Consultancy with distinction in Water Supply and Sanitation, Water Resources Management, Road / Bridge & Railway Sector, Land-use
Planning & Infrastructure Development, Port/Harbour & Inland Water way, Building, Energy & Power Sector, Environment, Economic & Social Studies/HRD & Institutional Development, Agriculture & Livestock,
Information Management Sector, CAD/GIS & Modeling, Education & Training Sector
2
Background BETS Consulting Services Ltd. is one of the leading consulting firms in Bangladesh. It started its
journey in the year 1979 as Bangladesh Engineering and Technological Services Ltd. (BETS). In the
year 2005 it renamed as BETS Consulting Services Ltd. (BETS).
BETS enjoys unique reputation in its fight against poverty, hunger and poor social context, where
BETS is a proud development partner providing appropriate and sustainable solutions for infrastructure
development through innovative technologies, affordable ideas, capacity building, proper policy
making, suitable institutional reforms and community participations.
Ever since its establishment in 1979, BETS has developed into a premier consultancy organisation
providing services from the stage of conceptualisation to planning, design and detailed engineering of
diverse discipline projects. Focusing on the need of clients, BETS has expanded its activities in
diversified fields to develop areas of complementary expertise and strengthen firm’s capabilities.
Collective professional achievements include a large number of assignments spread all over
Bangladesh and of late in the Tajikistan, Kazakhstan, Azerbaijan, Georgia, Afghanistan, Pakistan,
Cambodia, Nepal, Albania, Somaliland, Tanzania, Vietnam, Papua New Guinea and Yemen.
The firm has a highly experienced team of about 450 experts and professionals in different fields.
BETS professional achievements include a large number of assignments spread all over Bangladesh
and abroad. BETS is staffed by eminent, experienced and qualified professionals. The professional
staff of BETS comprises Engineers of various disciplines, Project Management and Quality Assurance
Experts, Educationists, Designers, Agriculturists, Irrigation Specialists, Hydrologists, Energy
Specialists, Community & Institutional Development Specialists, Financial Analysts, Sociologists,
Economists, Socio-economists, IT Specialists, Environmentalists, Architects, Planners, etc. BETS also
has an active panel of associate consultants and advisors with rich experience in various fields and
known in their fields of expertise. They cover a wide range of disciplines and specialities. This has in
effect led to an integrated approach to planning, particularly for projects, which have multi-disciplinary
ramifications.
BETS has worked at both national and international levels for public as well as private sector clients
and has successfully participated many projects funded by most of the international funding agencies
like the WB, IDA, ADB, IDB, SFD, DFID, JICA, JBIC and other funding agencies and therefore is
familiar with their procedures.
BETS is an ISO 9001-2015 certified company and maintains quality management system standard. As
an ISO Certified Company, we mainly put emphasis on effective planning, operation and quality
management system processes. With quality assurance, the company is better equipped and prepared
to deliver at an even higher level.
Our clients range across the public and private sectors at home and abroad. They include govt., semi-
govt., local government, autonomous bodies, international, multi and bilateral funding agencies. We
help our clients to realize their objectives by developing and delivering practical solutions, adding value
to their services through application of our experience, innovative thinking and state-of-the-art
technology.
BETS has achieved an enviable record of success with an involvement in about 530 projects at home
and abroad. This level of experience was made possible by the application of highly specialized
expertise and total impartiality. This serves as a testimony to the reputation and trust gained over more
than 38 years of uncompromising effort.
BETS is proud to have been favoured with the trust and confidence by its many clients. BETS offers on
all projects international standard of creative thinking backed by diverse range of applicable
engineering technologies. Working to realize the dreams and hopes of people to improve their living
standards, BETS excels at concepts that continue to serve their purpose as key building blocks in the
expanding economic infrastructure.
3
Trainings and transfer of technology has become one of the integral project components for most of the
projects undertaken by BETS. Over time BETS has established a sound track record in the design and
implementation of training programs with particular focus on development of technical expertise geared
towards Continuing Professional Development (CPD), Institutional Capacity Building and Human
Resources Development (HRD).
The firm is registered with World Bank (32355), Asian Development Bank (000464) and Islamic
Development Bank (B310). As an independent consulting firm, BETS has no commercial, manufacturing
or contracting interest. The firm complies with the requirements for membership in the International
Federation of Consulting Engineers (FIDIC) and Federation of Consultants from Islamic Countries (FCIC).
General Information
Name of the Firm : BETS Consulting Services Ltd.
Acronym : BETS
Year of Establishment : 1979
Age of the Firm : 38 years
Type of Organization : Private Limited Company and registered under Joint Stock
Companies Act, 1913
Company Registration No. : C-7240/99 of 1979 – 80 dated August 14, 1979
(Renamed by Joint Stock Company vide Issue No. 25996 dated 5th
April 2005)
ISO 9001: 2015 Certificate No. : BAN450324
Tax Identification Number : TIN No. 238813160238, Taxes Circle-155, Taxes Zone-08 [Previous TIN : 2452000609]
VAT Registration No. : 18141055205 (Area Code : 180304)
Trade License : Trade License No. 03-00099, Ward No. 19, Issue No. 99, Issue Date 16/07/2013 under Dhaka North City Corporation
Mailing Address : House No. 10, Road No. 135, Gulshan-1, Dhaka-1212, Bangladesh
Telephone Numbers : Dhaka – (880 2) 9889923-24, 9861529-32
Telex/Fax Number : (880 2) 9889967
E-Mail : bets@betsbd.com; shabur@betsbd.com
Web : www.betsbd.com
Contact Person : Dr. Abdus Shabur, Managing Director
Tel: 880-2-9889923-4, 9861529-32
Fax: 880-2-9889967
Email: bets@betsbd.com; shabur@betsbd.com
4
Management The overall management of BETS rests on a Board of Management. All the Directors and General
Managers under Board of Management have proven qualification and experience with high level of
management capabilities. The management is familiar with the relevant development sectors of
national and international levels. The Board of Management convenes regularly to discuss policy
issues, project management and future course of activities.
Moreover, each and every Director/General Manager meets regularly with the senior division
professionals in order to identify and remove bottlenecks of the Department and discuss status of
different on-going projects and other relevant issues.
BETS management provides backstopping services to the projects including Quality Assurance,
Contractual Negotiations, Financial Management, Travel/Medical, Database Development, Project
Accounting, Report Production, etc.
In addition to that a fully developed Management Information System (MIS) is functional to generate
and provide required management information like status of ongoing projects, developing projects,
staff resources, inventories of documents, CVs, etc. The MIS is continuously updated to meet the
management requirement and to facilitate decision-making.
BOARD OF MANAGEMENT
Managing Director Dr. Abdus Shabur M.Sc.(Ground Water Engg.), Azerbaijan State University, Baku, Azerbaijan, 1982 Ph.D.(Hydrogeology), Azerbaijan State University, Baku, Azerbaijan, 1988
Director Dr. Emran Kabir Chowdhury Ph. D in Biotechnology, United Graduate School of Ehime University, Japan, 1997 MS. in Applied Microbiology, Kochi University, Japan, 1994 M. Sc. in Biochemistry, University of Dhaka, 1987
Director, Finance Ms. Ishita Kabir Bachelor in Economics, Monash University, Melbourne, Australia, 2005
KEY MANAGEMENT PERSONNEL
General Manager, Water Supply, Sanitation & Environment (WSE) Rupan Kanti Das M.Sc. Engg. (Water Resource), First Position, Asian Institute of Technology, Thailand, 1998. B.Sc. Engg. (Civil), First Class, Bangladesh University of Engineering and Technology, Dhaka, 1995.
General Manager, Infrastructure, Power & Energy (IPE) Md. Nazrul Islam, PEng Post Graduate Diploma (PGD) in Water Resources Development, IWFM, BUET, Bangladesh, June 2004. B.Sc. Engg., 1978 from Rajshahi Engineering College under Raishahi University, Bangladesh.
General Manager, Education & Social Science (ESS) Md. Badiuzzaman M.Sc. in Applied Mathematics, Dhaka University, 1977 Post Graduate Diploma in Development Planning from National Academy for Planning and Development, 2014
General Manager, Water Resources & Agriculture (WRA) A.F.M. Farooque B.Sc. Engineer (Civil) Bangladesh University of Engineering and Technology (BUET)
Advisor, Gas & Energy Sector Department Delawar Bakht, P.Eng. B.Sc. Engg. (Civil), BUET, Dhaka, 1968 M. Engg. (Civil), BUET, Dhaka, 1998 Completed works under Ph.D program with Environmental Engineering Division at BUET
5
BETS Organizational Structure
BETS
General Manager
Infrastructure,
Power & Energy
(IPE)
Rural & Urban Infrastructure
Roads and Bridge
Building
Power and Energy
Land Management
Railway
General Manager
Water Resources
& Agriculture
(WRA)
Flood Control
Drainage & Irrigation
Land Reclamation
Hydrology & Hydrogeology
Waterways & Port
Agriculture
General Manager
Education & Social
Science
(ESS)
Socio-economic studies
Institutional Development
Education
Financial Management & Banking
Information Technology
MIS, GIS
Advisory Panel
Legal Tax Financial
General Manager
Water Supply,
Sanitation &
Environment
(WSE)
Water Supply
Sanitation Sewerage &
Drainage
Environment
ETP, CDM
Solid Waste Management
SUPPORT SERVICES
Project Development & Bidding Unit
Admin. & General Services
Research, Development &
Applications
Accounts & Audit
GIS & CAD
6
Field of Activities Water Supply, Sewage and Sanitation
Sanitation Structures, e.g. Pumping Stations, Water
Treatment Plants etc. Urban and Rural Water Supply Environmental Sanitation
Water Supply System Planning and Engineering Sewerage System & Sewage Treatment Industrial Water & Waste Management
Water Pollution Control Solid and Municipal Waste Management
Environmental Assessment
Environmental Assessment including IEE & EIA Environmental Management Plan (EMP) Environmental Monitoring Services (EMS)
Resettlement Action Plan (RAP)
Water Resource Management and Agriculture
Water Resource Management Irrigation, Drainage, Flood Control & Land Reclamation
Embankment Protection Ground Water Modelling Ground Water Management
Hydrology and Hydrogeology Simulation modelling Agriculture and Rural Development
Infrastructure Development
Urban & Rural Infrastructure Development like Road, Bridge, Culverts, Drainage, Growth Centres, Power, Water & Sanitation System
Preparation of Master Plan Hill Tracts Regional Development Plan Hand Tube-well & Village Water Supply
Hand Tube-well Screening for Arsenic Contamination
Baseline Survey, Economic and Social Studies & Institutional Strengthening
Baseline Survey Socioeconomic Survey, Data Collection
Socioeconomic Studies Social Impact Assessment and Monitoring Impact Evaluation Studies
Focus Group Discussion Stakeholder Identification Monitoring and Evaluation
Capacity Building Institution Strengthening Community Development
Urban and Rural Planning
Community and Regional Planning Urban Planning and Design Housing Development
Stadium and Sports Ground
Transportation
Transport Planning & Economics
Traffic Surveys and Operations
Roads and Highways
Transportation System Engineering
Transport Physical Planning
Railway
Energy, Electrical & Mechanical Engineering
Energy Planning
Power Sector Planning & Strategy Gas Sector Planning & Strategy Power transmission
Power distribution Illumination & building electrification Telecommunication & telemetry systems
Infrastructure development Ventilation & air-conditioning Plumbing, fire fighting & Lifting
Maintenance management
Architecture
High-rise Building
Urban and Physical Planning Housing Commercial Complex
Universities / Institutions Hospitals Banks
Industrial Complex
Structural & Civil Engineering
Buildings Public, Residential & Commercial Structures e.g.
Theatres, Town Halls, Hotels, Hospitals etc. Industrial Plant Buildings and Structures
Agro-Industries
Agro-processing
Agro-industries Agro-management
River and Port
Surface Water Modelling
Jetties and Ports Ferry and Approach Roads River Morphology
River Engineering & Training
Information Technology (IT)
Computer Services System Study
Data Processing MIS & GIS Computer Aided Design
Procurement Monitoring System (PMS) Design
Training and Education
Curricula Development Design and programming
Program Implementation Institutional Strengthening Human Resource Development
Formal Education Classroom Training On the Job Training
Project Management
Organization Coordination Cost Planning
Cost Monitoring Project Scheduling Time Schedule Control
Quality Control
7
Key Personnel
In terms of manpower strength, BETS has now over 450 members of engineers, professionals and
support staff of various discipline, majority of whom are highly qualified, experienced, skilled with wide
knowledge of relevant modern technologies. They form a coordinated team to use the advanced
technical resources available to them, thus ensuring that projects of whatever nature are studied,
designed and constructed which best suit the requirements of the clients and incorporate the most up-
to-date technology and method available at that time.
