CHAPTER 3 APPENDIX
Appendix 3.1 List of Work Specialisation for Contractors Registration in CIDB Malaysia 160
Appendix 3.2 Numbers of Local Contractors Registered by State and Grade in 2013 and 2014 162
Appendix 3.3 Sijil Perolehan Kerja Kerajaan (SPKK) Awarded to Contractor by Grade in 2013 and 2014 163
Appendix 3.4 Monthly Average Price of Construction Materials in Malaysia in 2013 and 2014 164
Appendix 3.5 Monthly Average Price for Diesel in Malaysia in 2013 and 2014 165
Appendix 3.6 Monthly Average Price for Cement in Malaysia (RM/bag) in 2013 and 2014 166
Appendix 3.7 Monthly Average Price for Aggregate in Malaysia (RM/tonne) in 2013 and 2014 167
Appendix 3.8 Monthly Average Price for Sand in Malaysia (RM/tonne) in 2013 and 2014 168
Appendix 3.9 Monthly Average Price for Steel Bar in Malaysia (RM/tonne) in 2013 and 2014 169
Lampiran 3.10 Monthly Average Price for Ready Mixed Concrete in Malaysia (RM/per m³) in 2013 and 2014 170
Appendix 3.11 Monthly Average Price for Reinforcement Iron Mesh A10 (BRCA A10) in Malaysia (RM/per m²) in 2013 and 2014 171
Appendix 3.12 PMonthly Average Price for Bricks in Malaysia (RM/per unit) in 2013 and 2014 172
Appendix 3.13 Average Daily Wage Rates for Skilled Local Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 173
Appendix 3.14 Average Daily Wage Rates for Semi-Skilled Local Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 175
Appendix 3.15 Average Daily Wage Rates for Skilled Local Machine Operators in Sabah in 2013 and 2014 (RM/day) 177
CHAPTER 3 APPENDIX
Appendix 3.16 Average Daily Wage Rates for Semi-Skilled Local Machine Operators in Sabah in 2013 and 2014 (RM/day) 179
Appendix 3.17 Average Daily Wage Rates for Local Machine Operators in Sarawak in 2013 and 2014 (RM/day) 181
Appendix 3.18 Average Daily Wage Rates for Semi-Skilled Local Machine Operators in Sarawak in 2013 and 2014 (RM/day) 183
Appendix 3.19 Average Daily Wage Rates for Skilled Local Construction Workers in Peninsular Malaysia in 2013 and 2014 (RM/day) 185
Appendix 3.20 Average Daily Wage Rates for Semi-Skilled Local Construction Workers in Peninsular Malaysia in 2013 and 2014 (RM/day) 188
Appendix 3.21 Average Daily Wage Rates for Skilled Local Construction Workers in 2013 and 2014 (RM/day) 191
Appendix 3.22 Average Daily Wage Rates for Semi-Skilled Local Construction Workers in Sabah in 2013 and 2014 (RM/day) 194
Appendix 3.23 Average Daily Wage Rates for Skilled Local Construction Workers in Sarawak in 2013 and 2014 (RM/day) 197
Appendix 3.24 PAverage Daily Wage Rates for Semi-Skilled Local Construction Workers in Sarawak in 2013 and 2014 (RM/day) 200
Appendix 3.25 Average Daily Wage Rates for IBS Component Installers in Peninsular Malaysia in 2013 and 2014 (RM/day) 203
Appendix 3.26 Average Daily Wage Rates for Skilled Foreign Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 204
Appendix 3.27 Average Daily Wage Rates for Semi-Skilled Foreign Machine Operators in Peninsular Malaysia in 2013 and 2014 (RM/day) 206
CHAPTER 3 APPENDIX
Appendix 3.28 Average Daily Wage Rates for Skilled Foreign Machine Operators in Sabah in 2013 and 2014 (RM/day) 208
Appendix 3.29 Average Daily Wage Rates for Semi-Skilled Foreign Machine Operator in Sabah in 2013 and 2014 (RM/day) 210
Appendix 3.30 Average Daily Wage Rates for Skilled Foreign Machine Operator in Sarawak in 2013 and 2014 (RM/day) 212
Appendix 3.31 Average Daily Wage Rates for Semi-Skilled Foreign Machine Operator in Sarawak in 2013 and 2014 (RM/day) 214
Appendix 3.32 Average Daily Wage Rates for Skilled Foreign Construction Workers in Peninsular Malaysia in 2013 and 2014 (RM/day) 216
Appendix 3.33 Average Daily Wage Rates for Semi-Skilled Foreign Construction Workers in Peninsular Malaysia in 2013 and 2014 (RM/day) 219
Appendix 3.34 Average Daily Wage Rates for Skilled Foreign Construction Workers in Sabah in 2013 and 2014 (RM/day) 222
Appendix 3.35 Average Daily Wage Rates for Semi-Skilled Foreign Construction Workers in Sabah in 2013 and 2014 (RM/day) 225
Appendix 3.36 Average Daily Wage for Skilled Foreign Construction Workers in Sarawak in 2013 and 2014 (RM/day) 228
Appendix 3.37 Average Daily Wage for Semi-Skilled Foreign Construction Workers in Sarawak in 2013 and 2014 (RM/day) 231
Appendix 3.38 Average Daily Rental Rates for Major Machineries in Peninsular Malaysia in 2013 and 2014 (RM/unit) 234
Appendix 3.39 Average Monthly Rental Rates for Major Machineries in Peninsular Malaysia in 2013 and 2014 (RM/unit) 236
CHAPTER 3 APPENDIX
Appendix 3.40 Average Daily Rental Rates for Major Machineries in Sabah and Sarawak in 2013 and 2014 (RM/unit) 238
Appendix 3.41 Average Cost for Building Material Index by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 240
Appendix 3.42 Average Cost for Building Material Index by Building Category and Region in Sabah in 2013 and 2014 (July 2012 = 100) 241
Appendix 3.43 Average Cost for Building Material Index by Building Category and Region in Sarawak in 2013 and 2014 (July 2012 = 100) 241
Appendix 3.44 Average Cost Index for a Unit of Construction Materials by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 242
Appendix 3.45 Average Cost Index for a Unit of Construction Materials by Major City in Sabah in 2013 and 2014 (July 2012 = 100) 243
Appendix 3.46 Average Cost Index for a Unit of Construction Materials by Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 243
Appendix 3.47 Average Cost Index for Construction Materials by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 244
Appendix 3.48 Average Cost Index for Construction Materials by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100) 244
Appendix 3.49 Average Average Cost Index for Construction Materials by Building Category and Region in Sarawak in 2013 and 2014 (July 2012 = 100) 245
Appendix 3.50 Average Cost Index for a Construction Workers by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 245
CHAPTER 3 APPENDIX
Appendix 3.51 Average Cost Index for a Construction Workers by Major City in Sabah in 2013 and 2014 (July 2012 = 100) 246
Appendix 3.52 Average Cost Index for a Construction Workers by Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 246
Appendix 3.53 Average Cost Index for a Construction Workers by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 247
Appendix 3.54 Average Cost Index for a Construction Workers by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100) 247
Appendix 3.55 Average Cost Index for a Construction Workers by Building Category and Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 248
Appendix 3.56 Average Cost Index for a Unit of Machinery by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 248
Appendix 3.57 PAverage Cost Index for a Unit of Machinery by Major City in Sabah in 2013 and 2014 (July 2012 = 100) 249
Appendix 3.58 Average Cost Index for a Unit of Machinery by Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 249
Appendix 3.59 Average Cost Index for a Unit of Machinery by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100) 250
Appendix 3.60 Average Cost Index for a Unit of Machinery by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100) 250
Appendix 3.61 Average Cost Index for a Unit of Machinery by Building Category and Major City in Sarawak in 2013 and 2014 (July 2012 = 100) 250
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
160
Appendix 3.1 List of Work Specialisation for Contractors Registration in CIDB Malaysia
Specialisation Category Building (B)
B01 IBS: Prefabricated buildings and industrial plant B15 Roof installation and metal cladding works
B02 IBS: Steel framed buildings and industrial plant B16 Swimming pool construction and system
B03 Restoration and conservation B17 Pressurising & post-tensioning works
B04 General building works & maintenance B18 Metal works
B05 Piling works B19 IBS: System formwork
B06 Concrete repairs B20 Installation of gas pipe in building
B07 Interior design/decoration B21 Scaffolding installation
B08 Water proofing installation B22 IBS: System block
B09 Landscaping B23 IBS: Sistem kerangka kayu
B10 Plumbing B24 Building maintenance
B11 Sign craft installation B25 Connection of private pipeline to the sewerage system
B12 Aluminium/metal & glazing works B26 Demolition works
B13 Tiling and plastering works B27 Maintenance services of water supply systems or sewerage
B14 Painting B28 Various work
Specialisation Category Civil Engineering (CE)
CE01 Road and pavement construction CE20 Water supply system
CE02 Bridge construction CE21 General civil engineering works
CE03 Marine structures CE22 Synthetic track and playing fields
CE04 Dam CE23 Pressurising and post-tensioning works
CE05 Tunnelling and underpinning CE24 Civil engineering structures
CE06 Irrigation and flood control systems CE25 Rock blasting works
CE07 Railway tracks CE26 Sculptured structures
CE08 Slope protection systems CE27 Thermal insulation/refectory works
CE09 Oil or gas pipe lines CE28 Specialised formwork systems
CE10 Piling works CE29 Scaffolding installation
CE11 Concrete repairs CE30 Soil stabilisation works, underground drainage
CE12 Soil investigation works CE31 Civil engineering works telecommunications
CE13 Sign craft installation CE32 Maintenance of civil engineering work
CE14 Landscaping CE33 Drilling for underground water
CE15 Offshore construction works CE34 Installation of pre-cast concrete work
CE16 Underwater construction works & maintenance CE35 Concrete test
CE17 Airports CE36 Earthworks
CE18 Reclamation works CE37 Works chimney power station
CE19 Sewerage system
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
161
Specialisation Category Mechanical (ME)
M01 Air conditioning and ventilation system M13 Drilling rig
M02 Fire protection system M14 Pollution control system
M03 Lifts and escalators M15 Miscellaneous mechanical equipment
M04 Building automation systems M16 Tower crane
M05 Works, mill, quarry and etc. M17 Laundry equipment
M06 Medical equipment M18 Hot water system
M07 Kitchen equipment M19 Installation of plant equipment
M08 Heat recovery system M20 General maintenance of mechanical
M09 Compressor and mechanical based generator M21 Kerja-kerja kimpalan
M10 Chiller for power generation M22 Sistem pam
M11 Specialized fabrication and treatment M23 Sistem SCADA dan telemetri
M12 Specialised plant
Specialisation Category Electrical (ME)
E01 Sound systems E19 Kabel bawah tanah voltan tinggi melebihi 11KV sehingga 33KV
E02 Surveillance and security systems E20 Kabel bawah tanah voltan tinggi melebihi 33KV
E03 Building automation system and energy generation systems E21 Talian atas voltan rendah Kabel talian atas voltan tinggi
Sehingga 33KV
E04 Low voltage installation E22 Kabel talian atas voltan tinggi Melebihi 33kv
E05 High voltage installation E23 Pemasangan voltan tinggi melebihi 11 KV sehingga 33 KV
E06 Specialized lighting systems E24 Pemasangan voltan tinggi Melebihi 33 KV
E07 Internal telecommunications system E25 Kerja-kerja mencantum kabel voltan rendah 1KV
E08 External telecommunication systems E26 Kerja-kerja mencantum kabel Sehingga 11 KV
E09 Miscellaneous specialized equipment E27 Kerja-kerja mencantum kabel melebihi 11KV sehingga 33KV
E10 Specialized control panels E28 Kerja-kerja mencantum kabel 33KV sehingga 66KV
E11 General electrical works E29 Kerja-kerja mencantum kabel sehingga 132KV
E12 Electrical signboard E30 Kerja-kerja mencantum kabel Tiada sekatan melebihi 132KV
E13 Railway telecommunications system E31 Janakuasa voltan rendah
E14 Computer cable network E32 Janakuasa voltan tinggi Sehingga 33KV
E15 Lampu landasan lapangan terbang E33 Sistem solar fotovolta (photovoltic) tersambung grid yang
berkapasiti sehingga 72KW
E16 Lampu jalan dan lampu isyarat E34 Sistem solar fotovolta (photovoltaic)tersambung
E17 Kabel bawah tanah voltan rendah E35 Grid berkapasiti melebihi 72KW
E18 Kabel bawah tanah voltan tinggi sehingga 11KV
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
162
Appe
ndix
3.2
Num
bers
of L
ocal
Con
trac
tors
Reg
iste
red
by S
tate
and
Gra
de in
201
3 an
d 20
14
Stat
eTo
tal
Gra
de
G1
G2
G3
G4
G5
G6
G7
2013
2014
2013
2014
2013
2014
2013
2014
2013
2014
2013
2014
2013
2014
2013
2014
Joho
r6,
540
6,54
03,
111
2,99
11,
173
1,26
81,
079
1,08
333
233
433
834
313
112
537
639
6
Keda
h3,
528
3,56
92,
208
2,16
151
761
530
230
197
9714
913
861
5619
420
1
Kela
ntan
3,26
83,
271
2,18
92,
147
391
505
252
224
8785
141
118
7461
134
131
Mel
aka
2,21
32,
222
1,10
31,
073
358
398
338
332
131
133
110
114
4343
130
129
Neg
eri S
embi
lan
3,33
23,
289
2,02
61,
944
552
606
326
341
122
113
149
133
5250
105
102
Paha
ng3,
843
3,83
12,
270
2,22
958
164
443
141
019
319
616
016
362
5714
613
2
Pera
k4,
437
4,54
22,
622
2,58
568
176
549
150
719
920
520
824
094
8814
215
2
Perli
s1,
183
1,15
393
389
711
713
254
4818
1728
269
624
27
Pula
u Pi
nang
3,38
93,
334
1,39
41,
349
485
497
673
634
177
166
236
232
9010
433
435
2
Saba
h9,
674
10,0
446,
724
6,88
51,
272
1,47
878
376
014
515
021
121
179
7846
048
2
Sara
wak
3,48
53,
797
1,64
71,
768
638
728
355
412
151
164
168
179
102
8742
445
9
Sela
ngor
10,7
7311
,039
4,31
24,
091
1,36
91,
514
1,93
51,
999
705
709
942
1,03
232
835
51,
182
1,33
9
Tere
ngga
nu3,
744
3,83
22,
328
2,30
445
557
529
829
815
615
222
022
010
497
183
186
W.P
Kua
la L
umpu
r7,
263
7,37
01,
618
1,56
767
971
61,
508
1,52
652
557
21,
070
1,13
836
532
11,
498
1,53
0
Tota
l66
,672
67,8
3334
,485
33,9
919,
268
10,4
418,
825
8,87
53,
038
3,09
34,
130
4,28
71,
594
1,52
85,
332
5,61
8
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
163
Appe
ndix
3.3
Si
jil P
erol
ehan
Ker
ja K
eraj
aan
(SPK
K) A
war
ded
to C
ontr
acto
r by
Gra
de in
201
3 an
d 20
14
Stat
eTo
tal
G1
G2
G3
G4
G5
G6
G7
2013
2014
2013
2014
2013
2014
2013
2014
2013
2014
2013
2014
2013
2014
2013
2014
Joho
r4,
286
4,13
92,
566
2,44
770
271
230
429
622
721
517
917
072
6823
623
1
Keda
h2,
991
2,85
32,
034
1,92
038
339
815
713
777
7210
797
5954
174
175
Kela
ntan
3,11
82,
987
2,12
31,
985
342
397
199
176
8981
137
127
6965
159
156
Mel
aka
1,68
91,
624
1,03
498
223
623
813
213
010
493
6661
2628
9192
Neg
eri S
embi
lan
2,87
52,
758
1,89
51,
799
481
487
178
170
9080
102
9836
3593
89
Paha
ng3,
103
3,07
82,
060
2,02
038
742
521
320
714
213
712
311
553
5112
512
3
Pera
k3,
491
3,36
42,
464
2,36
942
642
720
018
112
611
812
012
059
5496
95
Perli
s1,
185
1,12
492
086
912
312
047
4418
1832
319
736
35
Pula
u Pi
nang
1,96
41,
880
1,18
41,
117
236
240
146
140
8077
7772
5654
185
180
Saba
h3,
423
3,01
22,
011
1,65
245
444
733
931
185
8710
810
154
4837
236
6
Sara
wak
2,00
21,
977
874
790
429
492
121
124
8583
8681
6161
346
346
Sela
ngor
8,36
68,
006
4,05
63,
734
971
1,01
781
279
845
547
357
253
326
725
81,
233
1,19
3
Tere
ngga
nu3,
532
3,55
02,
248
2,21
037
446
121
921
815
014
623
221
810
510
220
419
5
W.P
Kua
la L
umpu
r4,
101
3,92
41,
553
1,422
330
341
382
378
252
261
398
371
176
163
1,01
098
8
Tota
l46
,126
44,2
7627
,022
25,3
165,
874
6,20
23,
449
3,31
01,
980
1,94
12,
339
2,19
51,
102
1,04
84,
360
4,26
4
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
164
Appendix 3.4 Monthly Average Price of Construction Materials in Malaysia in 2013 and 2014
Month
Major Construction Materials (RM)
Cement/bag
Aggregate/tonne
Sand/tonne
Steel Bars/100kg
Ready-Mixed Concrete/m3
BRC A10/m²
Bricks/100 unit
Jan. 2013 17.03 29.61 19.00 242.02 221.30 17.08 39.00
Feb. 17.03 29.79 19.00 245.29 221.30 16.70 38.75
Mar. 17.03 29.79 19.00 246.05 221.30 16.86 38.75
Apr. 17.04 29.79 19.00 247.70 221.30 16.86 38.75
May 17.04 29.92 19.00 247.76 221.30 16.88 38.75
Jun. 17.10 29.92 19.00 245.63 221.30 16.88 38.75
Jul. 17.11 29.92 19.00 246.80 221.30 16.83 38.63
Aug. 17.13 29.92 19.00 245.92 221.30 16.83 38.75
Sep. 17.16 29.92 19.00 243.82 221.30 16.83 38.75
Oct. 17.18 29.92 19.00 244.30 221.30 16.79 39.13
Nov. 17.18 29.92 19.00 242.25 221.30 16.79 39.13
Dec. 17.18 29.92 19.00 241.03 221.30 16.65 38.88
Jan. 2014 17.69 36.46 30.25 237.25 210.67 17.02 40.38
Feb. 17.69 36.71 30.50 236.67 210.63 17.07 40.25
Mar. 18.84 37.42 31.04 235.45 210.75 17.07 40.25
Apr. 18.84 38.00 31.29 234.13 211.00 17.06 40.25
May 18.84 38.69 31.75 232.46 211.00 17.07 40.25
Jun. 18.84 38.73 32.09 219.54 211.21 17.04 40.50
Jul. 18.84 39.08 32.43 220.28 211.46 17.11 40.50
Aug. 18.38 39.67 32.96 219.10 210.63 17.16 40.50
Sep. 18.25 38.50 33.08 218.10 210.83 17.14 40.50
Oct. 18.17 38.63 33.87 216.74 212.17 17.14 40.63
Nov. 18.10 38.25 33.71 215.37 212.42 17.14 40.88
Dec. 18.19 38.62 34.13 215.46 212.42 17.18 40.88
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
165
Appendix 3.5 Monthly Average Price for Diesel in Malaysia in 2013 and 2014
MonthPrice (RM / liter)
Peninsular Sabah Sarawak Average
Jan. 2013 2.68 2.67 2.66 2.67
Feb. 2.85 2.84 2.83 2.84
Mar. 2.67 2.66 2.65 2.66
Apr. 2.49 2.48 2.45 2.47
May 2.46 2.46 2.45 2.46
Jun. 2.46 2.46 2.45 2.46
Jul. 2.61 2.60 2.60 2.60
Aug. 2.73 2.72 2.71 2.72
Sep. 2.81 2.80 2.80 2.80
Oct. 2.81 2.80 2.80 2.80
Nov. 2.73 2.72 2.71 2.72
Dec. 2.73 2.72 2.71 2.72
Jan. 2014 2.73 2.72 2.71 2.72
Feb. 2.73 2.72 2.71 2.72
Mar. 2.77 2.76 2.75 2.76
Apr. 2.77 2.76 2.75 2.76
May 2.74 2.73 2.72 2.73
Jun. 2.71 2.71 2.70 2.71
Jul. 2.71 2.71 2.70 2.71
Aug. 2.59 2.58 2.58 2.58
Sep. 2.59 2.58 2.58 2.58
Oct. 2.32 2.31 2.31 2.31
Nov. 2.32 2.31 2.31 2.31
Dec. 2.23 2.23 2.23 2.23
Source: Special Release 1, Peninsular Malaysia (For Civil Engineering Works), Mac 2015, Department of Statistic Malaysia. Special Release 1, Sabah and Sarawak (For Civil Engineering Works), Mac 2015, Department of Statistic Malaysia.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
166
Appendix 3.6 Monthly Average Price for Cement in Malaysia (RM/bag) in 2013 and 2014
Month
Peninsular Sabah Sarawak
Average Northern Region
Central Region
Eastern Region
Southern Region
AverageKota
KinabaluKuching
Jan. 2013 16.42 16.75 17.44 17.35 16.99 17.50 16.95 17.03
Feb. 16.42 16.75 17.44 17.35 16.99 17.50 16.95 17.03
Mar. 16.42 16.75 17.44 17.35 16.99 17.50 16.95 17.03
Apr. 16.42 16.85 17.44 17.35 17.01 17.50 16.95 17.04
May 16.42 16.85 17.44 17.35 17.01 17.50 16.95 17.04
Jun. 16.42 16.85 17.44 17.76 17.12 17.50 16.95 17.10
Jul. 16.42 16.85 17.44 17.91 17.15 17.50 16.95 17.11
Aug. 16.42 17.00 17.44 17.91 17.19 17.50 16.95 17.13
Sep. 16.42 17.25 17.44 17.91 17.25 17.50 16.95 17.16
Oct. 16.42 17.25 17.44 18.00 17.16 17.50 16.95 17.18
Nov. 16.42 17.25 17.44 18.05 17.17 17.50 16.95 17.18
Dec. 16.42 17.25 17.44 17.95 17.15 17.59 16.95 17.18
Jan. 2014 18.00 17.75 17.65 18.00 17.84 17.50 17.00 17.69
Feb. 18.00 17.75 17.65 18.00 17.84 17.50 17.00 17.69
Mar. 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84
Apr. 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84
May 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84
Jun. 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84
Jul. 19.00 19.25 18.25 19.50 18.88 19.00 18.50 18.84
Aug. 18.25 19.00 18.00 19.50 18.50 18.00 18.00 18.38
Sep. 18.25 18.00 18.00 19.50 18.33 18.00 18.00 18.25
Oct. 18.25 17.00 18.25 19.83 18.31 18.00 17.50 18.17
Nov. 18.00 17.00 18.25 19.83 18.22 18.00 17.50 18.10
Dec. 17.50 17.00 18.50 20.00 18.17 19.00 17.50 18.19
Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
167
Appendix 3.7 Monthly Average Price for Aggregate in Malaysia (RM/tonne) in 2013 and 2014
Month
Peninsular Sabah Sarawak
Average Northern Region
Central Region
Eastern Region
Southern Region
AverageKota
KinabaluKuching
Jan. 2013 23.34 24.50 24.84 23.00 23.97 57.00 36.00 29.61
Feb. 23.34 26.00 24.84 23.00 24.22 57.00 36.00 29.79
Mar. 23.34 26.00 24.84 23.00 24.22 57.00 36.00 29.79
Apr. 23.34 26.00 24.84 23.00 24.22 57.00 36.00 29.79
May 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92
Jun. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92
Jul. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92
Aug. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92
Sep. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92
Oct. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92
Nov. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92
Dec. 23.34 27.00 24.84 23.00 24.39 57.00 36.00 29.92
Jan. 2014 31.84 43.33 27.33 33.00 32.44 58.00 39.00 36.46
Feb. 32.17 43.33 27.67 33.67 32.78 58.00 39.00 36.71
Mar. 33.50 45.33 28.00 34.00 33.72 58.00 39.00 37.42
Apr. 33.67 48.00 28.34 34.67 34.45 58.33 39.00 38.00
May 34.50 50.00 29.33 34.67 35.39 58.17 39.00 38.69
Jun. 35.17 50.00 29.50 35.33 35.78 58.50 36.67 38.73
Jul. 35.67 50.33 30.00 35.67 36.22 58.67 36.67 39.08
Aug. 36.67 51.00 30.67 36.33 37.00 58.67 36.67 39.67
Sep. 36.67 41.67 30.67 36.33 35.44 58.67 36.67 38.50
Oct. 37.33 40.00 31.34 36.33 35.61 58.67 36.67 38.63
Nov. 37.33 40.00 31.34 36.33 35.61 55.67 36.67 38.25
Dec. 37.67 40.33 31.67 37.00 36.00 55.67 37.33 38.62
Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
168
Appendix 3.8 Monthly Average Price for Sand in Malaysia (RM/tonne) in 2013 and 2014
Month
Peninsular Sabah Sarawak
Average Northern Region
Central Region
Eastern Region
Southern Region
AverageKota
KinabaluKuching
Jan. 2013 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Feb. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Mar. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Apr. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
May 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Jun. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Jul. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Aug. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Sep. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Oct. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Nov. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Dec. 12.00 21.00 9.84 15.50 13.36 38.80 33.00 19.00
Jan. 2014 26.50 35.00 22.67 35.00 28.06 38.00 35.67 30.25
Feb. 26.67 35.67 22.84 35.67 28.39 38.00 35.67 30.50
Mar. 28.00 36.00 23.00 36.00 29.00 38.33 36.00 31.04
Apr. 28.17 36.67 23.17 36.67 29.33 38.33 36.00 31.29
May 28.84 36.67 24.33 36.67 29.95 38.33 36.00 31.75
Jun. 29.34 37.73 24.50 37.33 30.46 39.33 34.67 32.09
Jul. 29.50 37.73 25.17 37.67 30.79 40.00 34.67 32.43
Aug. 30.34 38.33 25.84 38.33 31.50 40.00 34.67 32.96
Sep. 30.34 38.33 26.17 38.33 31.61 43.33 31.67 33.08
Oct. 31.50 38.33 27.67 38.33 32.50 46.33 29.67 33.87
Nov. 32.17 38.33 27.67 38.33 32.72 43.67 29.67 33.71
Dec. 32.67 39.00 28.00 39.00 33.22 43.67 30.00 34.13
Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
169
Appendix 3.9 Monthly Average Price for Steel Bar in Malaysia (RM/tonne) in 2013 and 2014
Month
Peninsular Sabah Sarawak
Average Northern Region
Central Region
Eastern Region
Southern Region
AverageKota
KinabaluKuching
Jan. 2013 2,380.51 2,216.67 2,398.15 2,340.42 2,352.40 2,624.69 2,622.22 2,420.17
Feb. 2,507.69 2,222.22 2,398.15 2,326.27 2,393.36 2,624.69 2,638.33 2,452.90
Mar. 2,488.47 2,296.67 2,398.15 2,333.12 2,400.50 2,640.13 2,641.11 2,460.53
Apr. 2,518.85 2,296.67 2,398.15 2,375.51 2,417.70 2,665.75 2,643.89 2,476.98
May 2,520.77 2,296.67 2,398.15 2,376.73 2,418.54 2,665.75 2,643.89 2,477.61
Jun. 2,451.80 2,296.67 2,398.15 2,363.38 2,393.32 2,653.00 2,637.41 2,456.29
Jul. 2,525.26 2,296.67 2,398.15 2,309.70 2,408.86 2,653.00 2,637.78 2,468.00
Aug. 2,458.59 2,296.67 2,398.15 2,309.70 2,386.64 2,623.81 2,729.72 2,459.17
Sep. 2,392.44 2,296.67 2,398.15 2,288.01 2,360.98 2,623.81 2,716.02 2,438.21
Oct. 2,425.26 2,132.22 2,441.26 2,288.01 2,358.88 2,621.88 2,769.17 2,443.04
Nov. 2,343.15 2,132.22 2,441.26 2,288.01 2,331.51 2,621.88 2,769.17 2,422.51
Dec. 2,290.98 2,132.22 2,441.26 2,306.16 2,317.14 2,610.50 2,769.17 2,410.32
Jan. 2014 2,241.67 2,311.11 2,363.89 2,350.00 2,312.04 2,585.93 2,522.22 2,372.55
Feb. 2,242.17 2,311.11 2,355.56 2,350.00 2,309.43 2,571.11 2,505.56 2,366.65
Mar. 2,233.33 2,338.89 2,355.56 2,250.00 2,294.44 2,563.70 2,505.56 2,354.49
Apr. 2,233.34 2,305.56 2,313.89 2,250.00 2,275.00 2,574.81 2,505.56 2,341.30
May 2,241.67 2,288.89 2,247.23 2,250.00 2,252.78 2,574.81 2,505.56 2,324.63
Jun. 2,110.00 2,162.96 2,141.67 2,094.44 2,126.79 2,447.04 2,355.56 2,195.42
Jul. 2,133.33 2,185.19 2,186.11 2,094.44 2,153.09 2,394.44 2,309.26 2,202.78
Aug. 2,149.17 2,201.85 2,186.11 2,094.44 2,161.14 2,294.44 2,266.67 2,190.99
Sep. 2,133.33 2,153.70 2,194.45 2,111.11 2,153.39 2,261.11 2,266.67 2,181.02
Oct. 2,133.33 2,127.78 2,186.11 2,127.78 2,149.07 2,211.11 2,233.33 2,167.36
Nov. 2,130.56 2,124.07 2,161.11 2,111.11 2,136.42 2,194.44 2,216.67 2,153.70
Dec. 2,103.71 2,118.52 2,169.44 2,144.44 2,134.88 2,194.44 2,233.33 2,154.63
Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
170
Appendix 3.10 Monthly Average Price for Ready Mixed Concrete in Malaysia (RM/per m³) in 2013 and 2014
Month
Peninsular Sabah Sarawak
Average Northern Region
Central Region
Eastern Region
Southern Region
AverageKota
KinabaluKuching
Jan. 2013 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Feb. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Mar. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Apr. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
May 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Jun. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Jul. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Aug. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Sep. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Oct. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Nov. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Dec. 201.39 204.63 204.85 199.00 202.68 288.33 266.00 221.30
Jan. 2014 190.00 193.00 187.67 193.33 190.28 300.00 243.67 210.67
Feb. 190.34 193.00 188.00 193.33 190.50 298.33 243.67 210.63
Mar. 190.50 193.00 189.17 193.33 190.94 296.67 243.67 210.75
Apr. 190.67 193.00 189.17 193.33 191.00 298.33 243.67 211.00
May 190.67 193.00 189.17 193.33 191.00 298.33 243.67 211.00
Jun. 190.67 193.00 189.17 195.00 191.28 298.33 243.67 211.21
Jul. 191.67 193.00 189.17 195.00 191.61 298.33 243.67 211.46
Aug. 190.00 193.00 189.17 195.00 191.06 295.00 243.67 210.63
Sep. 190.00 193.00 190.00 195.00 191.33 295.00 243.67 210.83
Oct. 190.34 193.00 192.50 195.00 192.28 300.00 243.67 212.17
Nov. 190.34 193.00 194.17 195.00 192.83 300.00 242.33 212.42
Dec. 190.34 193.00 194.17 195.00 192.83 300.00 242.33 212.42
Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
171
Appendix 3.11 Monthly Average Price for Reinforcement Iron Mesh A10 (BRCA A10) in Malaysia (RM/per m²) in 2013 and 2014
Month
Peninsular Sabah Sarawak
Average Northern Region
Central Region
Eastern Region
Southern Region
AverageKota
KinabaluKuching
Jan. 2013 15.97 16.00 17.77 16.64 16.69 17.51 19.00 17.08
Feb. 15.97 13.00 17.77 16.64 16.19 17.51 19.00 16.70
Mar. 16.21 13.75 17.77 16.64 16.39 17.51 19.00 16.86
Apr. 16.21 13.75 17.77 16.64 16.39 17.51 19.00 16.86
May 16.21 13.75 17.77 16.64 16.39 17.72 19.00 16.88
Jun. 16.21 13.75 17.77 16.64 16.39 17.72 19.00 16.88
Jul. 16.01 13.75 17.77 16.64 16.32 17.72 19.00 16.83
Aug. 16.01 13.75 17.77 16.64 16.32 17.72 19.00 16.83
Sep. 16.01 13.75 17.77 16.64 16.32 17.72 19.00 16.83
Oct. 15.84 13.75 17.77 16.64 16.27 17.72 19.00 16.79
Nov. 15.84 13.75 17.77 16.64 16.27 17.72 19.00 16.79
Dec. 15.84 13.75 17.77 15.49 16.08 17.72 19.00 16.65
Jan. 2014 16.13 13.43 17.77 16.00 16.21 17.83 21.10 17.02
Feb. 16.30 13.43 17.80 16.00 16.27 17.83 21.10 17.07
Mar. 16.33 13.43 17.77 16.00 16.27 17.83 21.10 17.07
Apr. 16.33 13.43 17.72 16.00 16.25 17.83 21.10 17.06
May 16.33 13.43 17.75 16.00 16.27 17.83 21.10 17.07
Jun. 16.33 13.43 17.75 15.83 16.24 17.83 21.10 17.04
Jul. 16.59 13.43 17.75 15.83 16.32 17.83 21.10 17.11
Aug. 16.59 13.83 17.75 15.83 16.39 17.83 21.10 17.16
Sep. 16.59 13.83 17.75 15.83 16.39 17.67 21.10 17.14
Oct. 16.59 13.83 17.75 15.83 16.39 17.67 21.10 17.14
Nov. 16.59 13.83 17.75 15.83 16.39 17.67 21.10 17.14
Dec. 16.59 14.00 17.84 15.83 16.45 17.67 21.10 17.18
Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
172
Appendix 3.12 Monthly Average Price for Bricks in Malaysia (RM/per unit) in 2013 and 2014
Month
Peninsular Sabah Sarawak
Average Northern Region
Central Region
Eastern Region
Southern Region
AverageKota
KinabaluKuching
Jan. 2013 0.38 0.37 0.44 0.40 0.40 0.35 0.37 0.39
Feb. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39
Mar. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39
Apr. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39
May 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39
Jun. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39
Jul. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39
Aug. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39
Sep. 0.38 0.35 0.44 0.40 0.40 0.35 0.37 0.39
Oct. 0.40 0.35 0.44 0.40 0.40 0.35 0.37 0.39
Nov. 0.40 0.35 0.44 0.40 0.40 0.35 0.37 0.39
Dec. 0.39 0.35 0.44 0.39 0.40 0.35 0.37 0.39
Jan. 2014 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40
Feb. 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40
Mar. 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40
Apr. 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40
May 0.40 0.40 0.44 0.41 0.41 0.35 0.40 0.40
Jun. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41
Jul. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41
Aug. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41
Sep. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41
Oct. 0.40 0.40 0.45 0.41 0.42 0.35 0.40 0.41
Nov. 0.40 0.40 0.45 0.41 0.42 0.37 0.40 0.41
Dec. 0.40 0.40 0.45 0.41 0.42 0.37 0.40 0.41
Note: Data Covers Major States Only: Northern Region: Perak and Pulau Pinang; Central Region: Selangor; Eastern Region: Kelantan and Pahang; Southern Region: Johor.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
173
Appe
ndix
3.1
3 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal M
achi
ne O
pera
tors
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Cent
ral
Regi
onNo
rther
n Re
gion
Easte
rn
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
stern
Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
Easte
rn
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Exca
vato
r Ope
rato
rs
Min
imum
60.0
080
.00
70.0
070
.00
70.0
057
.00
50.0
057
.69
57.0
055
.42
-5.0
-37.
5-1
7.6-1
8.6
-20.
8
Max
imum
150.
0015
0.00
110.
0013
0.00
135.
0018
0.00
140.
0011
0.00
150.
0014
5.00
20.0
-6.7
0.0
15.4
7.4
Com
mon
106.
4810
1.97
93.5
096
.13
99.5
211
2.68
101.4
294
.14
95.3
110
0.89
5.8
-0.5
0.7
-0.9
1.4
Pile
Rig
ger
Min
imum
60.0
075
.00
71.0
075
.00
70.2
560
.00
60.0
073
.00
75.0
067
.00
0.0
-20.
02.
80.
0-4
.6
Max
imum
140.
0014
5.00
120.
0011
5.00
130.
0015
0.00
145.
0012
0.00
160.
0014
3.75
7.1
0.0
0.0
39.1
10.6
Com
mon
103.
4097
.53
88.7
890
.31
95.0
111
1.08
102.
1789
.86
93.3
399
.11
7.44.
81.
23.
34.
3
Off-
Road
Tru
ck O
pera
tors
Min
imum
60.0
065
.00
60.0
070
.00
63.7
560
.00
60.0
040
.00
80.0
060
.00
0.0
-7.7
-33.
314
.3-5
.9
Max
imum
150.
0014
0.00
93.0
010
5.00
122.
0015
0.00
140.
0096
.00
120.
0012
6.50
0.0
0.0
3.2
14.3
3.7
Com
mon
96.3
392
.11
80.3
188
.13
89.2
210
5.00
93.7
280
.33
92.1
192
.79
9.0
1.7
0.0
4.5
4.0
Back
hoe
Load
er
Ope
rato
rs
Min
imum
50.0
075
.00
70.0
065
.00
65.0
050
.00
80.0
064
.54
71.0
066
.39
0.0
6.7
-7.8
9.2
2.1
Max
imum
145.
0015
0.00
100.
0012
5.00
130.
0015
0.00
150.
0011
5.00
125.
0013
5.00
3.4
0.0
15.0
0.0
3.8
Com
mon
100.
7897
.22
88.2
291
.72
94.4
910
3.05
100.
8989
.15
92.1
796
.32
2.3
3.8
1.1
0.5
1.9
Rolle
r Ope
rato
rs
Min
imum
50.0
065
.00
55.0
065
.00
58.7
555
.00
70.0
055
.00
65.0
061
.25
10.0
7.70.
00.
04.
3
Max
imum
135.
0013
5.00
91.0
013
5.00
124.
0015
0.00
135.
0097
.50
135.
0012
9.38
11.1
0.0
7.1
0.0
4.3
Com
mon
101.
1390
.50
81.6
189
.44
90.6
710
8.43
93.6
383
.03
91.0
194
.03
7.2
3.5
1.7
1.8
3.7
Rolle
r/C
ompa
ctor
O
pera
tors
Min
imum
50.0
070
.00
50.0
070
.00
60.0
038
.00
70.0
031
.00
38.0
044
.25
-24.
00.
0-3
8.0
-45.
7-2
6.3
Max
imum
130.
0013
5.00
100.
0010
0.00
116.
2515
0.00
135.
0010
6.50
100.
0012
2.88
15.4
0.0
6.5
0.0
5.7
Com
mon
100.
3595
.28
84.5
386
.19
91.5
910
0.80
97.6
084
.72
85.6
792
.20
0.4
2.4
0.2
-0.6
0.7
Scap
per O
pera
tors
Min
imum
50.0
060
.00
60.0
070
.00
60.0
040
.00
65.0
060
.00
70.0
058
.75
-20.
08.
30.
00.
0-2
.1
Max
imum
120.
0011
5.00
115.
0013
0.00
120.
0015
0.00
120.
0011
5.00
130.
0012
8.75
25.0
4.3
0.0
0.0
7.3
Com
mon
100.
2091
.33
90.2
898
.26
95.0
210
4.28
95.6
993
.56
94.4
797
.00
4.1
4.8
3.6
-3.9
2.1
Mot
or G
rade
r Ope
rato
rs
Min
imum
60.0
060
.00
80.0
075
.00
68.7
560
.00
70.0
063
.46
70.0
065
.87
0.0
16.7
-20.
7-6
.7-4
.2
Max
imum
150.
0012
0.00
110.
0012
5.00
126.
2515
0.00
125.
