm thick lintel beam.-1500X1200mm Aluminium windows
with grill mesh.-1500X250mm Ventilation blocks.
Classroom200X200 veranda columns
Section View.
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title:Floor plan andsection.
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
GSPublisherVersion 0.0.100.100
E D C B A
6.791 6.708 6.704 6.796
0.45
02.
956
1.14
2
1.00
01.
200
0.20
00.
250
BACK ELEVATION
A B C D E
6.796 6.704 6.708 6.791
3.00
41.
243
2.13
9
0.998
0.25
0
1.500
6.796 6.704 6.708 6.791
1 2 3
5.400 1.400
0.45
03.
000
0.45
03.
952
0.45
03.
247
0.30
03.
048
3 2 1
1.400 5.400
Drawing Scale
As ShownLayout IDaa. 1:4.78cc. 1:2.50d.d 1:4.58
E-02
E-03E-04
E-01
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title:Elevation View.
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
200mm width fascia boardalong the premeter roof
- Guage 28 iron sheet with red color- 1500X1200mmm high Aluminium
window with grill mesh.- Decorative plastering blocks shouldbe consist cement and fine aggregate
then paint to the indicated color.-250mm thick ventilaltion block above
the windows.
- External wall color should bewhite stuco paint.
-900X2100mm high steel doors.
- Front steps construction should beconcrete with 1:2:4 cement ratio.
-200X200mm dimention concrete column.
GSPublisherVersion 0.0.100.100
11
22
33
44
55
AA
BB
CC
1.6071.611
1.5971.618
6.600
0.2000.400
0.600 0.4000.200
0.4000.600 0.4000.200
0.4000.600 0.4000.200
0.4000.6000.400
0.4000.700
0.9000.700
0.500 0.2000.2000.700
0.9000.700
0.700
1.4001.400
1.4001.400
0.2003.000
0.1993.001
0.200
6.600
0.700 1.000 2.000
3.700
0.700 1.000 2.000
3.700
AAAA
E-06
E-07
E-05
E-08
LadiesG
ents.
1 2 3 4 5
1.607 1.611 1.597 1.618
0.80
0
1.607 1.611 1.597 1.618
0.45
02.
137
1.17
6
FOUNDATION SPECIFICATION- Floor tiling works should be 300X300mm.
-A42 BRC mesh.-100mm thick slab concrete with cement ratio 1:2:4.
-1000 guage polythene sheeting as Damp Proofmembrance.
-200mm thick ground beam laid on ruble stone.-compacted hardoce fill.
-400mm thick rubble stone.-50mm thick palin concrete under the rubble stone.
-Excavation depth should be 800mm.
ROOF SPECIFICATION.- Pitch 20 degree five profile 28 guage
roofing with blue color.- 100X75mm wall plate.
-100X50mm rafter at 600mm c/c 50X50m.-200mm with fascia board.
-All timber to be cured and painted with 2paint coats of painted.
12mm thick clipboard celling.
the doors should besteel doors with anti
rust paint
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title:Public toilet andsection.
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
Section AA--AA
GSPublisherVersion 0.0.100.100
1 2 3 4 5
1.607 1.611 1.597 1.618
1.607 1.611 1.597 1.618
0.45
01.
800
1.51
3
2.30
0
A B C
1.703 1.795
0.45
02.
800
0.45
01.
800
0.50
01.703 1.795
-200mm widthfascia board.
5 4 3 2 1
1.618 1.597 1.611 1.607
1.618 1.597 1.611 1.607
0.45
03.
313
0.60
0
0.600
C B A
1.795 1.703
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: Public toiletsElevation Views
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
E-05
E-06
E-07
E-08
GSPublisherVersion 0.0.100.100
A A
B B
2
2
1
1
2.002
2.200
0.800 0.600 0.800
2.80
0
2.59
4
2.59
4
2.80
0
0.4000.700 1.100
2.002
2.200
aaaa
E-09
E-10
E-11
E-12 WC
A B
2.594
0.45
02.
137
1.05
4
0.80
0
FOUNDATION SPECIFICATION- Floor tiling works should be 300X300mm.
-100mm thick slab concete-A42 BRC mesh.
-1000 guage polythene sheeting as Damp Proof membrance.-200mm thick ground beam laid on ruble stone.
-compacted hardoce fill.-400mm thick rubble stone.
-50mm thick palin concrete under the rubble stone.-Excavation depth should be 800mm.
ROOF SPECIFICATION.- Pitch 20 degree five profile 28 guage roofing with
blue color.- 100X75mm wall plate.
-100X50mm rafter at 600mm c/c 50X50m.-200mm with fascia board.
-All timber to be cured and painted with 2 paint coatsof painted.
-12mm thick clipboard celling.
-200mm thick concrete ofring beam
-200mm thick concrete ofring beam
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: Staff toilet floorplan and section
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
SECTION aa--aa
GSPublisherVersion 0.0.100.100
1 22.002
0.45
03.
324
0.45
02.
137
A B2.594
0.45
03.
324
0.45
02.
874
2 1
2.002
0.45
03.
152 0.
600
0.600
B A2.594
0.45
02.
874
0.45
03.
324
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title:Staff toiletElevation Views
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
E-09
E-10
E-11 E-12
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: 3D-01
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL AT GARBAHAREY DISTRICTNOVEMBER,2018, FINANCED BY IOM_RDS_MIDNIMO.
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: 3D-02
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
Client: Jubaland State of Somalia.
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: 3D-03
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
Client:Jubaland State of Somalia.
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: 3D-04
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
Client:Jubaland State of Somalia.
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: 3D-05
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
Client:Jubaland State of Somalia.
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: 3D-06
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
Client:Jubaland State of Somalia.
GSPublisherVersion 0.0.100.100
Drawing Scale
As ShownLayout ID
General Notes1. ALL DIMENSIONS ARE IN METERUNLESS STATED.
2. DO NOT SCALED DRAWINGS
3.COORDINATE ALL WORKS WITHARTCHITECTURE DRAWINGS ANDSPECIFICATION
4. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZETHEMSELVES WITH EXISTINGCONDITIONS, LOCATIONS ANDPROJECT REQUIREMENTS PRIOR TOSUBMITING A BID.
5. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFYALL DIMENSIONS AND FAMILIARIZETHEMSELVES WTH PROJECTREQUIREMENTS PRIOR TOCOMMENCING WITH THE WORK.CONTRACTOR SHALL REPORT ANYDESCRIPANCIES TO ENGINEER.
Cilent
Implemented by: IOM
Project title: CONSTRUCTIONOF GOGOL SCHOOL
Drawing title: 3D-07
Design by: Eng Awil
Drawing by: Eng Awil
Project Location:Garbaharey District
Date 20-Nov-2018
CONSTRUCTION OF GOGOL PRIMARY SCHOOL ATGARBAHAREY DISTRICT NOVEMBER,2018,
FINANCED BY IOM_RDS_MIDNIMO.
Client:Jubaland State of Somalia.