Moscow, February 18th, 2016

Jakub Wachocki

Организатор круглого стол по BIM-технологиям

BIM - PROCESS INNOVATION THAT DRIVES ROI. UNITED KINGDOM AND GLOBAL EXPERIENCE.

Global BIM Consultant | Bentley Systems

ABOUT BENTLEY

World’s leading provider of software for

Infrastructure design, construction and

operations:

#1 in Building Performance

#1 in Structural Engineering

#1 in Water Modeling

#1 in Roads and Transit Design

#1 in Bridge Engineering

#1 in Plant Operations

Global Business:

• Over 3,000 colleagues

• in 50+ countries

• Used by 90% of top 500 firms

Организаторкруглого стола

EMPLOYMENT IN SERVICES VS GOODS

Huge growth in Services

Организаторкруглого стола

EMPLOYMENT IN CONSTRUCTION VS MANUFACTURING

Организаторкруглого стола

LOW PRODUCTIVITY INDEX!Организатор

круглого стола

INDUSTRY DIGITALISATION INDEX

Where is Construction?

Организаторкруглого стола

PROJECT MANAGEMENT CHALLENGES

To create World Class Infrastructure:• Lots of stakeholders involved• Distributed projects teams• 5~10 Years of design and

construction• 30~50+ years of Operation and• Maintenance = 80% of lifecycle

costs (approx)

Организаторкруглого стола

DATA MANAGEMENT CHALLENGES

• Data Amount

• Formats

• Standards

• Remote locations

• Dynamic supply chains

• Information reuse

HOK Sport

Организаторкруглого стола

INITIAL BRIEF AND HANDOVER ISSUES

Business Needs

Build Operate

? ? ????

Design

?

Организаторкруглого стола

SOME PROJECTS CAN BE A NIGHTMARE…• Cost over-run

• Time over-run

• Compromised quality

• Reduced scope

THE RESULTОрганизатор

круглого стола

DEFINITION OF INSANITY

If you always do what you`ve always done,

You`ll always get what you have always got.

Albert Einstein

Организаторкруглого стола

BUILDING INFORMATION MODELLING AND MANAGEMENT

HANDOVERAS BUILTPRODUCTIONDESIGNCONCEPT

Dat

a, In

form

atio

n, K

no

wle

dge

People, Disciplines, Time

Full Lifecycle BIM

Current Practice

• Time and effort saved• Increase in quality and asset knowledge• Reduction in risk exposure

Организаторкруглого стола

Owner/Operator

Designers

Service Contracts

Subcontractors

Financial

Institutions

Insurers

Business Units

Contractors

ConsultantsSuppliers

Legal Agreements

Government

Agencies

Occupants

AECO BUSINESS ECOSYSTEM

Data aggregation, systems integration

and business analytics

Information models, data management,

quality project delivery

Data rich components, engineering optimization

Организаторкруглого стола

BIM as...

Business Information Management

Организаторкруглого стола

Information

INFORMATION MANAGEMENT

BUILDING THE INFORMATION MODEL

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Design Construction Operation

Graphics Graphics Graphics

Attributes Attributes Attributes

Организаторкруглого стола

22 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated

BIM

EIR

LOD

IPD

AIM

IFC

IDM

Avanti

BS

1192

: 200

7

PAS1192

Level 2 Level 3

DIGITAL POWBEP

Exe

cutio

n P

lan

CD

E

Common Data Environment

UNICLASS

COBie

Cla

sh A

void

ance

Volume Strategy

Information Management

Soft Landings

Project Implementation Plan

BIM Protocol

PROCESS

INF

OR

MA

TIO

N ASSET

Virt

ual D

esig

n an

d C

onst

ruct

ion

VD

C

UK

2011 – UK GOVERNMENT BIM STRATEGY

THE GOVERNMENT BIM STRATEGY

“The UK programme based on the BIS BIM Strategy is currently the most ambitious and advanced centrally driven programme in the world”(Industrial Strategy: government and industry in partnership)