0011
0.00
125.
0012
7.50
0.0
4.2
0.0
0.0
1.0
Com
mon
101.
8591
.61
90.6
796
.39
95.1
310
5.16
98.8
192
.43
94.2
697
.67
3.2
7.9
1.9
-2.2
2.7
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
174
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Cent
ral
Regi
onNo
rther
n Re
gion
Easte
rn
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
stern
Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
Easte
rn
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Whe
el L
oade
r Ope
rato
rs
Min
imum
55.0
075
.00
60.0
060
.00
62.5
055
.00
75.0
065
.00
60.0
063
.75
0.0
0.0
8.3
0.0
2.0
Max
imum
150.
0016
5.00
100.
0011
5.00
132.
5015
0.00
165.
0010
2.50
115.
0013
3.13
0.0
0.0
2.5
0.0
0.5
Com
mon
102.
0310
1.60
86.3
687
.19
94.3
011
0.20
103.
1889
.55
88.6
197
.89
8.0
1.6
3.7
1.6
3.8
Pave
r Ope
rato
rs
Min
imum
60.0
080
.00
75.0
065
.00
70.0
070
.00
80.0
078
.00
65.0
073
.25
16.7
0.0
4.0
0.0
4.6
Max
imum
150.
0014
0.00
120.
0010
8.00
129.
5015
0.00
140.
0011
5.00
113.
5012
9.63
0.0
0.0
-4.2
5.1
0.1
Com
mon
103.
7397
.39
96.1
193
.53
97.6
910
9.55
100.
9499
.20
93.5
810
0.82
5.6
3.6
3.2
0.1
3.2
Mob
ile C
rane
Ope
rato
rs
Min
imum
80.0
080
.00
85.0
090
.00
83.7
590
.00
80.0
076
.92
89.0
083
.98
12.5
0.0
-9.5
-1.1
0.3
Max
imum
150.
0018
0.00
122.
0013
2.00
146.
0031
0.00
170.
0012
5.00
150.
0018
8.75
106.
7-5
.62.
513
.629
.3
Com
mon
116.
0511
3.44
101.
5011
0.44
110.
3614
3.23
121.
5010
2.58
116.
3612
0.92
23.4
7.1
1.1
5.4
9.6
Cra
wle
r Cra
ne O
pera
tors
Min
imum
85.0
080
.00
90.0
090
.00
86.2
585
.00
80.0
092
.00
89.0
086
.50
0.0
0.0
2.2
-1.1
0.3
Max
imum
140.
0015
0.00
160.
0013
1.00
145.
2518
0.00
161.
0016
0.00
138.
5015
9.88
28.6
7.3
0.0
5.7
10.1
Com
mon
113.
8310
8.00
108.
9211
0.17
110.
2312
9.08
115.
2811
1.03
110.
3911
6.45
13.4
6.7
1.9
0.2
5.6
Tow
er C
rane
Ope
rato
rs
Min
imum
80.0
080
.00
100.
0010
3.00
90.7
569
.00
80.0
096
.15
84.0
082
.29
-13.
80.
0-3
.8-1
8.4
-9.3
Max
imum
180.
0016
5.00
145.
0020
0.00
172.
5021
0.00
165.
0014
5.00
200.
0018
0.00
16.7
0.0
0.0
0.0
4.3
Com
mon
120.
4012
3.31
116.
1712
9.47
122.
3413
0.63
126.
7811
6.48
122.
0612
3.99
8.5
2.8
0.3
-5.7
1.3
Fork
lift O
pera
tors
Min
imum
60.0
065
.00
80.0
055
.00
65.0
058
.00
70.0
070
.00
55.0
063
.25
-3.3
7.7-1
2.5
0.0
-2.7
Max
imum
115.
0012
0.00
120.
0010
0.00
113.
7515
0.00
120.
0012
0.00
115.
0012
6.25
30.4
0.0
0.0
15.0
11.0
Com
mon
85.9
590
.06
92.5
083
.71
88.0
691
.60
92.3
192
.86
84.7
590
.38
6.6
2.5
0.4
1.2
2.6
Slin
ger /
Dog
ger
Min
imum
60.0
070
.00
80.0
055
.00
66.2
555
.00
70.0
070
.00
55.0
062
.50
-8.3
0.0
-12.
50.
0-5
.7
Max
imum
115.
0012
5.00
125.
0011
0.00
118.
7515
0.00
125.
0012
5.00
120.
0013
0.00
30.4
0.0
0.0
9.1
9.5
Com
mon
86.2
392
.83
92.9
285
.50
89.3
79.
0395
.25
93.5
885
.17
70.7
6-8
9.5
2.6
0.7
-0.4
-20.
8
Not
e:
Dat
a C
over
s:
Cen
tral
Reg
ion:
Per
ak, S
elan
gor a
nd K
uala
Lum
pur
N
orth
ern
Regi
on: K
edah
and
Pul
au P
inan
g
East
ern
Regi
on: P
ahan
g, K
elan
tan
and
Tere
ngga
nu
Sout
hern
Reg
ion:
Neg
eri S
embi
lan,
Mel
aka
and
Joho
r
Appe
ndix
3.1
3 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal M
achi
ne O
pera
tors
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
175
Appe
ndix
3.1
4 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Mac
hine
Ope
rato
rs in
Pen
insu
lar M
alay
sia
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Cent
ral
Regi
onNo
rther
n Re
gion
Easte
rn
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
stern
Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
Easte
rn
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Exca
vato
r Ope
rato
rs
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Pile
Rig
ger
Min
imum
50.0
050
.00
55.0
055
.00
52.5
050
.00
50.0
060
.00
55.0
053
.75
0.0
0.0
9.1
0.0
2.4
Max
imum
100.
0013
0.00
90.0
095
.00
103.
7513
0.00
130.
0090
.00
100.
0011
2.50
30.0
0.0
0.0
5.3
8.4
Com
mon
71.2
378
.36
73.6
171
.20
73.6
085
.00
85.2
876
.08
74.3
980
.19
19.3
8.8
3.4
4.5
9.0
Off-
Road
Tru
ck O
pera
tors
Min
imum
40.0
050
.00
45.0
050
.00
46.2
545
.00
50.0
032
.00
55.0
045
.50
12.5
0.0
-28.
910
.0-1
.6
Max
imum
140.
0010
0.00
80.0
080
.00
100.
0014
0.00
110.
0079
.00
100.
0010
7.25
0.0
10.0
-1.3
25.0
7.3
Com
mon
71.4
072
.53
66.3
364
.88
68.7
977
.95
78.5
666
.89
72.6
674
.02
9.2
8.3
0.8
12.0
7.6
Back
hoe
Load
er
Ope
rato
rs
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Rolle
r Ope
rato
rs
Min
imum
45.0
055
.00
45.0
050
.00
48.7
548
.00
60.0
050
.00
50.0
052
.00
6.7
9.1
11.1
0.0
6.7
Max
imum
95.0
010
0.00
84.0
080
.00
89.7
510
0.00
95.0
088
.50
85.0
092
.13
5.3
-5.0
5.4
6.3
2.6
Com
mon
70.1
571
.22
68.8
965
.76
69.0
177
.20
73.9
971
.17
68.7
372
.77
10.0
3.9
3.3
4.5
5.5
Rolle
r/C
ompa
ctor
O
pera
tors
Min
imum
45.0
050
.00
50.0
045
.00
47.5
030
.00
55.0
025
.00
30.0
035
.00
-33.
310
.0-5
0.0
-33.
3-2
6.3
Max
imum
100.
0010
0.00
89.0
075
.00
91.0
010
0.00
100.
0093
.50
80.0
093
.38
0.0
0.0
5.1
6.7
2.6
Com
mon
70.9
074
.53
72.6
763
.69
70.4
573
.80
76.8
873
.22
64.4
772
.09
4.1
3.2
0.8
1.2
2.3
Scap
per O
pera
tors
Min
imum
45.0
055
.00
45.0
050
.00
48.7
534
.00
55.0
045
.00
50.0
046
.00
-24.
40.
00.
00.
0-5
.6
Max
imum
90.0
096
.00
91.0
087
.00
91.0
010
0.00
100.
0094
.50
92.5
096
.75
11.1
4.2
3.8
6.3
6.3
Com
mon
69.0
076
.67
74.8
172
.94
73.3
673
.93
78.3
277
.72
73.3
675
.83
7.1
2.2
3.9
0.6
3.4
Mot
or G
rade
r Ope
rato
rs
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Whe
el L
oade
r Ope
rato
rs
Min
imum
50.0
050
.00
50.0
050
.00
50.0
050
.00
50.0
055
.00
50.0
051
.25
0.0
0.0
10.0
0.0
2.5
Max
imum
95.0
011
0.00
84.0
090
.00
94.7
510
0.00
110.
0088
.50
90.0
097
.13
5.3
0.0
5.4
0.0
2.5
Com
mon
71.1
777
.91
71.8
670
.50
72.8
677
.86
80.1
774
.22
71.3
175
.89
9.4
2.9
3.3
1.1
4.2
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
176
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Cent
ral
Regi
onNo
rther
n Re
gion
Easte
rn
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
stern
Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
Easte
rn
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Pave
r Ope
rato
rs
Min
imum
45.0
050
.00
60.0
045
.00
50.0
045
.00
50.0
065
.00
45.0
051
.25
0.0
0.0
8.3
0.0
2.5
Max
imum
115.
0010
0.00
97.0
090
.00
100.
5011
5.00
100.
0010
0.00
94.0
010
2.25
0.0
0.0
3.1
4.4
1.7
Com
mon
72.1
375
.69
78.7
569
.22
73.9
578
.25
79.0
081
.67
70.8
377
.44
8.5
4.4
3.7
2.3
4.7
Mob
ile C
rane
Ope
rato
rs
Min
imum
50.0
055
.00
71.0
060
.00
59.0
050
.00
55.0
073
.00
60.0
059
.50
0.0
0.0
2.8
0.0
0.8
Max
imum
105.
0016
5.00
108.
0010
1.00
119.
7525
5.00
140.
0011
2.50
105.
0015
3.13
142.
9-1
5.2
4.2
4.0
27.9
Com
mon
71.9
487
.41
84.6
180
.53
81.1
299
.20
94.4
489
.92
84.3
891
.99
37.9
8.0
6.3
4.8
13.4
Cra
wle
r Cra
ne O
pera
tors
Min
imum
54.0
060
.00
60.0
060
.00
58.5
054
.00
60.0
065
.00
60.0
059
.75
0.0
0.0
8.3
0.0
2.1
Max
imum
125.
0011
0.00
100.
0010
4.00
109.
7514
7.00
121.
0010
5.40
108.
0012
0.35
17.6
10.0
5.4
3.8
9.7
Com
mon
77.1
583
.16
81.1
482
.58
81.0
192
.13
91.3
184
.33
86.1
188
.47
19.4
9.8
3.9
4.3
9.2
Tow
er C
rane
Ope
rato
rs
Min
imum
50.0
060
.00
89.0
075
.00
68.5
050
.00
65.0
075
.00
60.0
062
.50
0.0
8.3
-15.
7-2
0.0
-8.8
Max
imum
135.
0013
0.00
115.
0014
0.00
130.
0015
0.00
130.
0011
5.00
140.
0013
3.75
11.1
0.0
0.0
0.0
2.9
Com
mon
75.0
590
.41
97.5
095
.42
89.6
092
.38
97.2
798
.14
91.8
194
.90
23.1
7.60.
7-3
.85.
9
Fork
lift O
pera
tors
Min
imum
45.0
050
.00
70.0
045
.00
52.5
045
.00
55.0
072
.00
45.0
054
.25
0.0
10.0
2.9
0.0
3.3
Max
imum
80.0
095
.00
94.0
080
.00
87.2
510
0.00
105.
0097
.00
81.5
095
.88
25.0
10.5
3.2
1.9
9.9
Com
mon
60.6
371
.86
80.2
863
.19
68.9
968
.58
76.6
982
.31
63.7
672
.84
13.1
6.7
2.5
0.9
5.6
Slin
ger /
Dog
ger
Min
imum
40.0
050
.00
55.0
045
.00
47.5
050
.00
50.0
060
.00
45.0
051
.25
25.0
0.0
9.1
0.0
7.9
Max
imum
80.0
010
0.00
90.0
085
.00
88.7
510
0.00
100.
0093
.00
87.5
095
.13
25.0
0.0
3.3
2.9
7.2
Com
mon
61.3
074
.81
76.3
368
.92
70.3
468
.78
78.4
278
.06
69.3
173
.64
12.2
4.8
2.3
0.6
4.7
Not
e:
Dat
a C
over
s:
Cen
tral
Reg
ion:
Per
ak, S
elan
gor a
nd K
uala
Lum
pur
N
orth
ern
Regi
on: K
edah
and
Pul
au P
inan
g
East
ern
Regi
on: P
ahan
g, K
elan
tan
and
Tere
ngga
nu
Sout
hern
Reg
ion:
Neg
eri S
embi
lan,
Mel
aka
and
Joho
r
Appe
ndix
3.1
4 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Mac
hine
Ope
rato
rs in
Pen
insu
lar M
alay
sia
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
177
Appe
ndix
3.1
5 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal M
achi
ne O
pera
tors
in S
abah
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Exca
vato
r Ope
rato
rs
Min
imum
71.0
062
.00
69.0
067
.33
73.0
064
.00
71.0
069
.33
2.8
3.2
2.9
3.0
Max
imum
93.9
182
.00
88.0
087
.97
96.9
185
.00
91.0
090
.97
3.2
3.7
3.4
3.4
Com
mon
81.8
981
.69
72.5
078
.69
84.6
073
.58
79.5
879
.25
3.3
-9.9
9.8
0.7
Pile
Rig
ger
Min
imum
67.6
661
.00
65.0
064
.55
69.6
663
.00
67.0
066
.55
3.0
3.3
3.1
3.1
Max
imum
88.0
080
.00
88.0
085
.33
91.0
083
.00
91.0
088
.33
3.4
3.8
3.4
3.5
Com
mon
78.6
079
.05
71.0
076
.22
81.2
972
.92
78.1
677
.46
3.4
-7.8
10.1
1.6
Off-
Road
Tru
ck O
pera
tors
Min
imum
60.5
961
.00
62.0
061
.20
62.5
963
.00
64.0
063
.20
3.3
3.3
3.2
3.3
Max
imum
80.0
072
.00
72.0
074
.67
83.0
078
.00
78.0
079
.67
3.8
8.3
8.3
6.7
Com
mon
71.2
771
.38
67.0
069
.88
74.0
468
.83
70.8
571
.24
3.9
-3.6
5.7
1.9
Back
hoe
Load
er
Ope
rato
rs
Min
imum
73.0
064
.00
66.0
067
.67
75.0
066
.00
68.0
069
.67
2.7
3.1
3.0
3.0
Max
imum
97.9
577
.00
85.0
086
.65
100.
9580
.00
88.0
089
.65
3.1
3.9
3.5
3.5
Com
mon
83.5
380
.01
71.0
078
.18
86.2
372
.83
77.8
378
.96
3.2
-9.0
9.6
1.0
Rolle
r Ope
rato
rs
Min
imum
64.6
355
.00
54.0
057
.88
66.6
357
.00
56.0
059
.88
3.1
3.6
3.7
3.5
Max
imum
96.0
081
.00
87.2
688
.09
100.
0084
.00
90.2
691
.42
4.2
3.7
3.4
3.8
Com
mon
78.7
079
.60
68.5
875
.63
81.5
670
.58
76.1
876
.11
3.6
-11.
311
.10.
6
Rolle
r/C
ompa
ctor
O
pera
tors
Min
imum
60.7
161
.00
63.2
261
.64
62.7
163
.00
65.2
263
.64
3.3
3.3
3.2
3.2
Max
imum
94.0
080
.00
83.0
085
.67
97.0
083
.00
86.0
088
.67
3.2
3.8
3.6
3.5
Com
mon
78.6
079
.05
71.0
076
.22
81.4
672
.75
78.0
777
.43
3.6
-8.0
10.0
1.6
Scap
per O
pera
tors
Min
imum
66.0
062
.20
56.0
061
.40
68.0
064
.20
58.0
063
.40
3.0
3.2
3.6
3.3
Max
imum
81.0
072
.00
80.0
077
.67
84.0
075
.00
83.0
080
.67
3.7
4.2
3.8
3.9
Com
mon
73.0
072
.25
67.6
070
.95
75.8
069
.10
71.3
372
.08
3.8
-4.4
5.5
1.6
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
178
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Mot
or L
oade
r Ope
rato
rs
Min
imum
59.0
056
.00
46.0
053
.67
61.0
058
.00
48.0
055
.67
3.4
3.6
4.3
3.7
Max
imum
91.7
172
.00
85.0
082
.90
94.7
178
.00
88.0
086
.90
3.3
8.3
3.5
4.8
Com
mon
62.2
861
.89
57.0
060
.39
75.5
766
.67
68.9
270
.39
21.3
7.7
20.9
16.6
Load
er O
pera
tors
Min
imum
56.0
056
.00
46.0
052
.67
58.0
058
.00
48.0
054
.67
3.6
3.6
4.3
3.8
Max
imum
87.0
070
.00
85.0
080
.67
90.0
073
.00
88.0
083
.67
3.4
4.3
3.5
3.7
Com
mon
74.5
072
.00
63.5
070
.00
77.2
064
.92
68.8
370
.32
3.6
-9.8
8.4
0.5
Pave
r Ope
rato
rs
Min
imum
61.0
041
.00
64.0
055
.33
63.0
043
.00
66.0
057
.33
3.3
4.9
3.1
3.6
Max
imum
81.0
082
.00
77.0
080
.00
84.0
085
.00
80.0
083
.00
3.7
3.7
3.9
3.8
Com
mon
72.8
977
.20
62.0
070
.70
75.5
965
.08
72.8
371
.17
3.7
-15.
717
.50.
7
Mob
ile C
rane
Ope
rato
rs
Min
imum
91.9
086
.00
84.6
487
.51
93.9
088
.00
86.6
489
.51
2.2
2.3
2.4
2.3
Max
imum
137.
0010
6.00
104.
0011
5.67
145.
0010
9.00
107.
0012
0.33
5.8
2.8
2.9
4.0
Com
mon
108.
1810
6.84
96.5
010
3.84
111.
0399
.50
97.9
510
2.83
2.6
-6.9
1.5
-1.0
Cra
wle
r Cra
ne O
pera
tors
Min
imum
91.0
091
.00
89.0
090
.33
93.0
093
.00
91.0
092
.33
2.2
2.2
2.2
2.2
Max
imum
137.
0010
0.00
101.
7611
2.92
140.
0010
3.00
105.
0011
6.00
2.2
3.0
3.2
2.7
Com
mon
108.
1810
3.84
96.0
010
2.67
110.
9399
.58
97.9
410
2.82
2.5
-4.1
2.0
0.1
Tow
er C
rane
Ope
rato
rs
Min
imum
96.0
086
.00
84.0
088
.67
98.0
088
.00
85.0
090
.33
2.1
2.3
1.2
1.9
Max
imum
126.
0011
0.00
109.
9111
5.30
129.
0011
3.00
112.
9111
8.30
2.4
2.7
2.7
2.6
Com
mon
108.
2910
8.90
98.5
010
5.23
111.
0499
.64
98.0
610
2.91
2.5
-8.5
-0.4
-2.2
Fork
lift O
pera
tors
Min
imum
74.0
068
.00
61.0
067
.67
76.0
070
.00
62.0
069
.33
2.7
2.9
1.6
2.5
Max
imum
91.8
977
.00
88.0
085
.63
94.8
980
.00
91.0
088
.63
3.3
3.9
3.4
3.5
Com
mon
83.5
480
.02
73.0
078
.85
86.2
574
.58
77.3
379
.39
3.2
-6.8
5.9
0.7
Slin
ger /
Dog
ger
Min
imum
61.0
056
.00
54.0
057
.00
63.0
058
.00
55.0
058
.67
3.3
3.6
1.9
2.9
Max
imum
94.0
080
.00
84.4
686
.15
97.0
083
.00
87.4
689
.15
3.2
3.8
3.6
3.5
Com
mon
72.9
976
.25
68.5
072
.58
75.7
070
.50
74.0
173
.40
3.7
-7.5
8.0
1.1
Appe
ndix
3.1
5 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal M
achi
ne O
pera
tors
in S
abah
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
179
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Mot
or L
oade
r Ope
rato
rs
Min
imum
59.0
056
.00
46.0
053
.67
61.0
058
.00
48.0
055
.67
3.4
3.6
4.3
3.7
Max
imum
91.7
172
.00
85.0
082
.90
94.7
178
.00
88.0
086
.90
3.3
8.3
3.5
4.8
Com
mon
62.2
861
.89
57.0
060
.39
75.5
766
.67
68.9
270
.39
21.3
7.7
20.9
16.6
Load
er O
pera
tors
Min
imum
56.0
056
.00
46.0
052
.67
58.0
058
.00
48.0
054
.67
3.6
3.6
4.3
3.8
Max
imum
87.0
070
.00
85.0
080
.67
90.0
073
.00
88.0
083
.67
3.4
4.3
3.5
3.7
Com
mon
74.5
072
.00
63.5
070
.00
77.2
064
.92
68.8
370
.32
3.6
-9.8
8.4
0.5
Pave
r Ope
rato
rs
Min
imum
61.0
041
.00
64.0
055
.33
63.0
043
.00
66.0
057
.33
3.3
4.9
3.1
3.6
Max
imum
81.0
082
.00
77.0
080
.00
84.0
085
.00
80.0
083
.00
3.7
3.7
3.9
3.8
Com
mon
72.8
977
.20
62.0
070
.70
75.5
965
.08
72.8
371
.17
3.7
-15.
717
.50.
7
Mob
ile C
rane
Ope
rato
rs
Min
imum
91.9
086
.00
84.6
487
.51
93.9
088
.00
86.6
489
.51
2.2
2.3
2.4
2.3
Max
imum
137.
0010
6.00
104.
0011
5.67
145.
0010
9.00
107.
0012
0.33
5.8
2.8
2.9
4.0
Com
mon
108.
1810
6.84
96.5
010
3.84
111.
0399
.50
97.9
510
2.83
2.6
-6.9
1.5
-1.0
Cra
wle
r Cra
ne O
pera
tors
Min
imum
91.0
091
.00
89.0
090
.33
93.0
093
.00
91.0
092
.33
2.2
2.2
2.2
2.2
Max
imum
137.
0010
0.00
101.
7611
2.92
140.
0010
3.00
105.
0011
6.00
2.2
3.0
3.2
2.7
Com
mon
108.
1810
3.84
96.0
010
2.67
110.
9399
.58
97.9
410
2.82
2.5
-4.1
2.0
0.1
Tow
er C
rane
Ope
rato
rs
Min
imum
96.0
086
.00
84.0
088
.67
98.0
088
.00
85.0
090
.33
2.1
2.3
1.2
1.9
Max
imum
126.
0011
0.00
109.
9111
5.30
129.
0011
3.00
112.
9111
8.30
2.4
2.7
2.7
2.6
Com
mon
108.
2910
8.90
98.5
010
5.23
111.
0499
.64
98.0
610
2.91
2.5
-8.5
-0.4
-2.2
Fork
lift O
pera
tors
Min
imum
74.0
068
.00
61.0
067
.67
76.0
070
.00
62.0
069
.33
2.7
2.9
1.6
2.5
Max
imum
91.8
977
.00
88.0
085
.63
94.8
980
.00
91.0
088
.63
3.3
3.9
3.4
3.5
Com
mon
83.5
480
.02
73.0
078
.85
86.2
574
.58
77.3
379
.39
3.2
-6.8
5.9
0.7
Slin
ger /
Dog
ger
Min
imum
61.0
056
.00
54.0
057
.00
63.0
058
.00
55.0
058
.67
3.3
3.6
1.9
2.9
Max
imum
94.0
080
.00
84.4
686
.15
97.0
083
.00
87.4
689
.15
3.2
3.8
3.6
3.5
Com
mon
72.9
976
.25
68.5
072
.58
75.7
070
.50
74.0
173
.40
3.7
-7.5
8.0
1.1
Appe
ndix
3.1
6 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Mac
hine
Ope
rato
rs in
Sab
ah in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Exca
vato
r Ope
rato
rs
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Pile
Rig
ger
Min
imum
44.0
041
.00
44.0
043
.00
46.0
043
.00
46.0
045
.00
4.5
4.9
4.5
4.7
Max
imum
67.0
062
.00
57.0
062
.00
70.0
065
.00
60.0
065
.00
4.5
4.8
5.3
4.8
Com
mon
56.2
058
.85
52.0
055
.68
58.9
552
.17
54.9
255
.35
4.9
-11.4
5.6
-0.6
Off-
Road
Tru
ck O
pera
tors
Min
imum
41.0
039
.00
41.0
040
.33
43.0
041
.00
43.0
042
.33
4.9
5.1
4.9
5.0
Max
imum
63.0
057
.00
52.0
057
.33
66.0
060
.00
58.0
061
.33
4.8
5.3
11.5
7.0
Com
mon
52.6
554
.58
48.5
051
.91
55.3
550
.25
49.5
051
.70
5.1
-7.9
2.1
-0.4
Back
hoe
Load
er O
pera
tors
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Rolle
r Ope
rato
rs
Min
imum
41.0
044
.00
41.0
042
.00
43.0
046
.00
43.0
044
.00
4.9
4.5
4.9
4.8
Max
imum
62.0
057
.00
59.0
059
.33
65.0
060
.00
63.0
062
.67
4.8
5.3
6.8
5.6
Com
mon
52.5
054
.50
51.0
052
.67
55.2
052
.17
54.1
753
.85
5.1
-4.3
6.2
2.2
Rolle
r/C
ompa
ctor
O
pera
tors
Min
imum
42.0
042
.62
43.0
042
.54
44.0
044
.62
45.0
044
.54
4.8
4.7
4.7
4.7
Max
imum
62.0
062
.00
60.0
061
.33
65.0
065
.00
63.0
064
.33
4.8
4.8
5.0
4.9
Com
mon
52.5
057
.00
52.8
154
.10
55.2
052
.67
54.2
554
.04
5.1
-7.6
2.7
-0.1
Scap
per O
pera
tors
Min
imum
44.0
042
.00
39.0
041
.67
46.0
044
.00
41.0
043
.67
4.5
4.8
5.1
4.8
Max
imum
62.0
057
.00
60.0
059
.67
65.0
060
.00
63.0
062
.67
4.8
5.3
5.0
5.0
Com
mon
52.5
054
.50
50.0
052
.33
55.2
052
.83
52.3
353
.45
5.1
-3.1
4.7
2.1
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
180
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Mot
or L
oade
r Ope
rato
rs
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Whe
el L
oade
r Ope
rato
rs
Min
imum
41.0
043
.00
36.0
040
.00
43.0
045
.00
38.0
042
.00
4.9
4.7
5.6
5.0
Max
imum
66.0
060
.00
57.0
061
.00
69.0
063
.00
60.0
064
.00
4.5
5.0
5.3
4.9
Com
mon
49.9
057
.70
55.5
054
.37
52.7
052
.18
50.4
251
.77
5.6
-9.6
-9.2
-4.8
Pave
r Ope
rato
rs
Min
imum
36.0
045
.15
41.0
040
.72
38.0
047
.15
43.0
042
.72
5.6
4.4
4.9
4.9
Max
imum
66.0
057
.00
55.0
059
.33
69.0
060
.00
58.0
062
.33
4.5
5.3
5.5
5.1
Com
mon
50.9
053
.70
51.5
852
.06
53.7
052
.63
50.9
252
.42
5.5
-2.0
-1.3
0.7
Mob
ile C
rane
Ope
rato
rs
Min
imum
66.6
561
.00
56.0
061
.22
68.6
563
.00
58.0
063
.22
3.0
3.3
3.6
3.3
Max
imum
87.0
075
.00
69.0
077
.00
90.0
078
.00
72.0
080
.00
3.4
4.0
4.3
3.9
Com
mon
75.2
974
.90
68.5
072
.90
78.0
468
.92
65.0
870
.68
3.7
-8.0
-5.0
-3.0
Cra
wle
r Cra
ne O
pera
tors
Min
imum
66.6
555
.00
56.0
059
.22
68.6
557
.00
57.0
060
.88
3.0
3.6
1.8
2.8
Max
imum
87.0
072
.00
75.0
078
.00
90.0
075
.00
78.0
081
.00
3.4
4.2
4.0
3.8
Com
mon
75.3
073
.40
64.0
070
.90
78.0
169
.08
64.3
370
.47
3.6
-5.9
0.5
-0.6
Tow
er C
rane
Ope
rato
rs
Min
imum
66.6
561
.00
56.0
061
.22
68.6
563
.00
57.0
062
.88
3.0
3.3
1.8
2.7
Max
imum
87.0
078
.00
73.0
079
.33
90.0
081
.00
76.0
082
.33
3.4
3.8
4.1
3.8
Com
mon
75.2
676
.38
70.0
073
.88
77.9
768
.92
64.3
370
.41
3.6
-9.8
-8.1
-4.7
Fork
lift O
pera
tors
Min
imum
36.0
041
.00
41.0
039
.33
38.0
043
.00
42.0
041
.00
5.6
4.9
2.4
4.2
Max
imum
67.0
054
.00
65.0
062
.00
70.0
057
.00
68.0
065
.00
4.5
5.6
4.6
4.8
Com
mon
50.9
052
.20
48.0
050
.37
53.7
550
.17
54.6
752
.86
5.6
-3.9
13.9
5.0
Slin
ger /
Dog
ger
Min
imum
46.0
041
.00
38.0
041
.67
48.0
043
.00
39.0
043
.33
4.3
4.9
2.6
4.0
Max
imum
67.0
062
.00
57.0
062
.00
70.0
065
.00
60.0
065
.00
4.5
4.8
5.3
4.8
Com
mon
52.5
057
.00
52.0
053
.83
55.2
552
.58
52.0
853
.30
5.2
-7.8
0.2
-1.0
Appe
ndix
3.1
6 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Mac
hine
Ope
rato
rs in
Sab
ah in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
181
Appe
ndix
3.1
7 A
vera
ge D
aily
Wag
e R
ates
for L
ocal
Mac
hine
Ope
rato
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Exca
vato
r Ope
rato
rs
Min
imum
63.0
081
.00
98.0
080
.67
65.0
086
.60
106.
0085
.87
3.2
6.9
8.2
6.4
Max
imum
97.0
090
.31
136.
0010
7.77
100.
0013
7.00
139.
0012
5.33
3.1
51.7
2.2
16.3
Com
mon
84.2
887
.04
86.1
585
.82
86.9
888
.16
124.
0099
.71
3.2
1.3
43.9
16.2
Pile
Rig
ger
Min
imum
74.0
089
.00
70.0
077
.67
76.0
072
.00
74.0
074
.00
2.7
-19.
15.
7-4
.7
Max
imum
100.
0010
1.00
90.0
097
.00
105.
0010
5.00
93.0
010
1.00
5.0
4.0
3.3
4.1
Com
mon
89.2
094
.85
95.5
093
.18
91.8
598
.00
83.2
591
.03
3.0
3.3
-12.
8-2
.3
Off-
Road
Tru
ck O
pera
tors
Min
imum
70.3
681
.00
90.0
080
.45
72.3
685
.00
96.0
084
.45
2.8
4.9
6.7
5.0
Max
imum
92.0
010
0.00
100.
0097
.33
96.0
010
3.00
103.
0010
0.67
4.3
3.0
3.0
3.4
Com
mon
82.5
291
.01
91.0
088
.18
85.2
091
.42
98.5
091
.71
3.2
0.5
8.2
4.0
Back
hoe
Load
er O
pera
tors
Min
imum
61.0
061
.00
92.0
071
.33
63.0
066
.50
96.0
075
.17
3.3
9.0
4.3
5.4
Max
imum
89.0
087
.00
105.
0093
.67
93.0
010
6.00
108.
0010
2.33
4.5
21.8
2.9
9.3
Com
mon
72.5
079
.50
74.5
075
.50
75.2
079
.42
100.
2484
.95
3.7
-0.1
34.6
12.5
Rolle
r Ope
rato
rs
Min
imum
56.0
061
.00
88.0
068
.33
58.0
066
.50
92.0
072
.17
3.6
9.0
4.5
5.6
Max
imum
90.0
096
.00
126.
0010
4.00
94.0
012
7.00
129.
0011
6.67
4.4
32.3
2.4
12.2
Com
mon
70.9
083
.20
79.0
077
.70
73.6
079
.42
109.
7587
.59
3.8
-4.5
38.9
12.7
Rolle
r/C
ompa
ctor
Ope
rato
rs
Min
imum
70.0
071
.00
84.0
075
.00
72.0
076
.50
88.0
078
.83
2.9
7.7
4.8
5.1
Max
imum
100.
9410
0.00
116.
0010
5.65
104.
9411
7.00
119.
0011
3.65
4.0
17.0
2.6
7.6
Com
mon
84.2
391
.87
86.0
087
.37
86.9
488
.83
102.
5092
.76
3.2
-3.3
19.2
6.2
Scap
per O
pera
tors
Min
imum
81.0
081
.00
98.0
086
.67
83.0
086
.50
102.
0090
.50
2.5
6.8
4.1
4.4
Max
imum
100.
0010
7.00
116.
0010
7.67
104.
0011
7.00
119.
0011
3.33
4.0
9.3
2.6
5.3
Com
mon
92.6
199
.55
94.5
095
.55
95.3
198
.20
109.
8310
1.11
2.9
-1.4
16.2
5.8
Mot
or G
rade
r Ope
rato
rs
Min
imum
74.8
081
.00
90.0
081
.93
76.8
086
.50
96.0
086
.43
2.7
6.8
6.7
5.5
Max
imum
112.
0010
6.04
126.
0011
4.68
116.
0012
7.00
129.
0012
4.00
3.6
19.8
2.4
8.1
Com
mon
90.9
398
.23
94.0
294
.39
93.6
398
.08
109.
8310
0.51
3.0
-0.2
16.8
6.5
Whe
el L
oade
r Ope
rato
rs
Min
imum
71.0
071
.00
95.0
079
.00
73.0
075
.00
99.0
082
.33
2.8
5.6
4.2
4.2
Max
imum
110.
0097
.00
119.
0010
8.67
114.
0012
0.00
122.
0011
8.67
3.6
23.7
2.5
9.2
Com
mon
84.2
090
.35
84.5
086
.35
86.9
588
.00
110.
0995
.01
3.3
-2.6
30.3
10.0
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
182
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Pave
r Ope
rato
rs
Min
imum
76.8
591
.00
95.0
087
.62
78.8
595
.00
99.0
090
.95
2.6
4.4
4.2
3.8
Max
imum
108.
0010
0.00
121.
0010
9.67
112.
0012
2.00
124.
0011
9.33
3.7
22.0
2.5
8.8
Com
mon
92.5
496
.02
96.0
094
.85
95.3
498
.25
105.
7599
.78
3.0
2.3
10.2
5.2
Mob
ile C
rane
Ope
rato
rs
Min
imum
81.0
081
.00
106.
0089
.33
83.0
086
.00
112.
0093
.67
2.5
6.2
5.7
4.9
Max
imum
117.
0011
8.15
125.
0012
0.05
120.
2412
6.00
128.
0012
4.75
2.8
6.6
2.4
3.9
Com
mon
105.
1711
1.41
100.
0810
5.55
107.
9298
.19
117.
5810
7.90
2.6
-11.
917
.52.
2
Cra
wle
r Cra
ne O
pera
tors
Min
imum
93.0
081
.00
100.
0091
.33
95.0
086
.50
110.
0097
.17
2.2
6.8
10.0
6.4
Max
imum
125.
0011
2.00
127.
0012
1.33
129.
0012
8.00
130.
0012
9.00
3.2
14.3
2.4
6.3
Com
mon
105.
3210
8.41
97.0
010
3.58
107.
8998
.08
121.
0010
8.99
2.4
-9.5
24.7
5.2
Tow
er C
rane
Ope
rato
rs
Min
imum
96.0
088
.00
100.
0094
.67
98.0
091
.50
104.
0097
.83
2.1
4.0
4.0
3.3
Max
imum
147.
0012
8.00
131.
0013
5.33
151.
0013
2.00
134.
0013
9.00
2.7
3.1
2.3
2.7
Com
mon
111.
2911
9.40
108.
5011
3.06
114.
1811
1.46
117.4
211
4.35
2.6
-6.6
8.2
1.1
Fork
lift O
pera
tors
Min
imum
61.0
065
.00
90.0
072
.00
63.0
070
.50
94.0
075
.83
3.3
8.5
4.4
5.3
Max
imum
83.0
087
.00
103.
0091
.00
87.0
010
4.00
106.
0099
.00
4.8
19.5
2.9
8.8
Com
mon
70.9
078
.70
76.5
075
.37
73.5
579
.42
96.7
583
.24
3.7
0.9
26.5
10.4
Slin
ger /
Dog
ger
Min
imum
61.0
061
.00
85.0
069
.00
63.0
066
.50
89.0
072
.83
3.3
9.0
4.7
5.6
Max
imum
82.0
094
.00
106.
0094
.00
85.0
010
7.00
109.
0010
0.33
3.7
13.8
2.8
6.7
Com
mon
70.9
082
.20
78.0
077
.03
73.5
579
.52
97.1
783
.41
3.7
-3.3
24.6
8.3
Appe
ndix
3.1
7 A
vera
ge D
aily
Wag
e R
ates
for L
ocal
Mac
hine
Ope
rato
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
183
Appe
ndix
3.1
8 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Mac
hine
Ope
rato
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Exca
vato
r Ope
rato
rs
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Pile
Rig
ger
Min
imum
56.0
071
.00
55.0
060
.67
58.0
057
.00
62.0
059
.00
3.6
-19.
712
.7-2
.7
Max
imum
81.0
089
.00
79.0
083
.00
84.0
092
.00
82.0
086
.00
3.7
3.4
3.8
3.6
Com
mon
70.1
079
.30
80.5
076
.63
72.3
580
.83
69.9
274
.37
3.2
1.9
-13.
1-3
.0
Off-
Road
Tru
ck O
pera
tors
Min
imum
60.0
065
.00
73.0
066
.00
62.0
069
.00
79.0
070
.00
3.3
6.2
8.2
6.1
Max
imum
85.0
088
.00
93.0
088
.67
89.0
094
.00
96.0
093
.00
4.7
6.8
3.2
4.9
Com
mon
70.2
078
.85
77.0
075
.35
72.8
580
.17
88.5
080
.51
3.8
1.7
14.9
6.8
Back
hoe
Load
er O
pera
tors
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Rolle
r Ope
rato
rs
Min
imum
48.0
049
.00
82.0
059
.67
50.0
054
.50
87.0
063
.83
4.2
11.2
6.1
7.0
Max
imum
78.0
080
.00
96.0
084
.67
82.0
097
.00
99.0
092
.67
5.1
21.3
3.1
9.4
Com
mon
59.4
069
.45
65.0
064
.62
62.0
069
.13
89.5
873
.57
4.4
-0.5
37.8
13.9
Rolle
r/C
ompa
ctor
Ope
rato
rs
Min
imum
56.0
060
.70
76.0
064
.23
58.0
066
.20
83.0
069
.07
3.6
9.1
9.2
7.5
Max
imum
87.0
094
.00
95.0
092
.00
91.0
097
.00
98.0
095
.33
4.6
3.2
3.2
3.6
Com
mon
70.8
082
.15
77.8
576
.93
73.4
577
.69
86.5
879
.24
3.7
-5.4
11.2
3.0
Scap
per O
pera
tors
Min
imum
72.0
078
.00
81.0
077
.00
74.0
083
.00
84.0
080
.33
2.8
6.4
3.7
4.3
Max
imum
89.0
092
.00
99.0
093
.33
92.0
010
0.00
102.
