PLANNING OF CONSTRUCTION EQUIPMENTPLANNING OF CONSTRUCTION EQUIPMENTPLANNING OF CONSTRUCTION EQUIPMENTPLANNING OF CONSTRUCTION EQUIPMENT
Extent of mechanization
Nature & Magnitude of work Indi enous e ui ment
Cost comparison for Machine & Labour
Large quantity of material handling &speed of constructionPossibility of using manual labour shouldbe explored
-
8/13/2019 Construction Equipment Planning
2/67
DISADVANTAGES CONSTRUCTION EQUIPMENTDISADVANTAGES CONSTRUCTION EQUIPMENTDISADVANTAGES CONSTRUCTION EQUIPMENTDISADVANTAGES CONSTRUCTION EQUIPMENT
Success of a mechanized Construction
Coordination of all equipmentsEx : Failure of pump employed for dewatering afoundation pit may cause the excavator and hauling
un s o ecome eRegular Maintenance is neededIf maintenance is poor, it may increase cycle time of theconcerned activities and increase downtime..
Adequate Service & Maintenance req.
Safety at Work is important.
-
8/13/2019 Construction Equipment Planning
3/67
CRITERIA FOR SELECTION OF EQUIPMENTCRITERIA FOR SELECTION OF EQUIPMENTCRITERIA FOR SELECTION OF EQUIPMENTCRITERIA FOR SELECTION OF EQUIPMENT
Use of available equipment
- New Equip may not be fully utilized
-
- Economics, Depreciation etc
Suitability of Job Conditions- Demand of job. Soil & Valley Condition,
climate, working condition etc
-
8/13/2019 Construction Equipment Planning
4/67
Uniformity in types- Min No of Types
- Common types of engines for different machines
Size of EquipmentUse of Standard Equipment
- Commonly manufactured
- Easily available- Moderately priced
- Spare parts should be easily available
-
8/13/2019 Construction Equipment Planning
5/67
Unit Cost of Production- Freight
- Packing
- Insurance
- Erection
Country of Origin- Soft currency
Availability of Spare parts
-
8/13/2019 Construction Equipment Planning
6/67
Versatility
Selection of ManufacturerSuitability of local labour
Adaptability for future use
-
8/13/2019 Construction Equipment Planning
7/67
COMMON CONCRETING EQUIPMENTCOMMON CONCRETING EQUIPMENTCOMMON CONCRETING EQUIPMENTCOMMON CONCRETING EQUIPMENT
CONCRETEPUMP
-
8/13/2019 Construction Equipment Planning
8/67
Pumping, as a means of transporting and placing
concrete, has been used in developed countriesover last 4 to 5 decades. Often it has been found
uconcrete from mixing plant to the form, becauseby eliminating the use of dumpers, barrowshoists, etc., it can provide a considerablereduction in labour.
-
8/13/2019 Construction Equipment Planning
9/67
But its other main advantage is, it can place
concrete in congested sites with little access.Pumping is a means by which concrete can be
y v y,and, with hydraulically driven pumps mounted ontrucks or trailers, quick site to site movement, forplacing of concrete is possible.
-
8/13/2019 Construction Equipment Planning
10/67
From the usage point of view, there are two variety of pumps, the first one is the static type
usually mechanically driven models , and useslarger size bore, (125 mm to 250 mm) pipelines.
n n l hif in f m n r i n ndismantling of relatively heavier pipe lines arerequired. The second type is usually
hydraulically driven, uses comparatively smallerbore (75 mm to 100 mm) pipelines. They areusually mounted ontruck or trailer and this is
relatively recent development in technology.
-
8/13/2019 Construction Equipment Planning
11/67
This type of pump consists of a hopperthrough which concrete is fed, below whichthere is a rotary valve such that it can open, toallow inflow of concrete into the pump
Mechanically driven pumps
cy n er ur ng suct on stro e. The piston in the pump cylinder movesbackward during suction stroke and concrete is
sucked in. During the pumping stroke when the piston
moves forward the inlet valve closes and blocksthe entry of concrete from hopper.
