coastal engineering consultant services for segment iii shore … · 2017. 9. 14. · 8/16/2017 1...
Post on 17-Oct-2020
2 Views
Preview:
TRANSCRIPT
8/16/2017
1
Coastal Engineering Consultant Services for Segment III
Shore ProtectionBROWARD COUNTY
1SOLICITATION T2112588P1
Atkins Team Overview
Atkins originated in Miami in 1960
Leader Integrating Coastal Science and Engineering
Seagrass, Artificial Reef, and Hardbottom Monitoring/Mitigation are Core Competencies – AAUS and USACE compliant
Assisting Broward County for 19 years- $46.7M in Approved Tasks since 1998
- Aviation (South FLL Runway), Ports (Port Everglades CIP), Public Works, School Board, Sheriff
- Bridges, Lift Stations, Roadway Signals, Transportation Planning Studies, Roads, Drainage, Environmental Permitting
2
8/16/2017
2
Key team members and roles
3
Organizational Chart
4
8/16/2017
3
Organizational Chart
5
Organizational Chart
6
8/16/2017
4
Organizational Chart
7
Organizational Chart
8
8/16/2017
5
Approach
9
Knowledge of Current Project Goals
Maintain the design beach conditions- Recreational beach and shore protection
without impacts to nearshore hardbottom
Reduce the sand demand and nourishment events - With alternatives like higher quality
material, dunes for storage, shore-stabilizing structures, other alternatives
10
Maximize cost-share- Through local, federal, and state funding
opportunities
Reduce regulatory costs- Long-term, carefully crafted conceptual permits
- Optimize physical and biological monitoring
Assess quality and quantity of nearshore hardbottom
8/16/2017
6
Knowledge of Project Scope
Biological characterization
Sand source selection and development
Permitting and funding
Project participation and agreement
Incorporation of dune features
Modelling
Design
Construction management
Outreach
Managed retreat
This is not just an engineering project; it is a program management project that has many elements that need constant focus Coastal Engineering for Segment III Shore Protection
Atkins has the required Program Management experience plus the
Project elements and experience to perform the project scope
11
Florida Department of Environmental Protection Beach Management GEC (1997-2009)
Services Provided:
- Full time staff support to JCP
- Drafted Florida’s Strategic Beach Management Plan (SBMP)
- Developed training sessions for local, State, and federal permit processors
- Provided expertise in hard bottom and seagrass impacts and mitigation evaluation
- Reviewed Broward Co’s application, which resulted in the 3 segments used today
12
8/16/2017
7
FDEP Bureau of Beaches & Coastal Systems GEC
13
Maintenance of St. Lucie Inlet Federal Navigation Channel (2009-Present)
Primary Tasks:
- Assist Martin County with Inlet Management as Local Sponsor to the Corps of Engineers
Services Provided:
- Maintenance dredging design and permitting (2012, 2014)
- Construction oversight
- Annual physical monitoring, data analysis and reporting
- Annual Hard bottom monitoring, data analysis and reporting
14
8/16/2017
8
St. Lucie Inlet Beach Placement Area
Hardbottom Monitoring off Hobe Sound National Wildlife Refuge
15
Smathers Beach Nourishment Project City of Key West
Primary Tasks:
- Truck Haul Beach Nourishment Project
Services Provided:
- Design and Permitting
- Plans and Specifications
- Topo and Bathymetric Survey
- Marine Resource Assessment
- Construction Oversight
- Post Construction Monitoring (physical and environmental)
16
8/16/2017
9
Collier County Truck Haul Project
Primary Tasks:
- 2013 Emergency Truck Haul Nourishment Project (Hurricane Isaac and TS Debby)
Services Provided:
- Construction Management and Oversight
- Developed ArcPad Application and GIS Database for Truck tracking
- Post-construction Physical Monitoring, Analysis and Reporting
17
Broward Beach Nourishment Monitoring
Primary Tasks:
- Routine diver inspections of pipeline corridor
Services Provided:
- During construction monitoring of hardbottom resources in the vicinity of the pipeline corridors
- Recommendations for avoidance and minimization
- Damage assessments
- Reporting
18
8/16/2017
10
AT&T Telecommunication Fiber Optic Cable(Dania Beach)
Primary Tasks:- Coral repair and mitigation
construction
Services Provided:- Damage assessment
- Develop Mitigation Plan
- Design Mitigation Plan
- Contractor selection
- During construction monitoring
- Long Term Monitoring
19
Broward County Outfall Pipe Coral Relocation and Monitoring
(Pompano Beach) Primary Tasks:- Coral Relocation
Services Provided:- Developed Relocation Plan
- Coral relocations
- Coral monitoring
20
8/16/2017
11
Why Atkins?Industry Leader Unique program management expertise in coastal environment More than 100 Seagrass, Coral, and Artificial Reef Construction and
Monitoring Assignments over the past decade
Very Deep Bench Strength Longevity of Coastal Engineers and Scientists working collaboratively Regionally more than 12 Scientific Divers with Outstanding Dive
Record Average nearly 270 Scientific Dives per year
Unmatched Understanding of Regulations Award for Excellence in Monitoring by the DOI Longstanding Trusted Relationships with State and Federal Agencies
Transparent Communication We play by the rules, transparent communication early and often, and
it benefits our clients
21
Thank you
22
top related