BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
BS 6349 Part 1.2 – Assessment of
actions
Moving into Practice
1
Steve Osborn
Atkins Fellow
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Prologue
Why is BS 6349: Part 1.2 “Faulty”?
16 February 2017 2
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Prologue
During public
comment, someone
said “The equations
for wind and current
area both have 10-4
multipliers, which
converts the
Newtons to tonnes.”
3
Erroneous
power?
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Prologue
If we assume that CTW
and similar constants
are dimensionless this
is true. So we
changed the formula
to this:-
4
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Prologue
Except that CTW is not
dimensionless, so our
original formulae were
right.
5
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Prologue
So BSI withdrew the standard
The moral of this story:-
• Perhaps we should trust our judgement more
• Scrutinise the comments very carefully
6
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Prologue
The consequences:-
• An important contribution to the industry has been
withdrawn for several months
• Confidence has been disturbed
• Quite a few people (including in China, Africa and
France!) suddenly lost a document they were relying
on
7
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Prologue
Revised text has been approved and will
be available very shortly
8
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Contents
• Layout of the standard
• Part 1.2’s function as the “controlling document”
• Sea state and waves
• How the earthquake section was finalised
• Some interesting additions
• Summarising
9
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Contents
• Layout of the standard
• Part 1.2’s function as the “controlling document”
• Sea state and waves
• How the earthquake section was finalised
• Some interesting additions
• Summarising
10
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Layout of the standard
11
Combinations of actions and structural design
Wave and water level conditions
Actions loads and hydraulic responses
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Layout of the standard
The main sections of Part 1.2 are:-
• Combinations of actions and structural design
– Which is discussed later in this presentation
• Wave and water level conditions
– Also discussed later in this section
• Actions loads and hydraulic responses
• Annexes A to I
12
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Layout of the standard
Actions loads and hydraulic responses:-
• In itself is a major section
• Covers hydraulic actions, currents and waves
• Ship induced actions such as berthing and mooring (generally referring to Part 4), but also actions such as propeller wash
• Earthquakes
• Cargo loadings
• Cargo handling equipment loadings
13
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Contents
• Layout of the standard
• Part 1.2’s function as the “controlling document”
• Sea state and waves
• How the earthquake section was finalised
• Some interesting additions
• Summarising
14
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Part 1.2 has a major role as the
“controlling document” for all structural
design in the BS 6349 series
• It provides the “rules” connecting the codes
describing maritime works facilties to the Eurocodes
that permit the structural design.
• Much as BS 5400 Part 2 used to for Bridges.
15
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
16
“Actions” and “Controlling”
Code in one.
The revised BS 6349:Part
1.2
“Material”
Eurocode
e.g. EC3-2
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Contains the tables of partial factors
17
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Contains the tables of partial factors
18
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Contains the combination formulae
19
In Eurocode 0, the
combination formulae
are in 5 separate
tables on different
pages (see following –
actually 10, that’s 5 for
buildings and 5 for
bridges, all on different
pages!!)
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Compare that with finding your way round Eurocode 0
20
Showing you only the
building set -
Combination formulae
for the EQU set
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Compare that with finding your way round Eurocode 0
21
Partial factors are in
an obscure corner of
the tables
Combination
formulae for
the STR/GEO
set B
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Compare that with finding your way round Eurocode 0
22
Combination
formulae for
the STR/GEO
set C
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Compare that with finding your way round Eurocode 0
23
Combination
formulae for
seismic and
accidental
actions
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Compare that with finding your way round Eurocode 0
24
Combination
formulae for
SLS cases
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
And just to remind you, all 5 tables are here……
25
Persistent and
transient
Accidental
Seismic
Construction
SLS
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
And here!
26
Partial factors for
the EQU set A Partial factors for
the STR/GEO set
B
Partial factors for
the STR/GEO set
C
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Contains the tables of
combination factors
• (More about those when
discussing seismic issues)
27
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The “Controlling Document”
Selection of partial factors now rationalised
• For most variable actions, partial factors have been set at 1.50.
• For elastomeric fenders, typical partial factor has been set at 1.35 – a reduction
– Because the latest version of Part 4 requires additional load to allow for tolerances in rubber.
– Not reasonable increase load factors since loads are highly predictable and more factors are taken into account
28
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Contents
• Layout of the standard
• Part 1.2’s function as the “controlling document”
• Sea state and waves
• How the earthquake section was finalised
• Some interesting additions
• Summarising
29
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
This is a very large section:-
• Not possible to highlight everything
• However it brings some new approaches
16 February 2017 30
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
The change in
the
introduction is
indicative
This is from
Part 1:2000
16 February 2017 31
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
This is from Part 1.2,
2016
Includes an immediate
review of the purpose of
obtaining the wave
information
16 February 2017 32
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
Different information for different
purposes, e.g.
33
Open piled structures Breakwaters Mooring analysis
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
Immediately kicks off with reminder to choose your method to suit the requirement:-.
34
• Method of
simplification to suit
what is required
• Is it for near shore or
deeper seas?
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
• Climate change – completely new
• Wave characteristics – now more focus on
spectral and non-linear theories (previous heavily
based in linear theory)
• Offshore wave climate – new/ updated to focus
more on use of global numerical hindcast
sources rather than empirical hindcasts or
visually observed data
• New sections on joint (dependent) probability
35
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
Much information is now in
the Annexes:-
• e.g. formulae for linear wave
analysis
• Wave prediction curves
36
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
Much information is now in
the Annexes:-
• e.g. formulae for linear wave
analysis
• Wave prediction curves
37
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
Much information is now in
the Annexes:-
• e.g. formulae for linear wave
analysis
• Wave prediction curves
• Shallow water wave transformation
information
38
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
Much information is now in the Annexes:-
• e.g. formulae for linear wave analysis
• Wave prediction curves
• Shallow water wave transformation information
• Information on wave breaking processes
39
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
Includes new recommendations for
physical model testing
40
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
The assessment of hydraulic
actions:-
• Complexity means it is wise to refer to
detailed documentation, e.g. by CIRIA et al
• Information on wave formulae are given in
Annex E
• Information on flow induced vibrations etc
also there.
