ccr payload for the astrobotic lander

Post on 04-Jan-2016

34 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

CCR Payload for the Astrobotic Lander. 30 March 2011. - PowerPoint PPT Presentation

TRANSCRIPT

CCR Payload for the Astrobotic Lander

30 March 2011

--------------------------------------------Kris Zacny, PhDVice PresidentDirector, Technology Exploration Group

Honeybee Robotics Spacecraft Mechanisms Corporation 398 W Washington Blvd., Suite 200, Pasadena, CA 91103ph: 626-389-8459 / fax: 626-689-4823 / mob: 510-207-4555 / blackberry: 646-508-9807 zacny@honeybeerobotics.comhttp:/www.honeybeerobotics.com

2

CCR System

CCR Deployment Mechanism

3

CCR Deployment Sequence [1]

• CCR Deployment Mechanism in stowed position

• Pin Puller #1 is actuated, releasing the spring loaded linear stage

• Linear stage is on rollers for smooth deployment

1

Rover track and landing thrusters hidden for clarity

4

CCR Deployment Sequence [2]

1

2

3

• Linear stage reaches end of travel• Roller (1) constraining CCR is free,

due to slot in roller track (2)• Preloaded, redundant torsion springs

(3) cause CCR rod to pivot upwards

5

CCR Deployment Sequence [3]

• Pivot Assembly reaches hard stop. Limit switch is triggered

• Pin Puller #2 is actuated, releasing the CCR Rod

2

6

CCR Deployment Sequence [4]

2

3

1

4

• Nose Cone (3) contacts ground

• Puncture Rod (2) is pushed upwards. Tip punctures sealed gas cylinder (1)

• Gas is released from gas cylinder, exiting out the nose cone jets (4)

• CCR Rod plunges into the soil

CCR Rod is free to slide within the sleeve

7

CCR Deployment Sequence [5]

3

3

• (Left) Non-contact position sensor is triggered at end of travel

• (Center) Pin Puller #3 is actuated, releasing spring loaded arms simultaneously

• (Right) CCR Rod continues to plunge into soil unhindered

8

CCR Deployed [1]

9

CCR Deployed [2]

~39”

top related