Besides its full time staff, BETS has contractual arrangement with several specialized firms and individual experts who work as associates in specific projects under BETS’ overall management.
Professionals by Discipline
Water Supply, Sewage and Sanitation Engineer
Water Treatment Plant Specialist
Drainage & Irrigation Engineer
Planning and Design Engineer
Environmental Specialist
Water Resources Management Specialist
Hydraulic and River Engineer
Hydrologist/Hydro-geologist/Eng.
System Analyst/Data Management
Expert/Programmer
Training Specialist
Institutional Development Specialist
Survey Specialist
Socio-economist
Sociologist/Rural Credit Specialist
Communication Specialist
Road / Bridge Engineer
Structural Engineer
GIS Specialist
Geologist
Geo-technical Engineer
Civil Engineer (Construction)
Education Specialist
Management Specialist Environmental Specialist
Energy Specialist
WID Development/Gender Specialist
Finance & Accounting Management Specialist
NGO Specialist
Monitoring & Evaluation Specialist
Legal Specialist
Survey Specialist/Land Acquisition Specialist
Agricultural Engineer/ Agronomist, Fishery
Spec./Livestock Specialist
Petroleum Engineer
Chemical Engineer
Environmental Engineer
Electrical and Mechanical Engineers
Architect/Planner
Junior Engineer
Support Staff by Discipline Surveyors / Estimators
Administrative Officer/Accountant
Diploma Engineer
Computer Operator
Draftsman
Junior Officer / Enumerators
Driver
Office Assistants / Peon
Night Guard
Cleaner
Photocopy Operators
8
Staff Abilities
Surveys Studies Design & Planning Implementation Project
Management
Hydraulic Investigations
Hydrological Surveys
Hydrological Assessments
Geotechnics
Geology
Topography
Baseline Survey
Traffic
Inventories
Emission Surveys
Flora and Fauna
Land-use Planning
Sector Planning
Demand Studies
Feasibility Studies
Economic Evaluations
Financial Analysis
Master Planning
Environmental Assessments
Socio-economy
Forecasts
Concept Design
Preliminary Design
Final Design
GIS Development
Quantity Survey
Cost Estimate
Tender Documents
Bid Evaluation
Recommendation
Budgets
Supervision of Construction
Supervision of Installations
Documentation
Payment Certificates
Final Inspection and Certificate of Completion
Contract Documents
Objectives
Conflict Analyses
Public Relations
Official Authorization Procedure
Financial Planning
Monitoring
Work and Time Schedules
Cost, Time and Quality Control
Coordination
Training
9
Major Clients BETS has a long working relationship based on confidence and cooperation with major international and national agencies / organizations and institutions. Among others these are:
International
Asian Development Bank (ADB)
The World Bank (WB)
United Nations Fund for Population Activities (UNFPA)
United Nations Development Program (UNDP)
United Nations Children’s Fund (UNICEF)
Department For International Development (DFID)
International Fund for Agricultural Development (IFAD)
Ministry of Water Management & Amelioration, Tajikistan
Ministry of Transport, Tajikistan
Islamic Development Bank (IDB)
Ministry of Education, Tajikistan
Tajik Power Board (Barki Tajik), Tajikistan
Ministry of Urban Development and Housing,
Afghanistan
Afghan Association Coordination Unit
(AACA)Australian Youth Ambassadors for
Development Program, Australia
Japan International Cooperation Agency (JICA)
Occidental, Bangladesh
Chevron / UNOCAL, Bangladesh
Shell Hydrocarbons Holdings B.V.
Mott MacDonald (UK)
Mott Ewbank Preece (UK)
Cairn Energy Plc.
Okland Oil Company
Nippon Koei Co. Ltd. of Japan
Japan Engineering Co.
Ontario Centre for Environmental Technology
Advancement (OCETA), Canada
National
Dhaka Water Supply and Sewerage Authority (DWASA)
Chittagong Water Supply & Sewerage Authority (CWASA)
Khulna Water Supply and Sewerage Authority (KWASA)
Local Government Engineering Department (LGED)
Chittagong Port Authority and Mongla Port Authority
Department of Public Health Engineering (DPHE)
Bangladesh Water Development Board (BWDB)
Water Resources Planning Organization (WARPO)
Bangladesh Power Development Board (BPDB)
Rural Electrification Board (REB)
Department of Agricultural Extension (DAE)
Bangladesh Agricultural Development Corporation (BADC)
Roads & Highways Department (RHD)
CARE-Bangladesh
Ministry of Shipping (MoS)
Bangladesh Inland Transport Authority (BIWTA)
Ministry of Land (MoL)
Department of Environment (DoE)
Civil Aviation Authority of Bangladesh (CAAB)
Dhaka City Corporation (DCC)
Directorate of Land Records & Surveys (DLRS)
Petrobangla & its Operating Companies
Bangladesh Fertilizers and Agrochemicals Ltd.
Tullow Bangladesh Ltd.
Flood Plan Co-ordination Organization
Bangladesh Tobacco Company Ltd. (BTC)
Bangladesh Road Transport Corporation (BRTC)
Bangladesh Tea Board (BTB)
Directorate of Family Planning, GoB
Royal Danish Embassy, Dhaka
Bureau of Manpower Employment & Training
Bangladesh Telegraph & Telephone Board (BTTB)
Monirampur Pourashava Authority
Power Grid Company of Bangladesh (PGCB)
Biman Bangladesh (BB)
Bangladesh Railway (BR)
Ministry of Environment and Forest (MoEF)
Ministry of Chittagong Hill Tracts Affairs (MCHTA)
Ministry of Textile, Dhaka
Titas Gas Transmission & Distribution Co. Ltd. (TGTDCL)
Gas Transmission Company Ltd. (GTCL)
Bangladesh Petroleum Exploration & Production Company Ltd. (BAPEX)
The Unit for Policy Implementation (UPI)
Rajdhani Unnayan Kartipakkha (RAJUK)
Directorate of Primary Education
Ministry of Food
BGMEA
Lafarge Surma Cement
10
Major Funding Agencies
BETS worked in the projects funded by the following major funding agencies:
The World Bank (WB)
Asian Development Bank (ADB)
Islamic Development Bank (IDB)
Japan International Cooperation Agency (JICA)
United Nations Children's Fund (UNICEF)
United Nations Development Programme (UNDP)
Kreditanstalt für Wiederaufbau (KfW)
Duch Ministry of Foreign Affairs (DGIS)
World Health Organization (WHO)
Ministry of Foreign Affairs of Denmark (DANIDA)
The International Development Association (IDA)
The Department for International Development (DFID)
European Union (EU)
United States Agency for International Development (USAID)
International Fund for Agricultural Development (IFAD)
Canadian International Development Agency (CIDA)
Saudi Fund for Development (SFD)
Australian Government agency responsible for managing Australia's overseas aid program (AUSAID)
The Overseas Economic Cooperation Fund (OECF)
Commission of the European Communities (CEC)
The Norwegian Agency for Development Cooperation (NORAD)
Official Development Assistance (ODA), Japan
European Economic Community (EEC)
International Associates BETS has worked in association with more than 50 international consulting firms, the list of which is presented below: Adskill (Malaysia)
Arcadis, Euroconsult (The Netherlands)
AUSTRAINING International Pty Ltd. (Australia)
BCEOM (France)
Binnie & Partners Consulting Engineering (UK)
BKH (The Netherlands)
Booz, Allen & Hamilton, USA & Singapore
Camp Dresser & McKee International (USA)
CNR (France)
Coode & Partners (UK)
Coode Blizard (UK)
Corporate Solutions Ltd. (UK)
Lumina Geophysical L.L.C., USA
UGA SEISMIC SA, Argentina
GEUS, Geological Survey of Denmark and Greenland, Denmark
Ramboll Group A/S, Denmark
Danish Hydraulic Institute (DHI) (Denmark)
Danish Trading Co. (Pvt) Ltd. (Sri Lanka)
Delft Hydraulics (The Netherlands)
DEMAS (The Netherlands)
Department of Education Training and Employment (Australia)
DHV (The Netherlands)
Department of Land Administration (DOLA), Australia
Ernst & Young International, New York, USA
French Engineering (France)
GKW Consult (Germany)
HPC Hamburg Port, Consulting GMBH (Germany)
International Development Institute for Organization and Management, USA
IWACO B.V (The Netherlands)
Lahmeyer International (Germany)
Lanka Engineering Services (Sri Lanka)
Lechner & Partners (Germany)
Louis Berger (USA)
Martech International Inc. (USA)
MI Environmental Services (USA)
Mott MacDoland (UK)
Nathan Associates, USA
North West Hydraulics (Canada)
OPCV (Australia)
Pricewaterhouse Coopers (Canada)
Rhein-Ruhr (Germany)
Royal Haskoning (The Netherlands)
SATEC Development (France)
SEBA Messtechnic (Austria)
Shawining Lavalin Inc. (Canada)
Sir William Halcrow & Partners Ltd. (UK)
Sloner Associates Inc. (USA)
Span Consultants Pvt. Ltd. (India)
Span Travers Morgan Intl. Ltd. (India)
Thames Water International (UK)
WS Atkins International Ltd. (UK)
NEXENT, USA
RRI Beller GMBH Consulting Engineers, Germany
Kocks Consult GmbH, Germany
Wood Mackenzie Ltd. UK.
