To increase uptime of BTS without
increasing the energy consumption appears to becontradictory but by better management of
resources, we can achieve target for both the
entities.
-
8/6/2019 BTS Up Time & Energy Managementx
3/21
Categorize all the BTS in A,B,C categories.
A category - 24 hours
B category - Minimum 20 hours
C category - Minimum 12 hours
(Copy of Proposed A,B,C category of BTS
circulated)
Make available electricity connections to all sites
within two months.
Arrange sufficient & effective watch and ward at
remote sites.
-
8/6/2019 BTS Up Time & Energy Managementx
4/21
Make availability of a portable DG set in DE(Rural)
& DE(Datia) areas.
Keep sufficient spare of SUMA Cards, TRE&
Combiner etc.
Prompt action for restoration of optical fiber cable
in case of damage. Timely escalation of fault to appropriate authorities
for restoration/co-ordination.
-
8/6/2019 BTS Up Time & Energy Managementx
5/21
Save Diesel.
Save Electricity.
-
8/6/2019 BTS Up Time & Energy Managementx
6/21
` Save recurring diesel charges .
` Increase profitability of company.
` Reduce air &sound pollution.
` Save scarce global resource.
-
8/6/2019 BTS Up Time & Energy Managementx
7/21
1. GET MPEB SUPPLY QUICKLY.
2. GET UNITERRUPTED SUPPLY.
3. REMOTE SITES ON SOLAR PANEL.
4. SCRAPE BATTERY SETS & POWER MODULE.
5. REQUIRMENT TO CIRCLE OFFICE.
6. ENHANCE BATTERY BACKUP.
7. MAINTENANCE OF ENGINE ALTERNATOR.
8. MAINTENANCE OF POWER PLANT.
9. MAINTENANCE OF VEHICLE.
10. INSPECTION.
11. BE VIGILANT.
-
8/6/2019 BTS Up Time & Energy Managementx
8/21
Possibility may be explored the connect remote sites
on solar panel. Sites may be proposed.
-
8/6/2019 BTS Up Time & Energy Managementx
9/21
` Life expired batteries to be scrapped.
` Battery Set Life:
` Scrape RNP power modules.
S.No. AH of MF Battery Life prescribed in years
01. 12 volts/120AH 03 Years
02. Up to 200AH 04 Years
03. More than 200AH 06 years
-
8/6/2019 BTS Up Time & Energy Managementx
10/21
` Daily Checkup of batteries to identify weak cell & timely
replacement of cell.
` Preferably replace cell from same MAKE.
`
Set proper battery cut off point at power plant to avoiddeep discharge of batteries.
` (MM) to ensure lifting of batteries by field units at least
one month before the lapse of last date of charging.
Field officer may positively install & charge the sets
before last date.` Install adequate capacity of batteries.
-
8/6/2019 BTS Up Time & Energy Managementx
11/21
` servicing, over hauling, air/fuel filter replacement and
filling of lubricants of all E/A at prescribed intervals.
` AMC Agency of engine alternators .
` Docket Number of complain may be obtained from .
` Timely scrapping and replacement of engine alternator.
Life of E/A - Up to 50 KVA - 10 years
- More Than 50 KVA - 15 years
-
8/6/2019 BTS Up Time & Energy Managementx
12/21
` Check Fuel average.
` Follow Dos & Dont.
` Follow prescribed logbook & keep proper records.` Entry in the log book by inspecting officials.
-
8/6/2019 BTS Up Time & Energy Managementx
13/21
` Put adequate power plant module as per load
requirement.
` Timely repair of faulty power plant modules.
` For replacement, use module of same MAKE to set up
cut off point of batteries.
` Timely repair front panel of power plant.
` Focus on preventive maintenance.
-
8/6/2019 BTS Up Time & Energy Managementx
14/21
` Timely repairing & overhauling of vehicles as per
suppliers schedule.
` Use of Quality fuel & lubricants.
` servicing from authorized dealer.
` Identify life expired vehicle & scrape them in due time.
-
8/6/2019 BTS Up Time & Energy Managementx
15/21
` Regular inspection
-
8/6/2019 BTS Up Time & Energy Managementx
16/21
` Ensure proper functioning of hour meters of all engine
alternator.
` Frequently compare reading of logbook with hour meter.
`
Seal all the hour meter. If seal found broken, then samemay be investigated.
` Milometer of Vehicles has to be in working order.
` Logbook/history sheet of vehicle has to be
maintained/checked.
` Keep check on fleet card, petrol pump & other points
regarding quantity of supply.
-
8/6/2019 BTS Up Time & Energy Managementx
17/21
` General points.
` Avoid penalties.
` Decommissioning of spare equipments.
` Avoid multiple battery sets and power plant.
-
8/6/2019 BTS Up Time & Energy Managementx
18/21
` officers may keep a watch on electricity expenditure of each
exchange.
` Temporary connection to be converted to permanent
connection.
` All equipments i.e. computers, printers, tube lights, fans,
Office ACs, warmers must be powered off when not used.
` CRT may be replaced by LCD terminal.
` For rented building, check whether electricity is used only
equipments.
` Spare equipments may be switched off.
-
8/6/2019 BTS Up Time & Energy Managementx
19/21
` Bill should be paid well in time to avoid surcharge claim
by MPEB.
` Power factor penalties to be avoided in consultation with
electric wing.
` As per the usage transformer size can be reduced to
avoid excess minimum charges in consultation with
electric wing.
-
8/6/2019 BTS Up Time & Energy Managementx
20/21
` use one battery and power plant system checking the
load and decommission extra power plant and battery.
` Even At combine station of , use of multiple battery and
power plant is not permitted now.
-
8/6/2019 BTS Up Time & Energy Managementx
21/21
MAKE A DAILY
HABIT TO SAVEENERGY
-THANKS