0098
.00
3.4
8.7
3.0
5.0
Com
mon
81.6
086
.60
85.5
084
.57
83.8
087
.50
93.2
588
.18
2.7
1.0
9.1
4.3
Mot
or L
oade
r Ope
rato
rs
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
184
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Whe
el L
oade
r Ope
rato
rs
Min
imum
49.0
061
.00
79.0
063
.00
51.0
066
.00
85.0
067
.33
4.1
8.2
7.6
6.9
Max
imum
94.0
086
.00
101.
0093
.67
98.0
010
2.00
104.
0010
1.33
4.3
18.6
3.0
8.2
Com
mon
70.9
278
.21
74.0
074
.38
73.7
977
.67
95.1
782
.21
4.0
-0.7
28.6
10.5
Pave
r Ope
rato
rs
Min
imum
71.0
075
.00
78.0
074
.67
73.0
080
.00
83.0
078
.67
2.8
6.7
6.4
5.4
Max
imum
92.0
094
.00
99.0
095
.00
97.0
010
0.00
102.
0099
.67
5.4
6.4
3.0
4.9
Com
mon
81.5
087
.50
87.0
085
.33
84.1
587
.25
91.5
887
.66
3.3
-0.3
5.3
2.7
Mob
ile C
rane
Ope
rato
rs
Min
imum
71.3
869
.00
86.0
075
.46
73.3
874
.50
90.0
079
.29
2.8
8.0
4.7
5.1
Max
imum
95.0
099
.00
98.0
097
.33
98.0
010
2.00
101.
0010
0.33
3.2
3.0
3.1
3.1
Com
mon
84.2
991
.40
84.5
086
.73
87.0
187
.50
104.
2092
.90
3.2
-4.3
23.3
7.1
Cra
wle
r Cra
ne O
pera
tors
Min
imum
71.0
071
.00
86.0
076
.00
73.3
876
.50
91.0
080
.29
3.4
7.7
5.8
5.6
Max
imum
94.0
099
.00
98.0
097
.00
98.0
010
1.00
101.
0010
0.00
4.3
2.0
3.1
3.1
Com
mon
84.2
990
.90
85.0
086
.73
86.7
987
.67
93.7
589
.40
3.0
-3.6
10.3
3.1
Tow
er C
rane
Ope
rato
rs
Min
imum
73.4
273
.00
85.0
077
.14
75.0
078
.50
89.0
080
.83
2.2
7.5
4.7
4.8
Max
imum
100.
0097
.00
99.0
098
.67
104.
0010
0.00
102.
0010
2.00
4.0
3.1
3.0
3.4
Com
mon
83.7
289
.86
85.5
086
.36
86.7
088
.10
93.7
389
.51
3.6
-2.0
9.6
3.6
Fork
lift O
pera
tors
Min
imum
51.0
054
.00
71.4
058
.80
53.0
059
.50
75.4
062
.63
3.9
10.2
5.6
6.5
Max
imum
72.0
076
.00
88.0
078
.67
76.0
089
.00
91.0
085
.33
5.6
17.1
3.4
8.5
Com
mon
59.6
067
.55
65.5
064
.22
62.3
068
.75
82.1
071
.05
4.5
1.8
25.3
10.6
Slin
ger /
Dog
ger
Min
imum
51.0
051
.00
68.0
056
.67
53.0
056
.50
72.0
060
.50
3.9
10.8
5.9
6.8
Max
imum
72.0
082
.00
90.0
081
.33
75.0
091
.00
93.0
086
.33
4.2
11.0
3.3
6.1
Com
mon
59.8
070
.65
67.0
065
.82
62.3
068
.83
82.3
371
.15
4.2
-2.6
22.9
8.1
Appe
ndix
3.1
8 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Mac
hine
Ope
rato
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
185
Appe
ndix
3.1
9 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal C
onst
ruct
ion
Wor
kers
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Gen
eral
C
onst
ruct
ion
Wor
kers
- B
uild
ing
Min
imum
40.0
045
.00
50.0
045
.00
45.0
040
.00
40.0
040
.00
40.0
040
.00
0.0
-11.
1-2
0.0
-11.
1-1
1.1
Max
imum
90.0
090
.00
72.0
085
.00
84.2
511
0.00
93.0
078
.50
120.
0010
0.38
22.2
3.3
9.0
41.2
19.1
Com
mon
63.2
567
.69
62.1
963
.36
64.1
265
.30
68.4
763
.94
66.5
866
.07
3.2
1.2
2.8
5.1
3.0
Con
cret
ers
Min
imum
60.0
070
.00
50.0
060
.00
60.0
053
.33
70.0
050
.00
45.0
054
.58
-11.
10.
00.
0-2
5.0
-9.0
Max
imum
130.
0015
5.00
91.0
010
0.00
119.
0017
0.83
155.
0095
.00
150.
0014
2.71
31.4
0.0
4.4
50.0
19.9
Com
mon
90.6
310
2.75
76.5
381
.97
87.9
797
.03
101.
6979
.50
85.3
990
.90
7.1
-1.0
3.9
4.2
3.3
Bar B
ende
rs
Min
imum
70.0
080
.00
60.0
065
.00
68.7
570
.00
77.0
060
.00
60.0
066
.75
0.0
-3.8
8.3
-7.7
-2.9
Max
imum
130.
0013
0.00
89.0
012
0.00
117.
2524
0.00
130.
0011
5.00
130.
0015
3.75
84.6
0.0
3.4
8.3
31.1
Com
mon
99.0
593
.46
76.3
985
.47
88.5
910
5.03
97.0
780
.22
90.3
993
.18
6.0
3.9
5.6
5.8
5.2
Car
pent
ers
-Fo
rmw
ork
Min
imum
70.0
075
.00
60.0
075
.00
70.0
075
.00
75.0
055
.00
70.0
068
.75
7.1
0.0
-8.3
-6.7
-1.8
Max
imum
150.
0014
5.00
91.0
011
0.00
124.
0021
0.00
160.
0011
5.00
120.
0015
1.25
40.0
10.3
26.4
9.1
22.0
Com
mon
99.7
010
3.30
81.6
191
.72
94.0
811
0.15
106.
8586
.11
94.3
699
.37
10.5
3.4
5.5
2.9
5.6
Bric
klay
ers
Min
imum
60.0
065
.00
60.0
065
.00
62.5
060
.00
70.0
065
.00
45.0
060
.00
0.0
7.78.
3-3
0.8
-4.0
Max
imum
130.
0012
5.00
95.0
012
0.00
117.
5015
0.00
125.
0092
.00
160.
0013
1.75
15.4
0.0
21.1
33.3
12.1
Com
mon
94.5
091
.28
79.0
685
.94
87.7
010
2.63
97.6
980
.67
90.2
592
.81
8.6
7.014
.95.
05.
8
Roof
ers
Min
imum
70.0
070
.00
70.0
060
.00
67.5
070
.00
65.0
065
.00
65.0
066
.25
0.0
-7.1
0.0
8.3
-1.9
Max
imum
140.
0013
5.00
98.0
012
0.00
123.
2521
0.00
140.
0011
5.00
130.
0014
8.75
50.0
3.7
17.3
8.3
20.7
Com
mon
101.
3898
.19
87.7
892
.26
94.9
011
3.73
101.
0090
.83
96.0
010
0.39
12.2
2.9
4.4
4.1
5.8
Car
pent
ers
-Jo
iner
y
Min
imum
70.0
075
.00
70.0
070
.00
71.2
575
.00
75.0
070
.00
75.0
073
.75
7.1
0.0
0.0
7.1
3.5
Max
imum
150.
0014
5.00
95.0
012
0.00
127.
5021
0.00
190.
0011
5.00
180.
0017
3.75
40.0
31.0
21.1
50.0
36.3
Com
mon
111.
6310
9.50
88.0
610
0.03
102.
3112
6.05
116.
1991
.61
104.
8110
9.67
12.9
6.1
4.0
4.8
7.2
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
75.0
080
.00
65.0
080
.00
75.0
075
.00
80.0
070
.00
60.0
071
.25
0.0
0.0
7.7-2
5.0
-5.0
Max
imum
160.
0014
0.00
101.
0012
0.00
130.
2521
0.00
140.
0011
5.00
180.
0016
1.25
31.3
0.0
13.9
50.0
23.8
Com
mon
113.
5010
3.08
91.2
297
.64
101.
3613
1.10
107.
3695
.28
100.
6110
8.59
15.5
4.2
4.5
3.0
7.1
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
186
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Gen
eral
Wel
ders
Min
imum
90.0
065
.00
75.0
065
.00
73.7
545
.00
65.0
070
.00
65.0
061
.25
-50.
00.
0-6
.70.
0-1
6.9
Max
imum
170.
0012
0.00
105.
0012
5.00
130.
0020
5.00
120.
0011
5.00
180.
0015
5.00
20.6
0.0
9.5
44.0
19.2
Com
mon
118.
7589
.31
91.0
093
.1498
.05
128.
5892
.56
92.5
398
.72
103.
108.
33.
61.7
6.0
5.1
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
80.0
075
.00
60.0
065
.00
70.0
080
.00
75.0
070
.00
60.0
071
.25
0.0
0.0
16.7
-7.7
1.8
Max
imum
170.
0014
0.00
100.
0011
5.00
131.2
522
5.00
150.
0011
5.00
150.
0016
0.00
32.4
7.115
.030
.421
.9
Com
mon
107.3
894
.83
81.2
887
.61
92.7
812
6.83
97.4
785
.67
93.0
310
0.75
18.1
2.8
5.4
6.2
8.6
Plum
bers
-Re
ticul
atio
n
Min
imum
70.0
070
.00
60.0
070
.00
67.5
075
.00
75.0
065
.00
75.0
072
.50
7.17.1
8.3
7.17.4
Max
imum
150.
0013
5.00
105.
0015
0.00
135.
0022
5.00
180.
0010
9.50
150.
0016
6.13
50.0
33.3
4.3
0.0
23.1
Com
mon
103.
7598
.36
92.7
896
.06
97.7
412
3.58
103.
5097
.1710
1.25
106.
3819
.15.
24.
75.
48.
8
Build
ing
Wiri
ngIn
stal
lers
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Elec
tric
al W
irem
en
PW2
(Mon
thly
RM
)
Min
imum
1,750
.00
1,200
.00
1,550
.00
1,400
.00
1,475
.00
1,800
.00
1,050
.00
1,050
.00
1,400
.00
1,325
.00
2.9
-12.
5-3
2.3
0.0
-10.
2
Max
imum
4,20
0.00
3,00
0.00
2,50
2.00
4,53
0.00
3,55
8.00
5,00
0.00
3,00
0.00
2,60
0.00
4,53
0.00
3,78
2.50
19.0
0.0
3.9
0.0
6.3
Com
mon
3,07
1.75
2,12
7.61
2,09
3.00
2,32
5.94
2,40
4.58
3,14
3.13
2,19
5.92
2,03
2.53
2,41
3.94
2,44
6.38
2.3
3.2
-2.9
3.8
1.7
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
2,21
0.00
1,800
.00
1,850
.00
1,550
.00
1,852
.50
2,25
0.00
1,800
.00
1,950
.00
1,500
.00
1,875
.00
1.80.
05.
4-3
.21.2
Max
imum
4,50
0.00
3,36
0.00
2,96
9.00
5,25
0.00
4,01
9.75
6,00
0.00
3,40
6.00
2,97
2.00
5,25
0.00
4,40
7.00
33.3
1.40.
10.
09.
6
Com
mon
3,40
0.10
2,81
1.89
2,61
7.28
2,98
5.33
2,95
3.65
3,82
2.93
2,87
4.17
2,59
7.56
3,09
1.33
3,09
6.50
12.4
2.2
-0.8
3.6
4.8
Scaff
olde
rs -
Pref
abric
ated
Min
imum
80.0
060
.00
65.0
075
.00
70.0
080
.00
60.0
070
.00
60.0
067
.50
0.0
0.0
7.7-2
0.0
-3.6
Max
imum
140.
0015
5.00
99.0
012
0.00
128.
5016
0.00
155.
0010
2.00
180.
0014
9.25
14.3
0.0
3.0
50.0
16.1
Com
mon
103.
8810
4.42
80.5
692
.00
95.2
211
1.63
103.
6783
.81
93.5
898
.177.5
-0.7
4.0
1.73.
1
Scaff
olde
rs -
Tubu
lar
Min
imum
75.0
070
.00
65.0
065
.00
68.7
575
.00
70.0
070
.00
75.0
072
.50
0.0
0.0
7.715
.45.
5
Max
imum
120.
0012
5.00
100.
0011
5.00
115.
0016
0.00
131.0
010
0.00
130.
0013
0.25
33.3
4.8
0.0
13.0
13.3
Com
mon
97.0
090
.75
84.2
293
.89
91.4
710
7.63
97.2
586
.1498
.1797
.30
11.0
7.22.
34.
66.
4
Appe
ndix
3.1
9 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal C
onst
ruct
ion
Wor
kers
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
187
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Plas
tere
rs
Min
imum
70.0
080
.00
65.0
070
.00
71.2
575
.00
85.0
068
.00
45.0
068
.25
7.16.
34.
6-3
5.7
-4.2
Max
imum
150.
0012
0.00
90.0
011
0.00
117.5
017
0.00
160.
0011
5.00
170.
0015
3.75
13.3
33.3
27.8
54.5
30.9
Com
mon
106.
2596
.78
79.4
488
.47
92.7
410
9.40
106.
9782
.86
89.8
397
.27
3.0
10.5
4.3
1.54.
9
Tile
rs
Min
imum
80.0
080
.00
80.0
070
.00
77.5
080
.00
90.0
085
.00
70.0
081
.25
0.0
12.5
6.3
28.3
4.8
Max
imum
145.
0013
5.00
115.
0012
5.00
130.
0018
0.00
135.
0011
5.00
150.
0014
5.00
24.1
0.0
0.0
20.0
11.5
Com
mon
110.
4810
1.31
92.7
896
.56
100.
2811
6.43
106.
8195
.92
97.19
104.
095.
45.
43.
40.
73.
8
Pain
ters
- B
uild
ing
Min
imum
80.0
070
.00
55.0
060
.00
66.2
575
.00
70.0
068
.00
45.0
064
.50
-6.3
0.0
23.6
-25.
0-2
.6
Max
imum
130.
0012
5.00
90.0
012
0.00
116.
2515
0.00
125.
0010
0.00
130.
0012
6.25
15.4
0.0
11.1
8.3
8.6
Com
mon
96.1
389
.67
75.1
184
.17
86.2
710
5.78
92.5
379
.42
87.2
891
.25
10.0
3.2
5.7
3.7
5.8
Gen
eral
C
onst
ruct
ion
Wor
kers
-Civ
il
Min
imum
45.0
045
.00
45.0
045
.00
45.0
040
.00
35.0
045
.00
40.0
040
.00
-11.
1-2
2.2
0.0
-11.
1-1
1.1
Max
imum
100.
0080
.00
79.0
085
.00
86.0
013
0.00
101.
0082
.00
120.
0010
8.25
30.0
26.3
3.8
41.2
25.9
Com
mon
65.6
067
.06
62.3
964
.88
64.9
873
.18
72.4
265
.00
69.1
769
.94
11.6
8.0
4.2
6.6
7.6
Not
e:
Dat
a C
over
s:
Cen
tral
Reg
ion:
Per
ak, S
elan
gor a
nd K
uala
Lum
pur
N
orth
ern
Regi
on: K
edah
and
Pul
au P
inan
g
East
ern
Regi
on: P
ahan
g, K
elan
tan
and
Tere
ngga
nu
Sout
hern
Reg
ion:
Neg
eri S
embi
lan,
Mel
aka
and
Joho
r
Appe
ndix
3.1
9 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal C
onst
ruct
ion
Wor
kers
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
188
Appe
ndix
3.2
0 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Con
stru
ctio
n W
orke
rs in
Pen
insu
lar M
alay
sia
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Gen
eral
Con
stru
ctio
n W
orke
rs -
Bui
ldin
g
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Con
cret
ers
Min
imum
45.0
055
.00
40.0
040
.00
45.0
045
.00
54.0
045
.00
45.0
047
.25
0.0
-1.8
12.5
12.5
5.0
Max
imum
85.0
010
5.00
77.0
082
.00
87.2
510
0.00
105.
0080
.50
120.
0010
1.38
17.6
0.0
4.5
46.3
16.2
Com
mon
63.3
876
.11
63.6
465
.58
67.1
869
.48
75.0
066
.50
71.7
270
.68
9.6
-1.5
4.5
9.4
5.2
Bar B
ende
rs
Min
imum
50.0
050
.00
45.0
050
.00
48.7
550
.00
50.0
050
.00
45.0
048
.75
0.0
0.0
11.1
-10.
00.
0
Max
imum
100.
0090
.00
76.0
080
.00
86.5
020
0.00
100.
0080
.00
105.
0012
1.25
100.
011
.15.
331
.340
.2
Com
mon
71.4
371
.67
63.6
766
.34
68.2
878
.58
72.1
966
.42
70.7
871
.99
10.0
0.7
4.3
6.7
5.4
Car
pent
ers
-Fo
rmw
ork
Min
imum
45.0
045
.00
45.0
045
.00
45.0
050
.00
45.0
048
.00
50.0
048
.25
11.1
0.0
6.7
11.1
7.2
Max
imum
100.
0095
.00
82.0
089
.00
91.5
015
5.00
95.0
085
.00
100.
0010
8.75
55.0
0.0
3.7
12.4
18.9
Com
mon
70.3
876
.83
69.7
866
.47
70.8
779
.70
75.6
972
.08
70.8
774
.59
13.2
-1.5
3.3
6.6
5.2
Bric
klay
ers
Min
imum
45.0
045
.00
55.0
045
.00
47.5
045
.00
45.0
050
.00
45.0
046
.25
0.0
0.0
-9.1
0.0
-2.6
Max
imum
115.
0095
.00
76.0
095
.00
95.2
511
5.00
100.
0080
.50
120.
0010
3.88
0.0
5.3
5.9
26.3
9.1
Com
mon
68.0
071
.87
66.3
966
.51
68.1
973
.88
75.6
167
.53
72.6
672
.42
8.6
5.2
1.7
9.2
6.2
Roof
ers
Min
imum
50.0
050
.00
55.0
045
.00
50.0
055
.00
50.0
055
.00
48.0
052
.00
10.0
0.0
0.0
6.7
4.0
Max
imum
95.0
010
0.00
82.0
090
.00
91.7
512
5.00
100.
0087
.50
100.
0010
3.13
31.6
0.0
6.7
11.1
12.4
Com
mon
72.6
875
.75
71.1
769
.99
72.4
080
.00
78.7
273
.50
74.1
176
.58
10.1
3.9
3.3
5.9
5.8
Car
pent
ers
-Jo
iner
y
Min
imum
50.0
055
.00
55.0
045
.00
51.2
550
.00
60.0
055
.00
50.0
053
.75
0.0
9.1
0.0
11.1
4.9
Max
imum
120.
0011
0.00
87.0
095
.00
103.
0014
0.00
110.
0091
.50
140.
0012
0.38
16.7
0.0
5.2
47.4
16.9
Com
mon
75.0
088
.06
74.5
672
.39
77.5
086
.25
87.6
176
.58
79.4
482
.47
15.0
-0.5
2.7
9.7
6.4
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
50.0
055
.00
50.0
055
.00
52.5
050
.00
55.0
058
.00
40.0
050
.75
0.0
0.0
16.0
-27.
3-3
.3
Max
imum
120.
0010
5.00
91.0
010
0.00
104.
0015
0.00
105.
0096
.50
140.
0012
2.88
25.0
0.0
6.0
40.0
18.1
Com
mon
78.6
382
.06
76.6
177
.50
78.7
091
.98
84.1
178
.83
80.9
783
.97
17.0
2.5
2.9
4.5
6.7
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
189
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Gen
eral
Wel
ders
Min
imum
50.0
050
.00
55.0
045
.00
50.0
050
.00
50.0
050
.00
46.0
049
.00
0.0
0.0
-9.1
2.2
-2.0
Max
imum
130.
0091
.00
83.0
091
.00
98.7
515
0.00
96.0
088
.50
140.
0011
8.63
15.4
5.5
6.6
53.8
20.1
Com
mon
77.2
572
.50
74.0
671
.94
73.9
486
.40
75.6
776
.00
76.7
878
.71
11.8
4.4
2.6
6.7
6.5
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
53.0
055
.00
55.0
045
.00
52.0
055
.00
55.0
050
.00
40.0
050
.00
3.8
0.0
-9.1
-11.
1-3
.8
Max
imum
120.
0012
0.00
74.0
082
.00
99.0
013
5.00
130.
0079
.50
110.
0011
3.63
12.5
8.3
7.434
.114
.8
Com
mon
73.2
375
.50
66.9
464
.47
70.0
485
.20
76.5
668
.17
70.9
675
.22
16.3
1.41.
810
.17.4
Plum
bers
-Re
ticul
atio
n
Min
imum
50.0
055
.00
50.0
048
.00
50.7
550
.00
55.0
050
.00
50.0
051
.25
0.0
0.0
0.0
4.2
1.0
Max
imum
105.
0011
0.00
95.0
099
.00
102.
2515
0.00
150.
0097
.00
110.
0012
6.75
42.9
36.4
2.1
11.1
24.0
Com
mon
72.3
581
.25
80.3
373
.25
76.8
088
.55
85.8
982
.14
78.3
183
.72
22.4
5.7
2.3
6.9
9.0
Build
ing
Wiri
ngIn
stal
lers
Min
imum
70.0
060
.00
60.0
050
.00
60.0
070
.00
47.0
070
.00
50.0
059
.25
0.0
-21.
716
.70.
0-1
.3
Max
imum
130.
0012
0.00
100.
0010
6.00
114.
0015
0.00
140.
0010
1.50
130.
0013
0.38
15.4
16.7
1.5
22.6
14.4
Com
mon
92.5
090
.06
89.2
882
.28
88.5
399
.15
92.0
692
.97
90.1
493
.58
7.2
2.2
4.1
9.6
5.7
Elec
tric
al W
irem
en
PW2
(Mon
thly
RM
)
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Scaff
olde
rs -
Pref
abric
ated
Min
imum
60.0
040
.00
50.0
055
.00
51.2
560
.00
45.0
050
.00
40.0
048
.75
0.0
12.5
0.0
-27.
3-4
.9
Max
imum
110.
0012
0.00
74.0
010
5.00
102.
2512
0.00
120.
0077
.00
120.
0010
9.25
9.1
0.0
4.1
14.3
6.8
Com
mon
78.0
875
.03
65.9
474
.76
73.4
581
.83
77.8
167
.97
77.4
076
.25
4.8
3.7
3.1
3.5
3.8
Scaff
olde
rs -
Tubu
lar
Min
imum
50.0
050
.00
50.0
060
.00
52.5
050
.00
55.0
055
.00
50.0
052
.50
0.0
10.0
10.0
-16.
70.
0
Max
imum
90.0
010
5.00
80.0
090
.00
91.2
511
0.00
105.
0080
.00
98.0
098
.25
22.2
0.0
0.0
8.9
7.7
Com
mon
72.4
872
.39
67.3
973
.77
71.5
179
.58
74.7
868
.89
77.2
175
.12
9.8
3.3
2.2
4.7
5.0
Appe
ndix
3.2
0 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Con
stru
ctio
n W
orke
rs in
Pen
insu
lar M
alay
sia
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
190
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Plas
tere
rs
Min
imum
50.0
050
.00
55.0
040
.00
48.7
550
.00
50.0
055
.00
45.0
050
.00
0.0
0.0
0.0
12.5
2.6
Max
imum
105.
0010
0.00
76.0
085
.00
91.5
012
0.00
108.
0079
.50
135.
0011
0.63
14.3
8.0
4.6
58.8
20.9
Com
mon
73.0
073
.92
67.7
867
.80
70.6
379
.45
81.3
969
.86
73.3
276
.01
8.8
10.1
3.1
8.1
7.6
Tile
rs
Min
imum
55.0
050
.00
55.0
050
.00
52.5
055
.00
55.0
058
.00
55.0
055
.75
0.0
10.0
5.5
10.0
6.2
Max
imum
120.
0010
5.00
88.0
090
.00
100.
7512
0.00
105.
0092
.50
120.
0010
9.38
0.0
0.0
5.1
33.3
8.6
Com
mon
86.4
375
.67
73.4
471
.58
76.7
890
.65
82.7
275
.33
78.3
881
.77
4.9
9.3
2.6
9.5
6.5
Pain
ters
- B
uild
ing
Min
imum
50.0
050
.00
45.0
055
.00
50.0
050
.00
50.0
050
.00
45.0
048
.75
0.0
0.0
11.1
-18.
2-2
.5
Max
imum
95.0
010
0.00
71.0
090
.00
89.0
013
0.00
100.
0074
.00
100.
0010
1.00
36.8
0.0
4.2
11.1
13.5
Com
mon
69.6
367
.72
62.7
267
.69
66.9
476
.88
72.7
865
.75
70.6
771
.52
10.4
7.5
4.8
4.4
6.8
Gen
eral
Con
stru
ctio
n W
orke
rs-C
ivil
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Not
e:
Dat
a C
over
s:
Cen
tral
Reg
ion:
Per
ak, S
elan
gor a
nd K
uala
Lum
pur
N
orth
ern
Regi
on: K
edah
and
Pul
au P
inan
g
East
ern
Regi
on: P
ahan
g, K
elan
tan
and
Tere
ngga
nu
Sout
hern
Reg
ion:
Neg
eri S
embi
lan,
Mel
aka
and
Joho
r
Appe
ndix
3.2
0 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Con
stru
ctio
n W
orke
rs in
Pen
insu
lar M
alay
sia
in 2
013
and
2014
(RM
/day
) (3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
191
Appe
ndix
3.2
1 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal C
onst
ruct
ion
Wor
kers
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Gen
eral
C
onst
ruct
ion
Wor
kers
- B
uild
ing
Min
imum
46.4
546
.68
46.0
046
.38
48.4
548
.00
48.0
048
.15
4.3
2.8
4.3
3.8
Max
imum
67.0
068
.00
70.0
068
.33
70.0
071
.00
73.0
071
.33
4.5
4.4
4.3
4.4
Com
mon
55.4
855
.50
55.5
055
.49
58.2
458
.08
58.2
358
.18
5.0
4.6
4.9
4.8
Con
cret
ers
Min
imum
84.4
371
.00
80.0
078
.48
86.4
373
.00
82.0
080
.48
2.4
2.8
2.5
2.5
Max
imum
108.
0090
.00
100.
6099
.53
111.
0094
.00
103.
6010
2.87
2.8
4.4
3.0
3.3
Com
mon
92.5
782
.67
89.6
788
.30
95.2
885
.50
92.5
091
.09
2.9
3.4
3.2
3.2
Bar B
ende
rs
Min
imum
83.0
080
.00
89.0
084
.00
85.0
082
.00
91.0
086
.00
2.4
2.5
2.2
2.4
Max
imum
117.
0092
.00
100.
0010
3.00
120.
0095
.00
103.
0010
6.00
2.6
3.3
3.0
2.9
Com
mon
96.8
087
.67
94.6
793
.05
99.5
590
.17
97.4
295
.71
2.8
2.9
2.9
2.9
Car
pent
ers
-Fo
rmw
ork
Min
imum
90.2
188
.00
88.0
088
.74
92.2
190
.00
90.0
090
.74
2.2
2.3
2.3
2.3
Max
imum
111.
0010
0.00
104.
0010
5.00
114.
0010
3.00
107.
0010
8.00
2.7
3.0
2.9
2.9
Com
mon
98.5
093
.83
97.4
396
.59
101.
2097
.00
100.
1099
.43
2.7
3.4
2.7
2.9
Bric
klay
ers
Min
imum
86.0
071
.00
82.2
079
.73
88.0
073
.00
84.2
081
.73
2.3
2.8
2.4
2.5
Max
imum
107.
0090
.00
100.
6099
.20
110.
0093
.00
103.
6010
2.20
2.8
3.3
3.0
3.0
Com
mon
96.7
481
.83
92.6
090
.39
99.2
984
.67
95.2
093
.05
2.6
3.5
2.8
2.9
Roof
ers
Min
imum
96.1
681
.00
91.0
089
.39
98.1
683
.00
93.0
091
.39
2.1
2.5
2.2
2.2
Max
imum
127.
0010
1.00
116.
0011
4.67
103.
0010
4.00
119.
0010
8.67
-18.
93.
02.
6-5
.2
Com
mon
104.
4788
.50
103.
4098
.79
107.
1791
.33
106.
1510
1.55
2.6
3.2
2.7
2.8
Car
pent
ers
-Jo
iner
y
Min
imum
99.0
097
.00
99.0
098
.33
101.
0099
.00
101.
0010
0.33
2.0
2.1
2.0
2.0
Max
imum
127.
0011
2.00
117.
0011
8.67
130.
0011
5.00
120.
0012
1.67
2.4
2.7
2.6
2.5
Com
mon
110.
2310
1.83
104.
3310
5.46
112.
9810
4.67
106.
9210
8.19
2.5
2.8
2.5
2.6
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
96.1
679
.00
95.0
090
.05
98.1
681
.00
97.0
092
.05
2.1
2.5
2.1
2.2
Max
imum
127.
0010
1.00
119.
0011
5.67
130.
0010
4.00
122.
0011
8.67
2.4
3.0
2.5
2.6
Com
mon
108.
6488
.67
107.
3010
1.54
111.
2991
.50
110.
3010
4.36
2.4
3.2
2.8
2.8
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
192
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Gen
eral
Wel
ders
Min
imum
84.2
671
.00
87.0
080
.75
86.2
673
.00
89.0
082
.75
2.4
2.8
2.3
2.5
Max
imum
120.
0010
0.00
113.
0011
1.00
125.
0010
2.00
116.
0011
4.33
4.2
2.0
2.7
3.0
Com
mon
102.
5783
.08
100.
0395
.23
105.
2785
.94
102.
9598
.05
2.6
3.4
2.9
3.0
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
90.2
193
.00
97.0
093
.40
92.2
195
.00
100.
0095
.74
2.2
2.2
3.1
2.5
Max
imum
116.
0010
5.00
111.
0011
0.67
119.
0010
8.00
114.
0011
3.67
2.6
2.9
2.7
2.7
Com
mon
100.
7498
.00
102.
6710
0.47
103.
4410
0.83
105.
3310
3.20
2.7
2.9
2.6
2.7
Plum
bers
-Re
ticul
atio
n
Min
imum
96.1
677
.00
97.0
090
.05
98.1
679
.00
99.0
092
.05
2.1
2.6
2.1
2.2
Max
imum
127.
0010
4.00
125.
0011
8.67
130.
0010
7.00
128.
0012
1.67
2.4
2.9
2.4
2.5
Com
mon
112.
1390
.92
110.
1810
4.41
114.
8893
.83
113.
0610
7.26
2.5
3.2
2.6
2.7
Build
ing
Wiri
ngIn
stal
lers
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Elec
tric
al W
irem
en
PW2
(Mon
thly
RM
)
Min
imum
2,10
1.00
1,71
1.00
2,08
9.00
1,96
7.00
2,10
3.00
1,71
3.00
2,09
1.00
1,96
9.00
0.1
0.1
0.1
0.1
Max
imum
2,87
3.00
2,28
8.00
2,78
6.00
2,64
9.00
2,87
7.00
2,29
2.00
2,78
9.00
2,65
2.67
0.1
0.2
0.1
0.1
Com
mon
2,48
2.24
1,98
3.67
2,42
1.67
2,29
5.86
2,48
4.96
1,98
6.58
2,42
4.50
2,29
8.68
0.1
0.1
0.1
0.1
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
2,90
1.00
2,37
6.00
2,90
7.00
2,72
8.00
2,90
3.00
2,37
8.00
2,90
9.00
2,73
0.00
0.1
0.1
0.1
0.1
Max
imum
3,58
2.00
2,85
8.00
3,48
8.00
3,30
9.33
3,58
6.00
2,86
2.00
3,49
1.00
3,31
3.00
0.1
0.1
0.1
0.1
Com
mon
3,34
7.86
2,63
3.00
3,21
4.17
3,06
5.01
3,35
0.67
2,86
2.00
3,21
6.83
3,14
3.17
0.1
8.7
0.1
2.5
Scaff
olde
rs -
Pref
abric
ated
Min
imum
84.4
376
.00
82.2
080
.88
86.4
378
.00
84.2
082
.88
2.4
2.6
2.4
2.5
Max
imum
101.
0093
.00
99.0
097
.67
107.
0097
.00
102.
0010
2.00
5.9
4.3
3.0
4.4
Com
mon
93.6
785
.67
91.8
790
.40
96.3
788
.50
94.5
293
.13
2.9
3.3
2.9
3.0
Scaff
olde
rs -
Tubu
lar
Min
imum
84.4
376
.00
82.2
080
.88
86.4
378
.00
84.2
082
.88
2.4
2.6
2.4
2.5
Max
imum
110.
0092
.00
108.
0010
3.33
113.
0095
.00
111.
0010
6.33
2.7
3.3
2.8
2.9
Com
mon
96.8
582
.17
95.4
391
.48
99.6
385
.00
98.1
094
.24
2.9
3.4
2.8
3.0
Plas
tere
rs
Min
imum
86.0
079
.00
82.2
082
.40
88.0
081
.00
84.2
084
.40
2.3
2.5
2.4
2.4
Max
imum
114.
0094
.00
102.
0010
3.33
118.
0097
.00
105.
0010
6.67
3.5
3.2
2.9
3.2
Com
mon
99.6
486
.33
92.8
392
.93
102.
2489
.25
95.5
095
.66
2.6
3.4
2.9
2.9
Appe
ndix
3.2
1 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal C
onst
ruct
ion
Wor
kers
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
193
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Tile
rs
Min
imum
102.
0084
.00
94.0
093
.33
104.
0086
.00
96.0
095
.33
2.0
2.4
2.1
2.1
Max
imum
133.
0010
0.00
107.
0011
3.33
138.
0010
3.00
110.
0011
7.00
3.8
3.0
2.8
3.2
Com
mon
116.
3793
.17
101.
7310
3.76
119.
1796
.08
104.
1510
6.47
2.4
3.1
2.4
2.6
Pain
ters
- B
uild
ing
Min
imum
80.0
072
.00
76.4
076
.13
82.0
074
.00
78.4
078
.13
2.5
2.8
2.6
2.6
Max
imum
107.
0091
.00
100.
6099
.53
111.
0094
.00
103.
6010
2.87
3.7
3.3
3.0
3.3
Com
mon
91.9
783
.17
86.9
087
.35
94.6
786
.00
89.5
390
.07
2.9
3.4
3.0
3.1
Gen
eral
C
onst
ruct
ion
Wor
kers
-Civ
il
Min
imum
66.5
553
.23
66.0
061
.93
68.5
555
.25
68.0
063
.93
3.0
3.8
3.0
3.2
Max
imum
90.0
076
.00
84.0
083
.33
93.0
079
.00
87.0
086
.33
3.3
3.9
3.6
3.6
Com
mon
76.1
162
.38
75.3
371
.27
78.7
665
.29
77.8
773
.97
3.5
4.7
3.4
3.8
Appe
ndix
3.2
1 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal C
onst
ruct
ion
Wor
kers
in 2
013
and
2014
(RM
/day
) (3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
194
Appe
ndix
3.2
2 A
vera
ge D
aily
Wag
e Ra
tes
for S
emi-
Skill
ed L
ocal
Con
stru
ctio
n W
orke
rs in
Sab
ah in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Gen
eral
C
onst
ruct
ion
Wor
kers
- B
uild
ing
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Con
cret
ers
Min
imum
72.5
156
.00
68.0
065
.50
74.5
158
.00
70.0
067
.50
2.8
3.6
2.9
3.1
Max
imum
85.4
381
.00
91.0
085
.81
89.4
384
.00
94.0
089
.14
4.7
3.7
3.3
3.9
Com
mon
79.6
264
.75
78.3
074
.22
82.2
867
.50
81.0
576
.94
3.3
4.2
3.5
3.7
Bar B
ende
rs
Min
imum
66.4
253
.25
68.0
062
.56
68.4
255
.25
70.0
064
.56
3.0
3.8
2.9
3.2
Max
imum
86.0
076
.00
84.0
082
.00
90.0
079
.00
87.0
085
.33
4.7
3.9
3.6
4.1
Com
mon
76.6
862
.38
75.3
371
.46
79.4
165
.44
78.0
874
.31
3.6
4.9
3.7
4.0
Car
pent
ers
-Fo
rmw
ork
Min
imum
78.3
162
.75
77.0
072
.69
80.3
164
.75
79.0
074
.69
2.6
3.2
2.6
2.8
Max
imum
94.0
079
.00
90.0
087
.67
97.0
082
.00
93.0
090
.67
3.2
3.8
3.3
3.4
Com
mon
86.0
670
.33
85.0
080
.46
88.7
073
.10
87.6
783
.16
3.1
3.9
3.1
3.3
Bric
klay
ers
Min
imum
56.5
556
.00
55.0
055
.85
58.5
558
.00
57.0
057
.85
3.5
3.6
3.6
3.6
Max
imum
77.7
577
.00
77.0
077
.25
82.0
081
.00
80.0
081
.00
5.5
5.2
3.9
4.9
Com
mon
68.9
866
.00
66.1
767
.05
71.7
168
.83
69.1
769
.90
4.0
4.3
4.5
4.3
Roof
ers
Min
imum
81.0
064
.00
82.2
075
.73
83.0
066
.00
84.2
077
.73
2.5
3.1
2.4
2.6
Max
imum
96.0
080
.00
93.0
089
.67
100.
0083
.00
96.0
093
.00
4.2
3.8
3.2
3.7
Com
mon
88.3
271
.96
87.0
382
.44
91.0
074
.96
89.7
885
.25
3.0
4.2
3.2
3.4
Car
pent
ers
-Jo
iner
y
Min
imum
84.2
667
.50
82.2
077
.99
86.2
669
.50
84.2
079
.99
2.4
3.0
2.4
2.6
Max
imum
100.
0090
.00
101.
0097
.00
103.
0093
.00
104.
0010
0.00
3.0
3.3
3.0
3.1
Com
mon
90.1
074
.46
89.8
784
.81
92.8
977
.46
92.6
287
.66
3.1
4.0
3.1
3.4
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
88.0
072
.00
88.0
082
.67
90.0
074
.00
90.0
084
.67
2.3
2.8
2.3
2.4
Max
imum
103.
0087
.00
101.
0097
.00
110.
0091
.00
104.
0010
1.67
6.8
4.6
3.0
4.8
Com
mon
94.8
977
.71
93.6
388
.74
97.6
980
.63
96.1
391
.48
3.0
3.8
2.7
3.1
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
195
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Gen
eral
Wel
ders
Min
imum
84.2
664
.00
83.0
077
.09
86.2
666
.00
85.0
079
.09
2.4
3.1
2.4
2.6
Max
imum
100.
0081
.00
98.0
093
.00
104.
0089
.00
101.
0098
.00
4.0
9.9
3.1
5.4
Com
mon
92.7
974
.38
89.8
085
.66
95.4
977
.38
91.9
788
.28
2.9
4.0
2.4
3.1
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
72.3
758
.00
70.6
066
.99
74.3
760
.00
72.6
068
.99
2.8
3.4
2.8
3.0
Max
imum
90.0
081
.00
92.0
087
.67
93.0
084
.00
95.0
090
.67
3.3
3.7
3.3
3.4
Com
mon
78.3
064
.79
78.1
773
.75
81.1
267
.96
80.9
276
.67
3.6
4.9
3.5
4.0
Plum
bers
-Re
ticul
atio
n
Min
imum
90.2
172
.25
90.0
084
.15
92.2
174
.25
92.0
086
.15
2.2
2.8
2.2
2.4
Max
imum
110.
0096
.00
111.
0010
5.67
113.
0099
.00
114.
0010
8.67
2.7
3.1
2.7
2.8
Com
mon
99.0
981
.33
98.4
392
.95
101.
7484
.25
101.
2795
.75
2.7
3.6
2.9
3.0
Build
ing
Wiri
ngIn
stal
lers
Min
imum
102.
1081
.75
99.6
094
.48
104.
1083
.75
101.
