Camp Return StrategySHELTER CLUSTER – LEOGANE

CCCM Pilot Programme

Identification of Beneficiaries

•Global registration•Call for return•Advantage for CM agency

Return Package

•Shelter•Livelihoods (CFW, etc.)•WASH, NFIs, etc.

Shelter

•Organization of family information Name Size Locality of Return Contact information

Shelter

•Coordination with Shelter Cluster/Shelter Agency according to map

Evaluation of other needs

•Livelihoods▫CFW▫FFW▫Agriculture▫Fishery

•WASH•Health•Education•NFI

Final Product

Nb NoAbri Name Family Size Tel IP Current

LocationLocalite

of Return

Corresponding

Shelter Agency

Needs Upon Return (Y/N)

Shelter WASH CFW/FFW

1 131 LOUIS Erlande 4 3622-8116 ACTEDParc Gerard Christophe Chatuley ACTED N Y Y

2 105JACQUES Rose

Daniel 8 3662-1329 SASHParc Gerard Christophe

Rue d'Autant CARE N N Y

3 104 EXILAS Sirilia 7 3768-2103 IntersosParc Gerard Christophe Cada ? Y Y Y

ACTED Case Study

•Parc Gerard Christophe•Imol Camp•Marche Chatuley

Chatuley

• Partnership in Chatuley with Samaritan’s Purse because of material pipeline challenges

Nb NoAbri Name Family Size Tel IP Current

LocationLocalite

of Return

Corresponding

Shelter Agency

Needs Upon Return (Y/N)

Shelter WASH CFW/FFW

1 131 LOUIS Erlande 4 3622-8116 ACTEDParc Gerard Christophe Chatuley ACTED N Y Y

2 105JACQUES Rose

Daniel 8 3662-1329 SASHParc Gerard Christophe

Rue d'Autant CARE N N Y

3 104 EXILAS Sirilia 7 3768-2103 IntersosParc Gerard Christophe Cada ? Y Y Y

Process

•Evaluation•Delivery•Construction•Post-construction evaluation

Evaluation

•Terrain of origin•T-shelter criteria•Land Title

▫ Landowner information▫ Explanation▫ Neighbors▫ ASEC▫ CASEC▫ Mayor’s Office

Delivery/Construction•Beneficiaries sign contract

Agreement to leave the camp 48 hrs after installation

Volunteer to work for the day Preparation of terrain

•ACTED truck picks up materials at SP warehouse

•Camp volunteers unload, SP teams build T-shelter

•Reception receipt•Sensitization on anchors

Post-construction evaluation

•SP questionnaire•Anchors•T-shelter constructed•T-shelter inhabited•Camp site evacuated

Challenges

•Aid activities focused within camps•Families refuse to leave camp site

▫Camp still serves as a pull factor for families

▫Need to direct interventions towards localities of return Inter-cluster support critical

•Global subscription to return strategy•Hurricane season

Way forward• Coordination with local government to

understand and contribute to return strategy while strengthening capacity at return sites▫ Land titles, evaluations, camp decongestion support

• Advocacy at inter-cluster level▫ CCCM Agencies, IOM, OCHA

• Support from IPs• Realization of return of pilot population

▫ Develop lessons learnt▫ Prove the return process works

• Scale up

Thank you