company profile - panoramabh.com company profile.pdf · fabrication, erection, ... activities,...
Post on 21-Jul-2018
596 Views
Preview:
TRANSCRIPT
Company Profile
Contact Address:
P.O. Box 5602,
Manama,
Kingdom of Bahrain.
Tel. No. (+973) 17 729 935
Fax No. (+973) 17 723 330
e-mail: panorama@batelco.com.bh
“Our Obligation is to Provide
Unparalleled Personalized
Services, Craftsmanship and
Trust."
Mechanical & Civil Engineering Works Pumping Stations Ground Water Storage Tanks Elevated Storage Reservoirs Pipelines (Oil, Gas, Water & Sewerage/Drainage) Pressure Vessels Water Tanks Internal Lining (Corrocote) Heavy Structural Steel Fabrication and Erection Cladding Works Earthworks & Concrete works Heavy Duty Access Scaffolding And all Type of Coating Works
Values & Beliefs
Provide Value for Money to Customers through Quality Products and Services.
Adhere to Ethical Norms in all Dealings with Employees, Customers, Suppliers, Banks and Clients.
No Compromise on Quality Management System Developed.
Obtain the Satisfaction of Employees and Suppliers through Fulfillment of their Needs.
Recognize and Reward Initiative, Innovativeness and Creativity.
An Organizational Climate Conductive to Trust, Open Communication and Team Spirit is an
Integral Part of Business.
Manage the Environment Effectively to Various Sections of Society and Preserve
Environment.
Achieve the Commitment in an Accelerated Manner, Consistent with Values and Beliefs, by
Continuous Organization Renewal.
The Quality Policy of PANORAMA Contracting & Engineering Services WLL. is founded on the basic motive of customer satisfaction giving utmost emphasis to health, safety, and environmental factors. PANORAMA Management is committed to establish, implement, and maintain quality system according to the requirement of International Standards ISO 9001 at all levels. The project QA/QC Managers on behalf of the Company Project Managers are responsible to ensure that the quality systems are established, implemented, and maintained to the satisfaction of the customer. The implementation of the Quality Policy is regulated and monitored within the well-defined framework of work procedures, inspection test plan and quality plan with the active participation of all employees. Optimum resource availability is given prime importance and training is imparted for the continuous improvement in the quality of service in line with the latest technology and construction techniques. Our prime goal is ‘to be the best among the competitors’ and to uphold the interests of the customer in accordance
to the applicable procedures, standards, specifications and contractual obligations keeping in mind the all round
development of one and all involved.
Quality
Policy
Introduction
Mission Statement
Our goal at PANORAMA Contracting &
Engineering Services WLL. is to provide
our Customers with quality services. We
strive to maintain the principles upon
which our business was founded over 30
years ago. It is these principles of
honesty, integrity, quality and safety that
have enabled us to remain in business
over these 30 years.
We can deliver many products associated
with the Water System, Gas/ Petroleum
Distribution and any Storage Facilities,
Waste/Drainage Water System, Pumping
Station and any other types of Civil
Engineering Works.
PANORAMA Contracting & Engineering Services
WLL. is a major Contractor for Steel Works such as
Fabrication, Erection, Testing and Commissioning
of Pipelines for Gas, Oil, Water and Sewerage/
Drainage. Specialize in EPC Contract for the Steel
Storage Tanks, Pumping Stations and Structural
Building Works.
PANORAMA established in the year 1976 in
Bahrain, with the vision to cater the growing needs
of the industrial development taking place in the
region, having successfully completed major
engineering and contracting projects in the Island.
20Mg Ground Storage Tank Center Column
SITRA WEST VALVE STATION (SWVS)
Ground Storage Tanks Experience
PANORAMA Contracting & Engineering Services WLL., has
been leading in designing, fabricating, erecting and
commissioning Storage Tanks over the Island and for over 30
years built, a field force of experienced Engineer’s,
Superintendents, Foremen and Skilled Manpower, backed by
the energetic Management.
20MG Ground
Storage Tank Center
10MG Ground Storage Tank @ Sitra BS
Gas Pipelines Experience
PANORAMA specializes in the fabrication,
installation, testing and commissioning of
underground pipelines for BAPCO Upstream
(formerly BANOCO). Undertaken the major works
such as Gas Pipelines from ADP to DVS, SWVS to
GCC VS and DVS to Wharf VS.
