cbms survey results brgy. oring-oring, brooke’s …...priority projects for 2005-2006 p350,000.00...

Post on 23-Jun-2020

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

CBMS Survey ResultsBrgy. Oring-Oring,

Brooke’s Point, Palawan

Demographic CharacteristicsDemographic Characteristics

Land Area: 1,456 Has.Land Area: 1,456 Has.

Households: 277Households: 277

Population: 1,322Population: 1,322Male: 678Male: 678Female: 644Female: 644

41

Number of households

101

84

19

32

Health and Nutrition

• 2.24% - Prevalence of Malnutrition among 0-5 years old children

• 2 infant deaths out of 38 infants

• 1 child death out of the 222 children aged 1-6 years old

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Prevalence of Malnutrition among 0-5 years old children

Proportion of Infant deaths

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Taking

Proportion of Child deaths (1-6 years old)

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Access to Basic Services

• 88.81% - Proportion of households with access to safe water supply

• 9.4% - Proportion of households with access to sanitary toilet facilities

• 7.22% - Proportion of households with access to electricity

Proportion of households with access to safe water supply

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Proportion of households with access to sanitary toilet facility

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Taking

Proportion of households with access to electricity

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Shelter

• 84.5% - Proportion of households not living in makeshift housing

• 99.3% - Proportion of households who are formal settlers

Proportion of households not living in makeshift housing

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Proportion of households who are formal settlers

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Peace and Order

• 0.3% - Proportion of households with no victims of crime

Proportion of households with no victims of crime

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Income and Livelihood

• 27.44% - Proportion of households with income greater than poverty threshold

• 41.16% - Proportion of households with income greater than subsistence threshold

• 5.42% - Proportion of households who experienced food shortage

Income and Livelihood

• 83.64% - Employment rate

• 67.4% - Underemployment rate

Proportion of households with income greater than poverty threshold

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Proportion of households with income greater than the subsistence threshold

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Proportion of households who experienced food shortage

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Employment Rate by Purok

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Underemploy-ment rate by purok

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Basic Education and Literacy

• 68.04% - Elementary school participation rate (6-11 years old)

• 27.5% - Secondary school participation rate (12-15 years old)

• 67.30% - School participation rate (6-16 years old)

• 87.88% - Literacy rate (10 years old and above)

Elementary School Participation Rate

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Secondary School Participation Rate

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

School Participation Rate

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Literacy Rate

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

Community Participation

• 2.34% - Proportion of households with at least 1 member in community organization

Proportion of households who have members in community organizations

Taking

Cadjasan

Panamoton

Matangkay

Venturanza

PRIORITY NEEDSPRIORITY NEEDS

Based on the CBMS results and validation Based on the CBMS results and validation exercise, the following problems were exercise, the following problems were identified:identified:

•• Poor sanitationPoor sanitation•• Low access to electricityLow access to electricity•• Many are poorMany are poor•• Low participation of children in schoolLow participation of children in school•• Low participation in community organizationsLow participation in community organizations

PROGRAMS/PROJECTS PROGRAMS/PROJECTS IMPLEMENTED IN THE IMPLEMENTED IN THE BARANGAYBARANGAY

Construction feeder road at Construction feeder road at SitioSitio VenturanzaVenturanza

•• The The barangaybarangay was able to construct a 1.2 was able to construct a 1.2 kilometer feeder road at kilometer feeder road at SitioSitio VenturanzaVenturanza. .

•• The opening up of this access road would The opening up of this access road would help farmers to transport their goods to help farmers to transport their goods to nearby markets.nearby markets.

Expansion of electrification to Expansion of electrification to SitioSitio TakingTaking

•• The The barangaybarangay used funds provided by used funds provided by National Government (Share from the National Government (Share from the ManampalaManampala Fund). PALECO provided the Fund). PALECO provided the post for the electric wire. The program post for the electric wire. The program provided electricity to 50 houses along the provided electricity to 50 houses along the national highway. national highway.