Mega Engineering Ltd., Canada
TG Engineering Inc., Canada
Northstar Drillstem Testers Inc., Calgary
Consulting Engineering Services Pvt (India) Ltd. (CES), India
Scott Wilson, India
11
Hi-Tech International, USA
SMART Engineering Team, Afghanistan
NESPAK, Pakistan
JPZ, Malaysia
SAMES (Pvt.) Ltd., Italy Aarvee Associates Architects
Engineers & Consultants Pvt. Ltd., India
ABT Associates, INC., USA
ACE-Agrar Consulting GmbH Einbeck, Germany
ACIL Australia Pty. Ltd., Australia
ACRES INTERNATIONAL, Canada
AFC Consultants International GmbH, Germany
Agribusiness International Pty. Ltd, Australia
Agriconsulting S.P.A, Italy
ALMEC Corporation, Japan
Amberg Consulting Engineers Ltd., Switzerland
Ambidji Group Pty Ltd (THE), Australia
Aquanet BV, The Netherlands
ARD Inc. (Associates in Rural Development), U.S.A
Asia Pacific Engineering Consultants J.V Co., Vietnam
ASPI Consulting Engineers, Inc., Azerbaijan
Associated Consulting Engineers-ACE (Pvt.) Ltd., SA
Australian Water Technology (AWT), Australia
Bceom Societe Francaise Dingenierie, France
Beijing IWHR Corporation (BIC), China
Benchmark International Group Pty. Ltd., Australia
BKH Consulting Engineers, Netherlands
Black & Veatch, USA
BRGM, France
BRL Ingenierie, France
CAI Consulting (formerly MNT Consulting), Kyrgyz
Camp Dresser & Mckee International Inc., USA
Canora Asia Inc., Canada
Cardno MBK International Pty. Ltd., Australia
Carl Bro Group, Denmark
Chakra Infrastructure Consultants Private Limited, India
Chemonics International, INC., USA
CNR (Compagnie Nationale du Rhone), France
Connell Wagner Pty Ltd, Australia
CONSIA, Denmark
Consulting Engineers, Architects and Planners, India
Cowater International Inc., Canada
COWI Consulting Engineers and Planners AS,
Denmark
CPCS UPHAM CORPORATION, U.S.A
CRE Group Ltd., UK
Cumming Cockburn Ltd. (Water Resources Group),
Canada
Dainichi Consultant Inc., Japan
Dames & Moore, Inc., USA
Dangroup International, Denmark
Danish Road Directorate, Denmark
Darul Handus, Lebanon
DDFC Group of Companies,
DEMAS Dredging Consultants BV, Netherlands
Dessau-Soprin International, Inc., Canada
DEVTEC Nepal Pvt. Ltd., Nepal
DHV, Netherlands
DOHWA Consulting Engineers Co. Ltd, Korea
Dorsch Consult Ingenieurgesellschaft Mbh, Germany
Duerden &Keane Consultants Inc., Canada
Fichtner Water & Transportation GmbH, Stuttgart
FINNISH ENVIRONMENT INSTITUTE, Finland
FINNROAD LTD, Finland
Full Bright Consultancy, Nepal
German Water and Energy GMBH, Germany
GFA Management GmbH
GFA MANAGEMENT GMBH, Germany
GHD PTY LTD, Australia
GHK (HONG KONG) LTD.,
Gibb Limited, UK
Gitec Consult GmbH, Germany,
Green City India
Hagler Bailly, USA
HALCROW, UK
Haskoning BV Consulting Engineers, Netherlands
Hassall and Associates Pty. Ltd., Australia
Hatch Associates Ltd., Canada
Hifab, Sweden
HYDRO - YEMEN, Yemen
HYDROPLAN Ingenieur-Gesellschaft mbH, Germany
Hydrosult Inc, Canada
I.T. Transport Limited, U.K
IDEA Consultants, Inc., Japan
Indochine Engineering Vietnam Ltd,
INDUS ASSOCIATED CONSULTANTS (PVT) LTD.,
Pakistan
Intercontinental Consultants & Technocrats Pvt. Ltd. -
TRANSPORTATION, India
Intercontinental Consultants and Technocrats Pvt. Ltd,
India
INTERNATIONAL RESOURCES GROUP, LTD., USA
IOS PARTNERS, INC., U.S.A
ITECO Engineering Ltd., Switzerland
ITECO Nepal (P) Ltd., Nepal
IWACO (Consultant for Water & Environment)
Jaako Poyry Group, Finland
Japan Overseas Consultants (JOC), Japan
Joyce Engineering, Inc., USA
Jurutera Perunding Zaaba Sdn. Bhd., Malaysia
Kampsax AB, Sweden
KAMPSAX INTERNATIONAL A/S, Denmark
KATAHIRA & ENGINEERS INTERNATIONAL, Japan
Kellogg Brown & Root Pty Ltd. , Australia
KEO International Consultant, Kuwait
Kiso Jiban Consultants, Japan
KOCKS Consult GMBH, Germany
KOMEX International Ltd. Canada
Lahmeyer International GMBH, Germany
LANDELL MILLS LIMITED, UNITED KINGDOM
LEA INTERNATIONAL LTD., CANADA
LEADING EDGE AVIATION SDN.BHD., Malaysia
Les Consultants LBCD Inc., Canada
Lincoln International, NZ
Louis Berger International Inc.,
Mandala Agricultural Development Corporation,
MARTECH International, Inc.,
MBH, S.D.C CONSULTING CO., LTD, Cambodia
Melbourne Enterprises International Ltd., Australia
Montgomery Watson,
Mott Macdonald, U.K
N K Buildcon Pvt. Limited, India
12
Ecology & Environment, USA
EGIS Consulting, Australia
Engcon Limited, Canada
ENGCONSULT LTD., Canada
ENTEC UK LTD., UK
Environment & Resource Technology Ltd., Scotland
Environment Resource Management (ERM), United
Kingdom
Environmental Services, Australia
Environmental Technologic Consultant Co., Ltd., Japan
Epos Health Consultants GMBH, Germany
Ernest & Young, India
ESSEM CONSULTANTS, India
EVS Environment Consultants Ltd., Canada
Nippon Koei Co. Ltd., Japan
NJS Consultants Co. Ltd., Japan
NOVATEC CONSULTANTS INC., Canada
OPERATIONS RESEARCH GROUP (ORG), India
Pacific Consultants International, Japan
Plancenter LTD., UNITED STATES
PADCO, U.S.A
Posford Duvivier, United Kingdom, U.K
Poyry GKW, Germany
PriceWaterhouseCoopers
PROWA BLACK & VEATCH GMBH, Germany
Ramboll, Hannemann and Hojlund A/S, Denmark
RESEARCH TRIANGLE INSTITUTE, USA
RESOURCE FUTURES INTERNATIONAL, Canada
Rhein Ruhr Ingenieur- Gessellschaft
SMART Engineering Team, Ltd. (SET), Afghanistan
S.D.C CONSULTING CO., LTD, Cambodia
SAI Consulting Engineers Pvt. Ltd., India
Scott Wilson Kirkpatrick & Co Ltd. U.K
SEATEC Group,
SENES Consultants Limited, Canada
SETEC Engineering GMBH & Co., KG,
Shah Consult International (P.) Ltd., Nepal
Shah Technical Consultants Private Limited, India
Sheladia Associates & Consultants (India) Pvt. Ltd.,
India
National Engineering Services Pakistan (pvt.) Limited,
Pakistan
Netherlands Economic Institute (NEI), The Netherlands
Sheladia Associates, Inc. USA
SHIMIZU CORPORATION, JAPAN
Sinclair Knight Merz Pty. Ltd., Australia
SMEC INTERNATIONAL PTY LTD, Australia
SNC Lavalin Int. Inc., Canada
SOFRECO, France
SOGREAH CONSULTANTS, France
Span Consultants Pvt. Ltd., India
Stanley Consultants Inc., USA
STATKRAFT GRONER AS, NORWAY
TAMS Consultants Inc, USA
Tata Consultancy Services (TCS),
Thames Water, UK
The ARA Consulting Group Inc., Canada
The Arvind Mills Ltd, India
The Louis Berger Group, USA
The Royal Tropical Institute, The Netherlands
The S.M. Group International Inc., Canada
UBI Consulting, Uzbekistan
ULG Northumbrian Ltd., U.K
UNITED STATES, U.S.A
URBAS, Swiss Consortium
VKI, The Netherlands, Netherlands
W.S. Atkins Ltd., UK, U.K
WAPCOS, India
Water &Power Consultancy Services Limited, India
WESTON, USA
Winrock International Institute for Agricultural
Development, USA
World Aquaculture, France
WS Atkins Ltd., UK
WSP INTERNATIONAL
Registration with International Funding Agencies & Professional Organisations
BETS is a registered with the following National and International Funding Agencies:
The World Bank (32355)
Asian Development Bank (000464)
Islamic Development Bank (B 310)
United Nations Global Marketplace (UNGM) (518781)
Federation of Consultants from Islamic Countries (FCIC) – Registration No. 612)
The Dhaka Chamber of Commerce & Industry (DCCI) (3379),
Bangladesh Association of Consulting Engineers (BACE) (02/05, 02/04/05)
Bangladesh Association of Software and Information Services (BASIS) (G-027)
Department of Environment (DOE), Bangladesh
Bangladesh Survey Organization
Economic Relations Division (ED), Bangladesh (Enlisted No. 84023)
13
Experience Profile
International Projects
Andkhoy-Aquina (34 km) Road, Doshi-Pol E Khomri (51 km) Road, Jabul Saraj – Sourbi (50
km) Road, Fayzabad – Eshkashim (43 Km) Road, Baharak – Eshkashim Road (114KM) Road
Project, Afghanistan
Mini Hydro Power Plants in Rural
Areas, Tajikistan
Secondary School Reconstruction
Project, Tajikistan
Construction of Social Infrastructure
Facilities of IDPS in Azerbaijan
Dangara Valley Irrigation Project,
Tajikistan
Irrigation Rehabilitation Project, Tajikistan Dangara Valley Irrigation Project,
Tajikistan
CAREC Transport Corridor I
Investment Program, Kazakhstan Buna Bridge (Multispan Bridge)
Albania
National Testing Center,
Dushanbe, Tajikistan
14
Major Overseas Projects
Sl.
No. Country Project Client / Executing Agency
Funding
Agency Period
1) TAJ Water Resources Management in Pyanj River Basin-5 Project Implementation and Monitoring Consulting Services for ALRI
Agency for Land Reclamation and Irrigation of the Republic of Tajikistan (ALRI)
ADB 2017-2021
2) Kurgan-Tyube Solid Waste - Project Implementation Support, Engineering Design Services and Contract Supervision, Tajikistan
SUE Khojagii Manziliyu Kommunali in Kurgan-Tyube City, Tajikistan
EBRD 2015-2018
3) Technical Support for Development of Feasibility Report for Flood Controlling Measures on Flood Channel Tebalaisai Above the City of Kulyab for its Protection (Contract No. PAMPII-QCBS-001), Tajikistan
State Institute Project Management Unit Ferghana Valley Water Resources Management Project, Tajikistan
IDA 2015-2016
4) Melamchi Water Supply Project - Design and Construction Supervision Consulting Services during Construction for Headworks and Melamchi Diversion Tunnel, Nepal
Melamchi Water Supply Board Government of
Nepal 2015-2017
5) Water Supply of the City of Kabul - Implementation of Mid-Term Programme 1 (MTP 1), Afganistan
Afghan Urban Water Supply and Sewerage Cooperation (AUWSSC)
KfW 2015-2018
6) Grant 0352-TAJ: Building Climate Resilience in the Pyanj River Basin Implementation Support to State unitary enterprise for housing and communal services (KMK), Rural Water Supply Tajikistan
State Unitary Enterprise "Khojagii Manzilii Kommunali"
Asian Development Bank (ADB)
2015-2018
7) Private Sector Development Reengagement Phase II, Consulting Services Solid Waste Management, Somaliland
Hargeisa Municipality, Republic of Somaliland
World Bank 2012-13
8) Consulting Services for Construction Supervision Lae Tidal Basin Project, Phase-I , Papua New Guinea
Korea Engineering Consultants Corp. (KECC), Korea
Asian
Development
Bank (ADB) 2012-14
9) Provision of Construction Supervision Consultancy Services for Urban Infrastructure Development in Mbeya City under The Tanzania Strategic Cities Project (TSCP)
City Director, Mbeya City Council, Mbeya, Tanzania
International Development
Association (IDA) 2011-14
10) Construction Management and Supervision Services for Rehabilitation Works for IDP Housing for Six (6) Former Hospital Buildings and Partial Rehabilitation Works for Twenty two (22) Collective Centers for IDP Durable Housing
Municipal Development Fund (MDF) of Georgia
USAID 2014
11) Construction of Modern Rural Houses (Phase 1) Technical Review of the Constructed Houses and Associated Infrastructures (access and internal roads, access and internal water supply system) in Samarkand, Tashkent and Fergana Regions Istisn’a Agreement (UZB-0075), Uzbekistan
“Qishloq Qurilish Invest” LLC IDB 2017
12) Project Preparatory Consultant for the Sustainable Hydropower Project (Sub-consultancy), Uzbekistan
ADB ADB 2017-2018
13) Additional Financing for Municipal Infrastructure Development Project (AF MIDP
AF MIDP, Tajikistan
IDA 2013-15
15
Sl.
No. Country Project Client / Executing Agency
Funding
Agency Period
14) Development of a comprehensive framework for the introduction of River Basin Management to Tajikistan and Support to Local Authorities in the Project Area, Responsible for the Operation and Management of Irrigation and Drainage Schemes
State Institution Project Management Unit Ferghana Valley Water Resources Management Project, Tajikistan
European Community
2011
15) Design and Detailed Engineering for the National Testing Center in Dushanbe
Ministry of Education, Republic of Tajikistan
IDA 2011-13
16) Dahla Dam Project ("Arghandab Irrigation Rehabilitation Project") in Afghanistan (Sub-consultancy)
Ministry of Energy and Water (MEW), Afghanistan
Canadian International Development
Agency (CIDA)
2009-12
17) Detailed Survey and Design of Small and Medium Dams and Related Structures (Sub-consultancy)
Afghanistan Reconstruction and Development Services (ARDS) under Ministry of Energy & Water, Afghanistan
Govt. of Afghanistan
Sep 2010-Apr 2011
18)
Ministry of Urban Development Affairs (MUDA) and Afghan Urban Water Supply & Sewerage Corporation (AUWSSC)
Sub-Contractor Agreement for Northern Provinces Afghanistan Urban Water Supply Programme II, Afghanistan
Govt. of Afghanistan
2010-12
19) Construction Supervision of Fayzabad-Behrak Road Project
Ministry of Public Works, Afghanistan
Govt. of Afghanistan
2012-14
20) Supervision Consultancy for Construction of Road between Jabul Saraj – Sourbi (50 KM) [Jabul – Nijrab]
ARDS under Ministry of Public Works, Afghanistan
ABD Oct 2010-Sep 2016
21) Capacity Building to Ministry of Public Works - Transport Network Development Investment Program, Tranche 1
Ministry of Public Works, Afghanistan
ADB Jan 2014-Jan 2015
22) Dushanbe Solid Waste Management Project
Executive Body of the State Power of the City of Dushanbe, Tajikistan
EBRD (European Bank for
Reconstruction & Development)
Jan-Sep 2010
23) CAREC Transport Corridor I (Taraz-Korday Section) Investment Program; CSP-1 Project Management Consultant
Committee for Roads, Ministry of Transport and
Communications, Kazakhstan ADB
Dec 2009 May 2013
24) Consultancy services on Strengthening Human Capital and Institutional Capacity of Tax Committee
Tax Committee The Government of the Republic of Tajikistan
IDA 2009
25) Consultancy Services for Construction and Equipment for School Project, Phase-II
Ministry of Education, General Construction Division, Republic of Tajikistan
SFD Aug 2009 - Jun 2012
26) Khatlon Province Flood Risk Management Project [ADB LOAN NO. 40046]
Ministry of Water Resources and Land Reclamation (MWRLR), Tajikistan
ADB 2008-12
27) Consultancy Services for Management, Design, Monitoring and Supervision of Irrigation Rehabilitation Project ADB LOAN NO. 2124-TAJ (SF)
Ministry of Water Resources and Land Reclamation (MWRLR), Tajikistan
ADB 2006-2012
28) Design of Works and Installations for Rehabilitation of Irrigation and Drainage Systems and for Strengthening of Reservoir Embankments under Ferghana Valley Water Resources Management Project
Project Management Unit (PMU), FVWRMP , Tajikistan
IDA 2008-09
29) Golbahar Storage Dam Project, Social Survey, Environmental Assessment and Economic Feasibility Study
Ministry of Energy and Water (MEW), Afghanistan
MEW 2008-09
30) Consultancy Services for Major Works in Wadi Ahwar under 'Irrigation Improvement Project' (Sub-consultancy)
Ministry of Agriculture and Irrigation, Yemen
IDA 2008
16
Sl.