6096
.48
2.0
2.4
2.0
2.1
Max
imum
120.
0097
.00
117.
0011
1.33
123.
0010
0.00
120.
0011
4.33
2.5
3.1
2.6
2.7
Com
mon
109.
1488
.54
107.
1310
1.60
111.
8891
.46
109.
7510
4.36
2.5
3.3
2.4
2.7
Elec
tric
al W
irem
en
PW2
(Mon
thly
RM
)
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Scaff
olde
rs -
Pref
abric
ated
Min
imum
66.5
553
.25
64.8
061
.53
68.5
555
.25
66.8
063
.53
3.0
3.8
3.1
3.3
Max
imum
92.0
078
.00
90.0
086
.67
97.0
081
.00
93.0
090
.33
5.4
3.8
3.3
4.2
Com
mon
79.4
964
.83
78.3
074
.21
82.1
467
.90
81.1
377
.06
3.3
4.7
3.6
3.8
Scaff
olde
rs -
Tubu
lar
Min
imum
72.5
156
.00
70.6
066
.37
74.5
158
.00
72.6
068
.37
2.8
3.6
2.8
3.0
Max
imum
89.0
072
.00
90.0
083
.67
93.0
075
.00
93.0
087
.00
4.5
4.2
3.3
4.0
Com
mon
77.6
463
.96
77.1
772
.92
80.3
466
.88
79.7
875
.67
3.5
4.6
3.4
3.8
Appe
ndix
3.2
2 A
vera
ge D
aily
Wag
e Ra
tes
for S
emi-
Skill
ed L
ocal
Con
stru
ctio
n W
orke
rs in
Sab
ah in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
196
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Plas
tere
rs
Min
imum
72.0
055
.00
70.6
065
.87
74.0
057
.00
72.6
067
.87
2.8
3.6
2.8
3.0
Max
imum
96.0
080
.00
91.0
089
.00
100.
0083
.00
94.0
092
.33
4.2
3.8
3.3
3.7
Com
mon
84.1
268
.13
82.1
378
.13
86.7
271
.04
84.8
880
.88
3.1
4.3
3.3
3.5
Tile
rs
Min
imum
78.0
058
.00
74.4
070
.13
80.0
060
.00
78.4
072
.80
2.6
3.4
5.4
3.8
Max
imum
96.0
086
.00
89.0
090
.33
99.0
089
.00
92.0
093
.33
3.1
3.5
3.4
3.3
Com
mon
85.5
269
.54
83.2
379
.43
88.2
772
.46
85.8
782
.20
3.2
4.2
3.2
3.5
Pain
ters
- B
uild
ing
Min
imum
60.5
952
.00
59.0
057
.20
62.5
954
.00
61.0
059
.20
3.3
3.8
3.4
3.5
Max
imum
88.0
072
.00
86.0
082
.00
94.0
075
.00
89.0
086
.00
6.8
4.2
3.5
4.9
Com
mon
75.9
061
.63
73.9
370
.49
78.6
064
.54
76.6
873
.27
3.6
4.7
3.7
4.0
Gen
eral
C
onst
ruct
ion
Wor
kers
-Civ
il
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Appe
ndix
3.2
2 A
vera
ge D
aily
Wag
e Ra
tes
for S
emi-
Skill
ed L
ocal
Con
stru
ctio
n W
orke
rs in
Sab
ah in
201
3 an
d 20
14 (R
M/d
ay) (
3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
197
Appe
ndix
3.2
3 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal C
onst
ruct
ion
Wor
kers
in S
araw
ak in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Gen
eral
Con
stru
ctio
n W
orke
rs -
Bui
ldin
g
Min
imum
46.9
047
.00
46.0
046
.63
48.9
049
.00
48.0
048
.63
4.3
4.3
4.3
4.3
Max
imum
74.0
063
.00
67.0
068
.00
78.0
067
.50
70.0
071
.83
5.4
7.1
4.5
5.6
Com
mon
59.4
055
.33
55.3
356
.69
61.8
558
.25
57.6
759
.26
4.1
5.3
4.2
4.5
Con
cret
ers
Min
imum
77.2
582
.20
79.0
079
.48
79.2
584
.20
81.0
081
.48
2.6
2.4
2.5
2.5
Max
imum
100.
7110
0.60
107.
0010
2.77
104.
7110
3.60
110.
0010
6.10
4.0
3.0
2.8
3.2
Com
mon
89.9
389
.67
91.0
090
.20
92.6
392
.57
93.6
792
.96
3.0
3.2
2.9
3.1
Bar B
ende
rs
Min
imum
91.0
083
.00
86.0
086
.67
93.0
085
.00
88.0
088
.67
2.2
2.4
2.3
2.3
Max
imum
103.
0010
0.00
97.0
010
0.00
108.
0010
4.50
100.
0010
4.17
4.9
4.5
3.1
4.2
Com
mon
96.6
093
.17
92.8
394
.20
99.3
096
.00
95.5
096
.93
2.8
3.0
2.9
2.9
Car
pent
ers
-Fo
rmw
ork
Min
imum
93.1
788
.00
91.0
090
.72
90.9
890
.00
93.0
091
.33
-2.4
2.3
2.2
0.7
Max
imum
109.
0011
0.00
108.
0010
9.00
113.
0011
4.50
111.
0011
2.83
3.7
4.1
2.8
3.5
Com
mon
97.8
797
.37
98.6
597
.96
100.
5610
0.37
101.
3110
0.75
2.7
3.1
2.7
2.8
Bric
klay
ers
Min
imum
82.6
071
.00
87.0
080
.20
84.6
073
.00
89.0
082
.20
2.4
2.8
2.3
2.5
Max
imum
100.
7196
.00
101.
8899
.53
105.
0010
0.50
104.
8810
3.46
4.3
4.7
2.9
3.9
Com
mon
92.0
884
.83
93.9
890
.30
94.7
587
.83
97.0
693
.21
2.9
3.5
3.3
3.2
Roof
ers
Min
imum
95.1
293
.80
95.0
094
.64
97.1
295
.80
97.0
096
.64
2.1
2.1
2.1
2.1
Max
imum
111.
0011
8.00
117.
0011
5.33
116.
0012
2.50
120.
0011
9.50
4.5
3.8
2.6
3.6
Com
mon
103.
5610
3.40
104.
4610
3.81
106.
2510
6.25
107.
2110
6.57
2.6
2.8
2.6
2.7
Car
pent
ers
-Jo
iner
y
Min
imum
95.1
293
.80
96.0
094
.97
97.1
295
.80
98.0
096
.97
2.1
2.1
2.1
2.1
Max
imum
116.
0011
9.00
117.
0011
7.33
120.
0012
3.50
120.
0012
1.17
3.4
3.8
2.6
3.3
Com
mon
104.
2310
4.27
105.
4410
4.65
106.
9210
7.15
108.
3510
7.47
2.6
2.8
2.8
2.7
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
87.9
698
.00
95.0
093
.65
89.9
610
0.00
97.0
095
.65
2.3
2.0
2.1
2.1
Max
imum
113.
0011
2.00
120.
0011
5.00
120.
0012
6.50
123.
0012
3.17
6.2
12.9
2.5
7.1
Com
mon
103.
3810
7.30
108.
4410
6.37
106.
1311
0.17
111.
3610
9.22
2.7
2.7
2.7
2.7
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
198
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Gen
eral
Wel
ders
Min
imum
88.9
882
.20
83.2
584
.81
90.9
884
.20
85.2
586
.81
2.2
2.4
2.4
2.4
Max
imum
116.
0011
3.00
114.
0011
4.33
120.
0011
7.50
117.
0011
8.17
3.4
4.0
2.6
3.4
Com
mon
101.
2810
0.53
101.
6910
1.17
103.
9810
3.43
104.
4410
3.95
2.7
2.9
2.7
2.8
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
84.0
076
.40
83.0
081
.13
89.0
078
.00
85.0
084
.00
6.0
2.1
2.4
3.5
Max
imum
109.
0010
7.00
108.
0010
8.00
113.
0011
1.50
111.
0011
1.83
3.7
4.2
2.8
3.5
Com
mon
97.0
193
.17
93.6
994
.62
99.6
696
.05
96.6
097
.44
2.7
3.1
3.1
3.0
Plum
bers
-Re
ticul
atio
n
Min
imum
95.1
297
.00
99.0
097
.04
97.1
299
.00
101.
0099
.04
2.1
2.1
2.0
2.1
Max
imum
126.
0012
4.00
126.
0012
5.33
130.
0012
8.50
129.
0012
9.17
3.2
3.6
2.4
3.1
Com
mon
111.
3611
0.10
111.
4011
0.95
114.
0211
2.90
114.
0611
3.66
2.4
2.5
2.4
2.4
Build
ing
Wiri
ngIn
stal
lers
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Elec
tric
al W
irem
en P
W2
(Mon
thly
RM
)
Min
imum
2,00
1.00
2,08
9.00
2,11
6.00
2,06
8.67
2,00
3.00
2,09
1.00
2,11
8.00
2,07
0.67
0.1
0.1
0.1
0.1
Max
imum
2,85
7.60
2,78
6.00
2,82
2.00
2,82
1.87
2,86
1.60
2,78
9.00
2,82
5.00
2,82
5.20
0.1
0.1
0.1
0.1
Com
mon
2,41
1.97
2,42
1.50
2,45
2.50
2,42
8.66
2,41
4.68
2,42
4.58
2,45
5.42
2,43
1.56
0.1
0.1
0.1
0.1
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
2,80
1.00
2,90
7.00
2,93
8.50
2,88
2.17
2,80
3.00
2,90
9.00
2,94
0.50
2,88
4.17
0.1
0.1
0.1
0.1
Max
imum
3,57
1.75
3,48
2.00
3,53
3.00
3,52
8.92
3,57
5.75
3,48
5.00
3,53
6.00
3,53
2.25
0.1
0.1
0.1
0.1
Com
mon
3,17
8.81
3,21
4.17
3,25
5.58
3,21
6.19
3,18
1.51
3,21
7.42
3,25
8.33
3,21
9.09
0.1
0.1
0.1
0.1
Scaff
olde
rs -
Pref
abric
ated
Min
imum
88.0
094
.00
90.0
090
.67
90.0
096
.00
92.0
092
.67
2.3
2.1
2.2
2.2
Max
imum
100.
0010
3.00
104.
0010
2.33
104.
0010
6.00
107.
0010
5.67
4.0
2.9
2.9
3.3
Com
mon
96.0
098
.17
97.6
797
.28
98.7
010
1.00
100.
5010
0.07
2.8
2.9
2.9
2.9
Scaff
olde
rs -
Tubu
lar
Min
imum
84.3
291
.00
86.0
087
.11
86.3
293
.00
88.0
089
.11
2.4
2.2
2.3
2.3
Max
imum
108.
0010
7.00
112.
0010
9.00
113.
0011
1.50
115.
0011
3.17
4.6
4.2
2.7
3.8
Com
mon
95.9
698
.80
98.6
797
.81
98.6
510
1.72
101.
2510
0.54
2.8
3.0
2.6
2.8
Plas
tere
rs
Min
imum
82.6
093
.00
91.0
088
.87
84.6
095
.00
93.0
090
.87
2.4
2.2
2.2
2.3
Max
imum
100.
7110
2.00
108.
0010
3.57
105.
0010
6.00
111.
0010
7.33
4.3
3.9
2.8
3.6
Com
mon
92.0
997
.50
98.3
395
.97
94.8
110
0.42
101.
1798
.80
3.0
3.0
2.9
2.9
Appe
ndix
3.2
3 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal C
onst
ruct
ion
Wor
kers
in S
araw
ak in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
199
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Tile
rs
Min
imum
89.0
093
.80
95.0
092
.60
91.0
095
.80
97.0
094
.60
2.2
2.1
2.1
2.2
Max
imum
106.
5711
3.00
110.
0010
9.86
111.
0011
7.50
113.
0011
3.83
4.2
4.0
2.7
3.6
Com
mon
98.8
810
0.27
101.
6510
0.27
101.
5810
3.25
104.
3110
3.05
2.7
3.0
2.6
2.8
Pain
ters
- B
uild
ing
Min
imum
75.5
277
.00
80.0
077
.51
77.5
279
.00
82.0
079
.51
2.6
2.6
2.5
2.6
Max
imum
111.
0010
0.60
101.
8810
4.49
115.
0010
3.60
104.
8810
7.83
3.6
3.0
2.9
3.2
Com
mon
87.4
686
.97
88.0
287
.48
90.1
190
.05
90.7
790
.31
3.0
3.5
3.1
3.2
Gen
eral
Con
stru
ctio
n W
orke
rs-C
ivil
Min
imum
66.4
664
.80
65.6
365
.63
68.4
666
.80
67.6
367
.63
3.0
3.1
3.0
3.0
Max
imum
82.0
084
.00
87.0
084
.33
87.0
088
.50
90.0
088
.50
6.1
5.4
3.4
4.9
Com
mon
74.9
675
.23
76.1
975
.46
77.6
678
.15
78.8
578
.22
3.6
3.9
3.5
3.7
Appe
ndix
3.2
3 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Lo
cal C
onst
ruct
ion
Wor
kers
in S
araw
ak in
201
3 an
d 20
14 (R
M/d
ay) (
3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
200
Appe
ndix
3.2
4 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Con
stru
ctio
n W
orke
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Gen
eral
Con
stru
ctio
n W
orke
rs -
Bui
ldin
g
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Con
cret
ers
Min
imum
68.0
067
.00
67.0
067
.33
70.0
069
.00
69.0
069
.33
2.9
3.0
3.0
3.0
Max
imum
91.0
090
.00
92.0
091
.00
95.0
095
.50
95.0
095
.17
4.4
6.1
3.3
4.6
Com
mon
79.2
578
.30
79.1
778
.91
81.7
881
.13
82.0
081
.64
3.2
3.6
3.6
3.5
Bar B
ende
rs
Min
imum
65.7
071
.00
71.0
069
.23
67.7
073
.00
73.0
071
.23
3.0
2.8
2.8
2.9
Max
imum
86.0
089
.00
87.0
087
.33
90.0
093
.50
90.0
091
.17
4.7
5.1
3.4
4.4
Com
mon
75.0
579
.00
79.5
077
.85
77.5
681
.83
82.1
780
.52
3.3
3.6
3.4
3.4
Car
pent
ers
-Fo
rmw
ork
Min
imum
76.7
082
.00
77.3
878
.69
78.7
084
.00
79.3
880
.69
2.6
2.4
2.6
2.5
Max
imum
96.0
096
.00
95.0
095
.67
102.
0010
0.50
98.0
010
0.17
6.3
4.7
3.2
4.7
Com
mon
86.3
886
.83
86.7
586
.65
89.0
889
.58
89.5
089
.39
3.1
3.2
3.2
3.2
Bric
klay
ers
Min
imum
52.0
062
.00
61.0
058
.33
54.0
064
.00
63.0
060
.33
3.8
3.2
3.3
3.4
Max
imum
81.0
079
.00
77.0
079
.00
86.0
082
.00
80.0
082
.67
6.2
3.8
3.9
4.6
Com
mon
68.6
869
.50
69.5
069
.23
71.3
672
.42
72.2
572
.01
3.9
4.2
4.0
4.0
Roof
ers
Min
imum
77.7
381
.00
83.0
080
.58
79.7
383
.00
85.0
082
.58
2.6
2.5
2.4
2.5
Max
imum
94.0
094
.00
95.0
094
.33
98.0
099
.50
98.0
098
.50
4.3
5.9
3.2
4.4
Com
mon
86.2
387
.03
88.0
687
.11
88.9
390
.03
90.5
689
.84
3.1
3.4
2.8
3.1
Car
pent
ers
-Jo
iner
y
Min
imum
85.0
082
.20
84.0
083
.73
87.0
084
.20
86.0
085
.73
2.4
2.4
2.4
2.4
Max
imum
98.0
010
1.00
102.
0010
0.33
102.
0010
5.50
105.
0010
4.17
4.1
4.5
2.9
3.8
Com
mon
92.8
090
.87
90.8
591
.51
95.3
593
.77
93.6
894
.27
2.7
3.2
3.1
3.0
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
80.7
988
.00
86.0
084
.93
82.7
990
.00
88.0
086
.93
2.5
2.3
2.3
2.4
Max
imum
101.
0010
1.00
104.
0010
2.00
105.
0010
5.50
107.
0010
5.83
4.0
4.5
2.9
3.8
Com
mon
92.6
093
.63
94.6
993
.64
95.2
596
.47
97.3
496
.35
2.9
3.0
2.8
2.9
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
201
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Gen
eral
Wel
ders
Min
imum
77.4
776
.40
81.0
078
.29
79.4
778
.40
83.0
080
.29
2.6
2.6
2.5
2.6
Max
imum
95.1
210
1.00
100.
0098
.71
99.1
210
4.00
103.
0010
2.04
4.2
3.0
3.0
3.4
Com
mon
88.2
289
.73
91.0
489
.66
90.8
792
.63
93.7
992
.43
3.0
3.2
3.0
3.1
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
71.5
970
.60
76.0
072
.73
73.5
972
.60
78.0
074
.73
2.8
2.8
2.6
2.7
Max
imum
90.0
094
.00
90.0
091
.33
95.0
098
.50
93.0
095
.50
5.6
4.8
3.3
4.6
Com
mon
78.4
581
.50
83.0
080
.98
81.2
384
.42
85.9
283
.86
3.5
3.6
3.5
3.5
Plum
bers
-Re
ticul
atio
n
Min
imum
89.2
388
.00
92.0
089
.74
91.2
390
.00
94.0
091
.74
2.2
2.3
2.2
2.2
Max
imum
112.
0011
7.00
113.
0011
4.00
116.
0012
1.50
116.
0011
7.83
3.6
3.8
2.7
3.4
Com
mon
99.4
698
.37
99.6
599
.16
102.
1510
1.37
102.
3110
1.94
2.7
3.0
2.7
2.8
Build
ing
Wiri
ngIn
stal
lers
Min
imum
101.
0099
.60
100.
8810
0.49
103.
0010
1.60
102.
8810
2.49
2.0
2.0
2.0
2.0
Max
imum
113.
0012
2.00
117.
0011
7.33
117.
0012
6.50
120.
0012
1.17
3.5
3.7
2.6
3.3
Com
mon
107.
1310
7.13
108.
4210
7.56
109.
7811
0.00
111.
0811
0.29
2.5
2.7
2.5
2.5
Elec
tric
al W
irem
en P
W2
(Mon
thly
RM
)
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Scaff
olde
rs -
Pref
abric
ated
Min
imum
69.0
071
.00
74.0
071
.33
71.0
073
.00
76.0
073
.33
2.9
2.8
2.7
2.8
Max
imum
85.0
089
.00
92.0
088
.67
89.0
093
.50
95.0
092
.50
4.7
5.1
3.3
4.3
Com
mon
78.3
581
.37
82.8
880
.87
81.0
384
.20
85.5
483
.59
3.4
3.5
3.2
3.4
Scaff
olde
rs -
Tubu
lar
Min
imum
69.3
174
.00
73.0
072
.10
71.3
176
.00
75.0
074
.10
2.9
2.7
2.7
2.8
Max
imum
86.0
093
.00
91.0
090
.00
91.0
097
.50
94.0
094
.17
5.8
4.8
3.3
4.6
Com
mon
76.5
281
.67
81.6
779
.95
79.2
084
.50
84.3
382
.68
3.5
3.5
3.3
3.4
Plas
tere
rs
Min
imum
75.0
070
.60
71.5
072
.37
77.0
072
.60
73.5
074
.37
2.7
2.8
2.8
2.8
Max
imum
95.0
094
.00
91.0
093
.33
99.0
098
.50
94.0
097
.17
4.2
4.8
3.3
4.1
Com
mon
83.5
082
.00
82.1
382
.54
86.2
084
.83
84.7
985
.27
3.2
3.5
3.2
3.3
Appe
ndix
3.2
4 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Con
stru
ctio
n W
orke
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
202
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Tile
rs
Min
imum
71.3
876
.40
71.5
073
.09
73.3
878
.40
73.5
075
.09
2.8
2.6
2.8
2.7
Max
imum
91.0
091
.00
97.0
093
.00
96.0
095
.50
100.
0097
.17
5.5
4.9
3.1
4.5
Com
mon
83.2
383
.90
85.0
884
.07
85.9
286
.78
87.7
586
.82
3.2
3.4
3.1
3.3
Pain
ters
- B
uild
ing
Min
imum
65.0
064
.00
66.0
065
.00
67.0
066
.00
68.0
067
.00
3.1
3.1
3.0
3.1
Max
imum
85.0
084
.00
87.0
085
.33
89.0
088
.50
90.0
089
.17
4.7
5.4
3.4
4.5
Com
mon
74.8
174
.33
75.1
574
.76
77.2
277
.25
77.5
677
.34
3.2
3.9
3.2
3.5
Gen
eral
Con
stru
ctio
n W
orke
rs-C
ivil
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Appe
ndix
3.2
4 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed L
ocal
Con
stru
ctio
n W
orke
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
203
Appe
ndix
3.2
5 Av
erag
e D
aily
Wag
e Ra
tes
for I
BS C
ompo
nent
Inst
alle
rs in
Pen
insu
lar M
alay
sia
in 2
013
and
2014
(RM
/day
)
Wor
ker
Cat
egor
y
Min
imum
/ M
axim
um
Wag
e
Skill
edSe
mi-
Skill
ed
2013
2014
Cha
nge
(%)
2013
2014
Cha
nge
(%)
Wes
t C
oast
East
C
oast
Aver
age
Wes
t C
oast
East
C
oast
Aver
age
Wes
t C
oast
East
C
oast
Wes
t C
oast
East
C
oast
Aver
age
Wes
t C
oast
East
C
oast
Aver
age
Wes
t C
oast
East
C
oast
IBS
Prec
ast
Con
cret
e In
stal
lers
Min
imum
60.0
060
.00
60.0
070
.00
89.0
079
.50
16.7
48.3
50.0
050
.00
50.0
050
.00
71.0
060
.50
0.0
42.0
Max
imum
156.
0015
7.00
156.
5017
3.00
185.
0017
9.00
10.9
17.8
130.
0013
0.00
130.
0012
5.00
113.
0011
9.00
-3.8
-13.
1
Com
mon
106.
3311
0.58
108.
4611
5.59
120.
2111
7.90
8.7
8.7
80.2
679
.92
80.0
984
.88
89.9
287
.40
5.8
12.5
IBS
Ligh
twei
ght
Pane
l Ins
talle
rs
Min
imum
60.0
060
.00
60.0
070
.00
83.0
076
.50
16.7
38.3
55.0
055
.00
55.0
050
.00
63.0
056
.50
-9.1
14.5
Max
imum
160.
0016
0.00
160.
0018
0.00
148.
0016
4.00
12.5
-7.5
135.
0013
5.00
135.
0015
0.00
115.
0013
2.50
11.1
-14.
8
Com
mon
100.
5710
0.25
100.
4110
8.23
109.
9610
9.10
7.69.
780
.28
76.0
078
.14
84.5
585
.96
85.2
65.
313
.1
Ligh
t Blo
ck W
all
Inst
alle
rs
Min
imum
65.0
065
.00
65.0
065
.00
85.0
075
.00
0.0
30.8
55.0
055
.00
55.0
055
.00
56.0
055
.50
0.0
1.8
Max
imum
150.
0015
0.00
150.
0016
0.00
117.0
013
8.50
6.7
-22.
011
0.00
110.
0011
0.00
110.
0092
.00
101.
000.
0-1
6.4
Com
mon
94.9
489
.67
92.3
110
3.74
99.6
310
1.69
9.3
11.1
72.2
663
.92
68.0
978
.50
73.9
676
.23
8.6
15.7
Syst
em
Form
wor
k In
stal
lers
Min
imum
60.0
060
.00
60.0
065
.00
81.0
073
.00
8.3
35.0
50.0
050
.00
50.0
050
.00
63.0
056
.50
0.0
26.0
Max
imum
150.
0015
0.00
150.
0021
0.00
145.
0017
7.50
40.0
-3.3
120.
0012
0.00
120.
0012
0.00
110.
0011
5.00
0.0
-8.3
Com
mon
97.9
892
.83
95.4
110
6.81
102.
8810
4.85
9.0
10.8
77.6
473
.83
75.7
481
.45
84.0
082
.73
4.9
13.8
Roof
Tru
ss
Inst
alle
rs (W
ood)
Min
imum
60.0
060
.00
60.0
060
.00
88.0
074
.00
0.0
46.7
50.0
050
.00
50.0
050
.00
58.0
054
.00
0.0
16.0
Max
imum
140.
0014
0.00
140.
0020
0.00
118.
0015
9.00
42.9
-15.
710
5.00
105.
0010
5.00
150.
0098
.00
124.
0042
.9-6
.7
Com
mon
95.8
393
.25
94.5
410
6.91
103.
2510
5.08
11.6
10.7
73.4
865
.42
69.4
579
.36
75.4
277
.39
8.0
15.3
Roof
Tru
ss
Ista
llers
(Lig
ht
Stee
l Gau
ge)
Min
imum
60.0
060
.00
60.0
065
.00
78.0
071
.50
8.3
30.0
50.0
050
.00
50.0
050
.00
60.0
055
.00
0.0
20.0
Max
imum
150.
0015
0.00
150.
0020
0.00
122.
0016
1.00
33.3
-18.
711
5.00
115.
0011
5.00
150.
0011
4.00
132.
0030
.4-0
.9
Com
mon
94.2
395
.00
94.6
210
6.14
105.
0010
5.57
12.6
10.5
74.4
871
.83
73.1
680
.90
81.8
381
.37
8.6
13.9
Not
e :
Dat
a co
vers
:
Wes
t Coa
st: K
uala
Lum
pur,
Sela
ngor
, Pul
au P
inan
g, N
eger
i Sem
bila
n an
d Jo
hor
Ea
st C
oast
: Kel
anta
n an
d Te
reng
ganu
.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
204
Appe
ndix
3.2
6 Av
erag
e D
aily
Wag
e Ra
tes
for S
kille
d Fo
reig
n M
achi
ne O
pera
tors
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Exac
avat
ors
Ope
rato
rs
Min
imum
40.0
055
.00
65.0
050
.00
52.5
040
.00
35.0
038
.00
40.0
038
.25
0.0
-36.
4-4
1.5
-20.
0-2
7.1
Max
imum
125.
0011
0.00
92.0
010
0.00
106.
7515
5.00
110.
0096
.00
115.
0011
9.00
24.0
0.0
4.3
15.0
11.5
Com
mon
78.4
077
.22
80.1
172
.08
76.9
586
.95
78.1
480
.86
73.6
179
.89
10.9
1.2
0.9
2.1
3.8
Pile
Rig
gers
Min
imum
50.0
055
.00
60.0
055
.00
55.0
050
.00
50.0
060
.00
60.0
055
.00
0.0
-9.1
0.0
9.1
0.0
Max
imum
130.
0013
5.00
105.
0095
.00
116.
2513
0.00
135.
0010
5.00
115.
0012
1.25
0.0
0.0
0.0
21.1
4.3
Com
mon
81.2
383
.42
76.5
873
.83
78.7
785
.00
85.2
879
.25
75.6
481
.29
4.6
2.2
3.5
2.5
3.2
Off
Road
Tru
ck O
pera
tors
Min
imum
50.0
050
.00
45.0
055
.00
50.0
050
.00
50.0
035
.00
55.0
047
.50
0.0
0.0
-22.
20.
0-5
.0
Max
imum
135.
0011
0.00
82.0
090
.00
104.
2513
5.00
110.
0085
.00
97.0
010
6.75
0.0
0.0
3.7
7.82.
4
Com
mon
75.7
575
.83
68.9
469
.88
72.6
082
.38
78.5
670
.36
72.0
875
.85
8.8
3.6
2.1
3.1
4.5
Back
hoe
Load
er O
pera
tors
Min
imum
45.0
048
.00
50.0
040
.00
45.7
545
.00
50.0
045
.00
40.0
045
.00
0.0
4.2
-10.
00.
0-1
.6
Max
imum
140.
0011
0.00
87.0
010
0.00
109.
2514
0.00
110.
0091
.50
100.
0011
0.38
0.0
0.0
5.2
0.0
1.0
Com
mon
79.9
071
.81
75.3
371
.90
74.7
482
.58
79.2
875
.64
73.1
777
.67
3.4
10.4
0.4
1.8
3.9
Rolle
r Ope
rato
rs
Min
imum
45.0
055
.00
50.0
045
.00
48.7
550
.00
58.0
055
.00
40.0
050
.75
11.1
5.5
10.0
-11.
14.
1
Max
imum
120.
0011
0.00
86.0
090
.00
101.
5012
0.00
110.
0090
.50
115.
0010
8.88
0.0
0.0
5.2
27.8
7.3
Com
mon
76.8
076
.88
73.5
873
.53
75.2
082
.55
80.7
176
.33
71.6
477
.81
7.5
5.0
3.7
-2.6
3.5
Rolle
r/C
ompa
ctor
O
pera
tors
Min
imum
45.0
055
.00
45.0
045
.00
47.5
030
.00
55.0
025
.00
30.0
035
.00
-33.
30.
0-4
4.4
-33.
3-2
6.3
Max
imum
120.
0011
0.00
90.0
090
.00
102.
5012
0.00
110.
0094
.50
95.0
010
4.88
0.0
0.0
5.0
5.6
2.3
Com
mon
77.2
576
.06
74.6
169
.77
74.4
277
.20
81.9
575
.39
67.8
675
.60
-0.1
7.71.
0-2
.71.
6
Scra
pper
Ope
rato
rs
Min
imum
45.0
050
.00
40.0
055
.00
47.5
035
.00
55.0
045
.00
40.0
043
.75
-22.
210
.012
.5-2
7.3
-7.9
Max
imum
100.
0011
0.00
95.0
091
.00
99.0
010
0.00
105.
0096
.50
96.0
099
.38
0.0
-4.5
1.6
5.5
0.4
Com
mon
78.8
578
.53
78.3
376
.39
78.0
378
.65
83.0
682
.14
73.3
079
.29
-0.3
5.8
4.9
-4.0
1.6
Mot
or L
oade
r Ope
rato
rs
Min
imum
50.0
045
.00
60.0
050
.00
51.2
550
.00
50.0
045
.00
50.0
048
.75
0.0
11.1
-25.
00.
0-4
.9
Max
imum
105.
0010
0.00
95.0
010
0.00
100.
0013
0.00
100.
0095
.00
106.
0010
7.75
23.8
0.0
0.0
6.0
7.8
Com
mon
79.1
074
.75
78.8
978
.11
77.7
182
.63
80.6
980
.42
76.5
680
.08
4.5
7.9
1.9
-2.0
3.0
Whe
el L
oade
r Ope
rato
rs
Min
imum
55.0
060
.00
55.0
050
.00
55.0
058
.00
60.0
050
.00
50.0
054
.50
5.5
0.0
-9.1
0.0
-0.9
Max
imum
130.
0013
0.00
90.0
090
.00
110.
0013
0.00
130.
0094
.50
95.5
011
2.50
0.0
0.0
5.0
6.1
2.3
Com
mon
81.4
083
.56
77.1
773
.39
78.8
884
.35
86.3
080
.11
72.6
980
.86
3.6
3.3
3.8
-1.0
2.5
Pave
r Ope
rato
rs
Min
imum
50.0
050
.00
67.0
045
.00
53.0
050
.00
60.0
069
.00
40.0
054
.75
0.0
20.0
3.0
-11.
13.
3
Max
imum
130.
0011
0.00
100.
0010
0.00
110.
0013
0.00
110.
0010
1.00
105.
5011
1.63
0.0
0.0
1.0
5.5
1.5
Com
mon
82.3
880
.06
82.5
078
.58
80.8
884
.88
83.0
586
.19
76.8
182
.73
3.0
3.7
4.5
-2.3
2.3
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
205
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Mob
ile C
rane
Ope
rato
rs
Min
imum
60.0
060
.00
70.0
075
.00
66.2
560
.00
60.0
070
.00
60.0
062
.50
0.0
0.0
0.0
-20.
0-5
.7
Max
imum
110.
0015
0.00
110.
0011
0.00
120.
0025
0.00
145.
0011
6.50
117.
5015
7.25
127.
3-3
.35.
96.
831
.0
Com
mon
85.4
391
.83
90.9
491
.22
89.8
611
2.85
99.2
290
.58
90.4
998
.29
32.1
8.0
-0.4
-0.8
9.4
Cra
wle
r Cra
ne O
pera
tors
Min
imum
55.0
070
.00
70.0
065
.00
65.0
055
.00
70.0
080
.00
60.0
066
.25
0.0
0.0
14.3
-7.7
1.9
Max
imum
120.
0011
5.00
125.
0010
7.00
116.
7515
0.00
135.
0012
5.00
111.
0013
0.25
25.0
17.4
0.0
3.7
11.6
Com
mon
84.1
887
.77
93.8
689
.11
88.7
310
0.50
93.8
596
.89
87.3
994
.66
19.4
6.9
3.2
-1.9
6.7
Tow
er C
rane
Ope
rato
rs
Min
imum
60.0
055
.00
91.0
075
.00
70.2
555
.00
65.0
075
.00
60.0
063
.75
-8.3
18.2
-17.6
-20.
0-9
.3
Max
imum
150.
0014
0.00
125.
0013
5.00
137.
5017
0.00
140.
0012
5.00
150.
0014
6.25
13.3
0.0
0.0
11.1
6.4
Com
mon
88.7
898
.17
103.
8310
0.58
97.8
410
3.73
102.
9210
3.72
94.3
610
1.18
16.8
4.8
-0.1
-6.2
3.4
Fork
lift O
pera
tors
Min
imum
50.0
050
.00
70.0
045
.00
53.7
545
.00
55.0
060
.00
40.0
050
.00
-10.
010
.0-1
4.3
-11.
1-7
.0
Max
imum
95.0
010
0.00
96.0
088
.00
94.7
510
0.00
100.
0099
.00
95.0
098
.50
5.3
0.0
3.1
8.0
4.0
Com
mon
67.1
374
.33
81.3
969
.69
73.1
471
.63
77.5
383
.28
67.9
475
.10
6.7
4.3
2.3
-2.5
2.7
Slin
ger/
Dog
ger
Min
imum
50.0
050
.00
60.0
048
.00
52.0
048
.00
50.0
060
.00
40.0
049
.50
-4.0
0.0
0.0
-16.
7-4
.8
Max
imum
95.0
011
5.00
95.0
085
.00
97.5
010
0.00
120.
0010
0.00
89.5
010
2.38
5.3
4.3
5.3
5.3
5.0
Com
mon
70.0
879
.31
78.8
670
.37
74.6
673
.80
82.8
380
.61
68.8
176
.51
5.3
4.4
2.2
-2.2
2.5
Not
e:
Dat
a C
over
s:
Cen
tral
Reg
ion:
Per
ak, S
elan
gor a
nd K
uala
Lum
pur
N
orth
ern
Regi
on: K
edah
and
Pul
au P
inan
g
East
ern
Regi
on: P
ahan
g, K
elan
tan
and
Tere
ngga
nu
Sout
hern
Reg
ion:
Neg
eri S
embi
lan,
Mel
aka
and
Joho
r
Appe
ndix
3.2
6 Av
erag
e D
aily
Wag
e Ra
tes
for S
kille
d Fo
reig
n M
achi
ne O
pera
tors
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
206
Appe
ndix
3.2
7 Av
erag
e D
aily
Wag
e Ra
tes
for S
emi-
Skill
ed F
orei
gn M
achi
ne O
pera
tors
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Exac
avat
ors
Ope
rato
rs
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Pile
Rig
gers
Min
imum
35.0
045
.00
45.0
040
.00
41.2
535
.00
40.0
055
.00
40.0
042
.50
0.0
-11.
122
.20.
03.
0
Max
imum
95.0
012
5.00
75.0
070
.00
91.2
595
.00
125.
0078
.00
95.0
098
.25
0.0
0.0
4.0
35.7
7.7
Com
mon
59.3
565
.92
64.7
255
.34
61.3
362
.85
68.9
467
.58
58.7
064
.52
5.9
4.6
4.4
6.1
5.2
Off
Road
Tru
ck O
pera
tors
Min
imum
40.0
035
.00
40.0
040
.00
38.7
540
.00
38.0
035
.00
40.0
038
.25
0.0
8.6
-12.
50.
0-1
.3
Max
imum
115.
0090
.00
70.0
064
.00
84.7
511
5.00
90.0
074
.00
85.0
091
.00
0.0
0.0
5.7
32.8
7.4
Com
mon
59.7
561
.25
58.8
653
.76
58.4
162
.13
63.0
860
.89
59.0
961
.30
4.0
3.0
3.4
9.9
5.0
Back
hoe
Load
er
Ope
rato
rs
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Rolle
r Ope
rato
rs
Min
imum
40.0
040
.00
40.0
040
.00
40.0
040
.00
40.0
040
.00
40.0
040
.00
0.0
0.0
0.0
0.0
0.0
Max
imum
85.0
080
.00
77.0
070
.00
78.0
085
.00
80.0
081
.00
70.0
079
.00
0.0
0.0
5.2
0.0
1.3
Com
mon
58.0
359
.58
56.2
852
.16
56.5
161
.33
63.2
458
.97
52.4
158
.99
5.7
6.1
4.8
0.5
4.4
Rolle
r/C
ompa
ctor
O
pera
tors
Min
imum
35.0
040
.00
40.0
040
.00
38.7
530
.00
40.0
025
.00
30.0
031
.25
-14.
30.
0-3
7.5
-25.
0-1
9.4
Max
imum
75.0
085
.00
88.0
067
.00
78.7
510
0.00
85.0
092
.50
74.5
088
.00
33.3
0.0
5.1
11.2
11.7
Com
mon
56.2
060
.91
65.4
452
.28
58.7
173
.80
64.9
066
.83
52.1
464
.42
31.3
6.6
2.1
-0.3
9.7
Scra
pper
Ope
rato
rs
Min
imum
35.0
040
.00
40.0
040
.00
38.7
530
.00
40.0
040
.00
40.0
037
.50
-14.
30.
00.
00.
0-3
.2
Max
imum
75.0
086
.00
90.0
080
.00
82.7
575
.00
89.0
093
.00
87.5
086
.13
0.0
3.5
3.3
9.4
4.1
Com
mon
54.7
563
.14
68.3
960
.72
61.7
557
.20
65.4
970
.89
60.8
963
.62
4.5
3.7
3.7
0.3
3.0
Mot
or L
oade
r Ope
rato
rs
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Whe
el L
oade
r Ope
rato
rs
Min
imum
35.0
040
.00
45.0
040
.00
40.0
038
.00
40.0
045
.00
40.0
040
.75
8.6
0.0
0.0
0.0
1.9
Max
imum
85.0
090
.00
83.0
070
.00
82.0
090
.00
90.0
087
.50
76.5
086
.00
5.9
0.0
5.4
9.3
4.9
Com
mon
55.9
364
.94
66.3
656
.67
60.9
860
.23
68.3
670
.31
56.2
763
.79
7.75.
36.
0-0
.74.
6
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
207
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cent
ral
Regio
nNo
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Pave
r Ope
rato
rs
Min
imum
40.0
035
.00
45.0
040
.00
40.0
040
.00
40.0
045
.00
40.0
041
.25
0.0
14.3
0.0
0.0
3.1
Max
imum
95.0
095
.00
89.0
074
.00
88.2
595
.00
95.0
092
.00
78.0
090
.00
0.0
0.0
3.4
5.4
2.0
Com
mon
56.9
064
.58
67.6
157
.28
61.5
960
.10
68.4
471
.86
57.5
364
.48
5.6
6.0
6.3
0.4
4.7
Mob
ile C
rane
Ope
rato
rs
Min
imum
40.0
045
.00
50.0
050
.00
46.2
540
.00
50.0
050
.00
45.0
046
.25
0.0
11.1
0.0
-10.
00.
0
Max
imum
85.0
090
.00
97.0
081
.00
88.2
518
0.00
93.0
010
0.00
87.5
011
5.13
111.
