City of Johannesburg’s
Preparation for CAPCO Power
Air Quality & Climate Change: 20082
Objectives
•Proposal for delegation of CAPCO powers
•Need for preparation
•Work done
•Outcomes
Air Quality & Climate Change: 2008
CAPCO POWERS
The City of Johannesburg was delegated with the
CAPCO Powers on the 14th of August 2008
Air Quality & Climate Change: 20084
Need for Preparation
APPA Review Process:
• Only one industry sector in Johannesburg
• City responsible for updating industry
Air Quality & Climate Change: 20085
Work Done – Electronic Database
Air Quality & Climate Change: 20086
Work Done – Electronic Database
Air Quality & Climate Change: 20087
Work Done – Findings
• Appointment of Air Pollution Officer
• Specialised processes� SABS Standard Setting Process
• Emissions Data� Different Sampling Methods� Different Types of Emission Reports � SABS Standard Setting Process
Air Quality & Climate Change: 20088
• Prepare the City of Johannesburg for licensing
• Ensure a smooth and seamless APPA-AQA transition
• Reduce the current burden on the DEAT officials
Purpose of Delegation of CAPCO Powers
Air Quality & Climate Change: 20089
Arrangements
• Process current outstanding applications
• Process expired Provisional APPA Certificates
• Begin the APPA RC review for conversion to AQA
AEL
Air Quality & Climate Change: 200810
Considerations on Application Processing
• Best Available Technology & Best Practicable
Environmental option (Listed Activity and Standards
Process)
• Use of ADMS-Urban in application processing
Air Quality & Climate Change: 200811
Considerations on Application Processing
• Compliance history/record (APPA Registration
Certificates)
• The incorporation of Cleaner Production principles
on certificate conditions
• AEL System & EIA
Air Quality & Climate Change: 200812
•Activities listed under AQA are listed under EIA
(R.386 & R.387)
•Avoid a case of licensing an illegal operation
•Ensure that license conditions are part of ROD
•Promote Integrated Environmental Management
•Support principles of co-operative governance
EIA Process
Air Quality & Climate Change: 200813
Challenges
• APPA – EIA Linkages
� Processing applications awaiting an ROD
• Enforcement Section of DEAT/GDACE� Consultation on enforcement work and other litigation issues
• Relations with MOE � Adaptation of work planned
� Advisory role of Department
Air Quality & Climate Change: 200814
Outcomes
• Better understanding of industries in Johannesburg
• Understanding challenges of licensing
• Knowing what areas to focus on
• Preparation for licensing function