-
8/13/2019 Construction Equipment Planning
12/67
The outlet valve closes during suction strokeand opens during pumping stroke allowing concrete to flow into the delivery pipe. Thusthe concrete moves along the pipeline with a
pu sat ng ow. The hopper is usually equipped with remixing blades to agitate the concrete. Water iscontinuously flushed in the back of the cylinder,i.e. the non-concrete side, to remove any concreteslurry that may have entered. This is done to
reduce the friction between piston and cylinder.
-
8/13/2019 Construction Equipment Planning
13/67
Usually, they are powered by electric motor ordiesel engine, and operates at a maximum rateof 40 strokes/minute. Stroke length is of theorder of 300 mm and diameter of the cylinder
may e mm o mm.Output is of the order of 18m 3/h for singlecylinder model and that for twin cylinder model
is about of 34 m3/h. Pumping distance can beof the order of 450m or a vertical lift of 40 mfor cylinder dia of 180 mm for a single cylindermodel.
-
8/13/2019 Construction Equipment Planning
14/67
These are simple in principle, but with their mechanicalsystem they are heavy and require mounting at the base.
The pipe diameter for delivery line is large and erectionand dismantling of such pipe line is cumbersome.
These pumps operate from one position for long time.But they can handle a large volume of concrete overconsiderable distance, thus, suited where large volume of
concrete is needed for a long time.By providing feeder pipeline at discharge end, greaterflexibility in placing can be obtained
-
8/13/2019 Construction Equipment Planning
15/67
This is the most popular type of equipmentused these days. Hydraulic system using wateror oil as hydraulic fluid, being lighter can bemounted on a truck to make them mobile, thuscan be used for smaller jobs. The stroke
Hydraulic pumps
length is usually more and thus less numberof strokes allow the concrete flow to be morecontinuous. Control of pumping speed ispossible by varying the delivery pipe diameterof the pump. Hydraulic mechanism of pistonallows for a steady pressure on the concrete formost of the
-
8/13/2019 Construction Equipment Planning
16/67
length of stroke, thus sudden pressure onconcrete is avoided. The hydraulic pumps areeasy to operate from maintenance point of such pump is much larger than that of amechanical pump, therefore velocity of
concrete to be lifted to higher elevations, theratio of maximum horizontal pumping of view also. The pipe dia of the delivery is muchsmaller , thus easy to handle, and outputdistance to vertical lift is much lower, usually of the order of 3 to 4 compared to 10 to 11 incase of mechanical pumps
-
8/13/2019 Construction Equipment Planning
17/67
Oil driven piston pumps
Oil driven hydraulic systems are most common. A double acting hydraulic ram connected to thepiston, drives the piston in each cylinder. Oil tothe ram is supplied by a pump, driven by adiesel engine or motor. The twin cylinder
operate in sequence, such that hen one isadmitting the concrete the other one isdischarging. Flushing by water is also done inorder to reduce friction between piston and thecylinder.
-
8/13/2019 Construction Equipment Planning
18/67
The length of the pumping stroke is 600-2000mm and the range of cylinder bore is to mm. Output may be in the range of 15-114m3/h. Maximum pumping heights can be 70 to80 m with maximum horizontal distance of
pumping about 400 m. Fig. 1.2 shows diagramof such a pump
-
8/13/2019 Construction Equipment Planning
19/67
Water driven hydraulic pumps
In this type of hydraulic pump a centrifugal water pump applies pressure to the piston. When twin cylinders are used, the pressure isapplied alternately to each piston. The pistonshave no rods, but are connected to each other
by steel rope so that, as one piston is pushedforward on the delivery stroke the other ispulled back on the suction stroke. Stroke lengthis usually 2 to 3 m. The output can be of theorder of 125 m3/h with a delivery height of 7.5ms
-
8/13/2019 Construction Equipment Planning
20/67
Peristaltic pumps
A pump based on peristaltic or squeeze principle is usually designed for small-boreoperation
The concrete from the hopper, fitted withrotating blades to assist flow of concrete into
pumping cylinder and for mild remixing, passesthrough a flexible tube, to the pumping chamber. The pumping chamber is circular. Two
diametrically opposite rollers are fixed to theinner side of the pumping chamber. The flexibletube which carries concrete lies between theroller and the inner side of chamber.