ABOVEGROUND PIPE LINE
UNDERGROUND PIPE LINE
HYDROTESTING OF PIPE LINE
10Mg GROUND STORAGE TANK
Key Personnel
Salim Ahmed Mannai
The Company Chairman / Managing Director, Founder and Owner of the Company.
Having an Experience in the Construction Industry for more than 42 years.
Bishara N. Nusseir
The Company Director, a Mechanical Engineer in Profession. One of the Owner and
Founder of the Company. Having an Experience in the Construction Industry for more
than 42 years
Ahmed Isa Al Mannai
The Deputy Managing Director of the Company, Responsible in accurately forecasting
revenue, profitability, margins, bill rates and utilization, assures project legal
documents are completed and signed, manages project budget, identifies resources
needed and assigns individual responsibilities, In-charge of the Administration
Section of the Company. Having an Experience in Human Resources and
Administrative Management of Construction Projects for around 16 Years.
Zachariah Thomas
The Director- Projects & Contracting of the Company, responsible for Specifying
project objectives and plans including delineation of scope, budgeting, scheduling,
setting performance requirements, and selecting project participation, Maximizing
resource efficiency through procurement of labor, materials and equipment,
Developing effective communications and mechanisms for resolving conflicts.
Manages project budget, Analyzes project profitability, revenue, margins, bill rates and
utilization, Follows up with clients, when necessary. Have an experience in the
Construction Industry for more than 25 years.
Donrick Erril Joshua
The General Manager of the company, responsible for projects being handled by the
company. Having 15 years experience as Project Manager in Bahrain working on EPC
contracts for EWA/Alstorm Switzerland. Having an overall experience of 33 years in
the construction industry.
Thamizharasan. S
The Project Manager of the Company, direct and monitor the progress of construction
activities, oversee the delivery and use of materials, tools, and equipment, quality of
construction, worker productivity, and safety, review engineering and architectural
drawings and specifications to monitor progress and ensure compliance with plans
and schedules. Responsible for obtaining all necessary permits and licenses. In-
charge for the Tendering, Planning, Construction, Testing and Commissioning of
Storage Tanks, Water, Gas and Oil Pipelines. Having an experience in the Construction
Industry for more than 25 years
Ernesto T. Tumang
The Project Manager of the Company, Responsible for Facilitating team and client
meetings effectively, Tracks and reports team hours and expenses on a weekly basis,
Determines appropriate revenue recognition, ensures timely and accurate invoicing,
and monitors receivables for project. In-charge for the Tendering, Design, Planning,
Construction, Testing and Commissioning of Pumping Stations and Steel Storage
Tanks. Having an experience in the Construction Industry for more than 25 years
Kul Bhushan Chatra
The Project Manager of the Company, responsible for Creating and executing project
work plans and revises as appropriate to meet changing needs and requirements,
Identifies resources needed and assigns individual responsibilities, Reviews
deliverables prepared by team before passing to client, Effectively applies our
methodology and enforces project standards. In-charge for the Tendering, Planning,
Construction, Testing and Commissioning of Pumping Stations, Water, Gas and Oil
Pipelines. Having an experienced in the Construction Industry for more than 30 years
Munnar Parameshwara Bhat
Design Manager of the Company responsible for review of hydraulic and process
design of pumping system for meeting the specified requirements. He is also
responsible for review pumping system control philosophy for efficient operation of the
plants. He was designing various types of pumps for 8 years. He has been involved in
preparing water supply project reports; designing, preparing bid documents, evaluating
of bids, reviewing of contract drawings for various pumping plants equipment for more
than 50 cities. He has 33 years in the contracting
Libu Varghese Mathew
The Quantity Surveyor of the Company, In-charge for the Tendering and Estimation.
Evaluates the Tender Documents, Studies the feasibility of the Tender and selects the
Tender participation.
Manages all costing related to Tender, from the initial calculations to the final figures.
Surveyors seek to minimize the costs of a project and enhance value for money, while
still achieving the required standards and quality. Involved in a project from the start,
preparing estimates and costs of the work.