41
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Sea state and waves
The assessment of hydraulic actions:-
• Certain formulae for vertical walls now not explicitly quoted.
• e.g. Sainflou formula not displayed, but accessible via references (e.g. McConnell, Allsop and Flohr)
• Propeller wash scour issues highlighted and references available via PIANC
42
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Contents
• Layout of the standard
• Part 1.2’s function as the “controlling document”
• Sea state and waves
• How the earthquake section was finalised
• Some interesting additions
• Summarising
43
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
• The plans for finalising this
section were presented last year.
• The approach of pointing to both
Eurocode 8 and AISC 61-14 were
endorsed
• Part 1.2 only goes as far as
defining seismic accelerations
44
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
Eurocode 8 criteria for “Damage Limitation”
Taken as the Level 1 earthquake
45
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
Eurocode 8 criteria for “No collapse”
Taken as the Level 2 earthquake
46
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
Eurocode 8 criteria for “No collapse”
Taken as the Level 2 earthquake
47
What is “residual load bearing
capacity”?
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
AISC 61-14 has three
requirements
48
More or less equivalent to
“No collapse”
More or less equivalent to
“Damage limitation”
An additional but useful
criterion (relates to PIANC)
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
AISC 61-14 is the most
advanced code dealing with
seismic maritime issues
49
Very good for quays and
suspended jetties
Doesn’t cover retaining
wall type quays
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
The key items in
BS6349 Part 1.2 are:-
50
Defines the Level 1 and Level 2
earthquake
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
The key items in
BS6349 Part 1.2
are:-
51
Provides the means to carry out
the controlled and repairable
damage assessment using the
“Performance factor” and
reference to AISC 61-14 where
needed
Invokes the Eurocode 8
importance classes and
factors
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
By this means we can invoke both:-
• Eurocode 8
• AISC 61-14
52
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
A word about combination factors
53
Factor for quasi-permanent
value of a variable action
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
A word about combination factors
54
Magnitude of seismic action
Magnitude of building personnel loading
Characteristic value
Quasi permanent value
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
A word about combination factors
55
Magnitude of seismic action
Magnitude of building personnel loading
Characteristic value
Quasi permanent value
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
In the Eurocode that explains this:-
56
One assumes that those that designed the Eurocodes chose
these for seismic combinations to provide a suitable joint
probability ------ if only to allow for people not loading the area at
night!
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
Cargo storage areas
57
Magnitude of seismic action
Magnitude of cargo storage loading
Characteristic value
Quasi permanent value
Load can be expected to have less variation
So need to move the quasi permanent factor up
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
This is what the Eurocode did for storage
loadings:
58
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
The earthquake section
This is what the BS6349 has done for
cargo areas:-
59
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Contents
• Layout of the standard
• Part 1.2’s function as the “controlling document”
• Sea state and waves
• How the earthquake section was finalised
• Some interesting additions
• Summarising
60
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Some interesting additions
Since last year another “tweak” has been
introduced.
Guidance on bollard/mooring hook
loadings with multiple wires
61
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Some interesting additions
Table 8 gives useful
guidance and definition of
scenarios
62
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Some interesting additions
Guidance on reach
stacker loadings
63
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Some interesting additions
Guidance on rubber tyred
gantries
64
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Contents
• Layout of the standard
• Part 1.2’s function as the “controlling document”
• Sea state and waves
• How the earthquake section was finalised
• Some interesting additions
• Summarising
65
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Summarising
• BS 6349 Part 1.2 now completes the update of
Part 1:2000.
• It improves our connection to the Eurocodes
• It opens the way to new areas (particularly
seismic and scour)
• It is already making an international impact
– Even though it is presently suspended!!
66
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Summarising
• Completing the update of Part 1 has been a
gargantuan task.
• Even Part 1.2 on its own has been an heroic
undertaking.
• Please show your appreciation for the
contributors listed in the next slide
67
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Summarising
68
Initial thinking:
William Allsop
Jan De Waal
Terry Hedges
Dick Thomas
Simon Burchett
Partial factors:
Steve Osborn
Adrian Douglas
David Smith
Graeme Walker
Sea-state:
Jo Evans
Simon Burchett
John Fenton
Mark Calverley
Dominic Hames
Peter Hunter
Peter Hawkes
Hydraulic/ environmental actions:
Simon Burchett
Simon Everitt
Giovanni Cuomo
Ian Cruickshank
Gareth Evans
Operational actions:
Chris Boysons
David Veale
Mark McBride
Roger Allen
Andy Cook
Peter Stebbings
Peter Beamish
Seismic actions:
Steve Osborn
David Smith
Jack Pappin
Ziggy Lubkowski
Edmund Booth
Ian Smith
Helge Frandsen
Iain Tromans
Dimitrios Pachakis
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
Summarising
69
Corporate support • Aecom
• Arup
• Atkins
• CH2M
• Edmund Booth
• HR Wallingford
• Mott MacDonald
• Ramboll
• Royal HaskoningDHV
• WSP/Parsons Brinkerhoff
BS 6349: “Maritime Works”
Advancing on Firm Foundations 13th February 2017
Pa
rt 1
.2 M
ovin
g in
to P
rac
tic
e
Ste
ve
Os
bo
rn
THANK YOU
70
top related