-
8/13/2019 Construction Equipment Planning
21/67
The rollers are rotated about their spindles by hydraulic power. This causes a squeezing actionon concrete and thus a local compression, whichin turn forces the concrete forward towards theoutlet. Since there is no valve and with pipe
diameter same as the squeeze tube, concrete doesnot undergo any further changes in diameter. Toassist this action a high vacuum is maintained in
the pumping chamber, thus concrete enters thedelivery line under pressure. With this kind of roller action thus a continuous flow of concretetakes place.
-
8/13/2019 Construction Equipment Planning
22/67
These pumps are also light, self-contained andpipe bore being small on be made mobile. Pipebore is usually in the range of 75 to 100 mm,
with the squeeze tube also of same dimension.Output upto 69 m3/h, with a maximum
horizontal pumping distance of 183 m and vertical lift of 46 m have been reported.
-
8/13/2019 Construction Equipment Planning
23/67
There are four types of valves which are normally used in concrete pumps,
(1)Flat gate or slide valves, usually operate on sliding
principle, and serve both as inlet and outlet valve. They are used in both single cylinder and twincylinder pumps.
Pump valve system
(2)Spade valves, have curves profile to aid the flow of concrete are separate for inlet and outlet operation.
Thus there are four valves in a twin cylinder pump.
(3)Flapper valves, which perform both inlet and outletfunction in a twin cylinder pump. The valve can rotateabout a vertical axis allowing concrete to pass on both
sides of the blade, one side allows concrete to flow
-
8/13/2019 Construction Equipment Planning
24/67
from cylinder to pipe line and the other side fromhopper to cylinder. Easy maintenance and quick clearance of blockages are the advantages of this
system, however concrete need to be taken through atortuous path.
(4) Rotary valves are used mostly on mechanical pumps.
-
8/13/2019 Construction Equipment Planning
25/67
Major consideration in the selection of pipelines are,they need be capable of with standing the abrasiondue to concrete flow and also capable of withstanding
the rough handling at site. At the same time they needto be light for ease of handling.Steel has been the commonest material and recent
Pipelines for the pump
development in metal technology has reduced the weight/length of steel pipe for require abrasionresistance and strength.
Aluminum pipes have also been used but strength of concrete delivered through aluminum pipes isadversely affected by the reaction between cement
paste and aluminum, Ca (OH) and reactive alkalistake part in such a reaction generating hydrogen, thus
-
8/13/2019 Construction Equipment Planning
26/67
causing expansion of plastic concrete, with theconsequence that, strength and durability of concreteis lowered considerably.
Limited use of plastic pipes have also have also beenreported, but plastic pipes need reinforcement andstrengthening at the end, for coupling.
Flexible hoses are used on booms and at delivery endof the pipelines, where pressure is relatively low. Lowfrictional resistance and high resistance to wear are
the qualities which are required for hoses.Helical reinforcement can be used to avoid kinks.Other pipe accessories include, pipe couplings, rotary
distributors, shut-off valve, discharge pocket, washoutgun, adjustable pipe support, trap basket etc.
-
8/13/2019 Construction Equipment Planning
27/67
The following points need consideration whileplanning the pumping operations.
Type of pump required.
Concrete mix designPump locationsConcrete supply
Operation and cleaning
Layout of pipeline and boomPump location and space for cleaning Cleaning operation is normally done by compressed
air or water. This process is continued till overallflashing is over. Cleaning with water is generallysafer.
-
8/13/2019 Construction Equipment Planning
28/67
COMMON CONCRETING EQUIPMENTCOMMON CONCRETING EQUIPMENTCOMMON CONCRETING EQUIPMENTCOMMON CONCRETING EQUIPMENT
RMC VEHICLES
-
8/13/2019 Construction Equipment Planning
29/67
There are mainly two types of vehicle namely;truck mixer and agitator trucks, although tipper
trucks and dum er can also be used for
transporting ready mixed concrete.
