Client logo

MnDOT - ACEC/MN Annual Conference

Creating Multimodal Connections

FacilitatorPatrick Watz, AECOM

March 5, 2013

Page 2

Central Corridor – The Common Link

• 18 new stations• 11 miles long

• 9.8 miles of new double track• 47 new Light Rail Vehicles• 40,940 average weekday

ridership in 2030

• 18 new stations• 11 miles long• 9.8 miles of new double track• 47 new Light Rail Vehicles• 40,940 average weekday

ridership in 2030

Page 3

Preliminary Engineering (PE)

Environmental Documentation

Final Design -Heavy Construction Begins

Full Funding Grant Agreement

Continue Heavy Construction

Start Operation2014

Central Corridor Timeline

2009

2007

2011

2010

2011 - 2013

Page 4

Regional Transitway System

Page 5

Connecting Transit Modes

Page 6

Today’s Presentations

The Interchange Project:Innovation in Multimodal Planning & DesignGeorge Fantauzza, Project Architect, The Interchange

 

Union Depot Renovation & Restoration: A Multimodal Transportation HubGreg Brown, URS Corporation Kevin Dalager, MortensonMichael Bjornberg, HGA