Access to ElectricityAccess to Electricity(After Intervention)(After Intervention)

VenturanzaTaking

Cadjasan

Panamoton

Matangkay

After Intervention

Proportion of households with access

to electricity15.2 %

Before Intervention

Proportion of households with access to electricity

7.2%

Water system project at Water system project at SitioSitioTakingTaking

•• They have installed pressure pump and They have installed pressure pump and jetmaticjetmatic pump water pump in pump water pump in SitioSitio Taking Taking which provided safe water source for 30 which provided safe water source for 30 households. The fund for the program was households. The fund for the program was given by Congressman given by Congressman MitraMitra

Access to Safe WaterAccess to Safe Water(After Intervention)(After Intervention)

Venturanza Taking

Matangkay

Panamoton

Cadjasan

After Intervention

Proportion of households with access

to safe water89.2%

Before Intervention

Proportion of households with access

to safe water88.8%

Construction of public toilet in Construction of public toilet in SitioSitio CadjasanCadjasan and and SitioSitio TakingTaking•• A public toilet in A public toilet in SitioSitio CadjasanCadjasan was was

donated by the Islamic World Committee. donated by the Islamic World Committee. The public toilet is being used and The public toilet is being used and maintained by 10 households in the maintained by 10 households in the sitiositio..

•• The public toilet in The public toilet in SitioSitio Taking was Taking was donated by a businessman donated by a businessman -- Mr. Jake Mr. Jake AbdurahmanAbdurahman. The public toilet is being . The public toilet is being shared and maintained by 10 households shared and maintained by 10 households in the in the sitiositio..

Access to Sanitary ToiletAccess to Sanitary Toilet(After Intervention)(After Intervention)

VenturanzaTaking

Cadjasan

Panamoton

Matangkay

VenturanzaTaking

Cadjasan

Panamoton

Matangkay

After Intervention

Proportion of households with access to sanitary toilet facility

24.9 %

Before Intervention

Proportion of households with access to sanitary toilet facility

9.4%

Constructed 1 unit 2Constructed 1 unit 2--room room school buildingschool building

•• The The barangaybarangay was able to add two new was able to add two new classrooms in classrooms in OringOring OringOring Elementary Elementary School. The 1 unit 2School. The 1 unit 2--room building with room building with toilet facility was constructed with the toilet facility was constructed with the fund support of P720,000.00 from fund support of P720,000.00 from Congressman Congressman MitraMitra..

New Day Care Center at New Day Care Center at SitioSitioTakingTaking

•• In In SitioSitio Taking, the Taking, the barangaybarangay constructed constructed a 1 unit day care center building with a 1 unit day care center building with comfort room.comfort room.

“With the construction of these new “With the construction of these new educational facilities, participation in educational facilities, participation in school is expected to increase”school is expected to increase”

Irrigation facility in Irrigation facility in SitioSitioVenturanzaVenturanza•• An irrigation facility was installed in An irrigation facility was installed in SitioSitio

VenturanzaVenturanza with funds coming from NIAwith funds coming from NIA--DAR covering about agricultural 20 DAR covering about agricultural 20 hectares of agricultural land. Eight hectares of agricultural land. Eight households benefited from the program. households benefited from the program.

PRIORITY PROJECTS FOR PRIORITY PROJECTS FOR 20052005--20062006

National/ LocalP150,000.003. Development of Sea Spring

NationalP200,000,000.002. Delineation of alternative Port Area and Development

National/ LocalP200,000c. Museum building

NationalP25,000/sitio1 unit/sitiob. Public toilets to all sitio

NationalP350.000.00a. Public market

1. Construction of

SOURCECOSTUNITSPROJECTS

PRIORITY PROJECTS FOR PRIORITY PROJECTS FOR 20052005--20062006

NationalP350,000.007. JAMA MAPON Cultural Center

NationalP350,000.006. Tribal Hall

Sitio VenturanzaARISP-DAR

P2,000,000.005. Opening of Brgy Road at

Sitio Cadjasan

National/LocalP60,000.002 kms

4. Expansion of Electrification to

SOURCECOSTUNITSPROJECTS

top related