-
8/13/2019 Construction Equipment Planning
30/67
It consists of a mixing drum mounted on a truck chasis, which is capable of being revolved by power
take-off from the prime mover. The drum can mixconcrete or merely keep mixed concrete agitated. The vehicle is equipped with a water tank for carrying
Truck Mixer
the mixing water and an arrangement for adding the water to dry ingradients, in the drum. The truck mixers usually have a capacity ranging from 1 m3 to6m3. For maximum economy of operation they may have delivery radius of 10 to 16 kms, depending uponthe capacity of the truck. A swinging discharge chuteis usually provided so that concrete can be depositedover a wide area.
-
8/13/2019 Construction Equipment Planning
31/67
The agitator consists of a conically shapeddrum of 1m3 2m3 capacity, the cone being
considerably more elongated than normal typeof mixer drum. The concrete is mixed before itis placed in the agitator and the agitator merely
Agitator Truck
keeps it mixed and prevents it from stiffeningprematurely. The spiral blades are much lesselaborate than those in a proper mixer. Theyare arranged to move the mix towards the openend of the drum to help discharge but iscountered during transit by tilting the drumupward.
-
8/13/2019 Construction Equipment Planning
32/67
The agitator is usually driven by the prime moverat 1 to 3 r.p.m. and the agitation can be
continued when the truck is stationary byplacing the gear lever at neutral. The discharge
.
V hi l T d f k Ad R k
-
8/13/2019 Construction Equipment Planning
33/67
Vehicle Type and range of work for which the vehicle is
best suited
Advantages Remarks
Truck Mixer Used to mix and transportconcrete to job site over short and very long hauls
Central Mixing plant is notneeded, only a batching plant is
plant necessary as concrete can be completely mixed in thetruck. Controlled discharge is
possible thus there is no loss of homogeneity of concrete ondischarge
Control of concretequality is not as goodas central mixing.Slump test of concreteconsistency are needed
on discharge.Careful preparations areneeded for receivingthe concrete at site.
ruc g a or
Non agitatingtrucks
se o ranspor concre e
for all uses in pavements,structures and buildings and
buildings. Haul distancemust allow discharge of concrete within 1 hoursof mixingUsed to transport concreteon short hauls
ruc ag a ors usua y opera e
from central mixing plants,where quality concrete is
produced under controlledcondition . Discharge from theagitator is well controlled.Capital cost of such a vehicle islower than truck mixer or truckagtators
m ng o e vers o
suit job organization.Concrete crew andequipment must beready on site to handleconcrete in large
batches.Concrete slump should
be limited possibilityof segregation. Heightis needed for high liftof truck body upon
discharge.
-
8/13/2019 Construction Equipment Planning
34/67
-
8/13/2019 Construction Equipment Planning
35/67
-
8/13/2019 Construction Equipment Planning
36/67
-
8/13/2019 Construction Equipment Planning
37/67
-
8/13/2019 Construction Equipment Planning
38/67
-
8/13/2019 Construction Equipment Planning
39/67
T ti g d Pl i g f
-
8/13/2019 Construction Equipment Planning
40/67
Transporting and Placing of
Concrete The uniform wet concrete produced from a mixer isrequired to be transported to the forms for placing.
This handling tends to produce more or less segregationand loss of slump, if the distance is long. The practicalconsideration of economy frequently operates to placethe mixer far from the forms.
Methods of transporting and placing, which permit theuse of drier mixes, reduce the water cement ratio andhence are better. Drier mixes also reduce the change of segregation.
The method selected may be adopted for the slumpspecified.