GOAL: 20% reduction of the Capital Cost

Организаторкруглого стола

APRIL 2016 – UK MANDATE

• Fully collaborative 3D BIM

• All project and asset information, documentation and data to be electronic

• All centrally-funded projects

http://www.bimtaskgroup.org/

Организаторкруглого стола

UK CONSTRUCTION TARGETS FOR 2025

Организаторкруглого стола

BENEFITS OF THE BIM PROCESS

A report for the Government Construction Client Group, March 2011

RIBA 2013

Организаторкруглого стола

BIM MATURITY LEVELS

Paper / CAD

Drawings of lines, arcs, texts etc

L0

LEVEL 1

2D 3D

L1

LEVEL 3iBIMIntegrated, Web/Server Managed, Interoperable data

Bas

ed o

n th

e B

ew/R

icha

rds

Mat

urity

Lev

els

L3

LEVEL 2

BIMs

L2Models, object based collaboration

2016

Организаторкруглого стола

Pap

er/ CA

DL0

• Paper or Electronic Paper• CAD Applications

2D

/ 3D

BIM

siB

IMiB

IM

MATURITY LEVELS – LEVEL 0Организатор

круглого стола

Pap

er/ CA

D

• 2D / 3D CAD• Production Software• Analysis Software

2D

/ 3D

BIM

siB

IMiB

IM

MATURITY LEVELS – LEVEL 1

• File based collaboration

• CDE Solution-10%

Организаторкруглого стола

Pap

er/ CA

D2

D/ 3

DB

IMs

iBIM

iBIM

MATURITY LEVELS – LEVEL 2

• Many BIM Software Solutions• Interoperability• BIM Modelling through Construction

• File based collaboration• CDE Solution• Library Management

• Discipline based production and analysis software Solution

CDE

-20%

Организаторкруглого стола

BS

1192

:200

7

PA

S11

92-3

PA

S11

92-2

BS

7000

-4 2

013

GS

L

BS

8541

1-4

BS

1192

-4

PA

S11

92-5

BIM

UK – 8 PILARS OF BIM WISDOMОрганизатор

круглого стола

BIM

BS

1192

:200

7

PA

S11

92-3

PA

S11

92-2

BS

7000

-4 2

013

GS

L

BS

8541

1-4

BS

1192

-4

PA

S11

92-5

Ele

ctro

nic

Dat

a M

anag

emen

t

OP

EX

Info

rmat

ion

Man

agem

ent

CA

PE

X In

form

atio

n

Man

agem

ent

Co

llab

ora

tio

n

Bet

ter

Ou

tco

mes

Info

rmat

ion

def

init

ion

stan

dar

ds

Info

rmat

ion

Exc

han

ge

Info

rmat

ion

Sec

uri

ty

UK – 8 PILARS OF BIM WISDOMОрганизатор

круглого стола

Plan

DesignBuild

Operate

0 Strategic Definition

1Preparation of Brief

2 Concept Design

3Developed

Design

4 Technical Design

5Constructio

n

6 Handover and Close

Out

7 In Use

INFORMATION AS A LOOP

Организаторкруглого стола

BUSINESS AND THE LOOP – BIM LEVEL 2

Организаторкруглого стола

BUSINESS AND THE LOOP – BIM LEVEL 2

INFORMATION

Организаторкруглого стола

BUSINESS AND THE LOOP – BIM LEVEL 2

INFORMATION

DECISION MAKING

Организаторкруглого стола

Design

Construct

Test and

Commission

Operate

MaintainBusiness

outcomes

Create an end to end BIM process for an asset

NN7654321

(Part of a) “detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament”

ASSET LIFECYCLEОрганизатор

круглого стола

SOME OTHER BIM MANDATES WORLDWIDE

Spain 2018 - mandatory BIM requirements on public sector projects(similarities to UK)

Dubai Municipality (DM) updated the mandate in 2015 and mandated the use of Building Information Modelling (BIM) various cathegories of buildings (e.g. above 20 floors…) [Circular 196 2013 and Circular 207 2015 ]

