cii-green power - 2017 power 2017 - mr... · cii-green power - 2017. acc & ambuja - power...
Post on 28-Oct-2020
3 Views
Preview:
TRANSCRIPT
© LafargeHolcim Ltd 2015
Vikas Soni
( ACC & Ambuja Cement)
CII-Green Power - 2017
ACC & Ambuja - Power Assets
2
Thermal : ~ 750 + MW Captive wind: ~ 27 MW WHR : ~ 14 MW Captive Solar : ~ 0.3 MW
We are still a cement company ......
GAGAL
LAKHERI
CHANDACHAIBASA
BARGARH
JAMUL
KYMORE
Tikaria
WADI
MADUKKARAI
Sindri
Damodhar
Kudithini
Thondebhavi
Vizag
ACC Plant Footprint
SULI
RABRIYAWAS
AMBUJANAGAR
MARATHA
BHATAPARA
RAURI
Sankrail
Farakka
Roorkee
Nalagarh
Ropar
Bhatinda
Surat
Dadri
ACL Plant Footprint
Regulated state no open access allowed
Transitory state open access only on paper, IEX or
renewables may be not permitted high overhead charges or T&D
Mature state open access allowed favourable conditions for
renewables / IEX
Market Maturity- IEX & Renewable Energy (RE)
Gagal
Lakheri
ChandaChaibasa
Bargarh
Jamul
Kymore
Tikaria
Madukkarai
Sindri
Damodhar
Kudithini
Thondebhavi
VizagWadi
SULI
RABRIYAWAS
AMBUJANAGAR
MARATHA
BHATAPARA
RAURI
Sankrail
Farakka
Roorkee
Nalagarh
Ropar
Bhatinda
Dadri
Surat
POWER MARKET - Demand and Supply outlook
6
Source: IEA
demand
supply
Price to increase due to:
• Demand Growth at ~5% pa
• 175 GW of Renewable Energy by 2022
• Huge investments to be done in generation & transmission
25% of Generation by RE by 2040
Our Renewable Energy Journey.....
Short term Hydro Power PPA in HP –2016 Sep
Long term Solar PPA in Karnataka – In Jan’2017
Medium term solar PPA in Maharashtra
7
Long term Solar
PPA in Karnataka
Proposals under
process
Some thoughts ……. as a consumer of Renewable power
1. As a consumer of renewable power ( Solar / Non Solar) – Can we meet RPO obligation of the company ( combined for all the units ) by consuming renewable power in few units / locations ??
8
3. Innovative onsite solar solutions , I,e on BOOT model , less tenure ( Medium term / Long term)
4. Clarity of regulations : on one side , Karnataka with clear solar policy promoting open access solar power (31st Mar’2018) , where as no open access policy in West Bengal
2. One big Solar IPP supplying to various plants located in various states at a competitive prices… Can we beat Rewa price , if not Bhadla price ???
THANK YOU
9
top related