case study_the lifter
Post on 18-Nov-2014
121 Views
Preview:
TRANSCRIPT
CASE STUDYCASE STUDY
The Lifter ProjectThe Lifter Project
ScenarioScenario
The lifter company identified a demand for The lifter company identified a demand for new model.new model.
A need of new management control A need of new management control system.system.
I.e. simultaneousI.e. simultaneous engineeringengineering
New methodology is new and hard to New methodology is new and hard to adapt by the companyadapt by the company
The execution of new methodThe execution of new method
Reports were compiled at the end of Reports were compiled at the end of August 1992.August 1992.
Plans were re-processed to launch the Plans were re-processed to launch the project in March 1993.project in March 1993.
I.e. further resource I.e. further resource re-allocationre-allocation
The crisisThe crisis
Due to further resource re-allocation & Due to further resource re-allocation & more engineering activities the cost of the more engineering activities the cost of the project increasedproject increased
I.e. budget overrunI.e. budget overrun
Differences in profile of costs Differences in profile of costs incurred due to working towards incurred due to working towards
concurrent engineeringconcurrent engineering
DesignDesign
PurchasingPurchasing
Manufacture engineeringManufacture engineering
ToolingTooling
Testing (for each milestone)Testing (for each milestone)
External fittingExternal fitting
Quality testingQuality testing
DevelopmentDevelopment
The possibility of the project will The possibility of the project will be completed with only small be completed with only small
amount of slippageamount of slippage NoNo. because they spend more time on . because they spend more time on
manufacturing processes & testing. manufacturing processes & testing.
Some times after testing they need to Some times after testing they need to develop the product again develop the product again
to ensure the quality & to ensure the quality & satisfy the stack holders.satisfy the stack holders.
The helpful data other then costs The helpful data other then costs incurred & estimated times for incurred & estimated times for project manager to Form a project manager to Form a better overall picture of progressbetter overall picture of progress
Quality manual (Hierarchy of quality Quality manual (Hierarchy of quality system)system)
Internal/external audit of quality system Internal/external audit of quality system
Documentation reference manualDocumentation reference manual
Internal audit data of previous projectsInternal audit data of previous projects
END OF CASE STUDYEND OF CASE STUDY
top related