SALIDA DE LA BOMBA TRIPLE
CONSTANTE NUMERICA 0.000243
D.C = DIAMRTRO DE LA CAMISA 6.5
L = LONGITUD DEL BRAZO 10
E.B = EFICIENCIA DE LA BOMBA 88
FORMULA : ( 0.000243 * ( D.C)2 * L ) E.B
BOMBA ( 1 ) : STK / MIN 45
BOMBA ( 2 ) : STK / MIN 0
0
TASA DE BOMBEO
Total de Stks para Bombear el Lodo Total Stk de la Bomba
730.51 Stks 45
S.B: =
Realizado por: Jose Mavo
FORMULA : SAL BBA x STK TOTALES.
Profundidad del Pozo
Bomba 2
Bomba 1
Bomba 3
1/2 13 0.1 1011 0.21 1/2 0.32 0.42 1/2 0.53 0.63 1/2 0.74 0.84 1/2 0.95 15 1/2 1.16 1.26 1/2 1.37 1.47 1/2 1.58 1.68 1/2 1.79 1.89 1/2 1.910 2
2.12.22.32.42.52.62.72.82.93
3.13.23.33.43.53.63.73.83.94
4.14.24.34.44.54.64.7
4.84.95
5.15.25.35.45.55.65.75.85.96
6.16.26.36.46.56.66.76.86.97
7.17.27.37.47.57.67.77.87.98
8.18.28.38.48.58.68.78.88.99
9.19.29.39.49.59.69.79.8
9.910
10.110.210.310.410.510.610.710.810.911
11.111.211.311.411.511.611.711.811.912
12.112.212.312.412.512.612.712.812.913
13.113.213.313.413.513.613.713.813.914
14.114.214.314.414.514.614.714.814.9
1515.115.215.315.415.515.615.715.815.916
16.116.216.316.416.516.616.716.816.917
17.117.217.317.417.517.617.717.817.918
18.118.218.318.418.518.618.718.818.919
19.119.219.319.419.519.619.719.819.920
0.090347 BBLS/STK
PULGADAS
PULGADAS
STK / MIN
STK / MIN
STK / MIN 0.27056057 16.2336 16.23363447
4.07 BBLS / MIN Reloj: 0
170.76 Gals / Min Tiempo de Bombeo
66 Horas Minutos Segundos66 Barriles0 0 16 14
505 10.1
1674 Pie 98 879.18 Psi
0 Lpg
% PORCIENTO
Volumen por Bombear
Profundidad del Pozo Peso Lodo Presion Hidrostatica
Microsoft Editor de ecuaciones 3.0
0.1 1470.20.30.40.50.60.70.80.91
1.11.21.31.41.51.61.71.81.92
2.12.22.32.42.52.62.72.82.93
3.13.23.33.43.53.63.73.83.94
4.14.24.34.44.54.64.7
4.84.95
5.15.25.35.45.55.65.75.85.96
6.16.26.36.46.56.66.76.86.97
7.17.27.37.47.57.67.77.87.98
8.18.28.38.48.58.68.78.88.99
9.19.29.39.49.59.69.79.8
9.910
10.110.210.310.410.510.610.710.810.911
11.111.211.311.411.511.611.711.811.912
12.112.212.312.412.512.612.712.812.913
13.113.213.313.413.513.613.713.813.914
14.114.214.314.414.514.614.714.814.9
1515.115.215.315.415.515.615.715.815.916
16.116.216.316.416.516.616.716.816.917
17.117.217.317.417.517.617.717.817.918
18.118.218.318.418.518.618.718.818.919
19.119.219.319.419.519.619.719.819.920
04/18/2023
Pozo_____________________
Equipo____________________09:36:42
Supervisor_________________
Eficiencia 95% Camisa 7
Bomba Triple Emboladas por minuto 150 StkTasa
20.36 Bls/min
Salida de la Bomba 0.136 Bls/Stk 855.16 Gal/min
Calculos de Volumenes del Pozo
Exceso Anular Hoyo Abierto 0 %
Volumen Total Anular + Exceso 521.55 Bls
Volumen Total de la Sarta 19.94 Bls
Volumen Total del Sistema 541.49 Bls
Calculos de Emboladas
Emboladas hasta la Mecha 147 Stk
Emboladas Fondo Arriba 3,842 Stk
Emboladas Totales del Sistema 3,989 Stk
Calculos de Tiempo de Bombeo
Tiempo hasta la Mecha
Hora Minuto Segundo
0 0 59
Tiempo Fondo ArribaHora Minuto Segundo
0 25 37
Tiempo Total del SistemaHora Minuto Segundo
0 25 96
638.51 3 1/2 2 1/16
118.86 3 1/2 2 1/16
28.35 4 3/4 2 1/4
295.62 3 1/2 2 1/16HWDP
MARTILLO
HWDP
V 8
V 9
V 10
V 11
LONGITUD O.D I.D
V 12DP'S
1095.16 3 1/2 2 1/8
30.34 4 3/4 2 1/4
19.45 4 3/4 1 3/4
28.2 4 3/4 1 3/4
1.48 4 11/16 2 5/16
3.7 4 3/4 2 5/16
23.8 5 2
0.53 6 1/8 V 1
MO
NE
LM
WD
MF
RO
/XF.
SU
B
MECHA
MOTOR
FLOAT SUB
PIN - PIN
MFR
MWD
MONEL
DP'S
V 2
V 3
V 4
V 5
V 6
V 7
V 8
Longitud total BHA 1645.49
Longitud Total Hoyo 2284
V12 = 17.491
V=(OD)2-(ID2)/1029*LONGITUD
V11 = 3.256
V10 = 0.493
2056 7 6.36V9 = 0.123
LONGITUD O.D I.D
V 8
V 9
V 10
V 11
I.D
V 12
V8 = 30.001
V7 = 0.527
V6 = 0.338
V5 = 0.490
V4 = 0.027
V3 = 0.064
V2 = 0.357
V1 = 0.002
228 6 1/8
V 1
V 2
V 3
V 4
V 5
V 6
V 7
V 8