comunity hub
Post on 14-Mar-2016
222 Views
Preview:
DESCRIPTION
TRANSCRIPT
View along Thomas Street
01
INTRO COMMUNITYHUBA PLACE FOR
CEREMONY+
LOCAL ART& DESIGNGALLERY
SOUTH EAST VIEW OF THOMAS STREET ELEVATION
NORTH WEST VIEW OF THOMAS STREET ELEVATION
LAYERS OF TORN WALLPAPER AGAINST EXTERNAL BRICKWORK
REAR ELEVATION OF SITE 3, LOOKING SOUTHEAST ALONG BACK TURNER
“HOME IS WHERE THE HEART IS”
EVIDENCE OF PREVI-OUS OPENINGS, BUILDING MODIFI-CATIONS OVER TIME, MUTABLE BUILDING USE - PALIMPSEST.
VIEW LOOKING ALONG KELVIN STREET TO CAFE
CORNER OF BACK TURNER STREET AND KELVIN STREET.
NORTH WEST VIEW OF THOMAS STREET ELEVATION
/001
/003 /004 /005
/006
/009
/007 /008
/002
Site Location Plan @ 1:2000
Manchester, UK
NARRATIVEMy initial project, ‘A Place For Ceremony’, was designed as a purpose-built venue forsecular ceremonies (weddings & funerals). Though my previous site choice had beeninappropriate, the area suited the building aptly. However, the appropriatness of thebuilding in its location was questionable, and how greatly would the area havebene�tted from its presence.Therefore, the new incarnation of ‘A Place For Ceremony’ is entitled ‘Community Hub’.The design is now focussed on providing a location, around which, a community can beestablished in Northern Quarter.
02
SITE LOCATION & NARRATIVE AREA PHOTOS
THOM
AS STREET
SITE
SWAN STREET (A665)
CHURCH STREET
TIB STR
EET
OLD
HAM S
TREE
T
MARKET STREET
HIGH STREET Previo
us
Site
SHUDEHILL
WITHY GROVE
HIG
H S
TREE
T
N
03
FIRST FLOOR PLAN @ 1:100
a
b
b
a
Ceremony HallStage
Seating
Storage
Processional RouteVOID
VOID
LIFT
LIFT
AdminOf�ce
KitchenArea
LIFT
To Exit
Post- CeremonySpace
Balcony
VOID
VOID
VOID
DWCMWC
StaffM/DWC
StaffFWC
FWC
Cof�nLift
THOMAS STREET
BACK TURNER STREET
KELV
IN STR
EET
Stair to Gallery& Fire Escape
COMMUNITYHUB
04
GROUND FLOOR PLAN @ 1:100
a
b
b
b2
aGallery Space
GalleryEntrance
CeremonyExit
Ceremony Entrance
Staff Entrance&
Staff Room
CeremonyCar Stop
THOMAS STREET
KELV
IN STR
EET
BACK TURNER STREET
GalleryStore
Plant LIFT
RAMP
LIFTLIFT
Cof�nLift
ToProcessional
Route
FromPost
CeremonySpace
ToKitchen
ToCeremony Hall
FireEscape
Vent.Shaft
13
ELEVATIONS
Thomas Street Elevation @ 1:100
Back Turner Street Elevation @ 1:100
COMMUNITYHUB
14
ELEVATION & LONG SECTION
Kelvin Street Elevation @ 1:200
Ceremony Hall
Gallery Car Stop
PostCeremony
Space
CeremonyExit
View: Thomas Street 01 View: Thomas Street 02
Section a - a @ 1:100
Ground Floor Plan @ 1:200
07
First Floor Plan @ 1:200
View of Ceremony Hall
Entrance to Ceremony Hall (4)
Ceremony Entrance (1)
Post Ceremony Space (7)
Processional Route (3)
CEREMONY + GALLERY MODE
THOMAS STREET
BACK TURNER STREET
KELV
IN STR
EET
THOMAS STREET
BACK TURNER STREET
KELV
IN STR
EET
Gallery
CeremonyHall
Balcony
Post CeremonySpace
Kitchen
StaffWCs
AdminOf�ce
To Exit
Processional Route
Store
GalleryEntrance
Ga leryStore
LIFT
Cof�n Lift
DoorTo C.HallClosed
(Except forFire Escape)
Through-doorclosed
LIFTnot in
service
CeremonyEntrance
CeremonyExit
LIFTStaff Room/ Entrance
1
2
34
5 6
7
8
9
COMMUNITYHUB
Ground Floor Plan @ 1:200
08
First Floor Plan @ 1:200
Internal View of Gallery 02
Internal View of Gallery 01
EXHIBITION MODE
THOMAS STREET
