Application references Prestressing platforms
Silos Nuclear power stations
Bridges Gaz reservoirs
MC/805
productinformation
ref.:rev. no.:date:page:
M-293
11/881/4
1. BRIDGES ref. prod. inf.
Suez Bridges Contractor: ARAB CONTRACTORS (Egypt)Technical: FREYSSINET (Egypt)No. of platforms: 1Capacity of platform: 1.5 tWeight of jacks: 350 kgLifting points: 2 TIRFOR TU-16H, reeved with multiple sheave blocks
Viaduct on the Recht (Belgium) General Contractor: TRAVAUX S.A. (Belgium)Technical: Laboratoire de Cinématique (Subsidiary of Freyssinet)No. of platforms: 2Capacity of each platform: 2 tWeight of jacks: 350 kgLifting points: 2 TIRFOR TU-32H,reeved with multiple sheave blocks M-605
access equipmentfor post tensioning of concrete
reference list
MC/805
productinformation
ref.:rev. no.:date:page:
M-293
11/882/4
2. SILOS ref. prod. inf.Alexandria Cement Works (Egypt) General Contractor: ARAB CONTRACTORS (Egypt)
Technical: FREYSSINETNo. of platforms: 4Capacity of each platform: 1.5 tWeight of jacks: 250 kgLifting points: 4 TIRFOR TU-16H
Hassioud Cement Works (Egypt) General Contractor: ARAB CONTRACTORS (Egypt)Technical: DYWIDAGNo. of platforms: 2Capacity of each platform: 2 tWeight of jacks. 500 kgLifting points: 4 TIRFOR TU-32HNo. of access platforms: 2, fitted with TIRAK hoists. M-263
Suez Cement Works (Egypt) General Contractor: ARAB CONTRACTORS (Egypt)Technical: DYWIDAGNo. of platforms: 2 tWeight of jacks: 500 kgLifting points: 4 TIRFOR TU-32HNo. of access platforms: 2, fitted with TIRAK hoists M-146
Fujeirah Cement Works (Egypt) General Contractor: VOEST (Austria)Civil Engineering Contractor: SIX CONSTRUCT (Belgium)Technical: DYWIDAGNo. of platforms: 4Capacity of each platform: 1.5 tWeight of jacks: 300 kgLifting points: 4 TIRFOR TU-16HNo. of access platforms: 4 (fitted with TIRAK hoists)
Barbados Cement Works General Contractor: SIX CONSTRUCT (Belgium)Technical: DYWIDAGNo. of platforms: 4Capacity of each platform: 1.5 tWeight of jacks: 300 kgLifting points: 4 TIRFOR TU-16HNo. of access platforms: 4 (fitted with TIRAK hoists)
Damman Cement Works General Contractor: HELDE and FRANKE (Germany)(Saudi Arabia) Technical: HELDE and FRANKE
No. of platforms: 8Capacity of each platform: 1.5 tWeight of jacks: 750 kgNo. of access platforms: 8 (fitted with TIRAK hoists)
Ain Touta Cement Works (Algeria) General Contractor: SMIDTH (Denmark)Civil Engineering Contractor: SIX CONSTRUCT (Belgium)Technical: V.S.L.No. of platforms: 4Capacity of each platform: 1300 kgWeight of jacks: 70 kgLifting points: 2 TIRAK T-1000 hoists,reeved with multiple sheave blocks
Ciment Français (Beaucaire, France) Contractor: REYDELTechnical: CIPECLifting points: 2 TIRAK T-1000 hoists
access equipmentfor post tensioning of concrete
reference list
MC/805
productinformation
ref.:rev. no.:date:page:
M-293
11/883/4
3. GAS RESERVOIRS ref. prod. inf.Das Island (United Arab Emirates) General Contractor: Chicago Bridge and Iron (USA)
Civil Engineering Contractor: SPIE - BATIGNOLLESTechnical: FreyssinetNo. of platforms: 8Capacity of each platform: 5 tWeight of jacks: 2.5 tLifting points: 2 TIRFOR TU-32Hreeved with multiple sheave blocksNo. of access cradles: 8 (fitted with TIRAK hoists) M-262
Zeebrugge Port Terminal (Belgium) General Contractor: TRACTIONEL (Belgium)Civil Engineering Contractor: SBBM (Belgium)Technical Laboratoire de Cinématique (Subsidiary of Freyssinet)No. of platforms: 6Capacity of each platform: 3 tWeight of jacks: 750 kgLifting points: 4 TIRFOR TU-32H M-261
Pyeong Taek (South Korea) General Contractor: TECHNIGAZTechnical: FREYSSINETNo. of platforms: 6Capacity of each platform: 1 tWeight of jacks: 350 kgLifting points: 2 TIRAK T-1000 hoists,reeved with multiple sheave blocks
ENFERSA Factory, Contractor: AGROMAN, Empresa Constructora S.A.Cartegena / Spain Technical: FREYSSINET
No. of platforms: 3Capacity of each platform: 3 t.Lifting points: 9 TIRFOR TU-16H M-400
access equipmentfor post tensioning of concrete