No. Country Project Client / Executing Agency
Funding
Agency Period
31) Emergency Rehabilitation of Calamity Damage Project Vietnam (Sub-consultancy)
The government of Socialist Republic of Vietnam
ADB 2009
32) ADB TA 6478-REG: Preparing the Second Northern GMS Transport Network Improvement Project (Sub-consultancy)
ADB/DCI, Vietnam ADB 2009
33) Farah Rud Irrigation and Hydropower Project
Ministry of Energy and Water, Afghanistan
Govt. of Afghanistan
2006-07
34) Feasibility Study of Kelagai Storage Dam Project’
Ministry of Energy & Water, Afghanistan
Govt. of Afghanistan
2007-08
35) Feasibility Study for Small and Medium Dams Project
Ministry of Energy & Water, Afghanistan
Govt. of Afghanistan
2006-08
36) Construction Supervision of Dangara Valley Irrigation Project (Phase-1)
Ministry of Water Management & Amelioration, Republic of Tajikistan
IDB 2002-05
37) Consultancy Services for Developing a Comprehensive Bankable Document, Detailed Engineering Design and Tender Documents for the Dangara Valley Project
Ministry of Water Management & Amelioration, Republic of Tajikistan
IDB 1999-00
38) Accurate Engineering Surveying, Designing, Supervision and Monitoring under the Project “Construction of Social Infrastructure Facilities for IDPs in Azerbaijan”
Social Fund for Development of IDPs (SFDI), Azerbaijan
IDB 2006-09
39) Training Program on “Micro Credit” for Tajik Participants
PMU, Farm Privatization Support Project, Tajikistan
WB 2005
40) Detailed Design, Bidding Documents and Supervision of Works under Dushanbe Water Supply Project
Dushanbe Water Supply PMU, Dushanbe, Tajikistan
IDB 2007-10
41) Extension of the Water Supply System
of Kabul (Water Supply Kabul-II),
Afghanistan
Ministry of Urban Development
and Housing (MUDH) of the
Government of Afghanistan
KfW-Entwick-
lungsbank 2005-10
42) Re-establishment & Operation of Water Supply and Sanitation Services in Selected Provincial Towns
Afghan Association Coordination Unit (AACA) , Afghanistan
IDA 2003-11
43) Water Distribution System Leak Detection Program under Municipal Infrastructure Development Project
PMU, Municipal Infrastructure Development Project, Tajikistan
WB 2007-2009
44) Preparation of Service Delivery Development Program and Management Improvement Program
PMU, Municipal Infrastructure Development Project, Tajikistan
WB 2007-2009
45) Detailed Engineering Design, Procurement Assistance, Project Management and Construction Supervision Consultancy Services of Andkhoy-Aquina Road, Con-II
The Ministry of Public Works (MPW) of Islamic Republic of Afghanistan
IDB 2007-2013
46) Consultancy Services for Detailed
Engineering Design, Procurement
Assistance, Project Management and
Construction Supervision of Doshi-Pol
E Khomri Road, Con-I
The Ministry of Public Works
(MPW) of Islamic Republic of
Afghanistan
IDB 2007-2009
47) Construction of Mini Hydro Power
Plants in Rural Areas of Tajikistan Ministry of Energy, Tajikistan IDB 2005-07
17
Sl.
No. Country Project Client / Executing Agency
Funding
Agency Period
48)
“Assistance in Formulating Courses
Based on Banking Services” under
Capacity Building Technical Assistance
Foreign Investment and
International Financial
Institutions Department,
National Bank of Tajikistan
(NBT) , Tajikistan
IDB 2005-06
49) Consultancy Services for Completion
of Construction and Provision of
Equipment for Three Secondary
Schools in Tajikistan
Ministry of Education, Republic
of Tajikistan SFD
2004-06
50)
Institutional and Policy Support to the
Transport Sector, Tajikistan
Ministry of Transport, Republic
of Tajikistan ADB 2004
51) Feasibility Study of Turkmenistan-
Afghanistan-Pakistan Natural Gas
Pipeline Project II, ADB TA-6153-REG
Govt. of Pakistan ADB 2004
52) Reconstruction and Completion of
Comprehensive Secondary Schools
Project
Ministry of Education, Republic
of Tajikistan IDB 2000-03
53) TA 3601-TAJ Introduction of
International Accounting Standards at
Barki Tojik
Barki Tojik (Tajik Electricity
Board), Republic of Tajikistan ADB 2001-02
54) Structural Configuration of Buna
Bridge and Cost Comparison Between
Early Designed Multispan Bridge and
Proposed New Bridge Schemes with
Movable Span in Albania
General Roads Directorate,
Ministry of Transport and
Telecommunications, Tirana,
Republic of Albania
IDB 2005-06
55) Strengthening Embankment along
Pyanj River under Irrigation
Rehabilitation Project
Ministry of Water Resources &
Land Reclamation (MWRLR),
Tajikistan
ADB Oct - Nov
2006
56) A diagnostic assessment of the
Cambodian Payment and Settlement
System, and the project to upgrade
Information Technology in the
National Bank of Cambodia (TA 4835-
CAM: Preparing the Financial Sector
Development Program)
National Bank of Cambodia ADB 2007
57) ADB Loan No. 2053-TAJ (SF):
Education Sector Reform Project
Ministry of Education, Republic
of Tajikistan ADB 2006-2009
58) Dushanbe-Kyrgyz Border Road
Rehabilitation Project (Phase-II)
Ministry of Transport, Republic
of Tajikistan ADB 2005
18
PROMINENT PROJECT
Reviewing of the Design, Construction Supervision of EPC/Turnkey Contract & Contract Management for 500 MLD Capacity of Dasherkandi Sewage Treatment Plant Project.
Feasibility Study and Design for Improvement for Improved Latrine in Extremely Hard to Reach Areas under National Sanitation Project (Phase-III), DPHE
TA-7872 BAN: Khulna Water Supply Project of KWASA funded by ADB
Technical Assistance and Supervision of 40 Pourashavas and Growth Centre Water Supply & Environmental Sanitation Project (Phase-II)
Design, Construction Supervision and Related Services under KWSP2
Establishing Water Safety Plan (WSP) in Water Supplies of Sylhet City Corporation.
BRAC WASH Low Cost Sanitation under WASTE, funded by IRC
Feasibility Study, Design and Construction Supervision of Modunaghat Water Treatment Plant and related Transmission Pumping Facilities
Installation of Surface Water Treatment Plant at CPA Premises, Chittagong Port Authority
Design and Supervision Consultancy Services for Khulna Water Supply Project (ADB Component)
Consultancy Services for 37 District Towns Water Supply Project of DPHE
Strengthening Resilience of Urban Water, Drainage and Sanitation Sector to Climate Change in Coastal Towns
Preparation of Design & Estimation of Sewerage & Storm Water Network of Jahurul Islam City (Aftabnagar)
TA & Supervision of the IDB Assisted Water Supply & Sanitation Project in Cyclone Prone Coastal Areas of Bangladesh of DPHE
Detail Design & Construction Supervision for Development of Water Supply System in Khulna City under KWASA
Water Supply System Expansion and Rehabilitation of Narayangonj Town
Design and Management Consultancy (DMC) of Dhaka Water Supply Sector Development Project
Saidabad Water Treatment Plant Project Phase II Karnafuli Water Supply Project funded by JBIC Sylhet-Barisal Water Supply & Sanitation Project of
DPHE Conducting Detailed Engineering Design and
Construction Supervision of Water Supply and Environmental Sanitation Project in Mongla Pourashava, Mongla, Bagerhat
Review and Revisions of the Sector Development Programme (SDP) for the Water and Sanitation Sub-sector in Bangladesh, PSU, Local Government Division
Dhaka Integrated Environment & Water Resources Management Project (DIEWRMP), DWASA
Formulation of National Guidelines on Water Safety Framework (WSF) in Bangladesh, DPHE
Feasibility Study for Khulna Water Supply Improvement Project in the People's Republic of Bangladesh, NJS
Mohara & Kalurghat Water Treatment Plant Rehabilitation of CWASA
Pourashava (Municipality) & Thana (Sub-district) Water Supply and Sanitation Project of DPHE
Dhaka Water Supply Project Sludge Sample Analysis and Reporting Services of
TULLOW The Project for Advancing NRW Reduction Initiative of
Chittagong WASA funded by JICA Feasibility Study and Preparation of Project Proposal on
Rural Piped Water Supply Scheme Sample Survey for Region-Wise Drinking Water Supply
Coverage Removal of Water Logging in Dhaka City 18 District Town Water Supply & Sanitation Project Improved Sanitation Services Project Leak Detection and Waste Prevention Program Feasibility Study of Banderban Pourashava Water
Supply Municipal Services Project
MAJOR LOCAL PROJECTS
Water Supply, Sanitation, Sewerage & Drainage
Millions of people have safe water as a result of BETS water supply & sanitation
projects. BETS has carried out more than 110
water supply & sanitation projects
Water Supply and Sanitation is one of the sectors where BETS has proven capability and expertise. It is uniquely qualified in providing large scale water supply and sanitation services. The firm has provided services on feasibility studies, management and operational support, detailed design, system evaluations, strategy study, policy formulation etc., in water supply, water treatment, sewage management, pollution control, urban and rural sanitation, water conveyance, pumping and water distribution fields including institutional and human resources development. BETS has specific capability in leak detection, waste prevention, unaccounted for water management and improved sanitation. The tally is high by any standard: over 95 success stories in water supply, sewerage and sanitation projects.
Planning
Master Plan, Feasibility Study
Water Resource Development
Leakage/UFW (Uncounted for water) Control
Water Quality Control
Pollution Control
Strategy Study
Policy Formulation
Facilities Design & Construction Management
Intake System
Treatment Process
Transmission and Distribution System
Automated System
Hydraulic/Surge Analysis
Project Management / Construction Supervision
Testing & Commissioning
EXPERTISE
CONSULTING SERVICES
19
CONSULTING SERVICES
Water Resources Management / Development
BETS has improved sustainable water resources management for last 38 years and has carried out more than 90 water resources management & development projects
BETS is a leading firm in Bangladesh in Water Resources
Development/ Management. This sector has assembled expertise over a wide spectrum of disciplines starting from topographic/cadastral
surveys, geo-technical & geo-physical investigations, planning & design of irrigation, flood control & drainage systems and structures, dam
design and safety, barrages, weirs, siphons, super passages, spillways,
canals, lift irrigation and plumping stations, command area development, evaluation and monitoring studies, cost-benefit studies,
economic analysis, social costs & benefits, project management, contract administration, etc. of specific mention is its involvement in
the preparation of prestigious National Water Management Plan. BETS was involved in CPP/FAP 20, 9B, 3, 24, 6, 21 & 22 Components of
Flood Action Plan (FAP) Projects out of 26 components undertaken by
Bangladesh after the severe flood in 1988.