G l th d f t ti g &
-
8/13/2019 Construction Equipment Planning
41/67
General methods of transporting &
placing concrete Discharge directly in to forms through short
chute or for a very small lead manually incontainers
By wheel barrows and power buggies umpers an ruc s ag a ng an non
agitating) Monorail system Elevating towers and hoists Skips operated by cranes or overhead cable
ways Belt conveyers and Boom conveyers
-
8/13/2019 Construction Equipment Planning
42/67
General methods of transporting &placing concrete contd
Tremie
Truck mixers Concrete pumps and pneumatic placers
Any combinations of above.
h l
-
8/13/2019 Construction Equipment Planning
43/67
1. Direct Discharge, Manual Transport in
Containers and Short Chutes
Manual means is least sophisticated.
Segregation resulting from throwing ofconcrete in to form, depends on the skill of
.height of 2m is to be avoided.
Chutes are usually regarded
undesirable,because they tend to producesegregation and loss of slump
-
8/13/2019 Construction Equipment Planning
44/67
1. Direct Discharge, Manual Transport in
Containers and Short Chutes contd..
Short chutes with proper lower end treatmentdo not offend seriously in this regard
As they are simple to use and economical They are usually metallic, half round in section,
s ene a p aces n or er o avo ser ousdeformation and collapse under weight ofconcrete
The chutes must be steep enough to permitconcrete to flow without assistance
Chutes require cleaning by washing immediatelyafter each use
-
8/13/2019 Construction Equipment Planning
45/67
2a.Wheel Barrow-manual Wheel barrows preferably pneumatically tyred
are used for small jobs and for small haullengths
Capacity of such a wheel barrow is about 80 kgof concrete They can be wheeled up and down on
scaffolding boards and can be easily handled byone man and accommodated in a usual materialhoist.
The time required to position and fill successivebarrow load usually controls the number ofbatches produced per hour .
Hand carts and prams are also of similarcapacity.
-
8/13/2019 Construction Equipment Planning
46/67
2b.Power barrows The haul length and capacity of power barrows
are more than that of manual barrow more quantity of concrete is handled by a single
person, whose job is to control and direct the
The haul length may be about 300m andcapacity may be upto about 800 kg of concrete
Due to triangular arrangements of wheels theyhave better maneuverability and they can accentover a gradient of 20 percent easily
-
8/13/2019 Construction Equipment Planning
47/67
2b.Power barrows contd Power barrows, while transporting concrete over
very rough terrain, may cause segregation of theconcrete due to jolting.
Usually power barrows are loaded from a,
which the barrow would be brought in for loading.
This type of transportation of concrete in
barrows prams, etc., is useful in construction ofslabs or similar flat structures . Thus for buildingconstruction casting of wall column and floor,etc. may be done together to obtain moreefficiency
-
8/13/2019 Construction Equipment Planning
48/67
3.Dumpers and Trucks Used in road, dam or airport constructions,
where concrete is to be transported over arelatively long haul distance .
The haul distance may be even 5 to 10 kms aneuvera y o umpers are more an are
suitable also for rough and soft terrain. For controlled discharge hydraulic tipping may
be used to discharge concrete into bucket,platform or directly into mould
The capacity of a dumper may range from 0.5m 3to 0.75m 3, where as a truck can be of capacity
ranging from 3m 3 to 15m 3.
-
8/13/2019 Construction Equipment Planning
49/67
3.Dumpers and Trucks contd Because of the jolting on the ground,
ordinary trucks and dumpers tend to causesegregation of concrete during transit To reduce se re ation durin loadin and
discharge, distribution of concrete over thewhole surface area of truck body isnecessary, rather than forming a heap.