BACK TURNER STREET
KELV
IN STR
EET
THOMAS STREET
BACK TURNER STREET
KELV
IN STR
EET
Gallery
LIFT
ExhibitionArea
DisplayBoards
Balcony
SocialArea
Kitchen
StaffWCsAdmin
Of�ceLIFT LIFTLIFT
DWCMWC
FWCTo Exit
Store
GalleryEntrance
Ga leryStore
Plant
Deliveries
LIFT
ExhibitionExit
OpenCirculation
LIFTStaff Room/ Entrance
11
DETAIL SECTION @ 1:50 (SECTION b - b)
Section b - b2
Recessed rainwater gutter
Ceremony Hall
Gallery
Floating Filigree Screenmade from white painted
aluminium set 200mmfrom external façade
Large glazing unitwith 16mm argon �lled
cavity
Protective metal gridover roof-light
Recessed rainwatergutter abovecavity closer
External 22mm concretewall �nish100mm medium denseconcrete block60mm solid foam insulation50mm cavity100mm high denseconcrete blockInternal 22mm concrete wall �nish
DPC lapped intoDPM
Weak mix sand &cement
White ruberoid heat-welded roofover 200mm rigid insulation
on 15mm plywoodover 150mm steel trusses
Light tunneltaking naturallight down tothe Gallery atGround Floor
Ventilation void
Concrete raftfoundation
over sand blindedhardcore
40mm Finishing screed over110mm Insulation over DPM
Concrete step castin-situ
40mm �nishing screedover100mm insulation on15mm plywood on50 x 100mm timberjoists on100mm mediumdense concrete block
500mm deep steel beam
40mm �nishing screed over100mm concrete slab on80mm insulation on15mm plywood over250mm deep steel joists
12mm plasterboard ceilingsuspended from steel joists
White painted �ligreescreen hung 200mm from external insulatedwall panels, �xed to200mm UC steelsectionsinternal insulatedpanels also �xed toUC steel sections, with22mm �reboard &skim �nish, paintedwhite
COMMUNITYHUB
SUN
PATH
0800
07
1000120
1400
1600
1700
1
1
2
2
3
3
4
4
5
5
NORTHERN QRTR.
Thomas Street
Edge Street
Swan Street
High Street
Oldham
Stre
etTib Stre
et
Market Street
Stevenson Square
Hig
h St
reet
Shudenhill
Withy Grove
ManchesterTransportInterchange
NationalCar Parks
NationalCar Parks
474.2 m2
PERIPHERAL LOCATION TO NRTHN.QTR.AWKWARD BUT VACANT SITE.
600.8 m2
VERY LARGE SITE ON MOST BUSY THROUGH ROAD IN NRTHN.QTR.
332.7 m2
SMALLER SITE NEXT TO SITE 3, COULD BE USED AS EXTENSION TO SITE 3.
587.2 m2
GOOD SIZE SITE WITH CENTRAL LOCATION, HOW-EVER HIDDEN BY SURROUNDING TALL BUILDINGS.
SOUTH EAST VIEW OF THOMAS STREET ELEVATION
NORTH WEST VIEW OF THOMAS STREET ELEVATION
LAYERS OF TORN WALLPAPER AGAINST EXTERNAL BRICK-WORK
REAR ELEVATION OF SITE 3, LOOKING SOUTHE ST ALONG BACK TURNER STREET.
“HOME IS WHERE THE HEART IS”
EVIDENCE OF PREVI-OUS OPENINGS, BUILDING MODIFICA-TIONS OVER TIME, MUTABLE BUILDING USE - PALIMPSEST.
VIEW LOOKING ALONG KELVIN STREET TO CAFE OPPOSITE SITE.
CORNER OF BACK TURNER STREET AND KELVIN STREET.
NORTH WEST VIEW OF THOMAS STREET ELEVATION
1:1500 LOCATION PLAN WITH VARIOUS SITES AND SURROUNDING BUILDING USES.PEDESTRIAN FLOW INTO AREA INDICATED BY BLUE ARROWS.
447.5 m2
PROMINANT CORNER POSITION, THOUGH VERY SMALL SITE.
/001
/003 /004 /005
/006
/009
/007 /008
/002
NORT
THERN
N
RN QRT
RTR.
SECULAR COMMUNITY SITE 3:FOOD + DRINK
KEY
:CREATIVE INDUSTRIES
:RESIDENTIAL
:MISCELLANEOUS
:TRANSPORT/PARKING
:PEDESTRIAN FLOW INTONORTHERN QTR.
:NORTHERN QUARTERPERIMETER
N
top related