83.
33.
18.
030
.5
Com
mon
60.4
568
.81
71.6
767
.33
67.0
780
.65
74.0
173
.78
67.1
073
.89
33.4
7.62.
9-0
.310
.2
Cra
wle
r Cra
ne O
pera
tors
Min
imum
43.0
045
.00
50.0
045
.00
45.7
543
.00
45.0
055
.00
45.0
047
.00
0.0
0.0
10.0
0.0
2.7
Max
imum
90.0
095
.00
89.0
094
.00
92.0
010
0.00
95.0
093
.00
99.5
096
.88
11.1
0.0
4.5
5.9
5.3
Com
mon
62.9
569
.44
71.2
868
.50
68.0
473
.40
75.0
373
.19
69.4
772
.77
16.6
8.1
2.7
1.47.0
Tow
er C
rane
Ope
rato
rs
Min
imum
35.0
045
.00
77.0
055
.00
53.0
035
.00
45.0
055
.00
50.0
046
.25
0.0
0.0
-28.
6-9
.1-1
2.7
Max
imum
110.
0011
0.00
97.0
010
5.00
105.
5012
0.00
110.
0010
1.00
105.
0010
9.00
9.1
0.0
4.1
0.0
3.3
Com
mon
61.0
874
.72
87.0
677
.06
74.9
874
.75
80.2
887
.72
74.0
879
.21
22.4
7.40.
8-3
.95.
6
Fork
lift O
pera
tors
Min
imum
40.0
040
.00
55.0
038
.00
43.2
540
.00
40.0
055
.00
40.0
043
.75
0.0
0.0
0.0
5.3
1.2
Max
imum
65.0
085
.00
88.0
069
.00
76.7
570
.00
85.0
094
.00
74.5
080
.88
7.70.
06.
88.
05.
4
Com
mon
48.6
059
.53
72.2
253
.89
58.5
653
.75
62.8
974
.67
54.6
461
.49
10.6
5.6
3.4
1.45.
0
Slin
ger/
Dog
ger
Min
imum
40.0
040
.00
50.0
040
.00
42.5
040
.00
40.0
050
.00
40.0
042
.50
0.0
0.0
0.0
0.0
0.0
Max
imum
75.0
095
.00
84.0
077
.00
82.7
575
.00
95.0
089
.00
82.5
085
.38
0.0
0.0
6.0
7.1
3.2
Com
mon
51.4
561
.44
68.7
857
.71
59.8
554
.85
67.2
870
.67
58.6
662
.87
6.6
9.5
2.7
1.6
5.0
Not
e:
Dat
a C
over
s:
Cen
tral
Reg
ion:
Per
ak, S
elan
gor a
nd K
uala
Lum
pur
N
orth
ern
Regi
on: K
edah
and
Pul
au P
inan
g
East
ern
Regi
on: P
ahan
g, K
elan
tan
and
Tere
ngga
nu
Sout
hern
Reg
ion:
Neg
eri S
embi
lan,
Mel
aka
and
Joho
r
Appe
ndix
3.2
7 Av
erag
e D
aily
Wag
e Ra
tes
for S
emi-
Skill
ed F
orei
gn M
achi
ne O
pera
tors
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
208
Appe
ndix
3.2
8 Av
erag
e D
aily
Wag
e R
ates
for S
kille
d Fo
reig
n M
achi
ne O
pera
tors
in S
abah
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Exac
avat
ors
Ope
rato
rs
Min
imum
49.0
041
.00
51.0
047
.00
51.0
043
.00
53.0
049
.00
4.1
4.9
3.9
4.3
Max
imum
82.0
072
.00
70.0
074
.67
85.0
075
.00
73.0
077
.67
3.7
4.2
4.3
4.0
Com
mon
66.2
068
.85
57.0
064
.02
68.8
557
.17
62.5
862
.87
4.0
-17.
09.
8-1
.8
Pile
Rig
gers
Min
imum
56.0
046
.00
56.0
052
.67
58.0
048
.00
58.0
054
.67
3.6
4.3
3.6
3.8
Max
imum
80.0
070
.00
73.0
074
.33
83.0
073
.00
76.0
077
.33
3.8
4.3
4.1
4.0
Com
mon
65.5
067
.50
58.5
063
.83
68.1
560
.83
66.4
265
.13
4.0
-9.9
13.5
2.0
Off
Road
Tru
ck O
pera
tors
Min
imum
55.5
449
.00
47.0
050
.51
57.5
451
.00
49.0
052
.51
3.6
4.1
4.3
4.0
Max
imum
70.0
062
.00
65.9
565
.98
73.0
065
.00
68.9
568
.98
4.3
4.8
4.5
4.5
Com
mon
62.3
161
.91
56.0
060
.07
65.0
358
.08
59.4
960
.87
4.4
-6.2
6.2
1.3
Back
hoe
Load
er O
pera
tors
Min
imum
51.0
046
.00
46.0
047
.67
53.0
048
.00
48.0
049
.67
3.9
4.3
4.3
4.2
Max
imum
79.0
061
.00
67.0
069
.00
83.0
064
.00
70.0
072
.33
5.1
4.9
4.5
4.8
Com
mon
66.2
763
.39
54.0
061
.22
68.9
257
.25
61.0
062
.39
4.0
-9.7
13.0
1.9
Rolle
r Ope
rato
rs
Min
imum
56.0
048
.00
51.0
051
.67
58.0
050
.00
53.0
053
.67
3.6
4.2
3.9
3.9
Max
imum
80.0
060
.00
66.0
068
.67
84.0
063
.00
69.0
072
.00
5.0
5.0
4.5
4.9
Com
mon
66.2
262
.86
54.5
061
.19
68.9
957
.25
60.7
562
.33
4.2
-8.9
11.5
1.9
Rolle
r/C
ompa
ctor
O
pera
tors
Min
imum
55.6
551
.00
55.0
053
.88
57.6
553
.00
57.0
055
.88
3.6
3.9
3.6
3.7
Max
imum
80.0
070
.00
71.0
273
.67
84.0
073
.00
78.0
078
.33
5.0
4.3
9.8
6.3
Com
mon
66.3
067
.90
61.0
065
.07
69.1
161
.08
65.0
065
.06
4.2
-10.
06.
60.
0
Scra
pper
Ope
rato
rs
Min
imum
51.0
051
.00
46.0
049
.33
53.0
053
.00
48.0
051
.33
3.9
3.9
4.3
4.1
Max
imum
75.0
068
.00
69.0
070
.67
78.0
071
.00
72.0
073
.67
4.0
4.4
4.3
4.2
Com
mon
62.2
064
.85
60.0
062
.35
64.8
560
.83
59.0
061
.56
4.3
-6.2
-1.7
-1.3
Mot
or L
oade
r Ope
rato
rs
Min
imum
43.0
051
.00
36.0
043
.33
45.0
053
.00
38.0
045
.33
4.7
3.9
5.6
4.6
Max
imum
72.0
062
.00
75.0
069
.67
75.0
066
.00
78.0
073
.00
4.2
6.5
4.0
4.8
Com
mon
72.8
772
.19
64.5
069
.85
65.0
359
.08
57.4
260
.51
-10.
8-1
8.2
-11.
0-1
3.4
Whe
el L
oade
r Ope
rato
rs
Min
imum
51.0
050
.00
41.0
047
.33
53.0
052
.00
43.0
049
.33
3.9
4.0
4.9
4.2
Max
imum
72.0
060
.00
75.0
069
.00
76.0
063
.00
78.0
072
.33
5.6
5.0
4.0
4.8
Com
mon
62.2
060
.85
55.0
059
.35
64.9
557
.17
57.3
359
.82
4.4
-6.0
4.2
0.8
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
209
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Pave
r Ope
rato
rs
Min
imum
56.0
049
.72
46.0
050
.57
58.0
051
.72
48.0
052
.57
3.6
4.0
4.3
4.0
Max
imum
70.0
062
.00
71.0
067
.67
73.0
065
.00
74.0
070
.67
4.3
4.8
4.2
4.4
Com
mon
62.2
061
.85
53.3
659
.14
64.9
557
.52
60.9
261
.13
4.4
-7.0
14.2
3.4
Mob
ile C
rane
Ope
rato
rs
Min
imum
71.7
071
.00
71.0
071
.23
73.7
073
.00
73.0
073
.23
2.8
2.8
2.8
2.8
Max
imum
101.
0092
.00
92.6
095
.20
104.
0095
.00
95.6
098
.20
3.0
3.3
3.2
3.2
Com
mon
88.5
990
.04
82.0
086
.88
91.0
383
.08
83.0
185
.71
2.8
-7.7
1.2
-1.3
Cra
wle
r Cra
ne O
pera
tors
Min
imum
78.0
071
.00
71.0
073
.33
80.0
073
.00
72.0
075
.00
2.6
2.8
1.4
2.3
Max
imum
102.
0090
.00
92.6
094
.87
105.
0093
.00
95.6
097
.87
2.9
3.3
3.2
3.2
Com
mon
88.6
089
.05
81.0
086
.22
91.2
583
.00
92.5
688
.94
3.0
-6.8
14.3
3.2
Tow
er C
rane
Ope
rato
rs
Min
imum
71.7
071
.00
71.0
071
.23
73.7
073
.00
72.0
072
.90
2.8
2.8
1.4
2.3
Max
imum
98.0
092
.00
92.6
094
.20
101.
0095
.00
95.6
097
.20
3.1
3.3
3.2
3.2
Com
mon
88.6
090
.05
82.0
086
.88
91.0
483
.04
82.4
385
.50
2.8
-7.8
0.5
-1.6
Fork
lift O
pera
tors
Min
imum
53.0
046
.00
46.0
048
.33
55.0
048
.00
47.0
050
.00
3.8
4.3
2.2
3.4
Max
imum
73.0
067
.00
75.0
071
.67
76.0
070
.00
78.0
074
.67
4.1
4.5
4.0
4.2
Com
mon
66.2
066
.35
57.0
063
.18
68.8
559
.50
63.5
863
.98
4.0
-10.
311
.51.
3
Slin
ger/
Dog
ger
Min
imum
51.0
044
.00
49.0
048
.00
53.0
046
.00
50.0
049
.67
3.9
4.5
2.0
3.5
Max
imum
87.0
067
.00
70.0
074
.67
90.0
070
.00
70.0
076
.67
3.4
4.5
0.0
2.7
Com
mon
62.3
264
.41
56.0
060
.91
64.9
757
.25
62.0
861
.43
4.3
-11.
110
.90.
9
Appe
ndix
3.2
8 Av
erag
e D
aily
Wag
e R
ates
for S
kille
d Fo
reig
n M
achi
ne O
pera
tors
in S
abah
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
210
App
endi
x 3.
29 A
vera
ge D
aily
Wag
e R
ates
for
Sem
i-Sk
illed
Fo
reig
n M
achi
ne O
pera
tor
in S
abah
in 2
013
and
20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Exac
avat
ors
Ope
rato
rs
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Pile
Rig
gers
Min
imum
39.0
036
.00
31.0
035
.33
38.0
038
.00
38.0
038
.00
-2.6
5.6
22.6
7.5
Max
imum
60.0
050
.00
52.0
054
.00
60.0
052
.00
55.0
055
.67
0.0
4.0
5.8
3.1
Com
mon
45.5
046
.00
42.0
044
.50
48.1
545
.50
45.8
346
.49
5.8
-1.1
9.1
4.5
Off
Road
Tru
ck O
pera
tors
Min
imum
35.0
036
.00
31.0
034
.00
38.0
034
.00
36.0
036
.00
8.6
-5.6
16.1
5.9
Max
imum
62.0
047
.00
51.0
053
.33
61.0
053
.00
52.0
055
.33
-1.6
12.8
2.0
3.8
Com
mon
45.6
547
.58
41.5
044
.91
48.3
044
.25
44.4
245
.66
5.8
-7.0
7.0
1.7
Back
hoe
Load
er O
pera
tors
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Rolle
r Ope
rato
rs
Min
imum
46.0
046
.00
44.0
045
.33
38.0
036
.40
41.0
038
.47
-17.4
-20.
9-6
.8-1
5.1
Max
imum
67.0
073
.00
57.0
065
.67
63.0
052
.00
50.0
055
.00
-6.0
-28.
8-1
2.3
-16.
2
Com
mon
45.5
847
.04
42.2
044
.94
48.2
344
.48
45.9
646
.22
5.8
-5.4
8.9
2.9
Rolle
r/C
ompa
ctor
O
pera
tors
Min
imum
51.0
046
.00
46.0
047
.67
41.0
036
.50
38.0
038
.50
-19.
6-2
0.7
-17.4
-19.
2
Max
imum
70.0
067
.00
55.0
064
.00
58.0
054
.00
55.0
055
.67
-17.
1-1
9.4
0.0
-13.
0
Com
mon
45.5
848
.04
43.2
545
.62
48.2
644
.31
44.5
645
.71
5.9
-7.8
3.0
0.2
Scra
pper
Ope
rato
rs
Min
imum
51.0
044
.00
36.0
043
.67
33.0
037
.00
38.0
036
.00
-35.
3-1
5.9
5.6
-17.
6
Max
imum
77.0
062
.00
65.0
068
.00
60.0
055
.00
55.0
056
.67
-22.
1-1
1.3
-15.
4-1
6.7
Com
mon
45.5
048
.50
44.0
046
.00
48.2
544
.33
44.0
045
.53
6.0
-8.6
0.0
-1.0
Mot
or L
oade
r Ope
rato
rs
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Whe
el L
oade
r Ope
rato
rs
Min
imum
39.0
036
.00
31.0
035
.33
41.0
038
.00
33.0
037
.33
5.1
5.6
6.5
5.7
Max
imum
60.0
050
.00
52.0
054
.00
63.0
053
.00
55.0
057
.00
5.0
6.0
5.8
5.6
Com
mon
45.5
047
.50
43.5
045
.50
48.1
544
.25
44.2
545
.55
5.8
-6.8
1.7
0.1
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
211
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Pave
r Ope
rato
rs
Min
imum
35.0
036
.00
31.0
034
.00
37.0
038
.00
33.0
036
.00
5.7
5.6
6.5
5.9
Max
imum
62.0
047
.00
51.0
053
.33
65.0
050
.00
54.0
056
.33
4.8
6.4
5.9
5.6
Com
mon
45.6
046
.05
42.0
044
.55
48.2
544
.25
44.2
545
.58
5.8
-3.9
5.4
2.3
Mob
ile C
rane
Ope
rato
rs
Min
imum
46.0
046
.00
44.0
045
.33
48.0
048
.00
46.0
047
.33
4.3
4.3
4.5
4.4
Max
imum
67.0
073
.00
57.0
065
.67
70.0
076
.00
60.0
068
.67
4.5
4.1
5.3
4.6
Com
mon
56.9
064
.70
60.0
060
.53
59.6
057
.17
52.7
556
.51
4.7
-11.
6-1
2.1
-6.7
Cra
wle
r Cra
ne O
pera
tors
Min
imum
51.0
046
.00
46.0
047
.67
53.0
048
.00
47.0
049
.33
3.9
4.3
2.2
3.5
Max
imum
70.0
067
.00
55.0
064
.00
74.0
070
.00
58.0
067
.33
5.7
4.5
5.5
5.2
Com
mon
60.5
963
.55
57.0
060
.38
63.3
957
.17
51.6
757
.41
4.6
-10.
0-9
.4-4
.9
Tow
er C
rane
Ope
rato
rs
Min
imum
51.0
044
.00
36.0
043
.67
52.0
046
.00
37.0
045
.00
2.0
4.5
2.8
3.1
Max
imum
77.0
062
.00
65.0
068
.00
80.0
065
.00
68.0
071
.00
3.9
4.8
4.6
4.4
Com
mon
60.6
261
.06
53.5
058
.39
63.4
257
.58
51.7
557
.58
4.6
-5.7
-3.3
-1.4
Fork
lift O
pera
tors
Min
imum
33.0
034
.00
31.0
032
.67
35.0
036
.00
32.0
034
.33
6.1
5.9
3.2
5.1
Max
imum
57.0
047
.00
55.0
053
.00
60.0
050
.00
58.0
056
.00
5.3
6.4
5.5
5.7
Com
mon
44.9
045
.70
41.0
043
.87
47.5
544
.08
45.0
845
.57
5.9
-3.5
10.0
3.9
Slin
ger/
Dog
ger
Min
imum
41.0
036
.00
34.0
037
.00
43.0
038
.00
35.0
038
.67
4.9
5.6
2.9
4.5
Max
imum
62.0
052
.00
52.0
055
.33
65.0
055
.00
55.0
058
.33
4.8
5.8
5.8
5.4
Com
mon
46.5
649
.03
44.5
046
.70
49.2
444
.17
44.6
746
.03
5.8
-9.9
0.4
-1.4
App
endi
x 3.
29 A
vera
ge D
aily
Wag
e R
ates
for
Sem
i-Sk
illed
Fo
reig
n M
achi
ne O
pera
tor
in S
abah
in 2
013
and
20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
212
App
endi
x 3.
30 A
vera
ge D
aily
Wag
e R
ates
for
Skill
ed F
ore
ign
Mac
hine
Ope
rato
r in
Sar
awak
in 2
013
and
20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Exac
avat
ors
Ope
rato
rs
Min
imum
52.0
067
.00
79.0
066
.00
54.0
072
.50
83.0
069
.83
3.8
8.2
5.1
5.8
Max
imum
87.0
082
.00
121.
0096
.67
91.0
012
2.00
124.
0011
2.33
4.6
48.8
2.5
16.2
Com
mon
68.9
275
.21
75.0
073
.04
71.6
178
.17
102.
5884
.12
3.9
3.9
36.8
15.2
Pile
Rig
gers
Min
imum
56.0
071
.38
60.0
062
.46
58.0
062
.00
64.0
061
.33
3.6
-13.
16.
7-1
.8
Max
imum
82.5
889
.29
81.0
084
.29
87.0
095
.00
84.0
088
.67
5.4
6.4
3.7
5.2
Com
mon
70.9
579
.87
80.8
477
.22
73.6
581
.68
72.1
775
.83
3.8
2.3
-10.
7-1
.8
Off
Road
Tru
ck O
pera
tors
Min
imum
60.1
665
.26
73.4
466
.29
62.1
672
.00
80.0
071
.39
3.3
10.3
8.9
7.7
Max
imum
87.0
089
.00
93.0
089
.67
91.0
094
.00
96.0
093
.67
4.6
5.6
3.2
4.5
Com
mon
70.8
979
.69
77.6
376
.07
73.7
981
.53
88.7
981
.37
4.1
2.3
14.4
7.0
Back
hoe
Load
er O
pera
tors
Min
imum
46.0
056
.00
80.0
060
.67
48.0
061
.50
84.0
064
.50
4.3
9.8
5.0
6.3
Max
imum
77.0
077
.00
89.0
081
.00
80.0
090
.00
92.0
087
.33
3.9
16.9
3.4
7.8
Com
mon
61.5
069
.00
67.0
065
.83
64.1
569
.17
86.9
573
.42
4.3
0.2
29.8
11.5
Rolle
r Ope
rato
rs
Min
imum
48.0
051
.00
82.6
260
.54
50.0
056
.50
88.0
064
.83
4.2
10.8
6.5
7.1
Max
imum
79.0
083
.00
96.0
086
.00
82.0
097
.00
99.0
092
.67
3.8
16.9
3.1
7.8
Com
mon
59.9
071
.20
67.5
066
.20
62.6
569
.17
90.1
774
.00
4.6
-2.9
33.6
11.8
Rolle
r/C
ompa
ctor
Ope
rato
rs
Min
imum
56.0
060
.74
77.0
064
.58
58.0
066
.24
81.0
068
.41
3.6
9.1
5.2
5.9
Max
imum
87.0
096
.00
96.0
093
.00
91.0
099
.00
99.0
096
.33
4.6
3.1
3.1
3.6
Com
mon
70.9
083
.20
78.8
777
.66
73.5
578
.08
87.0
879
.57
3.7
-6.2
10.4
2.5
Scra
pper
Ope
rato
rs
Min
imum
72.7
578
.25
94.0
081
.67
74.7
583
.75
98.0
085
.50
2.7
7.0
4.3
4.7
Max
imum
91.0
093
.00
100.
0094
.67
95.0
010
1.00
103.
0099
.67
4.4
8.6
3.0
5.3
Com
mon
82.6
287
.56
86.1
385
.44
85.3
788
.35
100.
0891
.27
3.3
0.9
16.2
6.8
Mot
or L
oade
r Ope
rato
rs
Min
imum
58.0
071
.00
81.6
070
.20
60.0
076
.50
86.6
274
.37
3.4
7.7
6.2
5.9
Max
imum
97.0
099
.92
111.
0010
2.64
101.
0011
2.00
114.
0010
9.00
4.1
12.1
2.7
6.2
Com
mon
79.2
089
.31
85.9
684
.82
81.9
088
.07
95.3
688
.44
3.4
-1.4
10.9
4.3
Whe
el L
oade
r Ope
rato
rs
Min
imum
51.0
061
.00
82.0
064
.67
53.0
068
.00
86.0
069
.00
3.9
11.5
4.9
6.7
Max
imum
97.0
087
.00
104.
0096
.00
101.
0010
5.00
107.
0010
4.33
4.1
20.7
2.9
8.7
Com
mon
70.9
078
.70
74.5
074
.70
73.7
078
.17
98.6
783
.51
3.9
-0.7
32.4
11.8
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
213
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Pave
r Ope
rato
rs
Min
imum
72.7
575
.16
79.0
075
.64
74.7
580
.66
84.0
079
.80
2.7
7.3
6.3
5.5
Max
imum
94.0
096
.00
99.0
096
.33
98.0
010
0.00
102.
0010
0.00
4.3
4.2
3.0
3.8
Com
mon
82.5
489
.02
86.0
885
.88
85.2
788
.26
92.0
888
.54
3.3
-0.9
7.0
3.1
Mob
ile C
rane
Ope
rato
rs
Min
imum
76.0
071
.00
91.0
079
.33
78.0
076
.50
95.0
083
.17
2.6
7.7
4.4
4.8
Max
imum
101.
0099
.00
112.
1810
4.06
104.
0011
3.18
115.
1811
0.79
3.0
14.3
2.7
6.5
Com
mon
87.5
093
.00
85.5
088
.67
90.2
088
.75
104.
2094
.38
3.1
-4.6
21.9
6.4
Cra
wle
r Cra
ne O
pera
tors
Min
imum
81.0
071
.00
92.0
081
.33
83.0
079
.50
96.0
086
.17
2.5
12.0
4.3
5.9
Max
imum
96.0
098
.00
112.
1810
2.06
100.
0011
3.18
115.
1810
9.45
4.2
15.5
2.7
7.2
Com
mon
87.5
092
.50
85.0
088
.33
90.1
588
.17
104.
2994
.20
3.0
-4.7
22.7
6.6
Tow
er C
rane
Ope
rato
rs
Min
imum
81.0
076
.00
92.0
083
.00
83.0
081
.50
96.0
086
.83
2.5
7.2
4.3
4.6
Max
imum
114.
0011
0.00
111.
0011
1.67
118.
0011
3.00
114.
0011
5.00
3.5
2.7
2.7
3.0
Com
mon
92.5
810
1.40
93.5
095
.83
95.3
395
.91
104.
6798
.64
3.0
-5.4
11.9
2.9
Fork
lift O
pera
tors
Min
imum
51.0
054
.00
70.0
058
.33
53.0
059
.50
78.0
063
.50
3.9
10.2
11.4
8.9
Max
imum
72.0
077
.00
91.0
080
.00
76.0
092
.00
94.0
087
.33
5.6
19.5
3.3
9.2
Com
mon
59.9
068
.20
66.0
064
.70
62.6
569
.42
83.0
071
.69
4.6
1.8
25.8
10.8
Slin
ger/
Dog
ger
Min
imum
51.0
051
.00
68.0
056
.67
53.0
056
.50
72.0
060
.50
3.9
10.8
5.9
6.8
Max
imum
72.0
082
.00
91.0
081
.67
75.0
092
.00
94.0
087
.00
4.2
12.2
3.3
6.5
Com
mon
59.9
070
.70
67.0
065
.87
62.6
569
.08
82.9
271
.55
4.6
-2.3
23.8
8.6
App
endi
x 3.
30 A
vera
ge D
aily
Wag
e R
ates
for
Skill
ed F
ore
ign
Mac
hine
Ope
rato
r in
Sar
awak
in 2
013
and
20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
214
Appe
ndix
3.3
1 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed F
orei
gn M
achi
ne O
pera
tor i
n Sa
raw
ak in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Exac
avat
ors
Ope
rato
rs
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Pile
Rig
gers
Min
imum
51.0
060
.16
50.0
053
.72
53.0
052
.00
55.0
053
.33
3.9
-13.
610
.0-0
.7
Max
imum
67.0
077
.00
66.0
070
.00
70.2
681
.50
69.0
073
.59
4.9
5.8
4.5
5.1
Com
mon
59.9
868
.24
69.0
865
.77
62.8
171
.19
61.8
365
.28
4.7
4.3
-10.
5-0
.7
Off
Road
Tru
ck O
pera
tors
Min
imum
49.9
656
.08
58.0
054
.68
51.9
660
.00
65.0
058
.99
4.0
7.0
12.1
7.9
Max
imum
67.0
077
.00
89.0
077
.67
70.0
090
.00
92.0
084
.00
4.5
16.9
3.4
8.2
Com
mon
58.2
367
.36
67.0
464
.21
60.9
271
.17
77.7
569
.95
4.6
5.7
16.0
8.9
Back
hoe
Load
er O
pera
tors
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Rolle
r Ope
rato
rs
Min
imum
41.0
045
.00
55.0
047
.00
43.0
050
.50
62.0
051
.83
4.9
12.2
12.7
10.3
Max
imum
61.1
676
.00
93.0
076
.72
65.1
694
.00
96.0
085
.05
6.5
23.7
3.2
10.9
Com
mon
49.9
262
.71
61.0
057
.88
52.6
761
.15
77.5
863
.80
5.5
-2.5
27.2
10.2
Rolle
r/C
ompa
ctor
Ope
rato
rs
Min
imum
50.2
050
.44
60.0
053
.55
52.2
054
.44
64.0
056
.88
4.0
7.9
6.7
6.2
Max
imum
82.0
087
.00
93.0
087
.33
86.0
094
.00
96.0
092
.00
4.9
8.0
3.2
5.3
Com
mon
59.9
573
.22
69.2
267
.46
62.6
469
.17
75.9
269
.24
4.5
-5.5
9.7
2.6
Scra
pper
Ope
rato
rs
Min
imum
62.2
070
.01
67.3
266
.51
64.2
069
.32
72.0
068
.51
3.2
-1.0
7.0
3.0
Max
imum
78.0
087
.00
96.0
087
.00
83.0
097
.00
99.0
093
.00
6.4
11.5
3.1
6.9
Com
mon
70.8
778
.69
79.0
176
.19
73.6
777
.65
81.1
777
.50
4.0
-1.3
2.7
1.7
Mot
or L
oade
r Ope
rato
rs
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Whe
el L
oade
r Ope
rato
rs
Min
imum
41.0
056
.00
72.0
056
.33
43.0
061
.50
76.0
060
.17
4.9
9.8
5.6
6.8
Max
imum
78.0
070
.34
91.0
079
.78
83.0
092
.00
94.0
089
.67
6.4
30.8
3.3
12.4
Com
mon
59.9
164
.87
63.6
762
.82
62.5
667
.47
85.0
071
.68
4.4
4.0
33.5
14.1
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
215
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Mir
iSi
buAv
erag
eKu
chin
gM
iri
Sibu
Aver
age
Kuch
ing
Mir
iSi
buAv
erag
e
Pave
r Ope
rato
rs
Min
imum
60.4
567
.95
65.0
064
.47
62.4
567
.00
70.0
066
.48
3.3
-1.4
7.7
3.1
Max
imum
85.0
083
.00
89.0
085
.67
89.0
090
.00
92.0
090
.33
4.7
8.4
3.4
5.4
Com
mon
68.3
075
.40
75.9
873
.23
70.8
877
.93
81.3
376
.71
3.8
3.4
7.0
4.8
Mob
ile C
rane
Ope
rato
rs
Min
imum
61.0
066
.00
72.4
266
.47
63.0
071
.50
76.4
270
.31
3.3
8.3
5.5
5.8
Max
imum
80.0
087
.00
89.0
085
.33
83.0
090
.00
92.0
088
.33
3.8
3.4
3.4
3.5
Com
mon
70.9
078
.70
77.0
075
.53
73.6
078
.42
83.2
578
.42
3.8
-0.4
8.1
3.8
Cra
wle
r Cra
ne O
pera
tors
Min
imum
56.0
069
.68
74.0
066
.56
58.0
071
.50
80.0
069
.83
3.6
2.6
8.1
4.9
Max
imum
81.0
087
.00
87.0
085
.00
85.0
090
.00
90.0
088
.33
4.9
3.4
3.4
3.9
Com
mon
70.9
578
.72
78.8
476
.17
73.7
377
.82
83.2
778
.27
3.9
-1.1
5.6
2.8
Tow
er C
rane
Ope
rato
rs
Min
imum
61.0
069
.68
71.0
067
.23
63.0
073
.00
75.0
070
.33
3.3
4.8
5.6
4.6
Max
imum
88.0
087
.00
89.0
088
.00
92.0
090
.00
92.0
091
.33
4.5
3.4
3.4
3.8
Com
mon
70.8
578
.67
78.8
476
.12
73.5
878
.07
83.0
278
.22
3.9
-0.8
5.3
2.8
Fork
lift O
pera
tors
Min
imum
41.0
041
.00
60.0
047
.33
43.0
046
.50
64.0
051
.17
4.9
13.4
6.7
8.1
Max
imum
62.0
067
.00
77.5
068
.83
66.0
078
.50
80.5
075
.00
6.5
17.2
3.9
9.0
Com
mon
49.9
058
.20
54.5
054
.20
52.6
058
.08
72.2
860
.99
5.4
-0.2
32.6
12.5
Slin
ger/
Dog
ger
Min
imum
39.0
046
.00
53.0
446
.01
41.0
051
.50
57.0
449
.85
5.1
12.0
7.5
8.3
Max
imum
57.0
064
.00
87.0
069
.33
61.0
088
.00
90.0
079
.67
7.0
37.5
3.4
14.9
Com
mon
49.9
156
.70
55.5
054
.04
52.5
658
.42
71.9
260
.97
5.3
3.0
29.6
12.8
Appe
ndix
3.3
1 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed F
orei
gn M
achi
ne O
pera
tor i
n Sa
raw
ak in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
216
Appe
ndix
3.3
2 A
vera
ge D
aily
Wag
e Ra
tes
for S
kille
d Fo
reig
n C
onst
ruct
ion
Wor
kers
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Gen
eral
C
onst
ruct
ion
Wor
kers
- B
uild
ing
Min
imum
35.0
038
.00
40.0
035
.00
37.0
035
.00
38.0
030
.00
35.0
034
.50
0.0
0.0
-25.0
0.0
-6.8
Max
imum
70.0
071
.00
66.0
070
.00
69.2
585
.00
74.0
070
.50
100.
0082
.38
21.4
4.2
6.8
42.9
19.0
Com
mon
52.3
850
.30
52.5
852
.1651
.86
51.6
452
.29
54.2
555
.86
53.5
1-1
.44.
03.
27.1
3.2
Con
cret
ers
Min
imum
40.0
050
.00
45.0
040
.00
43.75
40.0
050
.00
45.0
040
.00
43.75
0.0
0.0
0.0
0.0
0.0
Max
imum
95.0
012
5.00
82.0
090
.00
98.0
010
0.00
125.0
086
.50
120.
0010
7.88
5.3
0.0
5.5
33.3
10.1
Com
mon
71.5
078
.64
68.4
268
.7871
.84
73.3
879
.89
71.3
370
.1273
.68
2.6
1.64.
31.9
2.6
Bar B
ende
rs
Min
imum
53.0
050
.00
50.0
045
.00
49.5
055
.00
55.0
050
.00
40.0
050
.00
3.8
10.0
0.0
-11.1
1.0
Max
imum
110.
0098
.00
78.0
090
.00
94.0
020
0.00
98.0
083
.50
120.
0012
5.38
81.8
0.0
7.133
.333
.4
Com
mon
75.5
373
.32
68.3
969
.67
71.73
82.10
74.9
170
.58
72.14
74.9
38.
72.
23.
23.
54.
5
Car
pent
ers
-Fo
rmw
ork
Min
imum
50.0
055
.00
50.0
060
.00
53.75
50.0
055
.00
50.0
040
.00
48.75
0.0
0.0
0.0
-33.
3-9
.3
Max
imum
110.
0010
0.00
84.0
095
.00
97.2
511
0.00
100.
0087
.00
115.0
010
3.00
0.0
0.0
3.621
.15.
9
Com
mon
75.3
877
.44
73.8
975
.49
75.5
579
.63
80.3
676
.31
77.75
78.5
15.6
3.8
3.3
3.03.
9
Bric
klay
ers
Min
imum
45.0
055
.00
50.0
050
.00
50.0
045
.00
55.0
050
.00
40.0
047
.50
0.0
0.0
0.0
-20.
0-5
.0
Max
imum
100.
0010
0.00
85.0
011
0.00
98.75
100.
0010
1.00
89.5
012
0.00
102.
630.
01.0
5.3
9.1
3.9
Com
mon
74.6
374
.94
71.19
72.2
773
.26
79.13
80.0
373
.03
75.0
076
.80
6.0
6.8
2.6
3.8
4.8
Roof
ers
Min
imum
50.0
060
.00
60.0
045
.00
53.75
50.0
060
.00
60.0
050
.00
55.0
00.
00.
00.
011
.12.
3
Max
imum
105.0
010
5.00
89.0
010
5.00
101.0
013
0.00
105.0
092
.00
105.0
010
8.00
23.8
0.0
3.40.
06.
9
Com
mon
77.4
082
.42
77.6
176
.1378
.39
83.8
884
.36
80.0
677
.1181
.35
8.42.4
3.2
1.33.
8
Car
pent
ers
-Jo
iner
y
Min
imum
55.0
050
.00
58.0
045
.00
52.0
055
.00
65.0
060
.00
50.0
057
.50
0.0
30.0
3.411
.110
.6
Max
imum
120.
0011
5.00
90.0
010
0.00
106.
2513
0.00
125.0
094
.50
135.0
012
1.13
8.3
8.7
5.035
.014
.0
Com
mon
82.2
590
.08
79.2
281
.69
83.3
192
.1594
.7282
.31
85.16
88.5
912
.05.
23.
94.
26.
3
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
60.0
060
.00
60.0
050
.00
57.5
060
.00
60.0
065
.00
40.0
056
.25
0.0
0.0
8.3
-20.
0-2
.2
Max
imum
120.
0011
0.00
97.0
011
0.00
109.
2513
5.00
110.
0010
0.50
110.
0011
3.88
12.5
0.0
3.60.
04.
2
Com
mon
85.18
88.17
84.4
483
.81
85.4
095
.55
88.6
486
.08
82.9
488
.30
12.2
0.5
1.9-1
.03.4
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
217
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Gen
eral
Wel
ders
Min
imum
55.0
055
.00
55.0
054
.00
54.75
50.0
055
.00
33.0
050
.00
47.0
0-9
.10.
0-4
0.0
-7.4
-14.
2
Max
imum
120.
0099
.00
92.0
099
.00
102.
5015
0.00
104.
0097
.50
110.
0011
5.38
25.0
5.1
6.0
11.1
12.6
Com
mon
85.6
378
.53
79.0
075
.7579
.7392
.23
81.6
780
.7278
.1883
.20
7.74.
02.
23.
24.4
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
50.0
050
.00
45.0
050
.00
48.75
60.0
050
.00
50.0
055
.00
53.75
20.0
0.0
11.1
10.0
10.3
Max
imum
130.
0013
0.00
83.0
095
.00
109.
5015
0.00
130.
0086
.00
110.
0011
9.00
15.4
0.0
3.615
.88.
7
Com
mon
76.6
376
.7270
.61
72.4
274
.1089
.7580
.1774
.06
75.6
479
.91
17.1
4.5
4.9
4.47.8
Plum
bers
-Re
ticul
atio
n
Min
imum
50.0
055
.00
45.0
045
.00
48.75
60.0
055
.00
50.0
045
.00
52.5
020
.00.
011
.10.
07.7
Max
imum
100.
0012
0.00
96.0
010
0.00
104.
0016
0.00
145.0
010
0.50
110.
0012
8.88
60.0
20.8
4.7
10.0
23.9
Com
mon
76.9
580
.94
81.8
376
.39
79.0
394
.7584
.92
86.0
080
.81
86.6
223
.14.
95.
15.8
9.6
Build
ing
Wiri
ngIn
stal
lers
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Elec
tric
al W
irem
en
PW2
(Mon
thly
RM
)
Min
imum
1,400
.00
700.
001,2
00.0
01,3
00.0
01,1
50.0
01,4
00.0
075
0.00
850.
001,0
00.0
01,0
00.0
00.
07.1
-29.
2-2
3.1
-13.0
Max
imum
3,600
.00
2,50
0.00
1,992
.00
2,75
0.00
2,71
0.50
4,50
0.00
2,450
.00
1,999
.00
3,700
.00
3,16
2.25
25.0
-2.0
0.4
34.5
16.7
Com
mon
2,22
7.50
1,744
.50
1,683
.94
1,809
.781,8
66.4
32,4
72.5
01,8
14.4
21,6
36.5
01,8
93.5
01,9
54.2
311
.04.
0-2
.84.
64.
7
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
1,800
.00
950.
001,6
00.0
01,4
00.0
01,4
37.5
01,8
00.0
01,0
00.0
01,4
80.0
01,0
00.0
01,3
20.0
00.
05.
3-7
.5-2
8.6
-8.2
Max
imum
3,750
.00
2,80
0.00
2,80
2.00
3,20
0.00
3,13
8.00
5,50
0.00
3,20
0.00
2,80
5.00
4,00
0.00
3,876
.25
46.7
14.3
0.1
25.0
23.5
Com
mon
2,494
.152,
247.6
12,
119.
562,
173.
392,
258.
682,
915.4
52,
356.
282,
087.0
62,
329.
392,4
22.0
516
.94.
8-1
.57.2
7.2
Scaff
olde
rs -
Pref
abric
ated
Min
imum
65.0
040
.00
55.0
060
.00
55.0
060
.00
45.0
055
.00
40.0
050
.00
-7.7
12.5
0.0
-33.
3-9
.1
Max
imum
115.0
014
0.00
83.0
010
0.00
109.
5013
0.00
140.
0087
.00
140.
0012
4.25
13.0
0.0
4.8
40.0
13.5
Com
mon
82.4
587
.33
71.0
679
.1980
.01
86.2
585
.61
74.6
181
.42
81.9
74.
6-2
.05.0
2.8
2.5
Scaff
olde
rs -
Tubu
lar
Min
imum
60.0
060
.00
55.0
055
.00
57.5
060
.00
60.0
055
.00
60.0
058
.750.
00.
00.
09.
12.
2
Max
imum
95.0
011
5.00
90.0
095
.00
98.75
130.
0011
5.00
90.0
011
5.00
112.
5036
.80.
00.
021
.113
.9
Com
mon
77.3
577
.81
73.2
876
.89
76.3
386
.43
80.0
075
.53
80.9
780
.7311
.72.
83.
15.
35.8
Plas
tere
rs
Min
imum
60.0
065
.00
55.0
040
.00
55.0
055
.00
70.0
055
.00
40.0
055
.00
-8.3
7.70.
00.
00.
0
Max
imum
110.
0010
5.00
80.0
090
.00
96.2
512
0.00
121.0
085
.00
140.
0011
6.50
9.1
15.2
6.3
55.6
21.0
Com
mon
79.6
382
.47
70.8
370
.39
75.8
385
.50
91.17
73.4
271
.28
80.3
47.4
10.5
3.7
1.36.