The agitator truck of course totally aeliminates the possibility of segregation
4 Elevating Tower and Hoists
-
8/13/2019 Construction Equipment Planning
50/67
4. Elevating Tower and Hoists
(Vertical transport) In concreting of high level bridge deck, multistory
buildings, etc., elevating towers are used for lifting
concrete buckets . On a very large dam, the tower height may be 50 m or so, with a bucket capacity of about 1.5m 3
,
operated winches are used for lifting the concrete Hoists operate on a similar principle. A cantilever
platform hoist operates along a steel lattice mast For, chimneys, narrow shafts and slip form constructions
rope guided hoists are used, instead of hoists in centraltower or tower masts
4 Elevating Tower and Hoists
-
8/13/2019 Construction Equipment Planning
51/67
4. Elevating Tower and Hoistscontd
The rate of output per hour, maximum height of
elevation, the power source, available space atground level and secondary distribution systemto be used are the major considerations whileselecting the type of hoist required for aparticular construction site
One of the major disadvantages of hoists is that,
they are always associated with a secondarymeans of distribution of concrete at top andcosts of such a distribution system is the mainconsideration in selection of hoist
-
8/13/2019 Construction Equipment Planning
52/67
5.Monorail System Monorail system needs a track and consists of a
power wagon mounted on the single rail track,which can move at a speed of 80-90 m/min
The wagon needs no driver an e ue powere eng ne or r ve, or can e
battery driven or driven directly by electricity This system can transport concrete through a
maximum gradient of 1 in 12 The segregation of concrete may take place
due to jolting of concrete in the wagon over eachrail joints
6 Cranes and Cableway (Two or three
-
8/13/2019 Construction Equipment Planning
53/67
6. Cranes and Cableway (Two or three
dimensional transport) When a large area is to be covered for concrete
transport without a secondary distribution system, cranes
or cableways may be used Cable way is useful in river valley projects Cranes and cable-ways are often used for transporting
other objects in addition to transporting concrete Derrick crane, tower crane, crawler mounted, or wheel
mounted, or a hydraulic crane may be used. The main consideration in selecting the crane is height
and radius of operation, the ground condition, etc
6 Cranes and Cableway
-
8/13/2019 Construction Equipment Planning
54/67
6. Cranes and Cablewaycontd
The hydraulic crane can be used in
situation where accessibility is very difficult A cable way has the advantage of being
,interference with the other activities in thesite is least
Stiffer concrete can be handled forconsiderable distances
-
8/13/2019 Construction Equipment Planning
55/67
7.Belt conveyor Power required to drive a conveyor is usually
small By increasing the speed of running the
discharge can be as high as 115 m 3/hour on a
Conveyor lengths can be varied, and toughing of belt through suitable idlers may be provided
Conveying concrete through a limited elevationof 30 0 is possible
Belt conveyors are suitable for large thick raftsor large area slabs
-
8/13/2019 Construction Equipment Planning
56/67
7.Belt conveyor contd A dumper mounted unit is used to transport
concrete from dumper to mould One of the major drawbacks of conveyors, when
it is long, is that, in case of a breakdown of,
remain in the belt itself Initial cost of setting up is also high Both dry as well as wet mixes can be handled
with conveyors for slump of 50 mm inclination may be 24 0 but
for a slump of 150 mm the inclination is 12 o only
-
8/13/2019 Construction Equipment Planning
57/67
8.Concrete buckets or skips Buckets or Skips are most popular
containers used for transportingconcrete. ,
are two types of bucket or skip,1) Roll-over
2) Constant altitude type
8.Concrete buckets or skips
-
8/13/2019 Construction Equipment Planning
58/67
8.Concrete buckets or skips
contdHeight required during loading is more in
constant altitude skip compared to that of aroll-over skip, but clearance under the hook .
The capacity of skip may vary from 0.2 m 3 insmall jobs to 10 m 3 in mass concreting
8.Concrete buckets or skips
-
8/13/2019 Construction Equipment Planning
59/67
8.Concrete buckets or skips
contd The roll-over skip may require manual
assistance for low slump concrete, it issuitable for discharge into narrow openingfrom works .
Buckets are also used for under waterconcreting One of the disadvantages of using bucket
in underwater concreting is that,turbulance of the water caused duringlowering of the bucket may wash away the
mortar from already placed concrete
9.General Consideration in
-
8/13/2019 Construction Equipment Planning
60/67
placing of Concrete Maintaining uniformity of the concrete segregation control Concrete behaves like a heavy emulsion For higher slump mixes there is a tendency for
heavier particles to settle below During lateral movement coarse aggregate and
mortar tends to separate Pouring concrete at the same place or when
dumped at an angle cause lateral movement For proper bond between two horizontal layer,
each layer shall be soft when a new layer isplaced upon it.