Mansoor Mohammed Basha
The Senior QHSE Manager of the Company, In-charge for the preparation of the
companies QHSE documents and supervision of all amendments and revisions,
Control and the distribution of all the companies quality documentation, Monitor all
quality related activities on the project, Perform all internal and external audits on
behalf of the company’s management, Attend client quality management meetings,
Coordinate all QHSE activities with the Project manager, Control all achieve
documentation upon the completion of the project. Having an experience in the
Construction Industry of more than 15 years.
Biju Bhaskaran
The QA/QC Manager of the Company, In-charge for the preparation of the companies
QHSE manual control and supervision of all amendments and revisions, Control and
the distribution of all the companies quality documentation, Monitor all quality related
activities on the project, Attend client quality management meetings, Coordinate all
QA/QC activities with the Project manager, Control all achieve documentation upon
the completion of the project. Having an experience in the Construction Industry of
more than 15 years.
N.Sudhakaran
The Construction Manager of the Company, manages all costs relating to projects,
from the initial calculations to the final figures. Surveyors seek to minimize the costs
of a project and enhance value for money, while still achieving the required standards
and quality. Involved in a project from the start, preparing estimates and costs of the
work.. Having an experience in the Construction of Pumping Stations, Storage Tanks,
Water, Gas, Oil and Sewer Pipelines of more than 20 years.
Mohanan K P
The Tanks Superintend of the Company, Organizes, co-ordinates and controls the
correct performance of the construction and assembly work, even of high complexity,
assisting the construction manager in the management for correct performance and
monitoring of the project, Applies the final, procedures approved by the client, Ensures
observance of the project specifications, Ensures that safety and quality standards are
respected. Having an experienced in the Construction Industry of around 15 years
Sameer KB
The Safety Coordinator of the Company, In-charge for Implementing the
process for reviewing contractor safety performance against applicable laws,
regulations the Planning, Directs the work of Environmental Health and Safety
staff and outside consultants and contractors regarding new construction
safety, Coordinates construction safety program development and implements
activities. Having an experienced in the Construction Industry of more than 8
years.
Swathidev George
The Planning Engineer of the Company, In charge in Providing project control services to the Project Manager in implementation of the project, Responsible for timely issue of project control deliverables & progress reports, Provide leadership to planning engineers, schedulers and cost engineers to plan, monitor, and control the execution of the project within the time and budgetary parameters, optimizing resource utilization. In-charge for the Planning, Construction, Testing and Commissioning of Pumping Stations, Storage Tanks, Water, Gas and Oil Pipelines. Having an experienced in the Construction Industry of around 7 years
Thaha Aliyar Kunju
The Land Surveyor of the Company, responsible to offer valuable land surveying
service to clients, determine the location of boundaries, field surveys and record
details, and perform the projects according to the technical standards. Having an
experience in the Construction of Pumping Stations, Storage Tanks, Water, Gas, Oil
and Sewer Pipelines of more than 20 years.
C Venugopal
The In-charge for the Blasting and painting in Block stage and hull stage, Planning
and organizing Painting works, Quality control of surface preparation and coating
together with Client Painting representative. Having an experience in Scaffolding
Erection for Construction. Also In-charge for Plant & Equipments, involved in
transportation of man power resources according to changing needs, stock control,
warehousing, and ensuring structures are in place to monitor the flow of goods and
materials. Having an experience in the Construction Industry of around 20 years.
Joseph Marydas Antony
The Senior Mechanical Engineer, In-charge for the Fabrication, Testing and
Commissioning of Pumping Stations, Storage Tanks, Water Pipelines. co-ordinates and
controls the correct performance of the construction work, even of high complexity,
assisting the construction manager in the management for correct performance and
monitoring of the project Having an experienced in the Construction Industry of around
10 years.