Planning
Water Resources Development and Management Planning
River Basin Management Planning
Irrigation, Flood Control and Drainage System Planning
Erosion/Sediment Control Planning
River Training & Urban Drainage Planning
PROMINENT PROJECT Inland Waterway Dredging Feasibility Study Bangladesh
Trade and Transport Facilitation Studies RETF Project Irrigation Management Operator (IMO) for Muhuri
Irrigation Project (MIP), BWDB The Inventory Survey of Hydraulic Structures of Water
Resources Development along the Manu River in Moulvibazar O&M Division, BWDB
Management, Design & Supervision and Other Related Services for Haor Flood Management and Livelihood Improvement Project, BWDB (JICA funded)
JICA Project for Capacity Development of Management for Sustainable Water Related Infrastructure in The People's Republic of Bangladesh
Integrated Planning for Sustainable Water Management (IPSWAM) - Blue Gold Program
Field Survey, Investigation and Feasibility Study (FISIS) of 5 (five) Nos. Rubber Dam
Preparatory Survey on Upper Meghna River Basin Watershed Management Improvement Project
Innovations for More Food with Less Water - Task 2: Country and Project-Specific Recommendations and Pilot Initiatives (4572-001) -(Sub-consultancy Agreement with Lahmeyer International)
JICA Data Collection Survey on Water Resources Management in Haor Area of Bangladesh, JICA
ADB TA-8074 REG: Applying Remote Sensing Technology in River Basin Management
Data Collection under the Project "Support to JICA Study Team for Water Resources Development Poject in Meghna Basin"
Feasibility Study for Capacity-Building Project for Sustainable Development of Water-Related Infrastructure Part-2 & Part-3
Feasibility Study of Capital Dredging and Sustainable River Management in Bangladesh of BWDB; funded by GoB
Char Development and Settlement Project-IV (CDSP lV) funded by BWDB, LGED & DoF
Investigation & Feasibility Study of Rubber Dam under Construction of Rubber Dams in Small & Medium Rivers for Increasing of Food Production Project
Feasibility Study for Sureswar Flood Control, Drainage & Irrigation Project (Main Consultant)
Feasibility Study for Integrated Water Management Project of Gungiajuri Haor Area
Feasibility Study and Detailed Engineering for Ganges Barrage
Flood Damage Rehabilitation -2007 Works Under WMIP Estuary Development Program (EDP) (under Dutch
Assistance) Detail Engineering Design for Kurigram Irrigation Project
(North Unit) of BWDB Inventory Survey Related to Water Resources
Development in Greater Mymensingh Pre-feasibility Study for Drainage Improvement of Dhaka-
Narayangonj-Demra (DND) Irrigation Project Command Area Development Project-II Feasibility Study for Integrated Water Resources
Management of Chalan Beel Area including Halti Development Project
Char Development and Settlement Project National Water Management Plan BWDB Systems Rehabilitation Project Compartmentalization Pilot Project (CPP/FAP 20) – Ph-I Small Scale Flood Control Drainage and Irrigation
(SSFCDI) Project Gorai River Restoration Project North-East Regional Water Management Project (FAP-6) Bank Protection and River Training/AFPM Pilot Project
(FAP 21/22) Training Program for the River Survey Project FAP-24 North Central Regional Study (FAP 3) Meghna River Bank Protection Short Term Study (FAP9B) Flood Damage Restoration Project Feasibility Study, Detail Design and Construction
Supervision of Shrimp and Aquaculture Component Feasibility Study, Detailed Design & Construction
Supervision of Fish-Pass and Fish-Friendly Structures-Phase-II under Fourth Fisheries Project
Feasibility Study of Baral Basin Development Project
EXPERTISE
Design and Management River/Urban Drainage Facility
Design
Design of Irrigation, Flood Control & Drainage System
Project Management / Construction Supervision of Water Resources Facilities
Modelling Hydrologic, Hydraulic and
Water Quality Study
Mathematical Modelling
GIS Modelling
20
PROMINENT PROJECT Environmental Impact Assessment (EIA) & Resettlement Action
Plan (RAP) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh
Strategic Environmental Assessment (SEA) under JICA Data Collection Survey on the Matarbari Port Development in Bangladesh
Conducting Environmental and Social Impact Assessment (ESIA) of Kaliakoir High Tech Park, BTL
Regulatory Review for Liquefied Natural Gas Floating Storage and Regasification Unit and import terminal infrastructure, Moheshkhali Island, Bangladesh
Detailed Techno Feasibility Study and Conceptual Master Planning at Payra Port (Einvironmental and Social Assessment)
Consulting Services for Engagement of Environment Monitoring Consultant for Investment Promotion and Financing Facility (IPFF) Project, Bangladesh Bank
Environmental Impact Assessment (EIA) and Abbreviated Resettlement Action Plan (ARAP) Studies for Selected Gas Transmission Pipeline Projects of GTCL under the Preparatory Survey on the Natural Gas Efficiency Project
Environmental Impact Assessment (EIA) for HILIP Project Areas Compaising 28 Haor Upzilas of 5 Districts, LGED
Environmental Management Plan (EMP) Study for 10 (Ten) Existing Plans of Sylhet Gas Fields Limited.
Environmental Impact Assessment (EIA) in favour of Offshore LNG Floating Storage and Regasification Unit (FSRU) Terminal permanently moored at Island / Finger Jetty Activities Project at Maheshkhali area under Cox's Bazar District
Environmental Impact Assessment (EIA) study along the selected route of the proposed Gas transmission pipeline from Jalalabad to Danua via Bibiyana
EIA study along the selected route of the proposed Gas transmission pipeline from Moheshkhali to Anowara
Agro-Environmental Impact Assessment (AEIA) and Determination of Water Logged Area of South of the Padma River (Faridpur, Rajbai and Gopalgonj Districts)
Onshore Surveys (FEED & PMC for Installation of a SPM and Pipeline System) of Eastern Refinery Ltd.
Offshore & Onshore EIA studies for installation of a Single Point Mooring & Pipeline System of Eastern Refinery Ltd.
Conduct EIA Study for (a) 5000 BPD capacity Condensate Fractionation Plant with Catalytic Reforming Unit and (b) 1500 BPD capacity Catalytic Reforming Unit CRU at Rashidpur to convert Petrol into Octane at Kamaichera, near Railway Station at Upazilla-Bahubol, District-Hobigonj, SGFL
Environmental Impact Assessment of Sundalpur Gas/Oil Exploration.
Environmental Monitoring Services of TBL at Bangora, Comilla. IEE, EIA and RP for construction of Bakhrabad-Siddhirgang
High Pressure Natural Gas Transmission Pipeline including installation of stations and other related facilities
Environmental Management Plan (EMP) Study for Drilling of Wells at Kailashtilla Gas Fields Well no 3 & 4
Monitoring of Environmental and Social Performance of Lafarge Surma Cement
Environmental Management Framework (Package DS-5) Conducting EIA for Gopalnagar to Bangora Gas Gathering
Pipeline Bangladesh Environmental Technology, Verification-Support to
Arsenic Mitigation (BETV-SAM) Project Rendering Services for Data collection for the JBIC
Environmental Profile Study in the Republic of Bangladesh Environmental Impact Assessment (EIA) for Construction of Gas
Distribution Network at Rajshahi City and its Adjoining Areas. IEE, EIA, RP report on West Bank of Jamuna Bridge- Nalka-
Hatikamrul- Bonpara- Ishwardi- Bheramara Gas Transmission Pipeline Project and Bonpara-Rajshahi Gas Transmission Pipeline Project
Conduct IEE and EIA of Central Effluent Treatment Plant (CETP) and other Industrial Installations in the Proposed Tannery Estate, Dhaka
EIA for Moulavi Bazar Development (Gas Field) IEE, EIA, SIA and Baseline Study (BLS) of Blocks 5 & 10 Environment and Social Impact Assessment of Bangabandhu
Bridge Approach Road Gas Pipeline Project EIA for Installation of a Gas Process Plant, Condensate
Fractionation Plant and Gas Pipeline Project at Fenchuganj Gas Field
EIA & SIA for Construction of Gas Pipeline and other Installations under Dhaka Clean Fuel Project
Environmental Assessment & Management
BETS has successfully completed 75 environmental assessment & management projects
During the last 38 years, BETS has achieved extensive experience in conducting Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA), Environmental Management Plan (EMP) and Environmental Monitoring Services (EMS). BETS services cover a wide variety of environmental facets (water, air, waste, etc.). BETS offers all types of environmental assessment & environmental management including basic investigation to identify environmental problems, analysis of causes, elaborating solutions for monitoring and improvement of the environment, and implementation services required in projects of different sectors. Services also cover institutional building and human resources development as important components of environmental management. BETS strength is to achieve Sustainable Development with healthy social development that assures environmental protection and improvement. With BETS strong infrastructural development expertise, professional knowledge in both environment and development is harmonized to provide high quality environmental management services.
General o Multi-sector environmental impact assessment o Development of environmental monitoring system o Environmental Management Systems
Environmental Appraisal o Initial Environmental Examination (IEE) o Environmental Impact Assessment (EIA) o Environmental Management Plan (EMP) o Environmental Monitoring Services (EMS) o Resettlement Action Plan (RAP)
Water Environmental Management o Water pollution control planning o Development of water quality monitoring program
Atmospheric Environmental Management o Air pollution control planning
Solid Waste Management o Domestic, Industrial and Hazardous Waste
Ecosystem Management o Coastal and Marine Environmental Planning o Land use Zoning o Forest Environmental Planning o Reforestation o Ecosystem Reforestation
EXPERTISE
CONSULTING SERVICES
21
Agriculture and Rural Development
BETS has carried out more than 30 Agricultural and Rural Development projects
BETS has developed agricultural projects for rural villages and also the wider spectrum covering both upstream improvement activities (such as watershed conservation and management, reforestation) and downstream protection activities (such as flood control). BETS integrates agriculture and rural development to help clients effectively manage their natural resources and improve food production on a sustainable basis, alleviate poverty and improve overall welfare of rural population. BETS is also involved in empowerment and training of rural population through people participatory projects which aim to build and strengthen relationships between rural organizations and the local and central government, establish shared understanding and encouraging stakeholders to participate in the planning of resource development.
BETS projects cover a wide range of disciplines including agriculture, animal husbandry, forestry, irrigation & drainage, rural water supply, agricultural training & education. BETS professionals have in-depth knowledge and wide experience in many areas including Agricultural Engineering, Agronomy, Irrigation and Drainage, Soil Conservation and Improvement, On-farm development, Integrated Rural Development, Agricultural Processing, Agro Forestry, Watershed Management, Environmental Conservation and Protection and Socio-economy.
PROMINENT PROJECT Consulting Services for Impact Assessment of
Integrated Agricultural Productivity Project (IAPP)
Consultancy Services for Design, Management and Supervision of the Enhancing Quality Seed Supply Project, MoA through BADC
National Agricultural Technology Project (NATP):Phase-1, Concurrent Monitoring & Evaluation
Mid-Term Evaluation of the Agricultural Extension Component, ASPS-II
Assessment of Impact of Smallholder Livestock Development Project (SLDP 2) in Five Southern Districts, Bangladesh
Technical Assistance under Market Infrastructure Development Project in Charland Region (MIDPCR)
Preparation / Updating of Upazila Towns Master Plan under Upazila Town Infrastructure Development Project
Expansion of Irrigation through Utilization of Surface Water by Double Lifting (1st Phase)
Evaluation of Participating NGO of Agriculture Diversification and Intensification Project
Strengthening of Livestock Information Services (SLIS), Mid Term Review Mission
JICA Study for Rural Development Focusing on Flood Proofing (Survey on Agriculture and Water use), 2001
Netrakona Integrated Agricultural Production and Water Management Project (Component : On-farm research)
A special study on Potentials and Constraints of Oilseeds Production in Netrokona
Khulna - Jessore Drainage Rehabilitation Project (Component : Agricultural Development)
Conducting Survey for Collection of Field Level data for NOPOEST and LIFE Projects
O&M Strengthening of the Second Bhola Irrigation Project
A Study on the Impact of Polder Rehabilitation on the NIAPWMP
Feasibility Study of the Second Bhola Irrigation Project
Conducting Participatory Rural Appraisal (PRA) in Integrated Agriculture Development Project in Greater Sylhet District Including Orange and Pineapple Development
EXPERTISE
CONSULTING SERVICES
Integrated Agricultural Development
Infrastructure Development
Irrigation & drainage network, farm roads, etc.
Rural water supply
Sector Strengthening
Food crops, fruits and vegetables, livestock, fisheries, etc.
Food Production Improvement
Seed storage, post harvest
Institutional Strengthening
Planning, financial management, training, etc.