France mandating BIM for public procurement in 2017

Germany sets up Digital Building Platform [Platform Digitales Bauen] Group

And others…

Организаторкруглого стола

EXAMPLES

Организаторкруглого стола

BIM FOR BUILDINGS

Организаторкруглого стола

King`s Cross Station Redevelopment

John McAslan + Partners

Generative Design/Engineering

Parametric Detail Design

and Collaborative Fabrication

Workflows

CROSSRAIL – 4D PLANNINGОрганизатор

круглого стола

CROSSRAIL - WORK PACKAGE MANAGEMENT

Организаторкруглого стола

FEW STATIONS ACHIEVED 35%DELIVERY TIME REDUCTION

BIM FOR RAIL

Организаторкруглого стола

Организаторкруглого столаINTEGRATED TRANSPORTATION SOLUTIONS

VIDEO TUBE LINES

BIM FOR ROADS AND HIGHWAYS

Организаторкруглого стола

BIM FOR ROADS AND HIGHWAYSОрганизатор

круглого стола

A6 TO MANCHESTER RELIEF ROAD

BIM FOR BRIDGES

Организаторкруглого стола

ALS DATA SUPPLEMENTED 9 OVER-BRIDGES SCANNED WITH HIGH ACCURACY

As-built models Descartes used to create 3D solids

Headroom checkBridges’ models checked against

3D headroom components

Vertical geometry optimizationNew profile lowering minimalized

No bridges to be demolished

Maximum use of the exist. pavement

Design with confidence

BRIDGE DESIGNОрганизатор

круглого стола

ALS DATA SUPPLEMENTED 9 OVER-BRIDGES SCANNED WITH HIGH ACCURACY

As-built models Descartes used to create 3D solids

Headroom checkBridges’ models checked against

3D headroom components

Vertical geometry optimizationNew profile lowering minimalized

No bridges to be demolished

Maximum use of the exist. pavement

Design with confidence

BRIDGE DESIGNОрганизатор

круглого стола

ALS DATA SUPPLEMENTED 9 OVER-BRIDGES SCANNED WITH HIGH ACCURACY

As-built models Descartes used to create 3D solids

Headroom checkBridges’ models checked against

3D headroom components

Vertical geometry optimizationNew profile lowering minimalized

No bridges to be demolished

Maximum use of the exist. pavement

Design with confidence

BRIDGE DESIGNОрганизатор

круглого стола

ALS DATA SUPPLEMENTED 9 OVER-BRIDGES SCANNED WITH HIGH ACCURACY

As-built models Descartes used to create 3D solids

Headroom checkBridges’ models checked against

3D headroom components

Vertical geometry optimizationNew profile lowering minimalized

No bridges to be demolished

Maximum use of the exist. pavement

Design with confidence

BRIDGE DESIGNОрганизатор

круглого стола

ALS DATA SUPPLEMENTED 9 OVER-BRIDGES SCANNED WITH HIGH ACCURACY

As-built models Descartes used to create 3D solids

Headroom checkBridges’ models checked against

3D headroom components

Vertical geometry optimizationNew profile lowering minimalized

No bridges to be demolished

Maximum use of the exist. pavement

Design with confidence

BRIDGE DESIGNОрганизатор

круглого стола

ALS DATA SUPPLEMENTED 9 OVER-BRIDGES SCANNED WITH HIGH ACCURACY

As-built models Descartes used to create 3D solids

Headroom checkBridges’ models checked against

3D headroom components

Vertical geometry optimizationNew profile lowering minimalized

No bridges to be demolished

Maximum use of the exist. pavement

Design with confidence

BRIDGE DESIGNОрганизатор

круглого стола

CROSSRAIL - UK

Организаторкруглого стола

CROSSRAIL - STATISTICS

• 21 km of new sub-surface twin-bore railway

• Maximum depth of tunnels 30m

• 90km of existing surface network

• 9 new sub-surface stations

• 28 existing surface station upgrades

(11 major reconstructions)

• 16 Major new bridges

• 200 million passengers per year

• 14,000 Construction jobs

• $24Bn over 10 years

Организаторкруглого стола

CROSSRAIL – INFORMATION STRATEGY

Deliver Best Practice in Lifecycle Information Management

Provide effective management of all information assets throughout the lifecycle

Create an integrated 3D information model, facilitating multidisciplinary collaboration through design, construction and on to operation and maintenance

Enable effective handover of ‘valuable information’ to form the base of the operational asset management system

Организаторкруглого стола

CROSSRAIL’S APPLICATION PORTFOLIO

Geo Web Publisher

Bentley Rail

Track

Power Rail Overhead Line

Bentley AECOsim

Bentley Map

Bentley Descartes

InRoads

RM BridgeInterPlot

Bentley Mechanical

Structural Modeller

Bentley Rebar

Bentley Navigator

STAAD Pro

Generative Components

AECOsim Energy Simulator

RAM Concept

Dynamic Ploti-models

gINT

MicroStation

Bentley LEARN

ProjectWise

(c) Crossrail Copyright

AssetWise

Организаторкруглого стола

65

WHAT DOES BIM LOOK LIKE?