9.General Consideration in
-
8/13/2019 Construction Equipment Planning
61/67
placing of Concrete At joints compaction must be ensured When concrete is placed over rock or hardened
concrete a layer of mortar shall be placed at allportion of the joint before concrete is poured.
s necessary o ensure a concre e reac esall corners of the form and is well compacted
The concrete shall be placed generally within 20minutes of mixing and should not be disturbedafter 1 hr of mixing the water with cement
It the temperature is more than 30 0 precautionsare required to be taken by using cooler water,
cooler aggregate
10. Under water placing and the
-
8/13/2019 Construction Equipment Planning
62/67
p g
tremie Concrete cannot be compacted and may get
mixed with water Concrete must be self compacting and wet
enough to flow under its own weight, and must
The common methods of placing the concreteunderwater are:
1) use of pre packed or grouted concrete2) Tremie pipe or using bottom open bucket
described earlier3) Pumping4) Dumping by bags
10. Under water placing and the tremied
-
8/13/2019 Construction Equipment Planning
63/67
contd The tremie consists of a rigid pipe either metallic or
plastic, with a hopper at the top for feeding the concretein to the pipe from a concrete source
The pipe must be jointless or formed by bolting togethera series of flanged section with water tight joints
lowering and raising it, whenever required At the beginning the tremie pipe is lowered fully and
loose pug of material such as plastic sponge, coir orpaper is inserted at the top concrete is then loaded ontop of such a plug
10. Under water placing and the
-
8/13/2019 Construction Equipment Planning
64/67
p g
tremie contd The plug forms a separation between the water
and concrete And as the concrete is fed, this plug forces out
the water in the pipe s e p ug reac es e o om e p pe s
raised a little to drive out the plug and theconcrete is then placed at the bottom
The diameter of the tremie pipe is usually of theorder of 150 mm and above.
The tremie is very useful in diaphragm wallconstruction where concreting is done under
bentonite slurry in trenches.
Equipment Type & Range ofoperation
Advantages Remarks
Crane & Hoists Work above groundlevel
also handles itemsother than concrete
careful planning isrequired
-
8/13/2019 Construction Equipment Planning
65/67
level other than concrete required
Buckets & skips Useful on cranes andcableways Convey concrete frommixer to form utilizesversatility of cranes
controllable discharge isnecessary
Barrows & Prams For short hauls Labour intensive slow process
Chutes Conveying concrete toa lower level
Low cost Proper slope anddischarge arrangementis necessary
Belt Conveyor Conveying concretehorizontally or throughlimited slope
Can handle largevolume of concrete atfast rate
Cleaning of belts isneeded
Pneumatic Placers can place concrete in
difficult location
Ideal for tunnel
concreting
Skilful operation is must
Drop chutes &Elephant trunking
Placing concrete invertical forms
Segregation freeconcreting
Cross-section shall belarge enough so that nointerference withreinforcement
Tremies For under waterconcreting
--- Careful operation isnecessary richer mix is
requiredScrew spreaders Used in pavements --- ---
Monorail For horizontalmovement of concrete
--- Capital intense
Cableways Used in river valleyprojects
Can carry other items
also
careful planning is
required
11.Economic aspects and selection
-
8/13/2019 Construction Equipment Planning
66/67
Wheeled transports are essentially meant for relativelylong horizontal hauls
The rate of delivery, mixer type and their output,distance of haulage, site conditions and place of
delivery, and discharge characteristics are the factorson which selection of wheeled transport is dependentWhile comparing the cost involved in different
,
Capacity, speed of travel, charging and discharging time of the transport,
number of vehicles required ,
11 Economic aspects and selection contd
-
8/13/2019 Construction Equipment Planning
67/67
11.Economic aspects and selection contd
4. labour cost,
5. hire rates,6. fuel cost,
7. maintenance cost8. and cost of access, etc