Forestry and Watershed Management
Reforestation of degraded lands, forest management
Land development, watershed conservation and management
Environmental Studies & EIA
22
Energy and Power
BETS has carried out more than 20 Energy and Power Sector Projects
BETS is steadily consolidating its expertise in energy and power sector and has already emerged as one of the well-known local consultancy firms. BETS has carried out feasibility study, design and supervision, environmental and social assessment of number of power and energy sector projects. Recently BETS has completed Detailed Feasibility Study & Environment Impact Assessment of Haripur 150MW CCPP Project of Bangladesh Power Development Board (BPDB); Corporatization of Ashuganj Power Station Project of BPDB. BETS in association with Nippon Koei Co. Ltd. of Japan has completed the project of 230 KV Transmission Line and Substations under West Zone Power System Development Project of PGCB. BETS in association with NEXANT has carried out the power sector master plan of power Cell (GoB) under an ADB financed Project. At present BETS is involved in “Construction of Mini Hydro Power Plants in Rural Areas of Tajikistan” funded by IDB. The project is in implementation stage. Besides, BETS has carried out environmental impact assessment and environmental management & monitoring plans for number of power station Projects.
In the Gas Sector, BETS in association with Wood Mackenzie of UK has just completed Gas Sector Master Plan and Strategy 2025 for Petrobangla under a World Bank financed Project. Further, recently BETS has successfully completed the DST-1 & DST-2 of Kailashtila Well # 5 SGFL in association with Northstar Drillstem Testers Inc. Canada. BETS was involved in Fourth Natural Gas Development Project, Safety and Efficiency Improvement Project in Bangladesh Gas Sector, Development of an Environment and Safety Management System of Petrobangla.
PROMINENT PROJECT
GIS (Geographical Information System) Based Distribution Network System and Preparation of a 20 Years Master Plan for DPDC
Gas Market Assessment – Bangladesh, ICF ADB TA-8839 BAN: Study on Energy Security Execution Survey of Natural Condition for
Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project under TEPSCO
Rehabilitation and Expansion of Existing Supervisory Control and Data Acquisition (SCADA) System of National Gas Grid under GTCL (Component B of Bheramara Combined Cycle Power Plant Development Project)
Installation of Natural Gas Compressor Stations at Ashuganj and Elenga
Drill Stem Testing-Group: A (drilling of one new well at Bakhrabad gas field). Group: A (Workover / Recompletion of Two Nos. Existing Well at Bakhrabad gas field)
Drill Stem Testing & Production Testing Services for Kailashtilla Gas Field Well # 5&6
Construction of 230KV Transmission Lines and Sub-stations under West Zone Power System Development Project
Detailed Feasibility Study & Environment Impact Assessment of Haripur 150MW CCPP Project
TA No. 4379-BAN: Power Sector Development Program II
Study on the Present Power Supply Situation and its Impacts on the Readymade Garment Sector financed by GTZ
Preparation/Development of Gas Sector Master Plan and Strategy for Bangladesh
Improved Performance of Bangladesh’s Energy Sector (Individual Contract)
Topographical and Bathymetric Surveys and Geotechnical Investigations of the Project Site for 450 MW Combined Cycle Power Plant at Sirajganj
Corporation of Ashuganj Power Station (ADB Technical Assistance Project), Phase-I & II
Improved Performance of Bangladesh Energy Sector Meter Reading & Other Operational Activities of
Sales & Distribution Division 1,2,3 under BPDB, Khulna
Identification, Verification, Valuation & Recording of Fixed Assets and Inventories (Stocks and Stores); and Suggesting the modalities of making Regional Accounting Office (RAO), Chittagong Electric Supply, Agrabad & Sikalbaha Power Station, A Viable Profit Centre under BPDB
Resettlement Action Plan (RAP) for Hasnabad-Amin Bazar (Savar)-Tongi (50 km) and Haripur-Meghnaghat (10 km) 230 kV Transmission line project under Dhaka Power System upgrade project.
Fourth Natural Gas Development Project Safety and Efficiency Improvement in Bangladesh
Gas Sector The Maddhapara Hard Rock Mining Project Drillstem Testing for drilling & Workover Wells of
SGFL
EXPERTISE
Consultancy Services Energy Planning Power transmission Power distribution Gas Sector Development Illumination & building electrification Tele-communication & telemetry systems Environmental Impact Assessment Infrastructure development Ventilation & air-conditioning Plumbing, fire fighting & Lifting Maintenance management
23
PROMINENT PROJECT
Conducting Evaluation Study on the Completed Project titled "Secondary Towns Integrated Flood Protection (Phase-2)" Project - BWDB part, IMED, MoP
Baseline Study for Impact Assessment of Small Scale Water Resources Development Project in Greater Mymensingh, Sylhet and Faridpur Areas of JICA
Monitoring & Evaluation-Base Line Survey, Mid-term Evaluation & End of Project Evaluation (S-9), Avian Influenza Preparedness and Response Project
Contract for the Conduct of participatory Rural Appraisal (PRA) of Sub-Projects.
Baseline Survey of Urban Partnerships for Poverty Reduction Project (UPPRP), UNDP
Impact Evaluation Study of "Financial Services for the Poorest Project"
Assessment of Impact of Smallholder Livestock Development Project (SLDP 2) in Five Southern Districts, Bangladesh
Support for Rural Livelihoods Programme in Bangladesh
Performance and Financial Audit Services (PFAS) on Emergency Flood Damage Rehabilitation Project
Consulting Services for Assessment of Procurement Management Capacity and Its Institutionalization
Research study on “The informal sector of employment in Bangladesh, and how this sector could be mobilized to eliminate worst forms of child labour and increase job opportunities”
Consulting Services for Assessment of Procurement Management Capacity and Its Institutionalization
Socio-economic Monitoring and Impact Evaluation of Rural Electrification and Renewable Energy Program in Bangladesh
Second Small Scale Water Resources Development Sector Project for Forming, Establishing functioning WMCAs and Assist LCS Activities
Conducting Survey for Collection of Field Level data for NOPOEST and LIFE Projects
Study on Multipurpose Cyclone Shelter Project in Feni, Cox’s Bazar, Chittagong
Consultancy Services to Conduct “Socio-economic Baseline Survey” for the BUILD Component under the Integrated Food Security Program (IFSP) of CARE-Bangladesh
Baseline Survey /Participatory Rural Appraisal (PRA)/ for Agricultural Development Support to Adivashi and Char land Areas for SAIP of DAE
Social Impact Assessment of Block 15 (Sandwip) & Stakeholder Identification of Block 5 & 10 (Bhola & Sundarban)
Tarail - Pachuria Flood Control, Drainage and Irrigation Project, Phase-I
The Third Rural Infrastructure Development Project (Institutional Support)
Khulna - Jessore Drainage Rehabilitation Project (Beneficiary Participation)
Economic & Socio-economic Studies
BETS has carried out more than 25 Projects in Economic and Social Studies, Human Resources Development & Institutional Strengthening
BETS has impressive record of experience in conducting baseline
surveys, agro-socio-economic surveys, community need assessment
through PRA, planning, monitoring and evaluation of surveys and
studies. BETS provides services in social development, economic
development, affordability studies, socio-economic household
survey, collation and analysis of socio-economic data, socio-
economic status report, framing socio-economic models,
institutional strengthening, healthcare education, human resources
development, institutional building and entrepreneurship.
Baseline Survey
Socio-economic Survey, Data Collection
Socio-economic Studies
Social Impact Assessment and Monitoring
Impact Evaluation Studies
Focus Group Discussion
Stakeholder Identification
Monitoring and Evaluation
Capacity Building
Institution Strengthening
Community Development
Human Resources Development
EXPERTISE
CONSULTING SERVICES
24
Architecture and Building
Over the past 38 years, BETS has performed as Architectural Consultants in over
20 Projects
BETS distinguishes itself in the area of architectural design by its
revitalization of vernacular architecture. This use of local cultural
designs that harmonize with the client’s heritage and
environment has performed the key role in bridging the elements
of consulting works: namely planning, engineering, and
architecture. We also make full use of local materials to boost
local pride and participation in our projects and thus maximize
project benefits at the most reasonable cost.
Architectural Sector is the traditional stronghold of BETS, from
the age traditional design; our emphasis is now on art-of-the day
technology, having established the required facilities. BETS
provides consultancy services for planning & design of office
buildings, public buildings, commercial & retail, institutional
complexes, industrial buildings, etc.
PROMINENT PROJECT Technical Evaluation of GIZ Office Premises
Design, Supervision & Monitoring Consultancy for Field Infrastructure under Climate Resilient Participatory Afforestation and Reforestation Project of Bangladesh Forest Department, Funded by WB
Sustainable Urban Primary Health SDP II of ADB
Site Supervision Services for Fael Khair School-Cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR funded by IDB
Construction of a Concrete Grain Silo at Mongla Port with Facilities (50,000 MT Capacity)
Construction Supervision Consultants (CSC) Services for Construction of Core Family Shelter Phase-II, UNDP
Outline Design Study on the Project for Construction of Multipurpose Cyclone Shelter in SIDR affected area
Construction Supervision for DNCC Warehouse under the Programme for Improvement of Solid Waste Management in Dhaka City Toward Low Carbon Society in the People's Republic of Bangladesh
Topographic Survey and Subsoil Investigation for Construction of Multipurpose Cyclone Shelters in the SIDR Affected Area
Shopping, Commercial & Islamic Centre at Chawk Bazar
Preparation of Plan, designs, estimates, supervision and soil testing of civil works at different places of coastal area division
Style Aspire, An Apartment Complex
Planning, Detail Design, Cost Estimating & Construction Supervision of BETS Centre
Repair/renovation of Clinic building and construction of MO/FWV quarter at 18 MCWCs
Supervision of Construction of Dholaikhal Pump Station (Credit TA VI, 2393 BD)
Feasibility Study and Preliminary Design of City View Apartment cum Shopping Centre
Assessment of Repair/Renovation of 8 Maternal and Child Welfare Centres (MCWC)
Preparation of Master Plan, Detail Design & Construction Supervision of Telephone & Telegraph Exchange Building
Detail Design and Construction Supervision of Biman Poultry Complex, Phase-I&II
EXPERTISE
25
CONSULTING SERVICES
Road / Bridge and Railways & Other Infrastructure Development Projects
Infrastructure development is one of the major sectors, where BETS is consolidating its experience. During the past years BETS has played a pivotal role in both rural & urban infrastructure development
BETS has been an integral part of infrastructure development and
greatly contributed to the advancement infrastructure development technologies in Bangladesh. Road/Bridge & Railways comprise a
comprehensive system of facilities to fulfil the role as important
factors in the national and international traffic and trade patterns. Consultants of BETS have undertaken preparation of master plan,
modelling, designing and assessment. Consultants of BETS has undertaken projects in this sector, which include organizational
reform, preparation of master plan, modelling, designing and assessment. BETS also provides services on traffic management and
engineering, transport planning, regional planning, railways route
location and facility design, etc.