0
Appe
ndix
3.3
2 A
vera
ge D
aily
Wag
e Ra
tes
for S
kille
d Fo
reig
n C
onst
ruct
ion
Wor
kers
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
218
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Tile
rs
Min
imum
55.0
065
.00
60.0
050
.00
57.5
055
.00
60.0
050
.00
40.0
051
.25
0.0
-7.7
-16.
7-2
0.0
-10.
9
Max
imum
120.
0012
0.00
89.0
010
0.00
107.2
512
5.00
120.
0095
.00
120.
0011
5.00
4.2
0.0
6.7
20.0
7.2
Com
mon
81.5
883
.39
79.17
79.14
80.8
289
.98
88.3
181
.81
80.78
85.2
210
.35.
93.
32.
15.4
Pain
ters
- B
uild
ing
Min
imum
55.0
050
.00
45.0
045
.00
48.75
55.0
055
.00
50.0
040
.00
50.0
00.
010
.011
.1-1
1.12.
6
Max
imum
115.0
010
0.00
75.0
090
.00
95.0
013
0.00
105.0
078
.00
120.
0010
8.25
13.0
5.04.
033
.313
.9
Com
mon
76.13
73.6
365
.00
69.2
271
.00
82.6
378
.1066
.81
70.3
974
.48
8.5
6.1
2.8
1.74.
9
Gen
eral
C
onst
ruct
ion
Wor
kers
-Civ
il
Min
imum
40.0
035
.00
40.0
038
.00
38.2
535
.00
35.0
040
.00
35.0
036
.25
-12.
50.
00.
0-7
.9-5
.2
Max
imum
70.0
070
.00
74.0
066
.00
70.0
080
.00
86.0
077
.00
90.0
083
.25
14.3
22.9
4.1
36.4
18.9
Com
mon
52.13
53.5
353
.50
52.8
052
.99
55.75
61.5
355
.7558
.1957
.81
6.9
14.9
4.2
10.2
9.1
Not
e:
Dat
a C
over
s:
Cen
tral
Reg
ion:
Per
ak, S
elan
gor a
nd K
uala
Lum
pur
N
orth
ern
Regi
on: K
edah
and
Pul
au P
inan
g
East
ern
Regi
on: P
ahan
g, K
elan
tan
and
Tere
ngga
nu
Sout
hern
Reg
ion:
Neg
eri S
embi
lan,
Mel
aka
and
Joho
r
Appe
ndix
3.3
2 A
vera
ge D
aily
Wag
e Ra
tes
for S
kille
d Fo
reig
n C
onst
ruct
ion
Wor
kers
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
219
Appe
ndix
3.3
3 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed F
orei
gn C
onst
ruct
ion
Wor
kers
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Gen
eral
Con
stru
ctio
n W
orke
rs -
Bui
ldin
g
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Con
cret
ers
Min
imum
40.0
040
.00
40.0
040
.00
40.0
040
.00
40.0
040
.00
40.0
040
.00
0.0
0.0
0.0
0.0
0.0
Max
imum
75.0
010
0.00
70.0
075
.00
80.0
085
.00
100.
0075
.00
100.
0090
.00
13.3
0.0
7.133
.312
.5
Com
mon
54.7
560
.31
56.11
54.4
956
.42
58.13
62.0
058
.06
59.4
959
.42
6.2
2.8
3.5
9.2
5.3
Bar B
ende
rs
Min
imum
35.0
040
.00
40.0
040
.00
38.7
538
.00
38.0
040
.00
40.0
039
.00
8.6
-5.0
0.0
0.0
0.6
Max
imum
90.0
077
.00
66.0
070
.00
75.7
595
.00
80.0
069
.50
80.0
081
.135.
63.
95.
314
.37.1
Com
mon
57.3
355
.1654
.1755
.22
55.4
760
.83
55.4
756
.39
57.14
57.4
66.
10.
64.
13.
53.
6
Car
pent
ers
-Fo
rmw
ork
Min
imum
45.0
040
.00
40.0
040
.00
41.2
540
.00
40.0
040
.00
40.0
040
.00
-11.1
0.0
0.0
0.0
-3.0
Max
imum
90.0
085
.00
78.0
080
.00
83.2
590
.00
85.0
082
.50
84.0
085
.38
0.0
0.0
5.8
5.0
2.6
Com
mon
59.13
63.3
662
.1158
.89
60.8
762
.50
63.2
764
.08
60.6
762
.63
5.7
-0.1
3.2
3.0
2.9
Bric
klay
ers
Min
imum
35.0
040
.00
40.0
035
.00
37.5
038
.00
40.0
040
.00
40.0
039
.50
8.6
0.0
0.0
14.3
5.3
Max
imum
90.0
085
.00
70.0
070
.00
78.7
590
.00
80.0
074
.50
100.
0086
.130.
0-5
.96.
442
.99.
4
Com
mon
55.9
857
.23
57.2
854
.94
56.3
659
.78
60.8
458
.64
58.8
359
.52
6.8
6.3
2.4
7.15.
6
Roof
ers
Min
imum
40.0
040
.00
43.0
040
.00
40.7
545
.00
40.0
043
.00
40.0
042
.00
12.5
0.0
0.0
0.0
3.1
Max
imum
80.0
080
.00
72.0
080
.00
78.0
090
.00
81.0
076
.50
86.0
083
.38
12.5
1.36.
37.5
6.9
Com
mon
56.2
564
.00
60.6
158
.69
59.8
961
.25
65.8
663
.31
61.6
463
.02
8.9
2.9
4.5
5.0
5.2
Car
pent
ers
-Jo
iner
y
Min
imum
40.0
040
.00
40.0
038
.00
39.5
040
.00
45.0
045
.00
40.0
042
.50
0.0
12.5
12.5
5.3
7.6
Max
imum
90.0
095
.00
81.0
086
.00
88.0
090
.00
95.0
085
.50
92.0
090
.63
0.0
0.0
5.6
7.03.
0
Com
mon
60.6
372
.1866
.1761
.94
65.2
366
.00
75.2
267
.75
65.6
168
.65
8.9
4.2
2.4
5.9
5.2
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
45.0
045
.00
40.0
040
.00
42.5
045
.00
45.0
040
.00
40.0
042
.50
0.0
0.0
0.0
0.0
0.0
Max
imum
90.0
085
.00
82.0
090
.00
86.7
595
.00
89.0
085
.00
96.0
091
.25
5.6
4.7
3.7
6.7
5.2
Com
mon
60.4
867
.1665
.22
61.5
663
.61
67.18
67.2
467
.94
63.7
566
.53
11.1
0.1
4.2
3.6
4.6
Gen
eral
Wel
ders
Min
imum
45.0
040
.00
40.0
038
.00
40.7
545
.00
40.0
045
.00
38.0
042
.00
0.0
0.0
12.5
0.0
3.1
Max
imum
90.0
086
.00
80.0
084
.00
85.0
010
0.00
89.0
083
.00
90.0
090
.50
11.1
3.5
3.8
7.16.
5
Com
mon
61.3
862
.31
65.5
060
.08
62.3
267
.60
63.5
067
.83
62.8
765
.45
10.1
1.93.
64.
65.
0
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
220
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
40.0
040
.00
40.0
040
.00
40.0
040
.00
40.0
040
.00
40.0
040
.00
0.0
0.0
0.0
0.0
0.0
Max
imum
100.
0010
5.00
70.0
072
.00
86.7
510
0.00
125.
0074
.50
80.0
094
.88
0.0
19.0
6.4
11.1
9.4
Com
mon
56.7
561
.89
58.3
955
.33
58.0
964
.25
64.6
260
.25
59.5
662
.1713
.24.
43.
27.6
7.0
Plum
bers
-Re
ticul
atio
n
Min
imum
40.0
040
.00
40.0
040
.00
40.0
040
.00
40.0
040
.00
40.0
040
.00
0.0
0.0
0.0
0.0
0.0
Max
imum
85.0
090
.00
87.0
087
.00
87.2
510
0.00
125.
0091
.50
93.0
010
2.38
17.6
38.9
5.2
6.9
17.3
Com
mon
60.8
863
.94
66.8
360
.21
62.9
769
.38
67.0
068
.89
63.4
967
.1914
.04.
83.
15.
46.
7
Build
ing
Wiri
ngIn
stal
lers
Min
imum
45.0
045
.00
45.0
040
.00
43.7
545
.00
40.0
050
.00
40.0
043
.75
0.0
-11.1
11.1
0.0
0.0
Max
imum
100.
0012
0.00
95.0
099
.00
103.
5013
0.00
120.
0098
.50
110.
0011
4.63
30.0
0.0
3.7
11.1
10.7
Com
mon
71.4
373
.91
78.9
471
.97
74.0
675
.60
76.15
81.2
575
.56
77.14
5.8
3.0
2.9
5.0
4.2
Elec
tric
al W
irem
en
PW2
(Mon
thly
RM
)
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Scaff
olde
rs -
Pref
abric
ated
Min
imum
45.0
042
.00
45.0
045
.00
44.2
545
.00
42.0
045
.00
40.0
043
.00
0.0
0.0
0.0
-11.1
-2.8
Max
imum
95.0
010
5.00
73.0
090
.00
90.7
510
0.00
105.
0077
.00
100.
0095
.50
5.3
0.0
5.5
11.1
5.2
Com
mon
62.4
065
.1361
.28
64.3
163
.28
64.5
365
.80
62.6
165
.81
64.6
93.
41.0
2.2
2.3
2.2
Scaff
olde
rs -
Tubu
lar
Min
imum
40.0
035
.00
45.0
040
.00
40.0
040
.00
35.0
045
.00
40.0
040
.00
0.0
0.0
0.0
0.0
0.0
Max
imum
80.0
090
.00
67.0
077
.00
78.5
090
.00
90.0
071
.50
84.0
083
.88
12.5
0.0
6.7
9.1
6.8
Com
mon
58.0
359
.67
58.8
361
.31
59.4
662
.95
60.5
859
.94
64.11
61.9
08.
51.5
1.94.
64.
1
Plas
tere
rs
Min
imum
40.0
040
.00
40.0
035
.00
38.7
540
.00
40.0
040
.00
40.0
040
.00
0.0
0.0
0.0
14.3
3.2
Max
imum
80.0
096
.00
73.0
070
.00
79.7
590
.00
96.0
077
.50
95.0
089
.63
12.5
0.0
6.2
35.7
12.4
Com
mon
58.7
063
.94
59.3
954
.83
59.2
262
.90
70.0
261
.1958
.46
63.14
7.29.
53.
06.
66.
6
Appe
ndix
3.3
3 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed F
orei
gn C
onst
ruct
ion
Wor
kers
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
221
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Chan
ge (%
)20
1320
14
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
eCe
ntra
l Re
gion
North
ern
Regi
onEa
ster
n Re
gion
Sout
hern
Re
gion
Aver
age
Cent
ral
Regi
onNo
rther
n Re
gion
East
ern
Regi
onSo
uthe
rn
Regi
onAv
erag
e
Tile
rs
Min
imum
40.0
045
.00
38.0
040
.00
40.7
540
.00
45.0
038
.00
40.0
040
.75
0.0
0.0
0.0
0.0
0.0
Max
imum
100.
0090
.00
74.0
080
.00
86.0
010
0.00
90.0
078
.50
90.0
089
.63
0.0
0.0
6.1
12.5
4.2
Com
mon
62.0
362
.00
62.8
358
.83
61.4
268
.20
69.2
864
.42
62.6
466
.149.
911
.72.
56.
57.7
Pain
ters
- B
uild
ing
Min
imum
40.0
040
.00
40.0
038
.00
39.5
040
.00
40.0
040
.00
40.0
040
.00
0.0
0.0
0.0
5.3
1.3
Max
imum
75.0
098
.00
62.0
070
.00
76.2
590
.00
85.0
068
.00
80.0
080
.75
20.0
-13.
39.
714
.35.
9
Com
mon
55.9
856
.83
52.6
154
.51
54.9
860
.23
59.5
655
.39
55.8
257
.75
7.64.
85.
32.
45.
0
Gen
eral
Con
stru
ctio
n W
orke
rs-C
ivil
Min
imum
--
--
--
--
--
--
--
-
Max
imum
--
--
--
--
--
--
--
-
Com
mon
--
--
--
--
--
--
--
-
Not
e:
Dat
a C
over
s:
Cen
tral
Reg
ion:
Per
ak, S
elan
gor a
nd K
uala
Lum
pur
N
orth
ern
Regi
on: K
edah
and
Pul
au P
inan
g
East
ern
Regi
on: P
ahan
g, K
elan
tan
and
Tere
ngga
nu
Sout
hern
Reg
ion:
Neg
eri S
embi
lan,
Mel
aka
and
Joho
r
Appe
ndix
3.3
3 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed F
orei
gn C
onst
ruct
ion
Wor
kers
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/d
ay) (
3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
222
Appe
ndix
3.3
4 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Fo
reig
n C
onst
ruct
ion
Wor
kers
in S
abah
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Gen
eral
Con
stru
ctio
n W
orke
rs -
Bui
ldin
g
Min
imum
40.4
040
.00
40.0
040
.13
43.4
043
.00
43.0
043
.13
7.47.
57.
57.
5
Max
imum
58.0
055
.00
57.0
056
.67
63.0
060
.00
62.0
061
.67
8.6
9.1
8.8
8.8
Com
mon
48.0
847
.83
47.8
347
.91
50.6
850
.58
50.7
550
.67
5.4
5.7
6.1
5.8
Con
cret
ers
Min
imum
71.5
162
.00
69.6
067
.70
74.5
165
.00
72.6
070
.70
4.2
4.8
4.3
4.4
Max
imum
89.3
980
.00
94.0
087
.80
94.3
985
.00
99.0
092
.80
5.6
6.3
5.3
5.7
Com
mon
81.8
770
.92
82.1
378
.31
84.5
773
.83
84.8
081
.07
3.3
4.1
3.3
3.5
Bar B
ende
rs
Min
imum
71.3
770
.00
73.0
071
.46
74.3
774
.00
76.0
074
.79
4.2
5.7
4.1
4.7
Max
imum
88.0
080
.00
85.0
084
.33
93.0
085
.00
90.0
089
.33
5.7
6.3
5.9
5.9
Com
mon
80.8
477
.00
81.4
379
.76
83.6
080
.00
84.3
282
.64
3.4
3.9
3.5
3.6
Car
pent
ers
-Fo
rmw
ork
Min
imum
77.3
170
.00
75.4
074
.24
80.3
173
.00
83.0
078
.77
3.9
4.3
10.1
6.1
Max
imum
94.0
085
.00
89.0
089
.33
99.0
090
.00
94.0
094
.33
5.3
5.9
5.6
5.6
Com
mon
87.7
380
.17
86.0
384
.64
90.5
283
.33
88.6
887
.51
3.2
3.9
3.1
3.4
Bric
klay
ers
Min
imum
67.0
058
.00
81.2
068
.73
73.0
061
.00
53.0
062
.33
9.0
5.2
-34.
7-9
.3
Max
imum
85.0
077
.00
98.6
086
.87
90.0
082
.00
87.0
086
.33
5.9
6.5
-11.
8-0
.6
Com
mon
77.5
067
.33
73.6
772
.83
80.2
570
.42
76.2
575
.64
3.5
4.6
3.5
3.9
Roof
ers
Min
imum
83.2
666
.50
81.2
076
.99
86.2
669
.50
84.2
079
.99
3.6
4.5
3.7
3.9
Max
imum
99.0
088
.00
99.0
095
.33
104.
0093
.00
104.
0010
0.33
5.1
5.7
5.1
5.2
Com
mon
93.1
276
.92
92.5
087
.51
95.8
079
.75
95.1
590
.23
2.9
3.7
2.9
3.1
Car
pent
ers
-Jo
iner
y
Min
imum
88.0
071
.25
87.0
082
.08
91.0
074
.25
90.0
085
.08
3.4
4.2
3.4
3.7
Max
imum
110.
0095
.00
105.
0010
3.33
115.
0010
0.00
110.
0010
8.33
4.5
5.3
4.8
4.8
Com
mon
96.0
983
.88
95.4
791
.81
98.7
987
.04
98.1
394
.65
2.8
3.8
2.8
3.1
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
89.2
171
.25
87.0
082
.49
92.2
176
.00
93.0
087
.07
3.4
6.7
6.9
5.6
Max
imum
110.
0093
.00
105.
0010
2.67
115.
0098
.00
110.
0010
7.67
4.5
5.4
4.8
4.9
Com
mon
100.
7782
.13
99.4
094
.10
103.
5685
.04
102.
0896
.89
2.8
3.5
2.7
3.0
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
223
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Gen
eral
Wel
ders
Min
imum
83.2
666
.40
81.2
076
.95
86.2
669
.50
84.2
079
.99
3.6
4.7
3.7
3.9
Max
imum
108.
0093
.00
106.
0010
2.33
113.
0098
.00
111.
0010
7.33
4.6
5.4
4.7
4.9
Com
mon
96.7
178
.96
95.4
790
.38
99.3
681
.92
98.2
893
.19
2.7
3.7
2.9
3.1
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
76.1
275
.00
74.2
475
.12
79.1
278
.00
77.2
478
.12
3.9
4.0
4.0
4.0
Max
imum
96.0
091
.00
96.0
094
.33
103.
0096
.00
101.
0010
0.00
7.3
5.5
5.2
6.0
Com
mon
90.1
383
.17
88.2
187
.17
92.8
886
.08
90.7
789
.91
3.1
3.5
2.9
3.1
Plum
bers
-Re
ticul
atio
n
Min
imum
89.2
171
.25
87.0
082
.49
92.2
174
.25
95.0
087
.15
3.4
4.2
9.2
5.7
Max
imum
112.
0095
.00
110.
0010
5.67
117.
0010
0.00
116.
0011
1.00
4.5
5.3
5.5
5.0
Com
mon
101.
4883
.00
100.
4094
.96
104.
1785
.98
103.
1597
.77
2.7
3.6
2.7
3.0
Build
ing
Wiri
ngIn
stal
lers
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Elec
tric
al W
irem
en
PW2
(Mon
thly
RM
)
Min
imum
1,54
9.34
1,23
5.00
1,50
8.00
1,43
0.78
1,55
2.34
1,23
8.00
1,51
1.00
1,43
3.78
0.2
0.2
0.2
0.2
Max
imum
2,38
5.00
2,00
6.00
2,32
0.00
2,23
7.00
2,39
1.00
2,01
2.00
2,32
5.00
2,24
2.67
0.3
0.3
0.2
0.3
Com
mon
2,00
7.79
1,66
7.83
1,91
8.67
1,86
4.76
2,01
0.51
1,67
0.58
1,92
1.58
1,86
7.56
0.1
0.2
0.2
0.1
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
2,20
0.00
1,71
6.00
2,08
8.00
2,00
1.33
2,20
3.00
1,71
9.00
2,09
1.00
2,00
4.33
0.1
0.2
0.1
0.1
Max
imum
3,00
0.00
2,38
1.00
2,90
6.00
2,76
2.33
3,00
5.00
2,38
7.00
2,91
1.00
2,76
7.67
0.2
0.3
0.2
0.2
Com
mon
2,63
6.18
2,07
0.92
2,52
7.83
2,41
1.64
2,63
8.85
2,07
4.21
2,53
0.58
2,41
4.55
0.1
0.2
0.1
0.1
Scaff
olde
rs -
Pref
abric
ated
Min
imum
71.5
161
.75
69.6
067
.62
74.5
164
.75
75.0
071
.42
4.2
4.9
7.8
5.6
Max
imum
94.0
080
.00
89.0
087
.67
100.
0086
.00
94.0
093
.33
6.4
7.5
5.6
6.5
Com
mon
84.4
975
.63
82.9
781
.03
87.1
678
.63
85.6
083
.80
3.2
4.0
3.2
3.4
Scaff
olde
rs -
Tubu
lar
Min
imum
71.5
165
.00
69.6
068
.70
74.5
169
.00
72.6
072
.04
4.2
6.2
4.3
4.9
Max
imum
95.0
080
.00
95.0
090
.00
100.
0085
.00
100.
0095
.00
5.3
6.3
5.3
5.6
Com
mon
83.5
774
.33
83.0
380
.31
86.2
977
.17
85.8
283
.09
3.3
3.8
3.4
3.5
Plas
tere
rs
Min
imum
68.0
061
.75
63.8
064
.52
75.0
064
.75
66.8
068
.85
10.3
4.9
4.7
6.7
Max
imum
95.0
085
.00
94.0
091
.33
101.
0090
.00
99.0
096
.67
6.3
5.9
5.3
5.8
Com
mon
84.3
272
.67
82.1
079
.70
86.9
275
.50
84.7
082
.37
3.1
3.9
3.2
3.4
Appe
ndix
3.3
4 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Fo
reig
n C
onst
ruct
ion
Wor
kers
in S
abah
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
224
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Tile
rs
Min
imum
78.0
066
.50
80.0
074
.83
81.0
069
.50
83.0
077
.83
3.8
4.5
3.8
4.0
Max
imum
98.0
094
.00
90.0
094
.00
103.
0099
.00
95.0
099
.00
5.1
5.3
5.6
5.3
Com
mon
90.8
281
.79
87.0
086
.54
93.5
384
.63
89.7
589
.30
3.0
3.5
3.2
3.2
Pain
ters
- B
uild
ing
Min
imum
71.5
160
.00
63.8
065
.10
74.5
164
.00
66.8
068
.44
4.2
6.7
4.7
5.1
Max
imum
100.
0080
.00
86.0
088
.67
106.
0085
.00
91.0
094
.00
6.0
6.3
5.8
6.0
Com
mon
81.6
070
.67
76.0
776
.11
84.3
573
.67
78.6
778
.90
3.4
4.2
3.4
3.7
Gen
eral
Con
stru
ctio
n W
orke
rs-C
ivil
Min
imum
53.6
342
.75
52.2
049
.53
56.6
345
.75
58.0
053
.46
5.6
7.0
11.1
7.9
Max
imum
75.0
065
.00
70.0
070
.00
80.0
070
.00
75.0
075
.00
6.7
7.7
7.1
7.1
Com
mon
65.4
553
.75
64.6
361
.28
68.1
256
.60
67.3
064
.01
4.1
5.3
4.1
4.5
Appe
ndix
3.3
4 A
vera
ge D
aily
Wag
e R
ates
for S
kille
d Fo
reig
n C
onst
ruct
ion
Wor
kers
in S
abah
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
225
Appe
ndix
3.3
5 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed F
orei
gn C
onst
ruct
ion
Wor
kers
in S
abah
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Gen
eral
Con
stru
ctio
n W
orke
rs -
Bui
ldin
g
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Con
cret
ers
Min
imum
60.5
948
.50
59.0
056
.03
62.5
950
.50
61.0
058
.03
3.3
4.1
3.4
3.6
Max
imum
77.0
067
.00
78.0
074
.00
80.0
070
.00
81.0
077
.00
3.9
4.5
3.8
4.1
Com
mon
70.3
257
.00
68.4
365
.25
72.9
760
.00
71.1
068
.02
3.8
5.3
3.9
4.3
Bar B
ende
rs
Min
imum
54.5
243
.75
59.0
052
.42
56.5
245
.75
61.0
054
.42
3.7
4.6
3.4
3.8
Max
imum
79.0
067
.00
76.0
074
.00
85.0
070
.00
79.0
078
.00
7.6
4.5
3.9
5.4
Com
mon
67.0
154
.54
65.6
362
.39
69.7
657
.56
68.5
565
.29
4.1
5.5
4.4
4.6
Car
pent
ers
-Fo
rmw
ork
Min
imum
72.3
758
.00
70.6
066
.99
74.3
760
.00
72.6
068
.99
2.8
3.4
2.8
3.0
Max
imum
86.0
076
.00
84.0
082
.00
90.0
079
.00
87.0
085
.33
4.7
3.9
3.6
4.1
Com
mon
77.7
063
.96
77.1
772
.94
80.4
466
.88
79.9
275
.75
3.5
4.6
3.6
3.8
Bric
klay
ers
Min
imum
47.0
046
.00
48.0
047
.00
49.0
048
.00
50.0
049
.00
4.3
4.3
4.2
4.3
Max
imum
62.6
064
.00
62.0
062
.87
68.0
067
.00
65.0
066
.67
8.6
4.7
4.8
6.0
Com
mon
57.8
556
.17
56.1
756
.73
60.5
959
.17
59.0
859
.61
4.7
5.3
5.2
5.1
Roof
ers
Min
imum
64.0
053
.25
64.8
060
.68
66.0
055
.25
66.8
062
.68
3.1
3.8
3.1
3.3
Max
imum
8
6.00
76.
00
84.0
082
.00
9
0.00
79.
00
87.0
085
.33
4.7
3.9
3.6
4.1
Com
mon
7
3.00
60.
75
73.4
069
.05
7
5.68
63.
56
76.3
271
.85
3.7
4.6
4.0
4.1
Car
pent
ers
-Jo
iner
y
Min
imum
72.3
758
.00
70.6
066
.99
74.3
760
.00
72.6
068
.99
2.8
3.4
2.8
3.0
Max
imum
94.0
080
.00
90.0
088
.00
98.0
083
.00
93.0
091
.33
4.3
3.8
3.3
3.8
Com
mon
82.0
467
.29
81.1
776
.83
84.7
770
.54
83.8
379
.71
3.3
4.8
3.3
3.7
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
72.3
758
.00
76.4
068
.92
74.3
760
.00
78.4
070
.92
2.8
3.4
2.6
2.9
Max
imum
96.0
077
.00
91.0
088
.00
100.
0083
.00
94.0
092
.33
4.2
7.8
3.3
4.9
Com
mon
85.9
768
.71
83.1
079
.26
88.7
471
.71
85.5
281
.99
3.2
4.4
2.9
3.4
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
226
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Gen
eral
Wel
ders
Min
imum
72.3
758
.00
70.6
066
.99
74.3
760
.00
72.6
068
.99
2.8
3.4
2.8
3.0
Max
imum
96.0
078
.00
90.0
088
.00
100.
0083
.00
93.0
092
.00
4.2
6.4
3.3
4.5
Com
mon
83.8
768
.04
81.9
377
.95
86.6
270
.88
84.6
080
.70
3.3
4.2
3.3
3.5
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
60.4
749
.00
59.0
056
.16
62.4
751
.00
61.0
058
.16
3.3
4.1
3.4
3.6
Max
imum
80.0
071
.00
84.0
078
.33
83.0
074
.00
87.0
081
.33
3.8
4.2
3.6
3.8
Com
mon
70.1
857
.58
69.4
365
.73
72.9
360
.48
72.1
068
.50
3.9
5.0
3.8
4.2
Plum
bers
-Re
ticul
atio
n
Min
imum
78.3
162
.75
76.4
072
.49
80.3
164
.75
78.4
074
.49
2.6
3.2
2.6
2.8
Max
imum
101.
0084
.00
98.0
094
.33
105.
0088
.00
101.
0098
.00
4.0
4.8
3.1
3.9
Com
mon
90.7
171
.88
86.7
383
.11
93.4
074
.81
89.6
285
.94
3.0
4.1
3.3
3.4
Build
ing
Wiri
ngIn
stal
lers
Min
imum
90.2
172
.25
88.0
083
.49
92.2
174
.25
90.0
085
.49
2.2
2.8
2.3
2.4
Max
imum
110.
0092
.00
112.
0010
4.67
113.
0095
.00
115.
0010
7.67
2.7
3.3
2.7
2.9
Com
mon
96.6
979
.88
96.4
791
.01
99.3
982
.69
99.3
093
.79
2.8
3.5
2.9
3.1
Elec
tric
al W
irem
en
PW2
(Mon
thly
RM
)
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Scaff
olde
rs -
Pref
abric
ated
Min
imum
60.5
952
.00
62.0
058
.20
62.5
954
.00
64.0
060
.20
3.3
3.8
3.2
3.4
Max
imum
87.0
068
.00
84.0
079
.67
91.0
071
.00
87.0
083
.00
4.6
4.4
3.6
4.2
Com
mon
74.4
160
.83
73.3
069
.51
77.0
864
.00
76.0
572
.38
3.6
5.2
3.8
4.1
Scaff
olde
rs -
Tubu
lar
Min
imum
61.7
849
.45
60.1
657
.13
63.7
851
.45
62.1
659
.13
3.2
4.0
3.3
3.5
Max
imum
81.0
070
.00
81.0
077
.33
84.0
073
.00
84.0
080
.33
3.7
4.3
3.7
3.9
Com
mon
69.4
757
.58
69.2
565
.43
72.2
060
.49
72.0
768
.25
3.9
5.1
4.1
4.3
Appe
ndix
3.3
5 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed F
orei
gn C
onst
ruct
ion
Wor
kers
in S
abah
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
227
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
K. K
inab
alu
Sand
akan
Taw
auAv
erag
eK.
Kin
abal
uSa
ndak
anTa
wau
Aver
age
K. K
inab
alu
Sand
akan
Taw
auAv
erag
e
Plas
tere
rs
Min
imum
54.6
347
.00
53.2
051
.61
56.6
349
.00
55.2
053
.61
3.7
4.3
3.8
3.9
Max
imum
87.0
072
.00
87.0
082
.00
90.0
075
.00
90.0
085
.00
3.4
4.2
3.4
3.7
Com
mon
77.1
960
.08
72.3
369
.87
79.7
962
.85
75.4
872
.71
3.4
4.6
4.4
4.1
Tile
rs
Min
imum
66.5
548
.50
64.8
059
.95
68.5
550
.50
66.8
061
.95
3.0
4.1
3.1
3.3
Max
imum
84.0
076
.00
84.0
081
.33
88.0
079
.00
87.0
084
.67
4.8
3.9
3.6
4.1
Com
mon
74.2
060
.75
73.3
769
.44
77.1
063
.83
76.0
372
.32
3.9
5.1
3.6
4.1
Pain
ters
- B
uild
ing
Min
imum
54.6
348
.00
53.2
051
.94
56.6
350
.00
55.2
053
.94
3.7
4.2
3.8
3.9
Max
imum
77.0
067
.00
72.0
072
.00
81.0
070
.00
75.0
075
.33
5.2
4.5
4.2
4.6
Com
mon
64.7
153
.04
63.5
360
.43
67.4
055
.79
66.2
863
.16
4.2
5.2
4.3
4.5
Gen
eral
Con
stru
ctio
n W
orke
rs-C
ivil
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Appe
ndix
3.3
5 A
vera
ge D
aily
Wag
e R
ates
for S
emi-
Skill
ed F
orei
gn C
onst
ruct
ion
Wor
kers
in S
abah
in 2
013
and
2014
(RM
/day
) (3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
228
Appe
ndix
3.3
6 A
vera
ge D
aily
Wag
e fo
r Ski
lled
Fore
ign
Con
stru
ctio
n W
orke
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Gen
eral
Con
stru
ctio
n W
orke
rs -
Bui
ldin
g
Min
imum
41.8
041
.00
41.0
041
.27
43.8
043
.00
43.0
043
.27
4.8
4.9
4.9
4.8
Max
imum
63.0
054
.00
57.0
058
.00
67.0
058
.50
60.0
061
.83
6.3
8.3
5.3
6.6
Com
mon
50.3
248
.00
47.8
348
.72
53.1
351
.00
50.5
851
.57
5.6
6.3
5.7
5.9
Con
cret
ers
Min
imum
71.3
870
.60
71.5
071
.16
73.3
872
.60
73.5
073
.16
2.8
2.8
2.8
2.8
Max
imum
92.0
095
.00
97.0
094
.67
96.0
099
.50
100.
0098
.50
4.3
4.7
3.1
4.0
Com
mon
81.0
381
.87
83.0
881
.99
83.7
184
.62
86.0
884
.80
3.3
3.4
3.6
3.4
Bar B
ende
rs
Min
imum
71.5
970
.60
72.0
071
.40
73.5
972
.60
74.0
073
.40
2.8
2.8
2.8
2.8
Max
imum
86.0
090
.00
87.0
087
.67
90.0
094
.50
90.0
091
.50
4.7
5.0
3.4
4.4
Com
mon
78.2
379
.53
80.1
079
.29
80.8
882
.40
82.8
582
.04
3.4
3.6
3.4
3.5
Car
pent
ers
-Fo
rmw
ork
Min
imum
76.7
076
.40
77.3
876
.83
78.7
078
.40
79.3
878
.83
2.6
2.6
2.6
2.6
Max
imum
95.0
098
.00
95.0
096
.00
99.0
010
2.50
98.0
099
.83
4.2
4.6
3.2
4.0
Com
mon
86.9
187
.07
87.0
887
.02
89.5
989
.95
89.8
389
.79
3.1
3.3
3.2
3.2
Bric
klay
ers
Min
imum
52.0
066
.00
61.0
059
.67
54.0
068
.00
63.0
061
.67
3.8
3.0
3.3
3.4
Max
imum
86.0
079
.00
81.0
082
.00
91.0
082
.00
84.0
085
.67
5.8
3.8
3.7
4.5
Com
mon
70.0
970
.83
71.1
770
.70
72.7
473
.92
73.9
273
.53
3.8
4.4
3.9
4.0
Roof
ers
Min
imum
83.3
582
.80
83.2
583
.13
85.3
584
.20
85.2
584
.93
2.4
1.7
2.4
2.2
Max
imum
99.0
010
7.00
107.
0010
4.33
104.
0011
1.50
110.
0010
8.50
5.1
4.2
2.8
4.0
Com
mon
92.5
092
.50
93.8
892
.96
95.3
495
.42
96.4
495
.73
3.1
3.2
2.7
3.0
Car
pent
ers
-Jo
iner
y
Min
imum
85.9
188
.00
89.1
387
.68
87.9
190
.00
91.1
389
.68
2.3
2.3
2.2
2.3
Max
imum
100.
0010
7.00
108.
0010
5.00
105.
0011
1.50
111.
0010
9.17
5.0
4.2
2.8
4.0
Com
mon
93.7
195
.47
96.8
595
.34
96.3
698
.38
99.5
298
.09
2.8
3.0
2.8
2.9
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
86.0
093
.00
89.1
389
.38
88.0
095
.00
91.1
391
.38
2.3
2.2
2.2
2.2
Max
imum
106.
0011
3.00
109.
0010
9.33
111.
0011
7.50
112.
0011
3.50
4.7
4.0
2.8
3.8
Com
mon
99.2
099
.37
100.
1799
.58
101.
8510
2.20
101.
8310
1.96
2.7
2.8
1.7
2.4
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
229
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Gen
eral
Wel
ders
Min
imum
85.0
088
.00
83.0
085
.33
87.0
090
.00
85.0
087
.33
2.4
2.3
2.4
2.3
Max
imum
106.
0010
8.00
111.
0010
8.33
110.
0011
2.50
114.
0011
2.17
3.8
4.2
2.7
3.5
Com
mon
96.4
395
.63
96.6
796
.24
99.1
898
.63
99.3
399
.05
2.9
3.1
2.8
2.9
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
75.6
875
.24
76.2
075
.71
77.6
877
.24
78.2
077
.71
2.6
2.7
2.6
2.6
Max
imum
93.0
097
.00
92.0
094
.00
98.0
010
1.50
95.0
098
.17
5.4
4.6
3.3
4.4
Com
mon
83.2
683
.65
84.7
283
.88
85.9
786
.70
87.4
786
.71
3.3
3.6
3.2
3.4
Plum
bers
-Re
ticul
atio
n
Min
imum
89.2
388
.00
93.0
090
.08
91.2
390
.00
95.0
092
.08
2.2
2.3
2.2
2.2
Max
imum
116.
0011
9.00
116.
0011
7.00
120.
0012
3.50
119.
0012
0.83
3.4
3.8
2.6
3.3
Com
mon
101.
4310
0.33
101.
4810
1.08
104.
1310
3.18
104.
0610
3.79
2.7
2.8
2.5
2.7
Build
ing
Wiri
ngIn
stal
lers
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Elec
tric
al W
irem
en
PW2
(Mon
thly
RM
)
Min
imum
1,54
8.33
1,50
9.00
1,52
8.50
1,52
8.61
1,55
0.33
1,51
1.00
1,53
0.50
1,53
0.61
0.1
0.1
0.1
0.1
Max
imum
2,38
1.50
2,32
2.00
2,35
2.00
2,35
1.83
2,38
5.50
2,32
5.00
2,35
5.00
2,35
5.17
0.2
0.1
0.1
0.1
Com
mon
1,93
1.00
1,91
8.67
1,94
3.33
1,93
1.00
1,93
3.68
1,92
1.67
1,94
6.04
1,93
3.80
0.1
0.2
0.1
0.1
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
2,06
8.93
2,08
9.00
2,11
6.00
2,09
1.31
2,07
0.93
2,09
1.00
2,11
8.00
1,53
0.61
-25.
1-2
7.7
-27.
7-2
6.8
Max
imum
2,97
6.63
2,90
8.00
2,94
6.00
2,94
3.54
2,98
0.63
2,91
1.00
2,94
9.00
2,35
5.17
-19.
9-2
0.0
-20.
1-2
0.0
Com
mon
2,46
5.20
2,52
7.83
2,56
0.38
2,51
7.80
2,46
7.92
2,53
0.83
2,56
3.29
1,93
3.80
-21.
6-2
4.0
-24.
0-2
3.2
Scaff
olde
rs -
Pref
abric
ated
Min
imum
72.4
270
.60
71.5
071
.51
74.4
272
.60
73.5
073
.51
2.8
2.8
2.8
2.8
Max
imum
90.2
794
.00
94.0
092
.76
95.0
097
.00
97.0
096
.33
5.2
3.2
3.2
3.9
Com
mon
82.6
383
.13
84.1
383
.30
85.2
886
.13
86.8
886
.10
3.2
3.6
3.3
3.4
Scaff
olde
rs -
Tubu
lar
Min
imum
71.4
276
.40
75.0
074
.27
74.4
278
.40
77.0
076
.61
4.2
2.6
2.7
3.1
Max
imum
90.2
797
.00
100.
0095
.76
94.2
710
1.50
103.
0099
.59
4.4
4.6
3.0
4.0
Com
mon
82.4
583
.27
84.1
083
.27
85.2
086
.35
87.0
286
.19
3.3
3.7
3.5
3.5
Appe
ndix
3.3
6 A
vera
ge D
aily
Wag
e fo
r Ski
lled
Fore
ign
Con
stru
ctio
n W
orke
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
230
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Plas
tere
rs
Min
imum
75.0
071
.00
65.6
370
.54
77.0
073
.00
67.6
372
.54
2.7
2.8
3.0
2.8
Max
imum
95.0
096
.00
97.0
096
.00
99.0
010
0.50
100.
0099
.83
4.2
4.7
3.1
4.0
Com
mon
84.4
384
.20
83.1
783
.93
87.0
887
.20
85.8
686
.71
3.1
3.6
3.2
3.3
Tile
rs
Min
imum
82.0
081
.00
72.0
078
.33
84.0
083
.00
74.0
080
.33
2.4
2.5
2.8
2.6
Max
imum
96.0
095
.00
98.0
096
.33
101.
0099
.50
101.