reference list
MC/805
productinformation
ref.:rev. no.:date:page:
M-293
11/884/4
4. NUCLEAR POWER STATIONS ref. prod. inf.Cattenom I and II (France) Contractor: DUMEZ - SPIE
Technical: GPN - VSLNo. of platforms: 2Capacity of each platform: 6 t.Weight of jacks: 2.5 tLifting points: 4 TIRFOR TU-32H
Thiange III (Belgium) Contractor: Laboratoire de Cinématique (Subsidiary of Freyssinet)Technical: FreyssinetNo. of platforms: 6Capacity of each platform: 5 tWeight of jacks: 1.6 tLifting points: 4 TIRFOR TU-32H M-237
Belleville (France) Contractor: GTMTechnical GPN - FreyssinetNo. of platforms: 2Capacity of each platform: 6 t.Weight of jacks: 2.5 tLifting points: 4 TIRFOR TU-32H
Other stations (USA) Contractor: EWING - BURKE (USA)Technical: PRESCON (Subsidiary of Freyssinet)
access equipmentfor post tensioning of concrete
reference list
MC1317
Application: Handling an overhead gantry.Site: New Baldwin motorway bridge,
Saybrook, Connecticut/USA.Customer: Joint-venture PERINI / PCL / C & G.Equipment: 2 hydraulic TIRAK T-3000 hoists.
Description:
The new 770 m Baldwin motorway bridge over the Connecticutriver at Saybrook and Old Lyne has been built using a newmethod of post-tensioned pre-cast segmental concrete.
The system used an overhead gantry to transport and positionthe prefabricated segmental concrete sections amongst theheaviest and widest ever used for balanced cantilever con-struction. The 2 hydraulic TIRAK T-3000 hoists were used forhandling the overhead gantry. These large 3 tonne capacityhoists operated in both directions for achieving the necessaryto-and-fro movements to position the segments.
The pulling effort was checked by 2 DYNAFOR load indicatorswith remote display mounted in the crane cabin.
The 2 post-tensioning platforms were lifted and lowered by 2x2TIRAK T-1000 machines reeved on 4 parts of wire rope (photoPA556.2).
Application completed by GRIPHOIST Inc., Westwood/USA
ref.:rev. no.:date:page:
productinformation
M-607
07/941/1
PA556.2
PA556.1 PA556
bridgeconstruction
MC1314
ref.:rev. no.:date:page:
productinformation
M-605
07/941/1
bridgeconstruction
Application: Positioning and pre-stressing prefabricatedbridge sections.
Site: Viaduct over the river Recht, for theVerviers to Prüm motorway, Belgium.
General contractor: Travaux S.A.Prestressing technique: Laboratoire de Cinématique
(Freyssinet subsidiary company).Equipment: 2 special pre-stressing platforms, 2000
kg capacity, each fitted with 2 hydraulicTIRFOR TU-32H machines, mounted in amultiple sheave system, and 2 pre-stressing rams.
Description of application:
The platforms are freely suspended from and are able totraverse along the construction beam. They are used for:
a) Transporting the personnel and materials to the workingposition during the positioning and pre-stressing of theprefabricated bridge sections (weight: 54 tonnes).These are transported and positioned using the guyedconstruction beam; total length 94 m.
b) Positioning the pre-stressing rams (weight: 350 kg)using a chain hoist which traverses along a fixed jib onthe platform.
Application completed by SECALT S.A. Luxembourg
PA112.10
MC729
ref.:rev. no.:date:page:
productinformation
M-262110/941/4
access equipmentfor post tensioning of concrete
Application: Prestressing work (Freyssinet system)on gazometers.
Site: Liquid Natural Gaz reservoir (LNG),Das Island, Abu-Dhabi
Customer: Freyssinet InternationalBoulogne-Billancourt/France
Building owner: Abu Dhabi National Oil CorporationEquipment:– 8 special double-deck prestressing platforms (11,40 m long,
cap. 5,400 kg) each equipped with: 2 hydraulic TIRFOR TU-32H machines, 1 two-way power pack, 4 safety devicesBLOCSTOP BS 35.30, 2 reeved suspension wire ropes 88 mlong, 4 safety wire ropes 44 m long, 4 manual chain hoists1,500 kg for handling the tensioning jacks, 1 access cradle(ALTA-Mono) with 1 TIRAK T-500, 1 safety device BLOCSTOPBS 15.301, 2 safety wire ropes 45 m long.