£14,800,000,000 Cost

CAD /BIM Model files – so far!

e-Documents stored – so far!

Assets to be tagged

Individual Document users – so far!

Individual CAD users – so far!

Main Construction Contracts

Main Central Interchanges

Future Infrastructure Maintainers

Crossrail

1,250,000

815,000

650,000

8,250

650

61

8

2

1

Main Design Contracts25

Организаторкруглого стола

LINKING THE PHYSICAL AND VIRTUAL

M25-TMPS-00265

Temporary Works

Scaffolding

Организаторкруглого стола

DIGITAL ID

COMMON DATA ENVIRONMENT

Collaboration Platform

Façade Model

Structure Model

Mechanical Model

Civil Model

Plumbing Model

Electrical Model

Roof Model

Others

Engineering Analysis

Engineering Design

Wind Simulation Design

Waste Studies

Access Studies

Drainage

Thermal Studies

Lift Studies

Fire Engineering

Light Studies

Cable dimensioning

Wind Studies

Glass Engineering

Wind Studies

Thermal Studies

LEGAL

FINANCE

OWNER

Project Manager

Организаторкруглого стола

Labour32%

Comodities

17%

Materials17%

Prelims23%

Margin6%

Risk5%

CROSSRAIL – ROI AND BENEFITS

• Provides improved cost and time certainty• Reduces risk

• $13 Million reduction of risk contingency on construction from 4D Modeling - $200k spent on product

• Ensures compliance to standards• CAD Quality Assurance - 50 man-days per month

• Increases productivity• PDF Creation - 26 man-days per month per

contract $250k/contract/year

• Improves supply chain delivery• Provides greater control• Ability to leverage all project information

© 2012 Crossrail, Ltd.

Организаторкруглого стола

WHERE TO START

Организаторкруглого стола

BIM ADVANCEMENT – ‘WHERE TO START?’

CAPEX ProcessesOPEX

Processes

Some Context… Asset and Project Lifecycle Information Management

Key information requirements &

exchanges between organisational entities

AMAsset

Management

OPSOperations

MaintMaintenan

ce

CLIENT DELIVERER

SUPPLY CHAIN(Design ConsultantMain Contractor)

(Delivery Partners) Tier (n)Supplier

Tier (n)Supplier

OIRAIREIRPIR

CLASSIFY: A COMPLEX, FACILITY, ENTITY & ELEMENT

Complex

Facility

Entity

Element

Asset Data Dictionary

Why create a dictionary?• Common understanding of the information

requirements• Anticipation of when information is needed• How to measure/ present the information• Helps to define hierarchy and functional groupings• How assets should be physically labeled

It’s an essential part of your EIR

Define your asset data dictionary

Strong leadership, management buy-in

and a clear brief are essential

STRONG LEADERSHIPОрганизатор

круглого стола

REVIEW AND PLAN FOR THEBIM COMPETENCY AREAS

0

20

40

60

80

100Technical

Operation

Functional

Implementation

Administration

Supportive

R&D

ManagerialBIM Competency

Technical

Operation

Functional

Implementation

Administration

Supportive

Research and Development

Managerial

Source: BIM Excellence

Организаторкруглого стола

ESTABLISH A AVTODOR BIM ACADEMY

ESTABLISH YOUR BIM PROCESSES AND DELIVERY MECHANISM

Организаторкруглого стола

ESTABLISH A COMMON DATA ENVIRONMENT

Client

Sub Contract

or

Engineer

Architect

Contractor

Lawyer

Project Manager

Supplier

Traditional Methods

CDE

Client

Sub Contract

or

Engineer

Architect

Contractor

Lawyer

Project Manager

Supplier

Common Data Environment

BS1192:2007 - Methodology for managing the production, distribution and quality of the construction information

Организаторкруглого стола

MONITOR PROGRESS WITH A COMMON PERFORMANCE ENVIRONNEMENT

Project Dashboards

Project 3 Analytics

Project 1 Analytics

Project 2 Analytics

Организаторкруглого стола

Jakub Wachocki

Global Services | BIM ConsultantBentley Systems

Jakub.Wachocki@Bentley.com

@_JakubW

THANK YOU!