Design and Construction
Urban and Rural Roads
Highways
Bridges/Culverts
Hydraulic Structures
Improvement & Rehabilitation
Operation and Management
Environmental Studies
PROMINENT PROJECT Pre-Feasibility Study of Bogra and Natore
Economic Zone under BEZA Management Design and Supervision (MDS)
Consultancy Services (Package No. UGIIP-III-AF/MDS/02)
Detailed Feasibility Study for Construction of Common Utility Tunnel in the Primary Roads of Dhaka South City Corporation Area (App. 6 Km)
The Logistic Condition Survey at Land Ports for The Data Collection Survey on Matarbari Port Development, JICA Project Team
Preparing Information Technology Parks for Employment and Innovation, ADB
Screening and Feasibility Study of Route Options Connecting Chittagong, Bangladesh and NE Border Area, and Survey, Detail Design of Road Connecting Thegamukh and Highway to Chittagong under BTTSRP
Preparation of Action Area Plan for Gazipur City Corporation under Preparation of Action Area Plan for Narayangonj and Gazipur City Corporation
Preparing Urban Governance & Infrastructure Improvement of LGED, funded by ADB
Coordinating & Consulting Services for Planning and Design on Access Road for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh (JICA Study)
TA 7840-BAN: Road Safety Improvement Project Preparation of Master Plan for Kishoreganj
Paurashava Under District Towns Infrastructure Development Project under LGED
Preparation of Municipal Development Programs (Western Part: Rajshahi, Rangpur, Khulna and Barisal Divisions)
Climate Resilient Infrastructure Improvement in Coastal Zone Project-1", ADB
Feasibility Study for construction of Bridge at ferry location at (a) 70th km on Labukhali-Dumki-Bogra-Dashmina-Golachipa-Amragachi Road (Z8806) (b) 53rd km on Barishal - Jhalokathi - Bhandaria-Pirojpur Road (R-870) over the river Kocha & (c) 8th km on Rahmatpur-Babuganj-Muladi-Hizlakok Road (Z8034)
Development of the BRT and Corridor Restructuring Implementation Study and Preliminary Design work for the Uttara - Mohakhali - Ramna - Sadarghat Corridor
Dhaka bus network and regulatory reform implementation study and design work funded by World Bank
Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project
Traffic Count Survey (Haor Area), Funded by JICA (Oct’10-Jan’11)
JBIC Special Assistance for Project Implementation (SAPI) for Dhaka-Chittagong Railway Development Project
JBIC Special Assistance for Project Formation (SAPROF) for Dhaka-Chittagong Trunk Railway Transportation Capacity Enhancement Project
Rehabilitation and Privatization of Eight Ferry Services in Patuakhali and Barguna
Organizational Reform of Bangladesh Railways (Phase-III), ADB
Regional Traffic Enhancement Project, Bangladesh Railway, ADB
Urban Governance and Infrastructure Improvement Project – Governance Project Development (GDP) Component
Supporting Urban Governance Reform, ADB The Third Rural Infrastructure Development
Project Preparation of Master Plan for Monirampur
Pourashava Monirampur Preparation of Detailed Area Plan DND North &
Airport-Demra bypass Area, RAJUK
EXPERTISE
Transport System Planning
Urban road, rail, public transport planning
Traffic management planning
Railway
Organizational Reform
Institutional Strengthening and Capacity Building
Rail tariff regulation policy
26
PROMINENT PROJECT
ICT Roadmap for the Power Sector in Bangladesh,
Power Cell
Development of Food Grain Movement Manual,
Least Cost Route, Stock in Transit, Movement
Programming Software and Reviewing of Godown
and Transit Loss
TA-7604 BAN: Supporting Governance
Management Project for Directorate of Land
Records and Surveys (DLRS) under ADB
Digital Information System Project under
Bangladesh Bureau of Statistics
Developing a National Management Information
System (MIS) for Water Supply and Sanitation in
Bangladesh under LGRD
Management Information Acquisition under the
Project Solid Waste Management in Dhaka City
Consulting Services on Preparation of Annual MIS
Report for 2000-01 & 2001-02 and Development of
Database for Textile Sub-sector from 1972-73 to
2001-02
Installation of Local Area Network (LAN) Facilities in
Petrobangla Head Office
Computer Based Khatian & Map Printing System
Modernisation Project (Pilot-1)
Computer Based Khatian & Map Printing System
Modernization Project (Pilot-2)
Digital Data Network of Bangladesh Telegraph &
Telephone Board (BTTB)
Installation of NMIC Software at 55 district offices of
the DAE & Related Training
Database Management System Software for
National Minor Irrigation Census (NMIC)
Information Technology
BETS information technologies and services have assisted many clients in home and abroad to develop their IT infrastructure assets
IT as a management tool enables very efficient and effective
development, operation, maintenance, and monitoring of
resources development, etc. BETS IT expertise enhances
conventional development projects with most advanced high-tech
innovational elements. BETS analyses effectiveness of available
tools in information management and recommends the client for
customizing system and applications to uniquely address the
issues. BETS has acquired and developed computer software and
built up library of technical programs developed in-house. The
same is being steadily expanded to cover different aspects in field
of water resources, sewerage and drainage, environmental
engineering, energy and power, telecommunication, GIS and
project management.
BETS expertise includes Strategy and Project Planning, IT Facility
Development and System and Application Development. Whatever
the nature and magnitude of the development requirements, BETS
creates ways for IT development to be expandable, self-
sustainable and standardized.
E X P E RT I S E
27
PROMINENT PROJECT
GIS Based Property and Infrastructure Asset Management Systems (GIS-PIAMS) Consultancy Services under MGSP (S-06)
Development of Web Based GIS Application System for Land Use Map of Chittagong Metropolitan Master Plan Area
Management Information Acquisition under the Project Solid Waste Management in Dhaka City
Consulting Services on Preparation of Annual MIS Report for 2000-01 & 2001-02 and Development of Database for Textile Sub-sector from 1972-73 to 2001-02
Installation of Local Area Network (LAN) Facilities in Petrobangla Head Office
Computer Based Digital Mapping and Khatian Printing System (Pilot-1) and Hardware Maintenance Project
Database Management System Software for National Minor Irrigation Census (NMIC)
Preparation of GIS Based Ecological Maps
Establishment of X, Y, Z Coordinates in Companyganj Area, Comilla
Installation of NMIC Software at 55 district offices of the DAE & Related Training
Preparation of Point Elevation Digital Coverage Maps for Cyclone Shelter Preparatory Study
CAD, GIS & MODELLING
Adaptation of new and latest emerging technologies has given GIS & CAD Unit of BETS a distinct edge over others
GIS & CAD Unit of BETS has always explored new opportunities to
enhance the quality and quantity of services to wider customer base
with diverse technological needs.
The technology perfected is also available for export. Technical challenges overcome in complicated projects have enthused confidence in the company to see and take up international assignments on a firm foundation. Modern tools, such as Computer Aided Design (CAD), Geographic Information System and Computer Modeling & Simulations are used with traditional ease to the satisfaction of clients. BETS maintains a fully equipped GIS facility. BETS has also developed special expertise in application of CAD, GIS hand Modeling and has completed number of projects in these fields.
Digital Theodolite, Electronic Distance Measuring Machines (EDM), Total Stations, Differential Global Positioning System (DGPS) etc., are utilized by GIS, RS & CAD Unit of BETS to provide data collection for survey data and soil exploration services by a team of expert surveyors and Engineers.
GIS & CAD Unit of BETS has always explored new opportunities to enhance the quality and quantity of services to wider customer base with diverse technological needs. The technology perfected is also available for export. Technical challenges overcome in complicated projects have enthused confidence in the company to see and take up international assignments on a firm foundation.
EXPERTISE
28
Training and Education
Trainings and transfer of technology has become one of the integral project components for most of the projects undertaken by BETS. BETS education services covers curriculum development, information technology support, policy formulation and planning of education system
Over time BETS has established a sound track record in the design and implementation of training programs with particular focus on development of technical expertise geared towards Continuing Professional Development (CPD), Institutional Capacity Building and Human Resources Development (HRD). The major objectives of the training are to raise professional knowledge, skill and improve the competencies of personnel working in industrial, commercial and service organizations in the public and private sectors; to promote effective transfer of technology through dissemination and exchange of technical knowledge with support from international institutions and organizations; to connect via Internet to worldwide resource centres; to organize and facilitate local and international seminars and conferences for creating awareness among the participants on contemporary issues; to initiate research to find out cost effective solutions to the problems affecting the society in order to ease the suffering of the common men and adopt appropriate technology for innovations contributing to better life and living conditions of the people; to undertake publications for disseminating knowledge and creating awareness among the readers for promoting human resources development, social upliftment and management improvement. BETS is steadily consolidating its expertise in education and human resource development and has already emerged as one of the well-known local consultancy firms.
Training: Community Development Health and Population Environmental Management Training Computer Systems and Data Processing Institution Building and strengthening Infrastructure Development Management and Development Administration Flood Control, Drainage and Irrigation Irrigation and Water Management Water Supply and Sewerage Social Services and NGO Activities Women and Youth Development Community Development Public Health and Sanitation Rural and Agricultural Development Technology Transfer, Product Development and Marketing
EXPERTISE
CONSULTING SERVICES
Education: Demand forecast on students and estimation of
appropriate capacity Design, construction supervision, equipment
installation and maintenance Development of curriculum if universities and
institutions Software and hardware support services Introduction of IT into educational tools and
facilities
29
Major Projects
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY
WATER SUPPLY AND SANITATION 1. Somaliland Hargeisa Municipality ,
Republic of Somaliland Private Sector Development Reengagement Phase II, Consulting Services Solid Waste Management, Somaliland
2012-13 World Bank
2. Tajikistan State Unitary Enterprise "Khojagii Manzilii Kommunali"
Grant 0352-TAJ: Building Climate Resilience in the Pyanj River Basin Implementation Support to State unitary enterprise for housing and communal services (KMK), Rural Water Supply
2015-2018 Asian Development Bank (ADB)
3. Tajikistan Executive Body of the State Power of the City of Dushanbe
Dushanbe Solid Waste Management Project
2010 EBRD (European Bank for Reconstruction & Development)
4. Tajikistan SUE Khojagii Manziliyu Kommunali in Kurgan-Tyube City, Tajikistan
Kurgan-Tyube Solid Waste - Project Implementation Support, Engineering Design Services and Contract Supervision, Tajikistan
2015-2018 EBRD
5. Tajikistan Dushanbe Water Supply PMU, Dushanbe
Detailed Design, Bidding Documents and Supervision of Works under Dushanbe Water Supply Project
2007-2010 Islamic Dev. Bank (IDB)
6. Tajikistan Municipal Infrastructure Development Project (AF MIDP)
Additional Financing for Municipal Infrastructure Development Project
2013-2015 IDA
7. Afghanistan Afghan Urban Water Supply and Sewerage Cooperation (AUWSSC)
Water Supply of the City of Kabul - Implementation of Mid-Term Programme 1 (MTP 1)
2015-2018 KfW
8. Afghanistan Ministry of Urban Development and Housing (MUDH)
Extension of the Water Supply System of Kabul (Water Supply Kabul-II), Afghanistan
2005-2010 KfW-Entwick-lungsbank
9. Afghanistan Sub-Contractor Agreement for Northern Provinces Afghanistan Urban Water Supply Programme II
Ministry of Urban Development Affairs (MUDA) and Afghan Urban Water Supply & Sewerage Corporation (AUWSSC)
2010-2012 Govt. of Afghanistan
10. Vietnam The government of Socialist Republic of Vietnam
Emergency Rehabilitation of Calamity Damage Project Vietnam (Sub-consultancy)
2009 Asian Development Bank (ADB)
11. Afghanistan Afghan Association Coordination Unit (AACA)
Re-establishment & Operation of Water Supply and Sanitation Services in Selected Provincial Towns
2003-11 International Development Association (IDA)
12. Tajikistan PMU, Municipal Infrastructure Development Project
Water Distribution System Leak Detection Program under Municipal Infrastructure Development Project
2007-09 World Bank (WB)
13. Bangladesh Dhaka WASA
Consultancy Services for Reviewing of the Design, Construction Supervision of EPC/Turnkey Contract & Contract Management for 500 MLD Capacity of Dasherkandi Sewage Treatment Plant Project.
2017-2020 China EXIM Bank
14. Bangladesh Department of Public Health Engineering (DPHE)
Feasibility Study and Design for Improvement for Improved Latrine in Extremely Hard to Reach Areas under National Sanitation Project (Phase-III)
2017-18 GoB
15. Bangladesh Chittagong Water Supply & Sewerage Authority (CWASA)
Design, Construction Supervision and Related Services under Karnaphuli Water Supply Project-Phase-2 (KWSP2)
2014-21 JICA
16. Bangladesh KWASA TA-7872 BAN: Khulna Water Supply Project (42171-013)
2016 ADB
30
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 17. Bangladesh ADB ADB TA 7820 BAN: Khulna Sewerage
Master Plan- 2015-2016 11/2015-02/2016
ADB
18. Bangladesh CWASA Feasibility Study, Design and Construction Supervision of Modunaghat Water Treatment Plant and related Transmission Pumping Facilities
2013-16 IDA
19. Bangladesh DPHE Technical Assistance and Supervision of 40 Pourashavas and Growth Centre Water Supply & Environmental Sanitation Project (Phase-II)
2015-2017 GoB
20. Bangladesh Hyundai Rotem Engineering Services Relating to Well Field Construction Project at Tetulzhora-Bhakurta Area of Savar Upazilla in Dhaka, Bangladesh (Sub-Consultancy)
2015 Hyundai Rotem
21. Bangladesh Khulna Water Supply and Sewerage Authority (KWASA)
Design and Supervision Consultancy Services for Khulna Water Supply Project (ADB Component)
2012-17 ADB
22. Bangladesh Eastern Housing Limited Preparation of Design & Estimation of Sewerage & Storm Water Network of Jahurul Islam City (Aftabnagar)
2018 Eastern Housing Limited
23. Bangladesh Chittagong Port Authority Installation of Surface Water Treatment Plant at CPA Premises
2013-14 GoB
24. Bangladesh Dhaka WASA Padma (Jashaldia) Water Treatment Plant (Phase-1) Project (PJWTPP)
2014-19 China EXIM Bank
25. Bangladesh WASTE BRAC WASH Low Cost Sanitation 2013-14 IRC
26. Bangladesh World Health Organization
Establishing Water Safety Plan (WSP) in Water Supplies of Sylhet City Corporation.
2014-15 World Health Organization
27. Bangladesh TULLOW Bangladesh Ltd. Provision of LQ Water Sampling & Microbiological Analysis Services.
2012-13 TULLOW
28. Bangladesh TULLOW Bangladesh Ltd. Provision of EQS Sampling & Analysis Services
2012 TULLOW
29. Bangladesh TULLOW Bangladesh Ltd. Provision of Black & Grey Water Sample Analysis Services
2012 TULLOW
30. Bangladesh TULLOW Bangladesh Ltd. Provision of Radiation Monitoring Services 2012 TULLOW 31. Bangladesh NJS Consultants Co. Ltd The Preparatory Survey on Chittagong
Water Supply Improvement Project (Ground Level Survey & Social Survey).
