case study 2018 mathew john - the green guys group€¦ · mathew john facility lighting upgrade...

Post on 26-Jul-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Please Call: 1300 511 875Email: info@greenguys.com.au

MathewJohnFacility Lighting Upgrade

Case Study 2018

info@greenguys.com.au

THEY SAVE

$50,642 PER YEAR

Age Care Facility

Mathew John Aged Care Facility is an

independent care provider. The facility has 182

beds in total with Secure Access and 24 Hour

Emergency Call.

The aged care facility accomodates some of the

more vulnerable and less robust members of

the community and lighting had to be

appropriate to a range of uses and

requirements. The organisation’s goals were to

dramatically improve the quality of light for

residents and staff, save money on energy costs

and reduce their environmental impact. These

goals had to be achieved in a 24/7 operational

and residential environment so planning to

ensure minimal disruption to residents and staff

was paramount.

In Energy Costs Saved per year

901Lights Replaced

Please Call: 1300 511 875 or Email: info@greenguys.com.au

$50,642

kWh of Energy NotUsed per year 266,540

Tonnes of TotalCO² Abated187

Barrels of Oil Not Consumed 434

Acres of Forests Grown in 10 Year 4,855

How the Mathew Johnupgrade made a difference...

Cars off the road for 1 year400

top related