0010
0.50
5.2
4.7
3.1
4.3
Com
mon
89.3
486
.87
87.0
687
.76
92.0
589
.87
89.9
090
.61
3.0
3.5
3.3
3.2
Pain
ters
- B
uild
ing
Min
imum
66.4
666
.00
68.0
066
.82
68.4
668
.00
70.0
068
.82
3.0
3.0
2.9
3.0
Max
imum
86.0
084
.00
90.0
086
.67
90.0
088
.50
93.0
090
.50
4.7
5.4
3.3
4.4
Com
mon
75.4
575
.33
76.3
175
.70
78.0
578
.20
79.0
678
.44
3.4
3.8
3.6
3.6
Gen
eral
Con
stru
ctio
n W
orke
rs-C
ivil
Min
imum
54.5
653
.20
53.8
853
.88
56.5
655
.20
55.8
855
.88
3.7
3.8
3.7
3.7
Max
imum
71.0
072
.00
77.0
073
.33
76.0
076
.50
80.0
077
.50
7.0
6.3
3.9
5.7
Com
mon
64.1
764
.50
65.4
264
.70
66.8
467
.58
68.0
967
.50
4.2
4.8
4.1
4.3
Appe
ndix
3.3
6 A
vera
ge D
aily
Wag
e fo
r Ski
lled
Fore
ign
Con
stru
ctio
n W
orke
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
231
Appe
ndix
3.3
7 A
vera
ge D
aily
Wag
e fo
r Sem
i-Sk
illed
For
eign
Con
stru
ctio
n W
orke
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (1)
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Gen
eral
Con
stru
ctio
n W
orke
rs -
Bui
ldin
g
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Con
cret
ers
Min
imum
57.1
059
.00
59.7
558
.62
59.1
061
.00
61.7
560
.62
3.5
3.4
3.3
3.4
Max
imum
76.0
077
.00
77.0
076
.67
80.0
080
.00
80.0
080
.00
5.3
3.9
3.9
4.3
Com
mon
67.7
668
.43
69.3
868
.52
70.5
071
.60
71.9
871
.36
4.0
4.6
3.7
4.1
Bar B
ende
rs
Min
imum
56.0
059
.00
56.0
057
.00
58.0
061
.00
58.0
059
.00
3.6
3.4
3.6
3.5
Max
imum
73.0
072
.00
77.0
074
.00
77.0
076
.50
80.0
077
.83
5.5
6.3
3.9
5.2
Com
mon
64.8
265
.57
66.4
065
.60
67.5
668
.58
69.2
368
.46
4.2
4.6
4.3
4.4
Car
pent
ers
-Fo
rmw
ork
Min
imum
70.5
670
.60
71.5
070
.89
72.5
672
.60
73.5
072
.89
2.8
2.8
2.8
2.8
Max
imum
86.0
087
.00
91.0
088
.00
90.0
091
.50
94.0
091
.83
4.7
5.2
3.3
4.4
Com
mon
77.0
477
.17
78.0
677
.42
79.6
980
.08
80.8
180
.19
3.4
3.8
3.5
3.6
Bric
klay
ers
Min
imum
46.9
051
.00
52.0
049
.97
48.9
053
.00
54.0
051
.97
4.3
3.9
3.8
4.0
Max
imum
69.0
067
.00
70.0
068
.67
73.0
070
.00
73.0
072
.00
5.8
4.5
4.3
4.9
Com
mon
58.2
559
.00
61.3
359
.53
60.9
062
.00
64.0
062
.30
4.5
5.1
4.4
4.7
Roof
ers
Min
imum
65.7
064
.80
65.6
365
.38
67.7
066
.80
67.6
367
.38
3.0
3.1
3.0
3.1
Max
imum
82.0
090
.00
87.0
086
.33
87.0
094
.50
90.0
090
.50
6.1
5.0
3.4
4.8
Com
mon
73.4
773
.33
74.3
573
.72
76.0
176
.50
77.0
576
.52
3.5
4.3
3.6
3.8
Car
pent
ers
-Jo
iner
y
Min
imum
71.5
970
.60
71.5
071
.23
73.5
972
.60
73.5
073
.23
2.8
2.8
2.8
2.8
Max
imum
90.0
090
.00
97.0
092
.33
94.0
094
.50
100.
0096
.17
4.4
5.0
3.1
4.2
Com
mon
81.5
581
.10
82.0
481
.56
84.2
584
.10
84.7
184
.35
3.3
3.7
3.3
3.4
Stee
l Stru
ctur
eFa
bric
ator
s
Min
imum
69.5
476
.40
75.0
073
.65
71.5
478
.40
77.0
075
.65
2.9
2.6
2.7
2.7
Max
imum
90.0
092
.00
90.1
390
.71
95.0
095
.00
93.1
394
.38
5.6
3.3
3.3
4.0
Com
mon
82.6
883
.10
84.0
683
.28
85.3
785
.98
86.8
186
.05
3.3
3.5
3.3
3.3
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
232
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Gen
eral
Wel
ders
Min
imum
71.5
970
.60
71.5
071
.23
73.5
972
.60
73.5
073
.23
2.8
2.8
2.8
2.8
Max
imum
90.0
095
.00
92.0
092
.33
95.0
098
.00
95.0
096
.00
5.6
3.2
3.3
4.0
Com
mon
82.0
382
.03
82.9
482
.33
84.7
585
.07
85.6
085
.14
3.3
3.7
3.2
3.4
Plum
bers
-Bui
ldin
g an
d Sa
nita
ry
Min
imum
59.8
259
.00
59.7
559
.52
61.8
261
.00
61.7
561
.52
3.3
3.4
3.3
3.4
Max
imum
80.0
082
.00
80.0
080
.67
85.0
086
.50
83.0
084
.83
6.3
5.5
3.8
5.2
Com
mon
69.9
969
.37
70.4
069
.92
72.6
972
.22
73.0
072
.64
3.9
4.1
3.7
3.9
Plum
bers
-Re
ticul
atio
n
Min
imum
77.0
076
.40
81.0
078
.13
79.0
078
.40
83.0
080
.13
2.6
2.6
2.5
2.6
Max
imum
101.
0094
.80
96.0
097
.27
105.
0097
.80
99.0
010
0.60
4.0
3.2
3.1
3.4
Com
mon
86.9
485
.73
87.8
586
.84
89.6
988
.73
90.6
089
.67
3.2
3.5
3.1
3.3
Build
ing
Wiri
ngIn
stal
lers
Min
imum
89.2
388
.00
89.1
388
.79
91.2
390
.00
91.1
390
.79
2.2
2.3
2.2
2.3
Max
imum
109.
0012
0.00
112.
0011
3.67
114.
0012
4.50
115.
0011
7.83
4.6
3.8
2.7
3.7
Com
mon
97.7
096
.43
97.6
997
.27
100.
3999
.43
100.
3410
0.05
2.8
3.1
2.7
2.9
Elec
tric
al W
irem
en P
W2
(Mon
thly
RM
)
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Elec
tric
al W
irem
enPW
4 (M
onth
ly R
M)
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Scaff
olde
rs -
Pref
abric
ated
Min
imum
60.5
159
.00
59.7
559
.75
62.5
161
.00
61.7
561
.75
3.3
3.4
3.3
3.3
Max
imum
83.0
084
.00
90.0
085
.67
87.0
088
.50
93.0
089
.50
4.8
5.4
3.3
4.5
Com
mon
72.9
873
.40
74.1
973
.52
75.6
376
.32
77.0
476
.33
3.6
4.0
3.8
3.8
Scaff
olde
rs -
Tubu
lar
Min
imum
61.7
060
.16
60.9
360
.93
63.7
062
.16
62.9
362
.93
3.2
3.3
3.3
3.3
Max
imum
77.0
078
.00
85.0
080
.00
81.0
082
.50
88.0
083
.83
5.2
5.8
3.5
4.8
Com
mon
68.5
769
.13
69.8
869
.19
71.2
772
.04
72.6
471
.98
3.9
4.2
3.9
4.0
Plas
tere
rs
Min
imum
53.7
953
.20
53.8
853
.62
55.7
955
.20
55.8
855
.62
3.7
3.8
3.7
3.7
Max
imum
90.0
084
.00
87.0
087
.00
94.0
088
.50
90.0
090
.83
4.4
5.4
3.4
4.4
Com
mon
73.7
372
.27
73.1
973
.16
76.4
175
.18
75.8
675
.82
3.6
4.0
3.6
3.8
Appe
ndix
3.3
7 A
vera
ge D
aily
Wag
e fo
r Sem
i-Sk
illed
For
eign
Con
stru
ctio
n W
orke
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
233
Wor
ker C
ateg
ory
Min
imum
/ M
axim
um
Wag
es
Year
Cha
nge
(%)
2013
2014
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Kuch
ing
Miri
Sibu
Aver
age
Tile
rs
Min
imum
59.0
064
.80
61.0
061
.60
61.0
066
.80
63.0
063
.60
3.4
3.1
3.3
3.2
Max
imum
86.0
084
.00
90.0
086
.67
90.0
088
.50
93.0
090
.50
4.7
5.4
3.3
4.4
Com
mon
72.8
073
.20
74.1
773
.39
75.5
376
.08
76.9
276
.18
3.8
3.9
3.7
3.8
Pain
ters
- B
uild
ing
Min
imum
54.5
653
.20
55.0
054
.25
56.5
655
.20
57.0
056
.25
3.7
3.8
3.6
3.7
Max
imum
75.0
072
.00
77.0
074
.67
79.0
076
.50
80.0
078
.50
5.3
6.3
3.9
5.1
Com
mon
64.1
163
.50
64.5
664
.06
66.7
966
.50
67.5
666
.95
4.2
4.7
4.6
4.5
Gen
eral
Con
stru
ctio
n W
orke
rs-C
ivil
Min
imum
--
--
--
--
--
--
Max
imum
--
--
--
--
--
--
Com
mon
--
--
--
--
--
--
Appe
ndix
3.3
7 A
vera
ge D
aily
Wag
e fo
r Sem
i-Sk
illed
For
eign
Con
stru
ctio
n W
orke
rs in
Sar
awak
in 2
013
and
2014
(RM
/day
) (3)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
234
Appe
ndix
3.3
8 A
vera
ge D
aily
Ren
tal R
ates
for M
ajor
Mac
hine
ries
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/u
nit)
(1)
Type
of w
ork
Cate
gory
Type
Min
imum
/ M
axim
um
Pric
e
Year
2013
2014
Chan
ge (%
)
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Land
Wor
k
Exca
vato
r
Whe
eled
Ex
cava
tor
Min
imum
500.
0045
0.00
500.
0043
3.33
470.
8350
0.00
450.
0050
0.00
450.
0047
5.00
0.0
0.0
0.0
3.8
0.9
Max
imum
586.
6755
0.00
600.
0052
3.33
565.
0060
0.00
550.
0060
0.00
540.
0057
2.50
2.3
0.0
0.0
3.2
1.3
Hyd
raul
ic
Exca
vato
r
Min
imum
375.
0035
0.00
350.
0031
6.67
347.9
237
5.00
350.
0038
0.00
316.
6735
5.42
0.0
0.0
8.6
0.0
2.2
Max
imum
1,600
.00
1,500
.00
1,500
.00
1,450
.00
1,512
.50
1,600
.00
1,500
.00
1,500
.00
1,450
.00
1,512
.50
0.0
0.0
0.0
0.0
0.0
Trac
ked
Exca
vato
r
Min
imum
370.
0035
0.00
400.
0035
0.00
367.5
037
0.00
350.
0040
0.00
350.
0036
7.50
0.0
0.0
0.0
0.0
0.0
Max
imum
1,293
.33
1,233
.33
1,250
.00
1,216
.67
1,248
.33
1,293
.33
1,233
.33
1,250
.00
1,216
.67
1,248
.33
0.0
0.0
0.0
0.0
0.0
Load
er
Whe
eled
Lo
ader
Min
imum
370.
0034
5.00
360.
0035
3.33
357.0
837
0.00
345.
0036
0.00
353.
3335
7.08
0.0
0.0
0.0
0.0
0.0
Max
imum
1,406
.67
1,350
.00
1,500
.00
1,400
.00
1,414
.171,4
06.6
71,3
50.0
01,5
00.0
01,4
00.0
01,4
14.17
0.0
0.0
0.0
0.0
0.0
Skid
Ste
er
Load
er
Min
imum
376.
6732
5.00
380.
0035
0.00
357.9
237
6.67
325.
0038
0.00
350.
0035
7.92
0.0
0.0
0.0
0.0
0.0
Max
imum
523.
3350
0.00
550.
0050
0.00
518.
3352
3.33
500.
0055
0.00
500.
0051
8.33
0.0
0.0
0.0
0.0
0.0
Trac
k Lo
ader
Min
imum
445.
0044
5.00
500.
0050
0.00
472.
5044
5.00
445.
0050
0.00
500.
0047
2.50
0.0
0.0
0.0
0.0
0.0
Max
imum
686.
6765
0.00
700.
0065
0.00
671.6
769
3.33
650.
0070
0.00
650.
0067
3.33
1.00.
00.
00.
00.
2
Doz
er
Bulld
ozer
Min
imum
700.
0065
0.00
650.
0063
3.33
658.
3370
0.00
650.
0065
0.00
633.
3365
8.33
0.0
0.0
0.0
0.0
0.0
Max
imum
1,150
.00
1,000
.00
1,100
.00
953.
331,0
50.8
31,1
50.0
01,0
00.0
01,1
00.0
095
3.33
1,050
.83
0.0
0.0
0.0
0.0
0.0
Doz
er
Shov
el
Min
imum
716.
6775
0.00
750.
0073
3.33
737.5
071
6.67
750.
0075
0.00
733.
3373
7.50
0.0
0.0
0.0
0.0
0.0
Max
imum
816.
6780
0.00
800.
0088
6.67
825.
8483
3.33
800.
0080
0.00
866.
6782
5.00
2.0
0.0
0.0
-2.3
-0.1
Whe
el
Doz
er
Min
imum
788.
3375
0.00
750.
0078
3.33
767.9
278
8.33
750.
0075
0.00
783.
3376
7.92
0.0
0.0
0.0
0.0
0.0
Max
imum
900.
0090
0.00
900.
0093
3.33
908.
3391
6.67
900.
0090
0.00
933.
3391
2.50
1.90.
00.
00.
00.
5
Com
pact
or
Soil
Com
pact
or
Min
imum
536.
6756
0.00
600.
0053
3.33
557.5
053
6.67
560.
0060
0.00
533.
3355
7.50
0.0
0.0
0.0
0.0
0.0
Max
imum
671.6
769
3.33
750.
0065
0.00
691.2
567
1.67
693.
3375
0.00
650.
0069
1.25
0.0
0.0
0.0
0.0
0.0
Land
fill
Com
pact
or
Min
imum
491.6
754
1.67
550.
0051
6.67
525.
0049
1.67
508.
3355
0.00
516.
6751
6.67
0.0
-6.2
0.0
0.0
-1.6
Max
imum
531.6
750
8.33
600.
0053
3.33
543.
3353
1.67
541.6
760
0.00
533.
3355
1.67
0.0
6.6
0.0
0.0
1.5
Vibr
ator
y So
il Co
mpa
ctor
Min
imum
580.
0056
0.00
600.
0056
0.00
575.
0058
0.00
570.
0060
0.00
560.
0057
7.50
0.0
1.80.
00.
00.
4
Max
imum
580.
0057
0.00
600.
0056
0.00
577.5
059
6.67
576.
6760
0.00
560.
0058
3.34
2.9
1.20.
00.
01.0
Vibr
ator
y As
phal
t Co
mpa
ctor
Min
imum
663.
3365
1.67
600.
0063
3.33
637.0
866
3.33
661.6
760
0.00
633.
3363
9.58
0.0
1.50.
00.
00.
4
Max
imum
691.6
768
1.67
750.
0071
0.00
708.
3469
1.67
680.
0075
0.00
710.
0070
7.92
0.0
-0.2
0.0
0.0
-0.1
Mot
or
Gra
der
Mot
or
Gra
der
Min
imum
536.
6753
3.33
600.
0050
0.00
542.
5053
6.67
533.
3360
0.00
500.
0054
2.50
0.0
0.0
0.0
0.0
0.0
Max
imum
638.
3363
3.33
700.
0060
0.00
642.
9263
8.33
633.
3370
0.00
600.
0064
2.92
0.0
0.0
0.0
0.0
0.0
Back
hoe
Back
hoe
Min
imum
450.
0045
0.00
450.
0044
3.33
448.
3345
0.00
450.
0046
0.00
450.
0045
2.50
0.0
0.0
2.2
1.50.
9
Max
imum
450.
0045
0.00
450.
0045
0.00
450.
0045
0.00
460.
0046
0.00
450.
0045
5.00
0.0
2.2
2.2
0.0
1.1
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
235
Type
of w
ork
Cate
gory
Type
Min
imum
/ M
axim
um
Pric
e
Year
2013
2014
Chan
ge (%
)
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Road
wor
kPa
ving
Equi
pmen
t
Asph
alt
Pave
r
Min
imum
475.
0045
0.00
516.
6740
0.00
460.
4247
5.00
450.
0051
6.67
400.
0046
0.42
0.0
0.0
0.0
0.0
0.0
Max
imum
576.
6756
0.00
616.
6750
0.00
563.
3459
3.33
560.
0061
6.67
500.
0056
7.50
2.9
0.0
0.0
0.0
0.7
Asph
alt
Trac
k Pa
vers
Min
imum
520.
0050
0.00
616.
6750
0.00
534.
1752
0.00
500.
0061
6.67
500.
0053
4.17
0.0
0.0
0.0
0.0
0.0
Max
imum
621.6
761
3.33
666.
6760
0.00
625.
4262
1.67
613.
3366
6.67
600.
0062
5.42
0.0
0.0
0.0
0.0
0.0
Scre
eds
Min
imum
276.
6729
3.33
316.
6730
0.00
296.
6727
6.67
293.
3331
6.67
300.
0029
6.67
0.0
0.0
0.0
0.0
0.0
Max
imum
376.
6736
0.00
416.
6730
0.00
363.
3437
6.67
360.
0041
6.67
316.
6736
7.50
0.0
0.0
0.0
5.6
1.1
Truc
k an
d H
aula
ge
Dum
p Tr
uck
Dum
p Tr
uck
Min
imum
508.
3347
0.00
500.
0045
0.00
482.
0850
8.33
470.
0051
6.67
450.
0048
6.25
0.0
0.0
3.3
0.0
0.9
Max
imum
693.
3368
3.33
716.
6767
0.00
690.
8369
3.33
683.
3371
6.67
670.
0069
0.83
0.0
0.0
0.0
0.0
0.0
Lorry
Lorry
Min
imum
400.
0040
0.00
450.
0045
0.00
425.
0040
0.00
400.
0045
0.00
450.
0042
5.00
0.0
0.0
0.0
0.0
0.0
Max
imum
893.
3392
0.00
950.
0095
0.00
928.
3391
0.00
920.
0095
0.00
950.
0093
2.50
1.90.
00.
00.
00.
4
Hoi
stin
g an
d Li
fting
Cran
e
Hyd
raul
ic
Craw
ler
Cran
e
Min
imum
1,133
.33
1,100
.00
1,200
.00
1,100
.00
1,133
.33
1,133
.33
1,116
.67
1,200
.00
1,166
.67
1,154
.170.
01.5
0.0
6.1
1.8
Max
imum
1,766
.67
1,683
.33
1,700
.00
1,683
.33
1,708
.33
1,766
.67
1,683
.33
1,700
.00
1,683
.33
1,708
.33
0.0
0.0
0.0
0.0
0.0
Mob
ile
Cran
e
Min
imum
500.
0050
0.00
566.
6750
0.00
516.
6750
0.00
516.
6756
6.67
500.
0052
0.84
0.0
3.3
0.0
0.0
0.8
Max
imum
1,150
.00
1,116
.67
1,200
.00
1,100
.00
1,141
.67
1,150
.00
1,116
.67
1,200
.00
1,100
.00
1,141
.67
0.0
0.0
0.0
0.0
0.0
Not
e:
Cen
tral
Reg
ion:
Sel
ango
r and
Kua
la L
umpu
r;
Nor
ther
n Re
gion
: Pul
au P
inan
g;
East
ern
Regi
on: P
ahan
g;
Sout
hern
Reg
ion:
Joh
or.
Appe
ndix
3.3
8 A
vera
ge D
aily
Ren
tal R
ates
for M
ajor
Mac
hine
ries
in P
enin
sula
r Mal
aysi
a in
201
3 an
d 20
14 (R
M/u
nit)
(2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
236
Appe
ndix
3.3
9 A
vera
ge M
onth
ly R
enta
l Rat
es fo
r Maj
or M
achi
neri
es in
Pen
insu
lar M
alay
sia
in 2
013
and
2014
(RM
/uni
t) (1
)
Type
of w
ork
Cate
gory
Type
Min
imum
/ M
axim
um
Pric
e
Year
2013
2014
Chan
ge (%
)
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Land
Wor
k
Exca
vato
r
Whe
eled
Ex
cava
tor
Min
imum
7,416
.67
7,433
.33
7,633
.33
7,050
.00
7,383
.33
7,416
.67
7,433
.33
7,633
.33
7,116
.67
7,400
.00
0.0
0.0
0.0
0.9
0.2
Max
imum
8,50
0.00
8,43
3.33
8,50
0.00
7,750
.00
8,29
5.83
8,50
0.00
8,43
3.33
8,50
0.00
7,750
.00
8,29
5.83
0.0
0.0
0.0
0.0
0.0
Hyd
raul
ic
Exca
vato
r
Min
imum
5,88
3.33
5,80
0.00
6,16
6.67
5,00
0.00
5,71
2.50
5,88
3.33
5,80
0.00
6,16
6.67
5,00
0.00
5,71
2.50
0.0
0.0
0.0
0.0
0.0
Max
imum
16,5
50.0
016
,433
.33
16,6
33.3
316
,033
.33
16,4
12.5
016
,550
.00
16,4
33.3
316
,633
.33
16,0
33.3
316
,412
.50
0.0
0.0
0.0
0.0
0.0
Trac
ked
Exca
vato
r
Min
imum
6,82
6.67
6,60
0.00
7,000
.00
6,50
0.00
6,73
1.67
6,82
6.67
6,60
0.00
7,000
.00
6,50
0.00
6,73
1.67
0.0
0.0
0.0
0.0
0.0
Max
imum
15,5
66.6
715
,383
.33
16,0
00.0
015
,600
.00
15,6
37.5
015
,566
.67
15,3
83.3
316
,000
.00
15,6
00.0
015
,637
.50
0.0
0.0
0.0
0.0
0.0
Load
er
Whe
eled
Lo
ader
Min
imum
6,82
6.67
6,65
0.00
6,80
0.00
6,50
0.00
6,69
4.17
6,84
3.33
6,65
0.00
6,80
0.00
6,50
0.00
6,69
8.33
0.2
0.0
0.0
0.0
0.1
Max
imum
16,0
66.6
715
,600
.00
16,0
00.0
015
,500
.00
15,7
91.6
716
,066
.67
15,6
00.0
016
,000
.00
15,5
00.0
015
,791
.67
0.0
0.0
0.0
0.0
0.0
Skid
Ste
er
Load
er
Min
imum
6,82
6.67
6,50
0.00
6,63
3.33
6,56
6.67
6,63
1.67
6,82
6.67
6,50
0.00
6,63
3.33
6,56
6.67
6,63
1.67
0.0
0.0
0.0
0.0
0.0
Max
imum
9,05
0.00
8,80
0.00
9,16
6.67
8,66
6.67
8,92
0.84
9,05
0.00
8,80
0.00
9,16
6.67
8,66
6.67
8,92
0.84
0.0
0.0
0.0
0.0
0.0
Trac
k Lo
ader
Min
imum
8,91
6.67
8,91
6.67
9,26
6.67
9,23
3.33
9,08
3.34
8,91
6.67
8,91
6.67
9,26
6.67
9,23
3.33
9,08
3.34
0.0
0.0
0.0
0.0
0.0
Max
imum
12,5
00.0
012
,183.
3312
,666
.67
12,16
6.67
12,3
79.17
12,5
00.0
012
,183.
3312
,666
.67
12,3
33.3
312
,420
.83
0.0
0.0
0.0
1.40.
3
Doz
er
Bulld
ozer
Min
imum
9,73
3.33
9,65
0.00
9,66
6.67
9,60
0.00
9,66
2.50
9,73
3.33
9,65
0.00
9,73
3.33
9,60
0.00
9,67
9.17
0.0
0.0
0.7
0.0
0.2
Max
imum
13,6
66.6
713
,100.
0013
,800
.00
13,5
00.0
013
,516
.67
13,6
66.6
713
,100.
0013
,800
.00
13,5
00.0
013
,516
.67
0.0
0.0
0.0
0.0
0.0
Doz
er
Shov
el
Min
imum
9,93
3.33
9,93
3.33
9,93
3.33
9,58
3.33
9,84
5.83
9,93
3.33
9,93
3.33
9,93
3.33
9,60
0.00
9,85
0.00
0.0
0.0
0.0
0.2
0.0
Max
imum
11,0
00.0
011
,000
.00
11,0
00.0
011
,533
.33
11,13
3.33
11,0
00.0
011
,000
.00
11,0
00.0
011
,533
.33
11,13
3.33
0.0
0.0
0.0
0.0
0.0
Whe
el
Doz
er
Min
imum
10,9
00.0
010
,800
.00
10,8
00.0
010
,500
.00
10,7
50.0
010
,950
.00
10,8
00.0
010
,800
.00
10,5
00.0
010
,762
.50
0.5
0.0
0.0
0.0
0.1
Max
imum
11,8
33.3
311
,800
.00
11,8
00.0
011
,666
.67
11,7
75.0
011
,833
.33
11,8
00.0
011
,800
.00
11,6
66.6
711
,775
.00
0.0
0.0
0.0
0.0
0.0
Com
pact
or
Soil
Com
pact
or
Min
imum
7,700
.00
7,700
.00
8,28
3.33
7,250
.00
7,733
.33
7,700
.00
7,700
.00
8,28
3.33
7,300
.00
7,745
.83
0.0
0.0
0.0
0.7
0.2
Max
imum
8,95
0.00
8,95
0.00
9,23
3.33
8,60
0.00
8,93
3.33
8,95
0.00
8,95
0.00
9,23
3.33
8,60
0.00
8,93
3.33
0.0
0.0
0.0
0.0
0.0
Land
fill
Com
pact
or
Min
imum
7,833
.33
7,833
.33
8,30
0.00
7,500
.00
7,866
.67
7,833
.33
7,833
.33
8,30
0.00
7,500
.00
7,866
.67
0.0
0.0
0.0
0.0
0.0
Max
imum
8,90
0.00
8,88
3.33
9,31
6.67
8,63
3.33
8,93
3.33
8,90
0.00
8,88
3.33
9,31
6.67
8,63
3.33
8,63
3.33
0.0
0.0
0.0
0.0
-3.4
Vibr
ator
y So
il Co
mpa
ctor
Min
imum
8,63
3.33
8,60
0.00
9,28
3.33
8,65
0.00
8,79
1.67
8,63
3.33
8,60
0.00
9,33
3.33
8,71
6.67
8,82
0.83
0.0
0.0
0.5
0.8
0.3
Max
imum
8,63
3.33
8,60
0.00
9,28
3.33
8,65
0.00
8,79
1.67
8,63
3.33
8,60
0.00
9,33
3.33
8,71
6.67
8,82
0.83
0.0
0.0
0.5
0.8
0.3
Vibr
ator
y As
phal
t Co
mpa
ctor
Min
imum
9,41
6.67
9,38
3.33
9,53
3.33
9,33
3.33
9,41
6.67
9,41
6.67
9,38
3.33
9,53
3.33
9,33
3.33
9,41
6.67
0.0
0.0
0.0
0.0
0.0
Max
imum
9,88
3.33
9,86
6.67
10,3
33.3
39,
833.
339,
979.
179,
883.
339,
866.
6710
,333
.33
9,83
3.33
9,97
9.17
0.0
0.0
0.0
0.0
0.0
Mot
or
Gra
der
Mot
or
Gra
der
Min
imum
8,63
3.33
8,50
0.00
9,00
0.00
8,00
0.00
8,53
3.33
8,60
0.00
8,50
0.00
9,00
0.00
8,06
6.67
8,54
1.67
-0.4
0.0
0.0
0.8
0.1
Max
imum
9,76
6.67
9,60
0.00
9,80
0.00
9,00
0.00
9,54
1.67
9,76
6.67
9,60
0.00
9,80
0.00
9,00
0.00
9,54
1.67
0.0
0.0
0.0
0.0
0.0
Back
hoe
Back
hoe
Min
imum
6,65
0.00
6,66
6.67
7,000
.00
6,76
6.67
6,77
0.84
6,70
0.00
6,76
6.67
7,050
.00
6,76
6.67
6,82
0.84
0.8
1.50.
70.
00.
7
Max
imum
6,66
6.67
6,66
6.70
7,000
.00
6,76
6.67
6,77
5.01
6,70
0.00
6,83
3.33
7,050
.00
6,76
6.67
6,83
7.50
0.5
2.5
0.7
0.0
0.9
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
237
Type
of w
ork
Cate
gory
Type
Min
imum
/ M
axim
um
Pric
e
Year
2013
2014
Chan
ge (%
)
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Cen
tral
Regio
n No
rthern
Re
gion
Easte
rn
Regio
nSo
uthe
rn
Regio
nAv
erage
Road
wor
kPa
ving
Equi
pmen
t
Asph
alt
Pave
r
Min
imum
7,066
.67
7,000
.00
7,500
.00
7,166
.67
7,183
.34
7,066
.67
7,000
.00
7,500
.00
7,250
.00
7,204
.170.
00.
00.
01.2
0.3
Max
imum
8,23
3.33
8,08
3.33
8,53
3.33
8,08
3.33
8,23
3.33
8,23
3.33
8,08
3.33
8,53
3.33
8,16
6.67
8,25
4.17
0.0
0.0
0.0
1.00.
3
Asph
alt
Trac
k Pa
vers
Min
imum
7,650
.00
7,500
.00
8,00
0.00
7,500
.00
7,662
.50
7,066
.67
7,500
.00
8,00
0.00
7,500
.00
7,516
.67
-7.6
0.0
0.0
0.0
-1.9
Max
imum
9,28
3.33
9,15
0.00
9,00
0.00
9,35
0.00
9,19
5.83
9,28
3.33
9,15
0.00
9,00
0.00
9,35
0.00
9,19
5.83
0.0
0.0
0.0
0.0
0.0
Scre
eds
Min
imum
5,30
0.00
5,33
3.33
6,00
0.00
5,75
0.00
5,59
5.83
5,30
0.00
5,33
3.33
6,00
0.00
5,75
0.00
5,59
5.83
0.0
0.0
0.0
0.0
0.0
Max
imum
6,46
6.67
6,38
3.33
6,50
0.00
5,75
0.00
6,27
5.00
6,46
6.67
6,38
3.33
6,50
0.00
5,75
0.00
6,27
5.00
0.0
0.0
0.0
0.0
0.0
Truc
k an
d H
aula
ge
Dum
p Tr
uck
Dum
p Tr
uck
Min
imum
8,93
3.33
8,60
0.00
9,00
0.00
8,60
0.00
8,78
3.33
8,93
3.33
8,60
0.00
9,00
0.00
8,60
0.00
8,78
3.33
0.0
0.0
0.0
0.0
0.0
Max
imum
12,0
00.0
011
,666
.67
12,0
00.0
011
,666
.67
11,8
33.3
412
,000
.00
11,6
66.6
712
,000
.00
11,6
66.6
711
,833
.34
0.0
0.0
0.0
0.0
0.0
Lorry
Lorry
Min
imum
8,53
3.33
8,43
3.33
9,00
0.00
8,70
0.00
8,66
6.67
8,53
3.33
8,43
3.33
9,00
0.00
8,80
0.00
8,69
1.67
0.0
0.0
0.0
1.10.
3
Max
imum
16,10
0.00
16,6
66.6
716
,500
.00
16,4
33.3
316
,425
.00
16,16
6.67
16,16
6.67
16,5
50.0
016
,600
.00
16,3
70.8
40.
4-3
.00.
31.0
-0.3
Hoi
stin
g an
d Li
fting
Cran
e
Hyd
raul
ic
Craw
ler
Cran
e
Min
imum
16,13
3.33
16,0
00.0
016
,500
.00
15,16
6.67
15,9
50.0
016
,133.
3316
,000
.00
16,5
00.0
015
,166.
6715
,950
.00
0.0
0.0
0.0
0.0
0.0
Max
imum
20,3
33.3
319
,667
.67
20,0
00.0
019
,833
.33
19,9
58.5
820
,333
.33
19,6
66.6
720
,000
.00
19,8
33.3
319
,958
.33
0.0
0.0
0.0
0.0
0.0
Mob
ile
Cran
e
Min
imum
7,850
.00
7,800
.00
8,00
0.00
7,666
.67
7,829
.177,8
50.0
07,8
00.0
08,
000.
007,6
66.6
77,8
29.17
0.0
0.0
0.0
0.0
0.0
Max
imum
16,16
6.67
16,0
00.0
016
,500
.00
16,0
00.0
016
,166.
6716
,166.
6716
,000
.00
16,5
00.0
016
,000
.00
16,16
6.67
0.0
0.0
0.0
0.0
0.0
Not
e:
Cen
tral
Reg
ion:
Sel
ango
r and
Kua
la L
umpu
r;
Nor
ther
n Re
gion
: Pul
au P
inan
g;
East
ern
Regi
on: P
ahan
g;
Sout
hern
Reg
ion:
Joh
or.
Appe
ndix
3.3
9 A
vera
ge M
onth
ly R
enta
l Rat
es fo
r Maj
or M
achi
neri
es in
Pen
insu
lar M
alay
sia
in 2
013
and
2014
(RM
/uni
t) (2
)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
238
Ap
pen
dix
3.4
0 A
vera
ge
Dai
ly R
enta
l Rat
es f
or
Maj
or
Mac
hin
erie
s in
Sab
ah a
nd
Sar
awak
in 2
013
an
d 2
014
(RM
/un
it) (
1)
Type
of w
ork
Cat
egor
yTy
peM
inim
um /
Max
imum
Pr
ice
Saba
hSa
raw
ak
K. K
inab
alu
Cha
nge
(%)
Kuch
ing
Peru
baha
n (%
)
Dai
ly R
enta
l (R
M p
er u
nit)
Dai
ly R
enta
l
(R
M p
er u
nit)
Dai
ly
Rent
al
(RM
per
un
it)
Dai
ly
Rent
al
(R
M p
er
unit)
Dai
ly R
enta
l (R
M p
er u
nit)
Dai
ly R
enta
l
(R
M p
er u
nit)
Dai
ly
Rent
al
(RM
per
un
it)
Dai
ly
Rent
al
(R
M p
er
unit)
(RM
per
un
it)20
1420
1320
1420
1320
1420
1320
14
Land
Wor
k
Exca
vato
rW
heel
ed
Exca
vato
r
Min
imum
550.
0055
0.00
8,60
0.00
8,60
0.00
0.0
0.0
483.
3348
3.00
8,26
6.67
8,26
6.67
-0.1
0.0
Max
imum
600.
0060
0.00
9,30
0.00
9,30
0.00
0.0
0.0
550.
0055
0.00
9,20
0.00
9,20
0.00
0.0
0.0
Hyd
raul
ic
Exca
vato
r
Min
imum
420.
0042
0.00
6,50
0.00
6,50
0.00
0.0
0.0
383.
3340
0.00
6,26
6.67
6,30
0.00
4.3
0.5
Max
imum
1,70
0.00
1,70
0.00
18,7
50.0
018
,750
.00
0.0
0.0
1,50
0.00
1,50
0.00
18,1
50.0
018
,150
.00
0.0
0.0
Trac
ked
Exca
vato
r
Min
imum
450.
0045
0.00
8,15
0.00
7,78
3.33
0.0
-4.5
400.
0040
0.00
7,23
3.33
7,23
3.33
0.0
0.0
Max
imum
1,51
0.00
1,35
8.33
18,0
00.0
017
,316
.67
-10.
0-3
.81,
233.
331,
233.
3316
,283
.33
16,2
83.3
30.
00.
0
Load
erW
heel
ed L
oade
r M
inim
um45
0.00
450.
008,
150.
008,
150.
000.
00.
040
0.00
400.
007,
300.
007,
300.
000.
00.
0
Max
imum
1,51
0.00
1,51
0.00
18,0
00.0
018
,333
.33
0.0
1.9
1,38
3.33
1,38
3.33
17,2
00.0
017
,200
.00
0.0
0.0
Skid
Ste
er
Load
er
Min
imum
420.
0042
5.00
7,450
.00
7,450
.00
1.2
0.0
391.
6739
1.67
7,18
3.33
7,18
3.33
0.0
0.0
Max
imum
578.
3357
8.33
9,51
6.67
9,51
6.67
0.0
0.0
503.
3350
3.33
9,03
3.33
9,03
3.33
0.0
0.0
Trac
k Lo
ader
Min
imum
528.
3352
8.33
9,38
3.33
9,38
3.33
0.0
0.0
495.
0049
5.00
9,38
3.33
9,38
3.33
0.0
0.0
Max
imum
783.
3378
3.33
13,4
83.3
313
,483
.33
0.0
0.0
728.
3372
8.33
13,2
66.6
713
,266
.67
0.0
0.0
Doz
erBu
lldoz
erM
inim
um70
0.00
710.
0010
,933
.33
10,9
33.3
31.4
0.0
726.
7072
6.67
10,1
66.6
710
,166
.67
0.0
0.0
Max
imum
1,18
6.67
1,18
6.67
14,9
50.0
014
,950
.00
0.0
0.0
1,19
3.33
1,19
3.33
14,4
66.6
714
,466
.67
0.0
0.0
Doz
er S
hove
lM
inim
um75
3.33
753.
3310
,800
.00
10,8
00.0
00.
00.
066
6.67
666.
6710
,000
.00
10,0
00.0
00.
00.
0
Max
imum
850.
0085
0.00
11,8
66.6
711
,866
.67
0.0
0.0
793.
3379
3.33
11,3
33.3
311
,333
.33
0.0
0.0
Whe
el D
ozer
Min
imum
816.
6781
6.67
11,8
00.0
011
,800
.00
0.0
0.0
783.
3378
3.33
11,1
16.6
711
,116
.67
0.0
0.0
Max
imum
883.
3388
3.33
12,3
50.0
012
,350
.00
0.0
0.0
865.
0086
5.00
12,4
33.3
312
,433
.33
0.0
0.0
Com
pact
orSo
il C
ompa
ctor
Min
imum
600.
0060
0.00
7,80
0.00
7,80
0.00
0.0
0.0
550.
0055
0.00
7,70
0.00
7,70
0.00
0.0
0.0
Max
imum
733.
3373
3.33
9,31
6.67
9,31
6.67
0.0
0.0
693.
3369
3.33
9,10
0.00
9,10
0.00
0.0
0.0
Land
fill
Com
pact
or
Min
imum
611.
6761
5.00
7,73
3.33
7,73
3.33
0.5
0.0
546.
6754
6.67
8,00
0.00
8,00
0.00
0.0
0.0
Max
imum
621.
6762
1.67
7,73
3.33
7,73
3.33
0.0
0.0
556.
6755
6.67
9,03
3.33
9,03
3.33
0.0
0.0
Vibr
ator
y So
il C
ompa
ctor
Min
imum
643.
3365
1.67
8,00
0.00
8,00
0.00
1.3
0.0
610.
0061
0.00
8,83
3.33
8,83
3.33
0.0
0.0
Max
imum
651.
6766
0.00
8,00
0.00
8,00
0.00
1.3
0.0
610.
0061
0.00
8,83
3.33
8,83
3.33
0.0
0.0
Vibr
ator
y As
phal
t C
ompa
ctor
Min
imum
643.
3366
0.00
9,30
0.00
9,30
0.00
2.6
0.0
653.
3365
3.33
9,26
6.67
9,26
6.67
0.0
0.0
Max
imum
710.
0071
0.00
9,73
3.33
9,73
3.33
0.0
0.0
680.
0068
0.00
9,71
6.67
9,71
6.67
0.0
0.0
Mot
or G
rade
rM
otor
Gra
der
Min
imum
550.
0055
0.00
8,63
3.33
8,63
3.33
0.0
0.0
553.
3356
0.00
8,50
0.00
8,50
0.00
1.2
0.0
Max
imum
650.
0065
0.00
10,3
33.3
310
,333
.33
0.0
0.0
600.
0060
0.00
9,50
0.00
9,50
0.00
0.0
0.0
Back
hoe
Back
hoe
Min
imum
450.
0045
0.00
7,00
0.00
7,00
0.00
0.0
0.0
416.
6743
3.33
7,00
0.00
7,06
6.67
4.0
1.0
Max
imum
450.
0046
0.00
7,00
0.00
7,06
6.67
2.2
1.0
416.