– 8 suspension brackets.
Description of application:The work is to prestress the safety cement walls which surroundthe metallic reservoirs. The eight double deck platforms enablethe installation of the prestressing ropes and the tensioningjacks on the eight rigs simultaneously.The installation of prestressing ropes takes place at the upperlevel whereas the tensioning takes place at the lower level ofthe platform.The platform move along the rigs. They are manoeuvred by tworeeved TIRFOR TU-32H and fitted with a suspension beams'system and with chain hoists for handling the tensioning jack(500 kg).
PA161.15
PA161.9
MC729
ref.:rev. no.:date:page:
productinformation
M-262110/942/4
access equipmentfor post tensioning of concrete
drawing 811008B/03
SUSPENSIONBRACKET
safety wire rope
suspension wire rope
TWO-LEVELWORKING PLATFORM
second working level
first working level
TIRFOR TU-32H
TIRAK T-500
overload safety device
electric winder
ACCESS CRADLE
1850
3300
PA161.8
PA161.19
BLOCSTOP BS 35.30safety device
upper limit switch
BLOCSTOP BS 15.301safety device
The small cradle designed for3 people gives access tothe bigger platform towhich it is suspendedwhatever the workinglevel.It is manoeuvredwith 1 TIRAK T-500,speed 9 m/min.
MC729
ref.:rev. no.:date:page:
productinformation
M-262110/943/4
access equipmentfor post tensioning of concrete
drawing 811008B/03
4700 TIRFOR
TU–32H
ladder
working platform4650 2000
11300
4650
hydraulic pack
access cradle
28900
28100
chain pulley block1500 daN
jackK500
first working level
second level access traps
second working level
MC729
ref.:rev. no.:date:page:
productinformation
M-262110/944/4
access equipmentfor post tensioning of concrete
PA161..5 - Overhead travelling trolley PA161.4 - Hydraulic power pack
Tensioning jack K500 PA161.3 - Hydraulic TIRFOR TU-32H
chain pulley block1500 daN
tensioning jackK500
MC728
ref.:rev. no.:date:page:
productinformation
M-261110/941/2
access equipmentfor post tensioning of concrete
Application: Presterssing work (Freyssinet system)on 3 liquid gas tanks
Site: Zeebrugge port/BelgiumCustomer: Laboratoire Cinématique, BruxellesEquipment: – 6 special prestressing platforms each fitted
with: 4 hydraulic TIRFOR TU-32H, 1 four waypower pack, 4 safety devices BLOCSTOP BS35.30, 1 electric trolley for the manoeuvring ofthe tensioning jack, 8 suspension and safetywire ropes, 40 m long.
– 6 suspension systems.
Description of application:Problem: The work consists in tensioning the prestressing wireropes on the inner part, cutting the extra length of the ropes andinjecting a protective cement to prevent corrosion.Each part is fitted with 3 ribs.Inner part: height 22.30 m, diam. 75.80 m.Outer part: height 14 m, diam. 85.80 m.Solution: The contractor has used the same platforms as forthe Nuclear Plant in Thiange (se M-237). They had beenpreviously mended and modified for this new application.The platforms are suspended to special suspension system.They move in tandem along the ribs.They have three functions:– lifting personnel and material up to the working position;– operating on the left and right of each rib for the placement
of the prestressing ropes and tensioning jacks;– handling the tensioning jacks (weight 750 kg) by means of an
electric trolley which moves along a mobile beam.A metallic frame construction is needed to support the beam,which is an integral part of the platform.
PA196.18
PA196.7 PA196.14
MC728
ref.:rev. no.:date:page:
productinformation
M-261110/942/2
access equipmentfor post tensioning of concrete
PA196.9PA196.9
+ 22,32
+ 14,00
+ 8,00
0,00
– 7,00
120°120°
120°
Nervure 2Rib 2
Nervure 3Rib 3
10001000 40
00
R 41900R 36900
Nervure 1Rib 1
MC957
ref.:rev. no.:date:page:
productinformation
M-400110/941/1
access equipmentfor post tensioning of concrete
Application: Prestressing work (Freyssinet system)on a gas reservoir.
Site: ENFERSA factory, Cartagena S.A./Spain.Contractor: AGROMAN, Empresa Constructora S.A.Equipment:– 3 x 10 m prestressing platforms, capacity 3000 kg, each
fitted with 3 hydraulic TIRFOR TU-16H machines, controlledfrom a power pack, 3 BLOCSTOP safety devices and 6 x 40m wire ropes.
– 9 stirrups suspended from trollies to allow movement of theplatforms.
– 3 hoists for manoeuvring the prestressing jacks.