Item Equipment description QTY. (Nos.) Type
1 Mobile Crane, 200T 2 Telescopic
2 Mobile Crane, 140T 1 Telescopic
3 Mobile Crane, 110T 1 Telescopic
4 Mobile Crane, 50T 1 Telescopic
5 Mobile Crane, 45T 1 Telescopic
6 Mobile Crane, 40T 2 Mechanical
7 Mobile Crane, 35T 1 Telescopic
8 Mobile Crane, 25T 2 Telescopic
9 Over Head Crane, 10T 5
10 Heavy Excavator, 1 m3 26
11 Compressor, 1110 cfm 5
12 Compressor, 400/625 cfm 9
13 Heavy Rock Breaker 16
14 Vermeer Hydrostatic Trencher 1
15 Loader, 4 m3 12 Front Loader
16 Loader with Backhoe, 3 m3 8
17 Compactor Plate 14
18 Roller, 1T to 2T 6
19 Roller 10T 8
20 Generator, 360/400kv 14
21 Generator, 200kv 6
22 Generator, 140kv 4
23 Generator, Atlas Capco 4
24 Welding Machine, Diesel, 400
Amps
26
25 Welding Machine, Electric, 400
Amps
55
26 Welding Machine, Automatic (1
side Horizontal)
4
27 Welding Machine, Automatic (2
side Horizontal)
2
28 Welding Machine, Automatic
(Vertical)
2
Plant & Equipments
Our Fully Own Plant/Equipment is the Best Available for the Work We
Perform. We have the Plant/Equipments to Self-Dependent in all our
Construction Needs.
Craneage/ Mechanical Works
Mobile Cranes Ranging from 15T to 200T Capacity, Trailers (Low and
Flat Bed), Diesel Generators, Air Compressors, Diesel, Electric and
Automatic Welding Machine, Scaffolding and Miscellaneous Erection
Tools.
General Construction Plant/ Equipment
Front Loader with Backhoe, Grader, Heavy Excavator/ Rock Breaker,
Roller/ Compactor (Different Capacities),
Dump Trucks, 10m³
Water Tanker (10,000 Gallons Capacity ) and Other
Miscellaneous Civil Works Equipment
29 Tract AUTO Welding Mc 4
30 Rolling Machine, up to 40mm
Thick Steel Plate
2
31 Rolling Machine, up to 25mm
Thick Steel Plate
1
32 Hydraulic Press 500 ton 1
33 Shearing Machine Thickness
upto 16mm
1
34 Lathe Machine 6
35 Drilling Machine 6
36 Cutting Sets, Oxy-Acetylene
Gas
28
37 Sand Blasting Unit 10
38 Painting Machine, Corrocote
Internal Coating
4
39 Painting Machine, Paint
Coating
10
40 Hiab Winch Truck, 5 ton
Capacity
6
41 Trailer, Flat Bed, 40 ton
Capacity
14
42 Trailer, Low Bed, 40 ton
Capacity
5
43 Diesel Tanker, 600 Gallon
Capacity
4
44 Water Tanker, 10000 Gallon
Capacity
2
45 Water Tanker, 5000 Gallon
Capacity
5
46 Dump Truck, 5 m3 7
47 Dump Truck, 10m3 10
48 Dump Truck, 20m3 9
49 Bus, 52 Seats 6
50 Bus, 40 Seats 4
51 Bus, 24Seats 12
52 Pick Up, Six Wheelers 38
53 Pipe Bending Machine upto 2’’ 2
Construction Capabilities
Gas/ Oil Pipelines Fabrication, Installation and Welding, Testing, Pigging and Commissioning
Fixed Roof/ Floating Roof Ground Storage Tanks Design and Built to API-650, BSEN 14015 and BS
2654 sized from 0.5Mg to 20Mg Capacity.
Elevated Steel Water Reservoir, Design and Built in AWWA D100 Standard with Different Capacities.
Pressure Vessels, Design and Built as per ASME Standard including Hoppers, Silos and Ducting.
Fire Protection Water Storage Tanks, built to NFPA or FM Specifications with Different Capacities.
Plate rolling up to thickness of 40mm and width of 3000mm.
Pump Stations Construction, Drainage and Sewerage Pipelines.
Mechanical Plant/ Equipment Installation Works.
Steel Structural Fabrication and Installation Works including Cladding Works.
Coating/ Lining Works including Surface Preparation to Sa 2.5 and Sa 3.0 Standard.
Earthworks and Civil or Concreting Works such as Buildings, Foundations, Chambers and any other Civil
Engineering Works.
