c offshore jeju 2013 02 24 f slide share
Post on 19-Aug-2015
86 Views
Preview:
TRANSCRIPT
C Offshore
+30 Years of Experience
Confidential • Copyright © 2011 - 2013 kk-electronic a/s, Denmark 1
C Offshore
More than 20,000 wind turbines since 1978
1978 1981 1984 1986 1991 2000 2002 2004 2007 2008 2009 2010 2011 2012
Signed first contract for the Korean
market
Established a Joint Venture
with CSIC/ Qianwei in Chongqing,
China
First control system to a modern wind
turbine (Riisager,
22kW.) For the first time:
wind turbine connected to
the grid
kk-electronic founded
First electronic control system (Windmatic,
50kW)
First Monitoring
system
kk develops WTC-2 control
system for the world’s
first offshore
wind farm (Vindeby, Denmark, 11 pcs. Of 450 kW)
Installation of complete
control and monitoring system for
Middelgrunden offshore wind farm (20 pcs.
Of 1.3 MW
kk-control system for the world’s largest wind farm (214 pcs of 1.3
MW)
Nysted, Denmark –the world’s
largest offshore
wind farm, at that time, (72 pcs of 2.3 MW
supplied with kk WTC-3
Kk WTC-5 control
system to the first serial
produced 5 MW
offshore
wind turbine
Nysted 2 offshore
wind farm Erected before
schedule
Nysted 2 2010 WTC 3
90 Wind turbines of 2.3 MW
BARD 1 2007 WTC 5
80 Wind turbines of 5MW
Middelgrunden 2000 WTC 3
20 Wind turbines of 2.0 MW
Vindeby 1991 WTC 2
11 Wind turbines of 450kW
80% of the
offshore market
with SWP turbines 7% with BARD
turbines.
Confidential • Copyright © 2011 - 2013 kk-electronic a/s, Denmark 2
81% of the
offshore market
with SWP turbines (74%)
and BARD (7%).
C Offshore
Smart and open Design
Confidential • Copyright © 2011 - 2013 kk-electronic a/s, Denmark 3
• The unique software architecture allows exchange of single modules without modifying others…
• …making it easy to implement any turbine application from kk-electronics extensive library of standardised and well-proven software.
• The flexibility of the C platform even allows you to use your own or 3rd party software.
C Offshore
Robust Design
Confidential • Copyright © 2011 - 2013 kk-electronic a/s, Denmark 4
Offshore challenges, to consider….
Design to:
Confidential • Copyright © 2011 - 2013 kk-electronic a/s, Denmark 5
Off shore challenges
• Design, validation, construction, test
• PS (Purchase Specification)
• Cooperation with suppliers
• Selection of components through experience
• Evaluating the historical data
• Critical component selection
Design to Quality, Reliability ……
Confidential • Copyright © 2011 - 2013 kk-electronic a/s, Denmark 6
Offshore challenges
• SCADA solution tailored for large wind power farms
• Based on modern technology, bringing flexibility
ease-of-operation known from the popular social
networking applications into industrial SCADA solutions
• An open platform that allows virtually any extension
• Remote access
• Remote control and monitoring
Design to high performance
Confidential • Copyright © 2011 - 2013 kk-electronic a/s, Denmark 7
KK PILOT SCADA
Offshore challenges
• Web based service interface
• Perform turbine service using any
tablet or smart phone you like
• Wireless access in turbines, to
ease service tasks
• Service interface can be accessed
from both local and remote
• Easily create your own web
pages using simple xml
Design to service
Confidential • Copyright © 2011 - 2013 kk-electronic a/s, Denmark 8
Introduced2013
Questions
C Offshore
Confidential • Copyright © 2011 - 2013 kk-electronic a/s, Denmark 9
Thank for your attention
Please contact: Jørgen Berg Tolstoy VP Global Strategic SalesJung-Hun Lee, General Sales Manager, Koreawww.kk-electronic.com
top related