Description of application:It was necessary to prestress the concrete safety ring whichcircled the metal reservoir. The 3 platforms allowed the work tocontinue simultaneously on the 3 seams for fitting and tensioningthe horizontal wire ropes. For work on the ledge, the platformshad to be slightly reversed using the trollies on the suspensionstirrups.
Application réalisée par TRACTEL IBERICA, Espagne.
PA309.3 PA309.1
PA309
MC730
ref.:rev. no.:date:page:
productinformation
M-263110/941/2
access equipmentfor post tensioning of concrete
PA117.1 PA117.2
PA117.5
Application: Post tensioning work (DYWIDAG system)on concrete silos
Site: Hassioud Cement Plant, EgyptCustomer: The Arab Contractor Osman Ahmed Osman,
CairoEquipment: – 2 special prestressing platforms
each equipped with:4 hydraulic TIRFOR TU-32H,1 four-way power pack,4 BLOCSTOP safety devices2x4 safety and suspension wire ropes
– 4 suspension brackets
Description of application:In the present application the platforms have been designedfor prestressing work according to the conception of theGerman specialised Co. DYWIDAG.Only one mobile beam is used for handling the tensioning jackgiving access to the wire ropes, either on the right or left rig.This suspension beam is moved manually along two rails andis telescopic so that accurate positioning of the jack ispossible.The platforms are fixed to the suspension brackets which areanchored at the top of the silo.
MC730
ref.:rev. no.:date:page:
productinformation
M-263110/942/2
access equipmentfor post tensioning of concrete
PA117.7
drawing 810101/B/01
TIRFORTU–32H
2805
3390
2390
12208000
28053390
B
B
16001200
2000
Coupe B – B
Blocstop
chain pulleyblock 500 kg
MC495
Application: Post tensioning of cement silos(Freyssinet system)
Site: Suez Cement Company, Suez/EgyptCustomer: The Arab Contractors Osman Ahmed Osman,
Cairo/EgyptEquipment: 4 special ALTA platforms, length 8 m, width 1.56
m,each fitted with:– 4 motorised TIRFOR TU-16H machines– 1 four-way power pack– 4 BLOCSTOP BS 20.301 safety devices– 8 wire ropes C12, 80 m long– 2 overhead trolleys
Description of application:Problem: The tensioning of the prestressing ropes of 5 silos (3for clinker material and 2 for homogenisation) to the new SUEZCEMENT COMPANY plant. The silos are 76 m high.After the tensioning, the extra lengths of the ropes have to becut, and to prevent corrosion, a protective cement is injected.Solution: The use of 4 supporting platforms equipped with 4motorised TIRFORs which move up and down 4 ribs outsidethe silo wall.These platforms have 2 functions:a) lifting personel and material up to the working level where
they can operate simultaneously on the left and on the rightof each rib for the placement of the prestressing ropes andtensioning jacks,
b) handling the tensioning jacks by means of 2 chain-blocks(250 kg capacity) which are suspended from a trolleyrunning on a I-beam.A metallic frame construction is needed to support theI-beam, which is an integral part of the platform.
ref.:rev. no.:date:page:
productinformation
M-146110/941/1
access equipmentfor post tensioning of concrete
wire rope bundle
4 way hydraulicpower pack
suspension
1800
8000
800
Ø 17000
mobile beam
TIRFORTU–16H
BLOCSTOP
4 way hydraulic power pack
PA101.8
flooring
chain hoist250 kg
MC709
ref.:rev. no.:date:page:
productinformation
M-237110/941/2
access equipmentfor post tensioning of concrete
PA107.14
PA107.21 PA107.18
Application: Pestressing work (Freyssinet conception)at a power station
Site: Tihange power station/BelgiumCustomer: Laboratoire de Cinématique, BrusselsEquipment: 6 special prestressing platforms
dim. 5x2 m, each equipped with:– 4 hydraulic TIRFOR TU-32H– 1 four-way power pack– 4 BLOCSTOP safety devices– 1 electric pulley block for handling the
tensioning jack.
Description of application:
Problem:The work consists of tensioning the prestressing wire ropes onthe inner part, cutting the extra length of the ropes and injectinga protective cement to prevent corrosion.
Solution:The platforms move two by two along the ribs. They have threefunctions:– lifting personnel and materials up to the working level– working on the left and on the right of each rib for the
positionning of the prestressing ropes and tensioning jacks,– handling of the tensioning jacks (weight 1600 kg) by means
of an electric pulley block which moves along a mobile beam(PA107.18). A metallic frame construction is needed tosupport the beam. It is an integral part of the platform.
The platforms come in from the top by means of a crane(PA107.16/19).
MC709
ref.:rev. no.:date:page:
productinformation
M-237110/942/2
access equipmentfor post tensioning of concrete
PA107.19
PA107.16