SCAFFOLDING WORKS
ADP HEADER 20Mg GST ROOF
20Mg GST BOTTOM PLATE SWVS HEADER
Construction Experience
PANORAMA Contracting & Engineering Services WLL. is a Major Player in the Turnkey Project such
as Design, Engineering, Procurement, Construction, Testing and Commissioning of Ground/
Elevated Storage Tanks, High Pressure Spheres/ Vessels, Piping Works such as Water, Gas, Oil,
Drainage and Sewerage Pipeline. Pumping Stations, Earthworks and Civil Engineering/ Concreting
Works.
With the Company ability to construct and commissioned pipelines, we
have also had the opportunity of being involved in the supply, fabrication, erection, testing and
commissioning of complex structures.
With Client appreciation forming the backbone of this product line, The Company are assure that
the skills set will enhance further to satisfy the needs of the Clients.
Gas Pipelines
HEADER FABRICATION
WELDING OF PIPELINES
ABOVE GROUND PIPE LINE
PIPE LAYING IN THE TRENCH
ABOVE GROUND PIPE LINE
ABOVE GROUND PIPE LINE
HEADER INSTALLATION UNDER GROUND PIPE LINE
GDU K-26
Panorama have constructed and commissioned DI Water Pipelines of various sizes from
Ø150mm to Ø1400mm .With Client appreciation forming the backbone of this product line,
The Company are assure that the skills set will enhance further to satisfy the needs of the
Clients.The experience gained from these various Projects has allowed the Company to
provide better customized solutions to service the actual needs of the Client. Fit for the
purpose, the designs take into consideration not only the unique environmental conditions of
the location but also the specific product to be stored.
Water Pipelines
With over 200 tanks of various sizes constructed to date, the Company had well earned market
reputation for the tank design and construction whilst meeting the stringent Quality, Safety and
Schedule requirements of the Clients.
The experience gained from these various Projects has allowed the Company to provide better
customized solutions to service the actual needs of the Client. Fit for the purpose, the designs take
into consideration not only the unique environmental conditions of the location but also the specific
product to be stored.
Storage Tanks
ELEVATED STORAGE RESERVOIRS
20Mg GST AT HIDD FS
GST RC FOUNDATION WORKS
BOTTOM PLATE
From early 80’s various sizes pumping stations were constructed to date at various parts of Bahrain,
the Company had well earned market reputation for the Pumping Station design and construction
whilst meeting the stringent Quality, Safety and Schedule requirements of the Clients.
The experience gained from these various Projects has allowed the Company to provide better
customized solutions to service the actual needs of the Client. Fit for the purpose, the designs take
into consideration not only the unique environmental conditions of the location but also the specific
product to be stored.
PUMPING STATION WORKS
Projects Undertaken The Company has successfully executed a number of turnkey projects since inception. With the Company’s core competence currently concentrated on the storage tanks, piping and other mechanical works, it has developed in house systems to ensure that all EPC projects are effectively and efficiently managed. The constant upgrade of these systems has allowed the Company to develop strong ties with Subcontractors such that there is a seamless management of interfaces. Overall, we have therefore been able to meet or exceed customer expectations by handing over facilities on time and budget, and within the quality and safety tolerances applied. A couple of the projects executed in last 20 years have been listed for information.