2012 JICA
32. Bangladesh DPHE Technical Assistance and Supervision of the IDB Assisted Water Supply and Sanitation Project in Cyclone Prone Coastal Areas of Bangladesh
2012-15 IDB
33. Bangladesh DPHE Consultancy Services for 37 District Towns Water Supply Project
2012-14 GoB
34. Bangladesh Khulna Water Supply and Sewerage Authority (KWASA)
Detail Design and Construction Supervision for Development of Water Supply System in Khulna City
01/2011-12/2012
GoB
35. Bangladesh World Bank Data Collection Survey on Water Supply Sector in Local Municipalities in Bangladesh
2012 World Bank Group
36. Bangladesh Tokyo Engineering Consultants (TEC) Co. Ltd.
Data Collection Survey on Water Supply Sector in Local Municipalities in Bangladesh
2012 JICA
37. Bangladesh Dhaka WASA Technical Assistance to Provide Supervision Services of the Project Implementation for Saidabad Water Treatment Plant Project Phase II
2010-2014 DANIDA
38. Bangladesh Dhaka WASA Design and Management Consultancy (DMC) of Dhaka Water Supply Sector Development Project (DWSSDP)
2009-2014 Asian Development Bank (ADB)
39. Bangladesh Dhaka WASA Consultancy Services to Provide Technical Assistance to PMU, DWSSP of DWASA (PACKAGE # S-17A)
2011-2014 International Development Association (IDA)
40. Bangladesh TULLOW Bangladesh Ltd. Sludge Sample Analysis and Reporting Services
2011 TULLOW
41. Bangladesh NJS Consultants Co, Ltd. Advancing NRW Reduction Initiative of Chittagong WASA (PANI)
2011-13 JICA
31
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 42. Bangladesh Dhaka WASA Water Supply System Expansion and
Rehabilitation of Narayangonj Town. 2010-2012 GoB
43. Bangladesh Chittagong WASA GIS Mapping of Distribution Network for The Project for Advancing Non Revenue Water (NRW) Reduction Initiative of Chittagong WASA
2010-2012 JICA
44. Bangladesh Chittagong WASA Field Verification and Underground Utility Survey of Distribution Network for The Project for Advancing NRW Reduction Initiative of Chittagong WASA
2010-2011 JICA
45. Bangladesh Chittagong WASA Test Excavation and Supplemental Topographic Survey of Distribution Network for The Project for Advancing NRW Reduction Initiative of Chittagong WASA
2010-2011 JICA
46. Bangladesh Chittagong WASA Public Campaign Assistance for The Project for Advancing NRW Reduction Initiative of Chittagong WASA
2010-2011 JICA
47. Bangladesh Chittagong WASA Institutional Development Consultants under Karnaphuli Water Supply Project (KWSP)
2010-2012 JICA
48. Bangladesh DPHE Ground Water Management and TPP for Survey, Investigation and Feasibility Study in Upazilla and Growth Center Level Pourasava having no Piped Water System under Mathematical Modelling for Surface Water Source Identification
2010-2012 GoB
49. Bangladesh LGSU Support Organization (SO) in Barisal Region under the Water Supply and Sanitation Sector Support Program
2008-2011 DANIDA-HYSAWA
50. Bangladesh DPHE Water Supply Sanitation and Drainage Project in Sylhet and Barisal City
2008-2012 GoB
51. Bangladesh PSU, LGED Review and Revision of Sector Development Program for Water Supply and Sanitation Sub-sector in Bangladesh
2009-2010 DANIDA
52. Bangladesh Policy Support Unit (PSU), Sector Policy Support for the Water Supply and Sanitation Sector, LGD
Review and Revisions of the Sector Development Programme (SDP) for the Water and Sanitation Sub-sector in Bangladesh
2008-2010 GoB-Danida
53. Bangladesh Dhaka WASA Water Quality and Industrial Pollution Monitoring System Program Design Feasibility and Engineering Studies under Dhaka Integrated Environmental and Water Resources Management Project
2009-2010 IDA
54. Bangladesh PSU, LGED Formulation of National Guidelines on Water Safety Framework (WSF) in Bangladesh
2009-2010 DANIDA
55. Bangladesh NJS Consultants Co. Ltd. - KWASA
Preparation of Base Map of Khulna City for Khulna Water Supply Improvement Project
2009 JICA
56. Bangladesh NJS Consultants Co. Ltd. - KWASA
Water Quality Analysis of Khulna Water Supply Improvement Project
2009-2010 JICA
57. Bangladesh NJS Consultants Co. Ltd. - KWASA
Land use Survey, Social and Environmental Study and Sub-soil Investigation of Khulna Water Supply Improvement Project
2010 JICA
58. Bangladesh NJS Consultants Co. Ltd. - KWASA
Water Quality Analysis Phase-2 of Khulna Water Supply Improvement Project
2010 JICA
59. Bangladesh NJS Consultants Co. Ltd. - KWASA
Environmental and Social Considerations Study for Khulna Water Supply Improvement Project
2010 JICA
60. Bangladesh NJS Consultants Co. Ltd. - KWASA
Survey Works for Water Distribution Network for Khulna Water Supply Improvement Project
2010 JICA
61. Bangladesh LGSU National Consultant to Conduct a Study on Governance of Union Parishad (UP) in HYSAWA Project Areas
2009-2010 DANIDA -HYSAWA
32
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 62. Bangladesh Department of
Environment (DOE)-DWASA
Social and Environmental Assessment (ESA) under Dhaka Integrated Environmental and Water Resources Management Project (DIEWRMP)
2009-2010 IDA
63. Bangladesh Chittagong Water Supply & Sewerage Authority (CWASA)
Engineering Consultancy Services for Detailed Design, Construction, Supervision and Related Services under Karnaphuli Water Supply Project
2008-12 JICA
64. Bangladesh CWASA Engineering Consulting Services for Mohara & Kalurghat Water Treatment Plant Rehabilitation
2008-11 GoB
65. Bangladesh CWASA Brief Cost Estimation and Hydraulic Analysis of Pipe Network Water Supply of Detailed Planned Area of Chittagong
2008 KOICA
66. Bangladesh Local Government Support Unit (LGSU), DPHE
Support Organization (SO) in Rajshahi District under the Water Supply and Sanitation Sector Support Program
2008-10 DANIDA-HYSAWA
67. Bangladesh Department of Public Health Engineering (DPHE)
Service and Design of Treatment Plant (Iron – Arsenic) at Hobiganj under “Rehabilitation and Development of Water Supply System in Pourashavas including regeneration of Tubewell project
2007-08 GoB
68. Bangladesh LGED/GHD, Australia Feasibility Study and Design of Sub-projects in three Selected Pourashavas
2007 GoB
69. Bangladesh DPHE Detail Engineering Design and Construction Supervision of Water Supply and Environmental Sanitation Project in Mongla Pourashava
2007-10 GoB
70. Bangladesh ADP / BAMWSP, DPHE
Feasibility Study and Preparation of Project Proposal on Rural Piped Water Supply Scheme
2005 World Bank (WB)
71. Bangladesh Sukhi Paribar Sangstha (SPS), BAMWSP, DPHE
Conducting Inception Report, Feasibility Study and Project Proposal of Rural Piped Water Supply Scheme in Shakrail and Chandoir Village of Manikgonj Sadar Upazila
2005-2009 IDA
72. Bangladesh DWASA Dhaka Water Supply Project (ADB TA No. 4651 BAN)
2006 ADB
73. Bangladesh Economisti Associati, Italy
Small Scale Private Service Provider in Water Supply and Electricity.
2006 WB
74. Bangladesh OCETA Execute the BETV-SAM (Bangladesh Environmental Technology Varification- Support to Arsenic Mitigation) Verification Field Testing.
2006 OCETA
75. Bangladesh Eastern Housing Ltd. Design of drainage system of Eastern Housing Pallabi Phase II Land Project.
2005 EHL
76. Bangladesh Unit for Policy Implementation (UPI)
Sample Survey for Region-Wise Drinking Water Supply Coverage
2005 DANIDA
77. Bangladesh DWASA Removal of Water Logging in Dhaka City 2004-05 GoB
78. Bangladesh LGED Feasibility Study of Banderban Pourashava Water Supply Municipal Services Project : IDA Credit # 3177-BD
2004-05 IDA
79. Bangladesh NJS Consultants, Japan Feasibility Study of Karnaphuli Water Supply Project
2005 JICA
80. Bangladesh CWASA Karnafuli Water Supply Project (SAPROF Study)
2005 JBIC
81. Bangladesh Department of Public Health Engineering (DPHE)
Feasibility Study, Detail Design and Construction Supervision of Water Supply and Sanitation Project at Gopalgonj, Tungipara and three other Thanas (Gopalgonj Pourashava and Thana Water Supply & Sanitation Project)
1998-04 GOB
33
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 82. Bangladesh PCI, Japan Waste Generation Amount and
Composition Survey 2004 JICA
83. Bangladesh PCI, Japan Recycling Market Study 2004 JICA
84. Bangladesh PCI, Japan Water Quality Analysis Survey 2004 JICA
85. Bangladesh The Royal Danish Embassy
Rural and Arsenic Transition Component Description under the Second Phase Water and Sanitation Sector Program Support (WSSPS II) in Bangladesh
2004 DANIDA
86. Bangladesh Unit for Policy Implementation (UPI)
Monitoring and Rapid Assessment of Month-Long Sanitation Campaign in Bangladesh
2003 DFID
87. Bangladesh LGED Participatory and Partnership Approach (PPA) Consultancy for Municipal Services Project
2000-03 IDA
88. Bangladesh DWASA Identify and Diagnosing Problems Including the Recommendation of Remedial Measurement for Smooth Operation and Maintenance of Dholaikhal Pumping Station after Determining Workability and Present Condition
2003 GoB
89. Bangladesh The Unit for Policy Implementation (UPI)
Monitoring and Rapid Assessment of Month-long Sanitation Campaign in Bangladesh
2003 DFID
90. Bangladesh DPHE Formulation of Standard Design Criteria for Urban Water Supply & Sanitation in Bangladesh
2001-02 WHO
91. Bangladesh DPHE Design of Water Treatment Plants at Rajbari, Serajganj and Chandpur Pourashava (Municipality)
2001-02 GOB
92. Bangladesh Kukusai Kogyo Co. Ltd. Tubewell Screening, Map Preparation and Social Survey In Keshabpur Thana, Jessore
2002 JICA
93. Bangladesh CWASA & DWASA Study of Organizational Capability of CWASA & DWASA
2002 JBIC
94. Bangladesh DPHE User Level Survey, Institutional Review Phase-I, Water Supply and Sanitation Sector
2002 DFID
95. Bangladesh DPHE Study of the Groundwater Development of Deep Aquifers for Safe Drinking Water Supply to Arsenic Affected Areas in Western Bangladesh
2000-01 JICA
96. Bangladesh DPHE Assessment of Groundwater Resources and Their Optimal Utilization and Protection in the Coastal Belt of Bangladesh
2000-01 DANIDA
97. Bangladesh DPHE Consultancy Services for Detailed Design & Construction Supervision of Water Supply Project for Rajshahi Metropolitan City
1996-00 GoB
98. Bangladesh DPHE Design of Overhead Water Tank and Iron Removal Plant under "23 Towns Water Supply Project
1999-00 GOB
99. Bangladesh DPHE Study and Detailed Design of Iron Removal Plant (Approx. Capacity 500M3/D) at Chittagong BIT
2000 GOB
100. Bangladesh CWASA Feasibility Study of Karnafuli Water Supply Project
2005 JBIC
101. Bangladesh DPHE IDB Assisted Water Supply and Sanitation Project in the Coastal Belt Areas
1999-00 IDB
102. Bangladesh DPHE Rapid Assessment of Household Level Arsenic Mitigation Techniques
2000 DFID
103. Bangladesh DWASA Management and Operational Support (Twinning) Program
1997-00 WB
104. Bangladesh DPHE Consultancy Services for DPHE-DANIDA Water Supply and Sanitation Components (CCU)
2000 DANIDA
34
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 105. Bangladesh CWASA Extension and Expansion Project of
Mohora Water Treatment Plant, CWASA 2000 JICA
106. Bangladesh DPHE 18 District Town Water Supply & Sanitation Project
1989-99 DGIS, Netherlands
107. