Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Purpose
Use this procedure to execute revaluation at actual activity price.
An alternative to standard cost accounting, enabling you to assign the costs incurred in the period directly to your materials.
Actual costing is based on materials that are valuated with a preliminary standard price and then revaluated with the difference between the preliminary price and actual cost.
Each time a transaction is run that is relevant to valuation, the system records the preliminary standard price and the variances against that price.
At the end of the period, you can assign these variances to the material inventories and consumption of the previous period across multiple production levels. The resulting material valuation is based on the periodic actual values.
Trigger
Perform this transaction when you need to execute revaluation at Actual Activity Price.
Menu Path
Use the following SAP Easy Access menu path(s) to begin this transaction:
Logistics > Production - Process > Process Order > Period-End Closing > Revaluate at Actual Prices > CON2 - Collective Processing
Transaction Code
CON2
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
1/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Screen Flow
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
2/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Procedure
1. In SAP, start the transaction using the menu path or transaction code.
SAP Easy Access
2. Double-click the Logistics node .
3. Double-click the Production - Process node .
4. Double-click the Process Order node .
5. Double-click the Period-End Closing node .
6. Double-click the Revaluate at Actual Prices node .
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
3/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
7. Double-click the CON2 - Collective Processing node
.
You can also enter "CON2" in the Command field "
" and click Enter " " to go directly to this transaction.
Set Controlling Area
8. As required, complete/review the following fields:
Field R/O/C Description
Controlling Area
R Organizational unit within a company, used to represent a closed system for cost accounting purposes. A controlling area may include single or multiple company codes that may use different currencies. These company codes must use the same operative chart of accounts.All internal allocations refer exclusively to objects in the same controlling area.
Example: TH01
9. Click the Enter button .
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
4/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Revaluation at Actual Prices: Production/Process Orders
10.
Click the With Production Orders check box .
11.
Click the With Process Orders check box .
12.
Click the With QM Orders check box .
13.
As required, complete/review the following fields:
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
5/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Field R/O/C Description
Period R Unit of time into which a fiscal year is subdivided. Company data can be analyzed on a particular date in each period. In accounting, a fiscal year can be subdivided into a maximum of 16 periods. The fiscal year itself is a period. Example: 11
Fiscal Year R Period, 12 months as a rule, for which the company is to create its inventory and balance sheet. The fiscal year can be the same as the calendar year, but does not have to be. Example: 2008
14.
Click the Detail Lists check box .
15.
Click the Execute button .
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
6/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Revaluation at Actual Prices: Production/Process Orders Basic list
16.
Click the Back button .
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
7/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Revaluation at Actual Prices: Production/Process Orders
17.
Click the Test Run check box .
18.
Click the Execute button .
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
8/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Revaluation at Actual Prices: Production/Process Orders Basic list
19.
Click the Back button .
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
9/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Revaluation at Actual Prices: Production/Process Orders
20.
Click the Exit button .
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
10/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Result
You have executed revaluation at actual activity price.
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual
Activity Price.udc
11/12
Work Instruction CON2 - JPN - Revaluation at Actual Activity Price
Scenario
Instructions
In this simulation you are required to: Execute Revaluation at Actual Activity Price in SAP ECC 6.0.
Required Data
This section provides the field data required to complete this exercise. Refer to this data sheet as necessary while performing the exercise.
Field Value
Controlling Area TH01
Period 11
Fiscal Year 2008
Detail List Check
Wednesday, July 15, 2009 CO_CON2_JPN_Revaluation at Actual