CLIENT CLIENT
CONTACT DETAILS
PROJECT DESCRIPTION YEAR
VALUE in
MILLION (BD)
BAPCO 17704040 Provision of Manpower Service for Onshore Bahrain Installation Pipeline Project
2017 .180
Electricity & Water Authority
17 996565 17 996888
Measured Term Contract (WTD MTC – PIPELINES Works)
2017 .4
Electricity & Water Authority
17 996565 17 996888
Water Stations Hidd – Lot A (4618A/2011/3100)
2016 10.5
Diyar Al Muharraq 77 155555 Water Distribution Station at Site A 2016 10
Diyar Al Muharraq 77 155555 Water Transmission Pipelines Supply and Installation
2016 1
Electricity & Water Authority
17 996565
17 996888
Pipeline Hidd Installation Works (4621/2011/3100)
2016 3.5
Electricity & Water Authority
Pipeline East Installation Works (4622/2011/3100)
2016 6.5
Electricity & Water Authority
Water Storage Ground Storage Tanks (4612C/2011/3100)
2014 8.1
Electricity & Water Authority
Pipeline South Installation Works (4619/2011/3100)
2013 4
Electricity & Water Authority
Water Stations Elevated Service Reservoirs (4614/2011/3100)
2012 15.6
Electricity & Water Authority
Water Storage Ground Storage Tanks (4612B/2011/3100)
2012 6.5
Electricity & Water Authority
New Al Dur FS, Storage Tank and Modification Works at West Riffa’a II BS and Refinery DS (4606/2010/3100)
2011 22.4
Electricity & Water Authority
Construct 1000mm Dia. Transmission Pipeline from WRBS to HTBS (4603/2009/3100)
2010 1.3
Electricity & Water Authority
Pumping Station Works at West Riffa’a BS, Hamad Town BS, and Al Areen – Package-01
2010 26.2 Pumping Station Works at Samahij BS, Ad Dur FS and Refinery DS – Package-02 (4606/2009/3100)
HYUNDAI Heavy Industries
17 121121 Construction of Nine (9) Ground Storage Tanks as Ad Dur IWPP
2009 26.2
USCO 17 359359 Water Requirements for USCO/GIIC. Fresh Water Pumping Station Work including Ø600mm Ductile Iron Pipeline
2008 0.8
FALCON Cement Plant
77 144443 Construction of Ø4” Gas Pipeline and Associated Facilities for Cement Plant
2008 0.53
USCO 17 359359 Construction of Ø600mm Water Transmission Line from Hidd FS to USCO/GIIC.
2008 0.65
GAMUDA BERHAD
17 148000 Construction of New Ø12” Gas Pipeline for Replacement of Sitra Bridges Project
2008 1.5
MWH/BAPCO 17 755708 Replacement of Sitra Bridge – New Ø12” Gas Pipeline
2008 1.5
Ministry of Electricity & Water
17 726501 Construction of 3 Nos. 1Mg Elevated Storage Reservoirs at South Alba, Samaheej BS and Durrat Al Bahrain DS
2008 3.9
Ministry of Electricity & Water
17 726501 Construction of 2 Nos. 1Mg Elevated Storage Reservoirs at Tubli DS and Buquwah DS.
2008 3.1
Ministry of Electricity & Water
17 726501 Construction of Ground Storage Tanks: 2 Nos. 10Mg at Buquwah DS, 5 Nos. 54Mg GST’s at Various Stations
2006-08 7.2
Ministry of Electricity & Water
17 726501 5 Nos. 20Mg Ground Storage Tanks at Hidd FS and Salmabad FS
2006-08 13.5
Ministry of Electricity & Water
17 726501 Construction of Ø600mm Water Pipeline at Durrat Al Bahrain
2007-08 1
GAMUDA BERHAD
17 148000 Sewerage Line for Replacement of Sitra Bridges Project
2007-08 0.4
Ministry of Electricity & Water
17 726501 3 Nos. 10Mg Ground Storage Tanks at Refinery DS and Sitra BS
2004-06 4
Ministry of Works & Housing / Tilke & Partners
17 545555
Supply and Installation of Rain Water Drainage Pipes and Chambers, Waste Water Pipes and Chambers and Pumping Stations (Ø300mm to Ø2200 Rain Water Pipeline) Subcontract Works under CYBARCO-WCT
2002-04 5
BAPCO Formerly BANOCO
17 755708 Contract No. C - 545
2002-03 1.3 No. Ø16” Gas Pipeline from SWVS to GCC VS
BAPCO Formerly BANOCO
17 755708 Contract No. C - 306
2001-02 1.2 New 40,000bbl gasoline Tank #964 at Sitra marketing Terminal (Fixed Roof/ Floating Roof)
BAPCO Formerly BANOCO 17 755708
Contract No. C - 152
2000 0.4 Gas Dehydration Unit (GDU) K26 and K27 Installation of Skids and Interconnecting Piping
BAPCO Formerly BANOCO 17 755708
