case study remediation in neath port talbot · 2017. 7. 18. · 5/26/2011 1 case study remediation...

Post on 04-Apr-2021

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

5/26/2011

1

Case Study

Remediation in Neath Port TalbotSt Modwen Developments

Richard Mitchener

Mike Poland

Remediation Approach

Key sites in former BP portfolio in South Wales

● Management of BP Legacy

– “Suitable for use” not definable at present

– Boundary protection

– Mass reduction => MNA can occur

•Perception Management

•Interaction of site specific factors on:

Coed Darcy

Baglan

Transit

5/26/2011

2

•Former Llandarcy Oil Refinery

•Junction 43 M4

•420 hectares

•Coed D’Arcy Business Park

•West and south – Crymlyn Bog

Coed Darcy

5/26/2011

3

Llandarcy Transformation…

5/26/2011

4

Environmental Risk Management

Historical land-use that has resulted in the release of contamination to the ground and groundwater.

The principal contaminants:

● Petroleum hydrocarbons

● Chlorinated Solvents

● Metals and Asbestos

● Varied spatial distribution

5/26/2011

5

Conceptual Model

5/26/2011

6

5/26/2011

7

5/26/2011

8

Tip Restoration

5/26/2011

9

RAP St Modwen

Development RemediationSt Modwen

Preventative MeasuresHousing Developer

StatutoryDirectional

Boundaries & Hot spotsNon Prosecution

RBSLNew RBSL

Development monitor

Vapour BarriersPassive Venting

Monitor

7-8Years

Final Housein 2026?

Remediation Process/Management

Catchment

Management

5/26/2011

10

Crymlyn Bog Lagoon

5/26/2011

11

5/26/2011

12

5/26/2011

13

25

Transit

26

Transit - Masterplan

5/26/2011

14

27

Transit - Remediation

Dune Complex to Chemical Works

KenfigNNR/SAC/SSSI

CrymlynBurrows SSSI

The site

5/26/2011

15

Dune Complex to Chemical Works

Site developed progressively from 1960s

Sand dunes levelled

Slag form nearby steel/ironworks imported

Maximum extent/operation in late 70s, wind down and demolition in 80s and 90s

Last facility removed in 2005

Today

Transit Site & CrymlynBurrows

GE Power Station Baglan

Energy ParkIntertissue

Sandifields

Ragwormfarm

5/26/2011

16

Sources?

Ground Investigation

5/26/2011

17

Geology

Hydrogeology

5/26/2011

18

Microbial Studies

How do you demonstrate MNA?

Aim: to get definitive proof that

● The right microbes are there

– Cultures, gene counts using qPCR

● The microbes are doing what they are supposed to

– Baited traps using C-13-labeled contaminant

● C-13 ends up mineralised and in the biomass.

● Benzene and phenol both used.

Risk Assessment – Human health

Key issues:

● Who uses the beach?

● How much do they use it?

● How do they come into contact with contamination?

Get real data!

● CCTV recording of beach

● Dog walkers main users, duration can be estimated

● Loads of monitoring to understand exposure

– Contaminated water close to low tide

Seepage zone

5/26/2011

19

Risk Assessment – Controlled Waters

Styrene areas key remediation objective

● Aquifer properties well known

– Site testing, CSIRO model

– MNA occurrence being demonstrated

– Infiltration high – flushing

● Declining source appropriate?

– But check equations carefully

– Decline of soil source or just assume that one pore volume of contamination

The Future

top related