6743
3.33
7,00
0.00
7,13
3.33
4.0
1.9
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
239
Ap
pen
dix
3.4
0 A
vera
ge
Dai
ly R
enta
l Rat
es f
or
Maj
or
Mac
hin
erie
s in
Sab
ah a
nd
Sar
awak
in 2
013
an
d 2
014
(RM
/un
it) (
1)
Type
of w
ork
Cat
egor
yTy
peM
inim
um /
Max
imum
Pr
ice
Saba
hSa
raw
ak
K. K
inab
alu
Cha
nge
(%)
Kuch
ing
Peru
baha
n (%
)
Dai
ly R
enta
l (R
M p
er u
nit)
Dai
ly R
enta
l
(R
M p
er u
nit)
Dai
ly
Rent
al
(RM
per
un
it)
Dai
ly
Rent
al
(R
M p
er
unit)
Dai
ly R
enta
l (R
M p
er u
nit)
Dai
ly R
enta
l
(R
M p
er u
nit)
Dai
ly
Rent
al
(RM
per
un
it)
Dai
ly
Rent
al
(R
M p
er
unit)
(RM
per
un
it)20
1420
1320
1420
1320
1420
1320
14
Land
Wor
k
Exca
vato
rW
heel
ed
Exca
vato
r
Min
imum
550.
0055
0.00
8,60
0.00
8,60
0.00
0.0
0.0
483.
3348
3.00
8,26
6.67
8,26
6.67
-0.1
0.0
Max
imum
600.
0060
0.00
9,30
0.00
9,30
0.00
0.0
0.0
550.
0055
0.00
9,20
0.00
9,20
0.00
0.0
0.0
Hyd
raul
ic
Exca
vato
r
Min
imum
420.
0042
0.00
6,50
0.00
6,50
0.00
0.0
0.0
383.
3340
0.00
6,26
6.67
6,30
0.00
4.3
0.5
Max
imum
1,70
0.00
1,70
0.00
18,7
50.0
018
,750
.00
0.0
0.0
1,50
0.00
1,50
0.00
18,1
50.0
018
,150
.00
0.0
0.0
Trac
ked
Exca
vato
r
Min
imum
450.
0045
0.00
8,15
0.00
7,78
3.33
0.0
-4.5
400.
0040
0.00
7,23
3.33
7,23
3.33
0.0
0.0
Max
imum
1,51
0.00
1,35
8.33
18,0
00.0
017
,316
.67
-10.
0-3
.81,
233.
331,
233.
3316
,283
.33
16,2
83.3
30.
00.
0
Load
erW
heel
ed L
oade
r M
inim
um45
0.00
450.
008,
150.
008,
150.
000.
00.
040
0.00
400.
007,
300.
007,
300.
000.
00.
0
Max
imum
1,51
0.00
1,51
0.00
18,0
00.0
018
,333
.33
0.0
1.9
1,38
3.33
1,38
3.33
17,2
00.0
017
,200
.00
0.0
0.0
Skid
Ste
er
Load
er
Min
imum
420.
0042
5.00
7,450
.00
7,450
.00
1.2
0.0
391.
6739
1.67
7,18
3.33
7,18
3.33
0.0
0.0
Max
imum
578.
3357
8.33
9,51
6.67
9,51
6.67
0.0
0.0
503.
3350
3.33
9,03
3.33
9,03
3.33
0.0
0.0
Trac
k Lo
ader
Min
imum
528.
3352
8.33
9,38
3.33
9,38
3.33
0.0
0.0
495.
0049
5.00
9,38
3.33
9,38
3.33
0.0
0.0
Max
imum
783.
3378
3.33
13,4
83.3
313
,483
.33
0.0
0.0
728.
3372
8.33
13,2
66.6
713
,266
.67
0.0
0.0
Doz
erBu
lldoz
erM
inim
um70
0.00
710.
0010
,933
.33
10,9
33.3
31.4
0.0
726.
7072
6.67
10,1
66.6
710
,166
.67
0.0
0.0
Max
imum
1,18
6.67
1,18
6.67
14,9
50.0
014
,950
.00
0.0
0.0
1,19
3.33
1,19
3.33
14,4
66.6
714
,466
.67
0.0
0.0
Doz
er S
hove
lM
inim
um75
3.33
753.
3310
,800
.00
10,8
00.0
00.
00.
066
6.67
666.
6710
,000
.00
10,0
00.0
00.
00.
0
Max
imum
850.
0085
0.00
11,8
66.6
711
,866
.67
0.0
0.0
793.
3379
3.33
11,3
33.3
311
,333
.33
0.0
0.0
Whe
el D
ozer
Min
imum
816.
6781
6.67
11,8
00.0
011
,800
.00
0.0
0.0
783.
3378
3.33
11,1
16.6
711
,116
.67
0.0
0.0
Max
imum
883.
3388
3.33
12,3
50.0
012
,350
.00
0.0
0.0
865.
0086
5.00
12,4
33.3
312
,433
.33
0.0
0.0
Com
pact
orSo
il C
ompa
ctor
Min
imum
600.
0060
0.00
7,80
0.00
7,80
0.00
0.0
0.0
550.
0055
0.00
7,70
0.00
7,70
0.00
0.0
0.0
Max
imum
733.
3373
3.33
9,31
6.67
9,31
6.67
0.0
0.0
693.
3369
3.33
9,10
0.00
9,10
0.00
0.0
0.0
Land
fill
Com
pact
or
Min
imum
611.
6761
5.00
7,73
3.33
7,73
3.33
0.5
0.0
546.
6754
6.67
8,00
0.00
8,00
0.00
0.0
0.0
Max
imum
621.
6762
1.67
7,73
3.33
7,73
3.33
0.0
0.0
556.
6755
6.67
9,03
3.33
9,03
3.33
0.0
0.0
Vibr
ator
y So
il C
ompa
ctor
Min
imum
643.
3365
1.67
8,00
0.00
8,00
0.00
1.3
0.0
610.
0061
0.00
8,83
3.33
8,83
3.33
0.0
0.0
Max
imum
651.
6766
0.00
8,00
0.00
8,00
0.00
1.3
0.0
610.
0061
0.00
8,83
3.33
8,83
3.33
0.0
0.0
Vibr
ator
y As
phal
t C
ompa
ctor
Min
imum
643.
3366
0.00
9,30
0.00
9,30
0.00
2.6
0.0
653.
3365
3.33
9,26
6.67
9,26
6.67
0.0
0.0
Max
imum
710.
0071
0.00
9,73
3.33
9,73
3.33
0.0
0.0
680.
0068
0.00
9,71
6.67
9,71
6.67
0.0
0.0
Mot
or G
rade
rM
otor
Gra
der
Min
imum
550.
0055
0.00
8,63
3.33
8,63
3.33
0.0
0.0
553.
3356
0.00
8,50
0.00
8,50
0.00
1.2
0.0
Max
imum
650.
0065
0.00
10,3
33.3
310
,333
.33
0.0
0.0
600.
0060
0.00
9,50
0.00
9,50
0.00
0.0
0.0
Back
hoe
Back
hoe
Min
imum
450.
0045
0.00
7,00
0.00
7,00
0.00
0.0
0.0
416.
6743
3.33
7,00
0.00
7,06
6.67
4.0
1.0
Max
imum
450.
0046
0.00
7,00
0.00
7,06
6.67
2.2
1.0
416.
6743
3.33
7,00
0.00
7,13
3.33
4.0
1.9
Type
of w
ork
Cat
egor
yTy
peM
inim
um /
Max
imum
Pr
ice
Saba
hSa
raw
ak
K. K
inab
alu
Cha
nge
(%)
Kuch
ing
Peru
baha
n (%
)
Dai
ly R
enta
l (R
M p
er u
nit)
Dai
ly R
enta
l
(R
M p
er u
nit)
Dai
ly
Rent
al
(RM
per
un
it)
Dai
ly
Rent
al
(R
M p
er
unit)
Dai
ly R
enta
l (R
M p
er u
nit)
Dai
ly R
enta
l
(R
M p
er u
nit)
Dai
ly
Rent
al
(RM
per
un
it)
Dai
ly
Rent
al
(R
M p
er
unit)
(RM
per
un
it)20
1420
1320
1420
1320
1420
1320
14
Road
wor
k
Pavi
ng
Equi
pmen
tAs
phal
t Pav
erM
inim
um55
3.33
553.
337,
583.
337,
600.
000.
00.
250
0.00
500.
007,4
00.0
07,4
00.0
00.
00.
0
Max
imum
650.
0065
0.00
8,78
3.33
8,78
3.33
0.0
0.0
600.
0060
0.00
8,50
0.00
8,50
0.00
0.0
0.0
Asph
alt T
rack
Pa
vers
Min
imum
638.
3363
8.33
8,31
6.67
8,31
6.67
0.0
0.0
600.
0060
0.00
7,80
0.00
7,80
0.00
0.0
0.0
Max
imum
716.
6771
6.67
9,51
6.67
9,51
6.67
0.0
0.0
700.
0070
0.00
9,23
3.33
9,23
3.33
0.0
0.0
Scre
eds
Min
imum
300.
0030
0.00
5,21
6.67
5,21
6.67
0.0
0.0
288.
3328
8.33
4,86
6.67
4,86
6.67
0.0
0.0
Max
imum
400.
0040
0.00
6,35
0.00
6,35
0.00
0.0
0.0
400.
0040
0.00
6,16
6.67
6,16
6.67
0.0
0.0
Truc
k an
d H
aula
ge
Dum
p Tr
uck
Dum
p Tr
uck
Min
imum
533.
3353
3.33
9,18
3.33
9,18
3.33
0.0
0.0
510.
0051
0.00
9,11
6.67
9,11
6.67
0.0
0.0
Max
imum
750.
0075
0.00
11,6
33.3
311
,633
.33
0.0
0.0
700.
0070
0.00
11,7
83.3
311
,783
.33
0.0
0.0
Lorr
yLo
rry
Min
imum
400.
0040
0.00
8,53
3.33
8,53
3.33
0.0
0.0
416.
6741
6.67
8,36
6.67
8,36
6.67
0.0
0.0
Max
imum
1,06
6.67
1,06
6.67
17,5
33.3
317
,533
.33
0.0
0.0
950.
0095
0.00
17,4
33.3
317
,433
.33
0.0
0.0
Hoi
stin
g an
d Li
ftin
g
Cra
neH
ydra
ulic
C
raw
ler C
rane
Min
imum
1,66
6.67
1,66
6.67
20,0
00.0
020
,000
.00
0.0
0.0
1,13
3.33
1,13
3.33
15,8
33.3
315
,833
.33
0.0
0.0
Max
imum
1,90
0.00
1,93
3.33
22,6
00.0
022
,600
.00
1.8
0.0
2,15
0.00
2,15
0.00
24,8
33.3
324
,833
.33
0.0
0.0
Mob
ile C
rane
Min
imum
516.
6751
6.67
8,16
6.67
8,16
6.67
0.0
0.0
500.
0050
0.00
7,50
0.00
7,50
0.00
0.0
0.0
Max
imum
1,26
6.67
1,26
6.67
17,2
33.3
317
,233
.33
0.0
0.0
1,26
6.67
1,26
6.67
16,0
00.0
016
,000
.00
0.0
0.0
Ap
pen
dix
3.4
0 A
vera
ge
Dai
ly R
enta
l Rat
es f
or
Maj
or
Mac
hin
erie
s in
Sab
ah a
nd
Sar
awak
in 2
013
an
d 2
014
(RM
/un
it) (
2)
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
240
Appe
ndix
3.4
1 A
vera
ge C
ost f
or B
uild
ing
Mat
eria
l Ind
ex b
y Bu
ildin
g C
ateg
ory
and
Regi
on in
Pen
insu
lar M
alay
sia
in 2
013
and
2014
(Jul
y 20
12 =
100
)
Build
ing
Cat
egor
y
2013
2014
AB
CD
EF
Aver
age
AB
CD
EF
Aver
age
Resi
dent
ial
99.8
99.6
101.
410
2.5
101.
898
.810
0.7
101.
710
1.1
103.
310
4.6
104.
410
1.1
102.
7
Hot
el99
.999
.410
1.4
102.
210
1.5
98.8
100.
510
1.7
101.
010
3.2
104.
510
3.9
101.
110
2.6
Offi
ce99
.699
.210
1.3
101.
910
1.6
98.6
100.
410
1.2
100.
110
2.9
103.
910
4.6
100.
810
2.3
Com
mer
cial
and
Indu
stria
l10
0.5
100.
010
1.3
102.
410
2.9
99.6
101.
110
2.1
100.
410
2.9
103.
810
5.4
101.
710
2.7
Educ
atio
n10
0.2
99.8
101.
810
2.9
102.
099
.010
1.0
102.
010
1.1
103.
610
5.0
104.
410
1.4
102.
9
Hea
lth99
.599
.110
1.2
101.
910
1.4
98.6
100.
310
1.3
100.
310
3.0
103.
910
3.8
100.
810
2.2
Soci
al F
acili
ty10
1.1
99.8
101.
610
2.5
101.
898
.910
1.0
101.
810
1.1
103.
410
4.7
104.
110
1.1
102.
7
Secu
rity
100.
299
.810
1.6
102.
710
2.0
99.1
100.
910
2.1
101.
310
3.3
104.
810
4.3
101.
410
2.9
Anci
llary
Bui
ldin
gs10
1.1
100.
710
2.7
103.
810
2.0
99.3
101.
610
3.4
103.
210
4.7
106.
610
3.8
102.
110
4.0
Not
e:
Regi
on A
: Pul
au P
inan
g, K
edah
and
Per
lis;
Re
gion
B: P
erak
;
Regi
on C
: Kua
la L
umpu
r, M
elak
a, N
eger
i Sem
bila
n an
d Se
lang
or;
Re
gion
D: J
ohor
;
Regi
on E
: Pah
ang;
Re
gion
F: K
elan
tan
and
Tere
ngga
nu.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
241
Appendix 3.42 Average Cost for Building Material Index by Building Category and Region in Sabah in 2013 and 2014 (July 2012 = 100)
Building Category
2013 2014
Kota Kinabalu
Sandakan Tawau AverageKota
KinabaluSandakan Tawau Average
Residential 100.2 100.2 101.3 100.6 100.7 101.1 102.0 101.3
Hotel 100.2 100.1 101.2 100.5 100.5 101.2 101.9 101.2
Office 99.9 99.9 101.4 100.4 100.1 100.8 102.0 101.0
Commercial and Industrial 100.2 100.4 101.2 100.6 100.7 101.8 102.0 101.5
Education 100.2 100.2 101.2 100.5 100.7 101.2 102.1 101.3
Health 100.0 100.1 101.1 100.4 100.3 101.2 101.9 101.1
Social Facility 100.2 100.4 101.3 100.6 100.5 101.5 102.0 101.3
Security 100.3 100.5 101.2 100.7 100.8 101.7 102.0 101.5
Ancillary Buildings 100.6 100.5 101.4 100.8 101.4 101.8 102.4 101.9
Appendix 3.43 Average Cost for Building Material Index by Building Category and Region in Sarawak in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
Kuching Sibu Miri Average Kuching Sibu Miri Average
Residential 100.1 99.9 100.1 100.0 102.2 101.7 102.1 102.0
Hotel 100.1 99.8 100.2 100.0 102.0 101.7 102.2 102.0
Office 99.7 99.6 100.1 99.8 102.0 101.3 101.9 101.7
Commercial and Industrial 99.6 99.5 99.6 99.6 101.1 100.8 100.6 100.8
Education 100.1 99.9 100.1 100.0 102.1 101.8 102.1 102.0
Health 99.9 99.7 100.3 100.0 101.7 101.4 102.1 101.7
Social Facility 100.0 99.8 100.2 100.0 102.1 101.7 102.1 102.0
Security 100.1 99.8 100.1 100.0 102.0 101.7 101.9 101.9
Ancillary Buildings 100.5 100.4 100.3 100.4 103.0 103.2 102.7 103.0
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
242
Appendix 3.44 Average Cost Index for a Unit of Construction Materials by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)
Construction Material2013 2014
A B C D E F Average A B C D E F Average
Cement 101.2 104.0 102.9 103.1 100.0 101.5 102.1 105.1 106.8 109.5 108.9 100.0 106.1 106.1
Aggregate 103.5 100.4 107.0 100.2 100.4 98.9 101.7 106.0 102.7 115.6 104.3 105.4 98.6 105.4
Sand 102.3 99.9 101.4 105.0 100.9 103.3 102.1 111.3 100.0 104.3 108.6 104.8 107.0 106.0
Steel Reinforcement 97.5 94.6 98.8 95.0 100.8 97.9 97.4 95.0 91.7 97.3 94.8 104.6 97.2 96.8
Ready Mix Concrete 102.9 101.5 101.4 102.5 100.2 97.1 100.9 103.4 103.2 102.5 109.4 100.8 99.9 103.2
Bricks 100.2 99.7 99.2 99.0 98.2 100.7 99.5 102.5 99.6 101.9 100.0 98.6 104.1 101.1
Roofing 100.0 100.1 99.7 101.3 100.1 100.1 100.2 100.6 100.6 99.9 102.2 100.7 100.2 100.7
Wall & Floor Tiles 100.5 100.5 100.5 100.0 100.5 100.1 100.4 109.0 106.6 107.1 100.0 113.8 107.2 107.3
Ceiling Board 99.0 99.5 99.3 99.6 119.8 99.0 102.7 101.1 100.8 99.7 103.0 129.6 100.2 105.7
Plumbing Works 101.2 100.6 100.0 99.4 100.1 101.5 100.5 103.0 102.2 100.7 101.9 102.4 103.3 102.3
Sanitary Fittings 100.6 102.3 100.0 101.5 100.0 100.1 100.8 101.5 106.1 99.8 100.1 100.1 103.0 101.8
Paint 101.0 101.0 103.0 100.3 100.2 102.0 101.3 103.2 101.8 104.5 100.4 100.9 104.6 102.6
Glass 102.0 100.2 102.2 102.0 100.0 100.2 101.1 104.0 101.7 105.7 104.5 105.7 104.3 104.3
Steel & Metal Sections 99.6 96.9 97.3 98.7 105.6 99.8 99.7 100.3 93.5 95.9 97.2 110.5 101.0 99.7
Timber 84.4 84.4 84.4 84.4 84.4 84.4 84.4 87.7 87.7 87.7 87.7 87.7 87.7 87.7
Plywood 75.2 75.2 75.2 75.2 75.2 75.2 75.2 68.1 68.1 68.1 68.1 68.1 68.1 68.1
Ironmongery 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 98.4 100.0 100.0 99.7
Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
243
Appendix 3.45 Average Cost Index for a Unit of Construction Materials by Major City in Sabah in 2013 and 2014 (July 2012 = 100)
Construction Material2013 2014
K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average
Cement 100.5 100.4 100.0 100.3 102.1 101.5 100.0 101.2
Aggregate 101.9 101.7 100.3 101.3 101.9 102.8 100.4 101.7
Sand 104.0 97.1 100.0 100.4 105.1 97.9 100.0 101.0
Steel Reinforcement 95.6 97.8 99.6 97.7 92.7 97.4 99.5 96.5
Ready Mix Concrete 101.0 100.0 102.1 101.0 101.0 100.0 102.1 101.0
Bricks 100.7 99.7 100.0 100.1 100.4 100.5 100.0 100.3
Roofing 100.2 108.2 100.0 102.8 100.4 116.8 100.0 105.7
Wall & Floor Tiles 100.9 99.4 104.3 101.5 103.8 99.7 104.3 102.6
Ceiling Board 100.0 100.0 100.0 100.0 100.4 103.7 100.0 101.4
Plumbing Works 102.8 99.5 99.2 100.5 104.6 100.5 99.2 101.4
Sanitary Fittings 104.1 99.7 102.6 102.1 104.7 99.8 102.7 102.4
Paint 101.5 100.0 102.4 101.3 102.0 100.3 102.4 101.6
Glass 100.0 100.0 100.0 100.0 99.7 100.0 100.0 99.9
Steel & Metal Sections 99.3 98.4 100.0 99.2 99.0 97.7 100.0 98.9
Timber 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
Plywood 97.9 97.9 97.9 97.9 82.9 82.9 82.9 82.9
Ironmongery 101.1 99.9 100.0 100.3 101.1 102.6 100.0 101.2
Appendix 3.46 Average Cost Index for a Unit of Construction Materials by Major City in Sarawak in 2013 and 2014 (July 2012 = 100)
Construction Material2013 2014
Kuching Sibu Miri Average Kuching Sibu Miri Average
Cement 100.0 100.0 100.0 100.0 104.8 106.5 100.0 103.8
Aggregate 100.5 102.4 100.1 101.0 102.0 103.0 100.4 101.8
Sand 99.2 100.0 99.3 99.5 99.2 100.0 97.7 99.0
Steel Reinforcement 96.0 95.3 99.7 97.0 94.7 93.1 99.7 95.8
Ready Mix Concrete 100.2 101.0 94.6 98.6 104.5 106.6 100.7 103.9
Bricks 101.6 100.1 100.6 100.8 99.9 101.8 102.0 101.2
Roofing 98.7 96.5 99.6 98.3 100.3 96.5 100.2 99.0
Wall & Floor Tiles 99.8 100.0 100.6 100.1 108.4 100.0 102.5 103.6
Ceiling Board 100.0 100.1 100.0 100.0 100.0 101.6 100.1 100.6
Plumbing Works 101.5 99.9 96.6 99.3 104.7 100.1 104.7 103.2
Sanitary Fittings 104.0 100.0 101.9 102.0 104.3 100.0 101.9 102.1
Paint 101.0 99.8 102.8 101.2 98.9 99.1 104.0 100.7
Glass 100.1 100.3 100.0 100.1 103.6 104.2 100.0 102.6
Steel & Metal Sections 97.1 97.3 96.3 96.9 95.2 95.2 92.1 94.2
Timber 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
Plywood 102.9 102.9 102.9 102.9 103.5 103.5 103.5 103.5
Ironmongery 100.0 100.0 100.0 100.0 100.0 101.7 100.0 100.6
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
244
Appendix 3.47 Average Cost Index for Construction Materials by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
A B C D E F Average A B C D E F Average
Residental 100.7 100.7 100.7 100.0 100.3 100.3 100.5 101.6 101.6 101.8 102.6 100.8 100.8 101.5
Hotel 100.8 100.8 100.7 98.8 100.6 100.6 100.4 101.6 101.6 101.8 103.3 101.1 101.1 101.8
Office 100.8 100.8 100.7 99.3 100.5 100.5 100.4 101.6 101.6 101.8 102.9 101.0 101.0 101.7
Commercial and Industrial 100.8 100.8 100.7 100.4 100.2 100.2 100.5 101.7 101.7 101.8 102.0 100.6 100.6 101.4
Education 100.8 100.8 100.7 99.5 100.4 100.4 100.4 101.6 101.6 101.8 102.9 100.9 100.9 101.6
Health 100.7 100.7 100.7 99.6 100.4 100.4 100.4 101.5 101.5 101.7 103.0 101.0 101.0 101.6
Social Facility 100.6 100.6 100.6 99.9 100.5 100.5 100.5 101.4 101.4 101.5 103.1 101.0 101.0 101.6
Security 101.2 101.2 100.7 100.1 100.3 100.3 100.6 101.6 101.6 101.8 102.5 100.8 100.8 101.5
Ancillary Buildings 100.5 100.5 100.5 100.8 100.3 100.3 100.5 101.3 101.3 101.5 102.8 100.9 100.9 101.5
Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.
Appendix 3.48 Average Cost Index for Construction Materials by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average
Residential 100.7 100.7 100.7 100.7 101.4 101.4 101.4 101.4
Hotel 100.8 100.8 100.8 100.8 101.6 101.6 101.6 101.6
Office 100.8 100.8 100.8 100.8 101.5 101.5 101.5 101.5
Commercial and Industrial 100.6 100.6 100.6 100.6 101.4 101.4 101.4 101.4
Education 100.7 100.7 100.7 100.7 101.5 101.5 101.5 101.5
Health 100.7 100.7 100.7 100.7 101.4 101.4 101.4 101.4
Social Facility 100.0 100.0 100.0 100.0 101.4 101.4 101.4 101.4
Security 99.4 99.4 99.4 99.4 101.4 101.4 101.4 101.4
Ancillary Buildings 100.0 100.0 100.0 100.0 101.2 101.2 101.2 101.2
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
245
Appendix 3.49 Average Average Cost Index for Construction Materials by Building Category and Region in Sarawak in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
Kuching Sibu Miri Average Kuching Sibu Miri Average
Residential 99.7 99.7 99.7 99.7 100.4 100.4 100.4 100.4
Hotel 99.3 99.3 99.3 99.3 100.4 100.4 100.4 100.4
Office 99.4 99.4 99.4 99.4 100.2 100.2 100.2 100.2
Commercial and Industrial 99.9 100.4 99.9 100.1 100.2 100.2 100.2 100.2
Education 99.5 99.5 99.5 99.5 100.4 100.4 100.4 100.4
Health 99.6 99.6 99.6 99.6 100.5 100.5 100.5 100.5
Social Facility 97.9 97.9 97.9 97.9 100.6 100.6 100.6 100.6
Security 97.9 97.9 97.9 97.9 100.4 100.4 100.4 100.4
Ancillary Buildings 98.2 98.2 98.2 98.2 100.6 100.6 100.6 100.6
Appendix 3.50 Average Cost Index for a Construction Workers by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)
Construction Workers2013 2014
A B C D E F Average A B C D E F Average
General Workers 105.1 110.4 116.9 118.6 114.9 103.5 111.6 109.2 109.3 119.6 115.8 112.5 108.7 112.5
Concreters 102.9 110.0 107.4 109.7 104.8 102.3 106.2 106.5 108.3 111.1 114.3 109.8 106.1 109.4
Steel Bar Benders 101.1 103.4 108.9 117.4 105.1 101.9 106.3 106.7 103.1 114.4 122.8 110.6 105.3 110.5
Carpenters (Formwork) 100.9 102.9 105.6 117.2 103.9 101.9 105.4 106.6 104.6 111.0 122.7 108.7 105.6 109.9
Carpenters (Joinery) 101.2 98.7 104.1 103.1 102.2 101.7 101.8 105.7 107.4 113.1 112.3 107.6 105.0 108.5
Bricklayers 107.4 100.5 107.1 114.9 106.6 102.0 106.4 115.6 109.1 113.2 120.7 105.8 105.9 111.7
Roofers 102.0 106.3 104.2 106.6 104.0 101.8 104.2 104.4 109.9 111.5 110.9 106.5 105.1 108.1
Structural Steel Workers 102.4 104.8 100.4 105.2 105.8 101.6 103.4 105.1 106.7 109.1 106.6 108.4 104.8 106.8
Plumbers 103.5 106.8 103.3 109.7 105.6 102.0 105.2 108.3 108.9 116.4 117.7 113.5 105.8 111.8
Plasterers 107.7 102.2 105.3 105.4 103.7 102.0 104.4 113.0 124.7 107.9 112.4 107.8 106.0 112.0
Tillers 100.5 104.8 105.2 107.0 107.0 101.8 104.4 102.7 118.3 110.4 111.7 110.4 105.3 109.8
Painters 101.4 104.4 101.9 105.1 104.9 102.2 103.3 105.0 112.1 107.6 110.7 109.7 106.4 108.6
Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
246
Appendix 3.51 Average Cost Index for a Construction Workers by Major City in Sabah in 2013 and 2014 (July 2012 = 100)
Construction Workers2013 2014
K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average
General Workers 102.9 103.0 103 103.0 108.1 108.3 108.7 108.4
Concreters 101.8 102.0 101.8 101.9 105.1 105.9 105.1 105.4
Steel Bar Benders 101.7 101.9 101.7 101.8 104.7 105.3 105 105.0
Carpenters (Formwork) 101.7 101.8 101.7 101.7 104.6 105.5 104.6 104.9
Carpenters (Joinery) 101.5 101.7 101.5 101.6 104.1 105 104.2 104.4
Bricklayers 101.8 102.1 101.9 101.9 105.0 106.2 105.1 105.4
Roofers 101.5 101.9 101.6 101.7 104.4 105.4 104.4 104.7
Structural Steel Workers 101.4 101.8 104.1 102.4 104.2 105.2 106.9 105.4
Plumbers 101.6 101.7 103.3 102.2 104.5 104.9 106.1 105.2
Plasterers 101.7 101.9 101.8 101.8 104.7 105.7 104.9 105.1
Tillers 101.5 101.8 101.6 101.6 104.2 105.1 104.4 104.6
Painters 101.8 102.0 101.9 101.9 105.0 105.9 105.2 105.4
Appendix 3.52 Average Cost Index for a Construction Workers by Major City in Sarawak in 2013 and 2014 (July 2012 = 100)
Construction Workers2013 2014
Kuching Sibu Miri Average Kuching Sibu Miri Average
General Workers 103.2 103 103 103.1 108.8 108.2 108.9 108.6
Concreters 101.8 101.8 101.8 101.8 104.8 105.1 105.1 105.0
Steel Bar Benders 101.8 101.8 101.8 101.8 104.7 105.0 105.2 105.0
Carpenters (Formwork) 101.7 101.6 101.7 101.7 104.5 104.6 104.9 104.7
Carpenters (Joinery) 101.5 101.5 101.5 101.5 104.1 104.3 104.5 104.3
Bricklayers 102.0 101.9 102.0 102.0 105.4 105.5 106.0 105.6
Roofers 101.6 101.5 101.6 101.6 104.4 104.3 104.6 104.4
Structural Steel Workers 101.5 101.2 101.5 101.4 104.2 103.4 104.3 104.0
Plumbers 101.7 101.7 101.7 101.7 104.5 104.9 105.2 104.9
Plasterers 101.7 101.7 101.7 101.7 104.7 104.9 105 104.9
Tillers 101.6 101.6 101.6 101.6 104.3 104.6 104.9 104.6
Painters 101.8 101.3 101.9 101.7 104.9 104.7 105.6 105.1
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
247
Appendix 3.53 Average Cost Index for a Construction Workers by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
A B C D E F Average A B C D E F Average
Residential 103.5 105.5 108.8 113.7 107.6 102.4 106.9 108.3 110.6 113.4 117.0 110.0 106.5 111.0
Hotel 103.9 105.2 108.8 113.8 107.5 102.4 106.9 108.9 110.6 113.5 117.4 109.8 106.5 111.1
Office 103.1 105.5 109.2 114.8 107.6 102.4 107.1 108.0 108.8 113.8 118.0 110.1 106.5 110.9
Commercial and Industrial 103.6 105.9 108.1 112.3 107.9 102.4 106.7 107.9 109.7 113.2 114.8 109.6 106.4 110.3
Education 103.8 105.5 109.3 114.2 107.8 102.4 107.2 108.7 110.2 113.7 117.3 109.9 106.6 111.1
Health 103.9 105.5 109.3 114.1 107.9 102.4 107.2 108.8 110.2 113.9 117.3 110.0 106.7 111.2
Social Facility 103.6 105.5 108.9 113.6 107.6 102.4 106.9 108.3 110.2 113.5 116.8 109.8 106.5 110.9
Security 104.0 105.4 108.9 113.6 107.6 102.4 107.0 108.8 110.6 113.5 116.8 109.7 106.5 111.0
Ancillary Buildings 104.6 105.5 109.5 113.4 107.9 102.5 107.2 109.6 112.2 113.3 116.5 109.6 106.7 111.3
Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.
Appendix 3.54 Average Cost Index for a Construction Workers by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average
Residential 102.0 102.2 102.1 102.1 105.6 106.2 105.9 105.9
Hotel 102.0 102.2 102.2 102.1 105.5 106.2 105.9 105.9
Office 102.0 102.2 102.1 102.1 105.6 106.3 105.9 105.9
Commercial and Industrial 102.0 102.2 102.5 102.2 105.6 106.3 106.3 106.1
Education 102.0 102.2 102.2 102.1 105.7 106.3 106.0 106.0
Health 102.1 102.2 102.2 102.2 105.7 106.4 106.0 106.0
Social Facility 102.0 102.2 102.2 102.1 105.6 106.3 105.9 105.9
Security 102.0 102.2 102.2 102.1 105.6 106.3 105.9 105.9
Ancillary Buildings 102.1 102.3 102.1 102.2 105.7 106.5 106.0 106.1
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
248
Appendix 3.55 Average Cost Index for a Construction Workers by Building Category and Major City in Sarawak in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
Kuching Sibu Miri Average Kuching Sibu Miri Average
Residential 102.1 102.1 102.1 102.1 105.8 105.7 106.2 105.9
Hotel 102.1 102.1 102.1 102.1 105.8 105.8 106.2 105.9
Office 102.1 102.1 102.1 102.1 105.8 105.8 106.2 105.9
Commercial and Industrial 102.1 102.0 102.1 102.1 105.8 105.6 106.1 105.8
Education 102.2 102.1 102.1 102.1 105.9 105.9 106.3 106.0
Health 102.2 102.1 102.1 102.1 106.0 105.9 106.4 106.1
Social Facility 102.1 102.1 102.1 102.1 105.8 105.7 106.2 105.9
Security 102.1 102.1 102.1 102.1 105.9 105.8 106.2 106.0
Ancillary Buildings 102.2 102.1 102.2 102.2 106.0 106.0 106.4 106.1
Appendix 3.56 Average Cost Index for a Unit of Machinery by Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)
Machinery Category2013 2014
A B C D E F Average A B C D E F Average
Excavator / Backhoe 100.0 100.0 100.0 102.5 100.3 100.3 100.5 100.4 100.4 105.0 104.2 101.3 101.3 102.1
Mobile Crane 100.9 100.9 100.8 100.7 100.0 100.0 100.6 101.9 101.9 102.1 101.2 100.3 100.3 101.3
Bar Cutter / Bender 101.2 101.2 100.8 94.5 101.4 101.4 100.1 101.6 101.6 101.4 106.3 102.0 102.0 102.5
Concrete Mixer 100.4 100.4 100.4 101.4 100.6 100.6 100.6 101.3 101.3 101.9 102.1 101.3 101.3 101.5
Power Trowel 100.0 100.0 101.5 101.1 102.2 102.2 101.2 100.0 100.0 99.3 102.3 102.2 102.2 101.0
Vibrator c/w Poker 96.9 96.9 101.0 102.1 100.1 100.1 99.5 102.0 102.0 103.8 103.4 100.8 100.8 102.1
Marble / Granite Polisher 100.0 100.0 100.0 101.2 100.0 100.0 100.2 100.0 100.0 103.1 103.6 100.0 100.0 101.1
Note: Region A: Pulau Pinang, Kedah and Perlis; Region B: Perak; Region C: Kuala Lumpur, Melaka, Negeri Sembilan and Selangor; Region D: Johor; Region E: Pahang; Region F: Kelantan and Terengganu.
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
249
Appendix 3.57 Average Cost Index for a Unit of Machinery by Major City in Sabah in 2013 and 2014 (July 2012 = 100)
Machinery Category2013 2014
K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average
Excavator / Backhoe 100.1 100.1 100.1 100.1 100.7 100.7 100.7 100.7
Mobile Crane 100.6 100.6 100.6 100.6 101.4 101.4 101.4 101.4
Bar Cutter / Bender 101.3 101.3 101.3 101.3 102.1 102.1 102.1 102.1
Concrete Mixer 100.8 100.8 100.8 100.8 101.3 101.3 101.3 101.3
Power Trowel 101.3 101.3 101.3 101.3 101.5 101.5 101.5 101.5
Vibrator c/w Poker 101.6 101.6 101.6 101.6 102.4 102.4 102.4 102.4
Marble / Granite Polisher 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
Appendix 3.58 Average Cost Index for a Unit of Machinery by Major City in Sarawak in 2013 and 2014 (July 2012 = 100)
Machinery Category2013 2014
Kuching Sibu Miri Average Kuching Sibu Miri Average
Excavator / Backhoe 100.5 100.5 100.5 100.5 101.8 101.8 101.8 101.8
Mobile Crane 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
Bar Cutter / Bender 97.8 97.8 97.8 97.8 100.6 100.6 100.6 100.6
Concrete Mixer 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
Power Trowel 101.4 101.4 101.4 101.4 101.4 101.4 101.4 101.4
Vibrator c/w Poker 100.3 100.3 100.3 100.3 101.0 101.0 101.0 101.0
Marble / Granite Polisher 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
STATISTICS AND CONSTRUCTION DEMAND 2015-2016
CHAPTER 3 APPENDIX
250
Appendix 3.59 Average Cost Index for a Unit of Machinery by Building Category and Region in Peninsular Malaysia in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
A B C D E F Average A B C D E F Average
Residential 97.8 96.5 97.7 96.9 98.9 96.9 97.5 98.5 96.3 98.3 98.4 101.8 98.5 98.6
Hotel 98.0 96.7 97.9 97.0 98.7 97.0 97.6 98.4 96.5 98.5 98.7 101.2 98.5 98.6
Office 98.3 96.9 98.4 97.2 99.4 97.2 97.9 98.8 96.8 99.0 98.8 102.7 98.7 99.1
Commercial and Industrial 99.2 97.5 98.5 98.3 101.0 98.4 98.8 99.6 96.5 98.5 99.3 103.9 99.7 99.6
Education 98.3 96.8 98.1 97.3 99.1 97.2 97.8 98.7 96.5 98.6 98.9 101.7 98.7 98.9
Health 97.6 96.3 97.7 96.6 98.6 96.9 97.3 98.1 96.0 98.3 98.1 101.2 98.3 98.3
Social Facility 98.4 97.1 98.4 97.6 99.2 97.3 98.0 98.8 96.9 98.8 99.2 101.7 98.7 99.0
Security 98.5 97.2 98.2 97.7 99.4 97.5 98.1 99.1 96.9 98.7 99.2 101.9 99.0 99.1
Ancillary Buildings 99.2 98.0 98.9 98.4 98.8 97.5 98.5 100.0 98.2 100.0 101.1 100.6 99.5 99.9
Appendix 3.60 Average Cost Index for a Unit of Machinery by Building Category and Major City in Sabah in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
K. Kinabalu Sandakan Tawau Average K. Kinabalu Sandakan Tawau Average
Residential 99.4 99.2 100.9 99.8 98.2 98.5 100.1 98.9
Hotel 99.3 99.2 100.7 99.7 98.2 98.9 100.1 99.1
Office 99.0 99.1 101.1 99.7 98.1 98.7 100.5 99.1
Commercial and Industrial 99.4 99.7 100.6 99.9 98.6 99.9 100.3 99.6
Education 99.2 99.1 100.8 99.7 98.1 98.6 100.1 98.9
Health 99.1 99.2 100.7 99.7 97.9 99.0 100.1 99.0
Social Facility 99.3 99.5 100.9 99.9 98.1 99.3 100.2 99.2
Security 99.5 99.6 100.8 100.0 98.5 99.6 100.1 99.4
Ancillary Buildings 99.8 99.5 101.0 100.1 98.9 99.2 100.4 99.5
Appendix 3.61 Average Cost Index for a Unit of Machinery by Building Category and Major City in Sarawak in 2013 and 2014 (July 2012 = 100)
Building Category2013 2014
Kuching Sibu Miri Average Kuching Sibu Miri Average
Residential 99.1 98.9 99.2 99.1 100.5 99.8 100.1 100.1
Hotel 99.2 98.8 99.3 99.1 100.2 99.8 100.4 100.1
Office 98.9 98.7 99.4 99.0 100.7 99.7 100.5 100.3
Commercial and Industrial 98.6 98.3 98.5 98.5 99.1 98.7 98.4 98.7
Education 99.0 98.8 99.1 99.0 100.2 99.8 100.1 100.0
Health 99.0 98.6 99.4 99.0 99.8 99.4 100.3 99.8
Social Facility 99.1 98.7 99.3 99.0 100.5 99.8 100.3 100.2
Security 99.2 98.8 99.1 99.0 100.3 99.8 100 100.0
Ancillary Buildings 99.6 99.5 99.2 99.4 101.4 101.7 100.6 101.2