Contract C – 93 2000 0.2 Facelifting/Upgrading of Sitra/Riffa’a and
Tubli Service Station
BAPCO Formerly BANOCO 17 755708
Contract No. 1829
1999-2000 2
2 x Ø18” dry gas Pipeline from Alba Distribution Point (ADP) to ALDAR Valve Station (DVS) and Revamping Dry Khuff Gas Headers at ADP
BAPCO Formerly BANOCO 17 755708
Contract No. 1724 1998-99
5.0
3 x Ø18” Dry Gas Pipeline from Al Dar VS to Wharf VS Contract No. 1710
1998-99 Construction of GPIC Valve Station – Mechanical Works Contract No. 1560
1998 Construction of Surge Tank No. 2-19 @ TB #3 BAPCO Formerly BANOCO (Feb 1998 – June 1998) Contract No. 8389
1997-98 7,250 BBL Ground Water Storage Tank at Awali Contract No. 8276
1997-98 Design, Construction of 40m Height, 60,000 USG Elevated Water Sphere Tank at Refinery including the RC Foundation
AMA / Ministry of Electricity & Water 17 726501 Construction of Ground Water Storage tank
at Riffa’a 2 (Hidd Power Project Phase II) 1999 2.5
Ministry of Electricity & Water 1772 6501
Laying of Ø800mm, 6.5KM Long D.I. Pipeline from BAPCO Tanks to RDS and Branch Line to West Riffa’a Blending Station
1999 0.5
Ministry of Electricity & Water, Qatar
+974 4485 8585
Design and Construction of seven (7) Ground Storage Tank and Six (6) Pressure Vessel for Air, gas, Oil and Water Storage at Ras Abu Fontas “B” with ABB Sae Sadelmi as the Consultant
1996-97 4.6
ALBA 17 835787
Design, Construction of 37M height, Elevated Water Sphere tank for Cooling System of Cast House No. 2
1997
1.2 Reduction Line 3 Mechanical Installation of 76 Cell Expansion Consist of Installation of Potshells, Anode Beams including Steel Brackets Alumina Bins, Pneumatic Pipeline, Air, gas and Water Pipelibs.
1996
Clients and Consultants to Date
Bahrain Petroleum Company W.L.L. (BAPCO),
Bahrain National Gas Company (BANAGAS),
Gulf Petrochemical Industrial Company (GPIC),
Aluminum Bahrain B.S.C. (ALBA),
Gulf Industrial and Investment Company (GIIC),
Arab Shipbuilding and Repair Yard (ASRY),
Ministry of Housing,
Electricity and Water Authority (EWA),
ELECTROWATTS,
Bechtel/ Lavalin Joint Venture (BLJV),
PROCEDAIR, France,
Black and Veatch International,
HYDER Consulting Middle East Ltd.,
ACER Consultants,
Consolidated Contractors Company (CCC),
Japan Gas Corporation (JGC),
HYUNDAI Heavy Industries
Quality Aspects
With our systems certified by ISO 9001-2000 we are confident in not only providing a sound engineering
solution but also one that meets or exceeds the stringent controls exercised by this certification system.
Our Quality, even prior to this certification, has been one to set the standards with rework percentages of
almost zero since 1975.
Safety Aspects
All our procedures have been designed in line with stringent safety analysis of the activities entailed in our
construction. With the utilization of Safety Officers in each Construction Site, amongst others, we endeavour
to constantly ensure that the hard earned performance of Zero LTIF (Lost Time Injury Frequency) since 1975,
is not in vain.
All site employees undergo a vigorous job related safety induction course at the start of each project. This is
further reinforced with monthly tool box meetings where all safety procedure related to working activities are
reviewed and analyzed to ensure our commitment to NO LTIF’s is effectively communicated and always
maintained.
Visual Inspection Coating Inspection
Salt Contamination Inspection Ultrasonic Inspection
TOOL BOX MEETIG
Gas Pipelines and Headers
20Mg Ground Storage Tanks Project
Ø90M 20Mg Ground Storage
Tanks at
HIDD FS & SALMABAD FS
20Mg Ground Storage Tank Coating
10Mg Ground Storage Tanks Project
Internal Lining (Corrocte)
External Coating
10Mg Ground Storage Tank s Project
Elevated Storage Reservoirs
Pressure Vessels
Storage Tanks and Pipelines
Miscellaneous Activities at Project
Fabrication Facilities at Workshop
top related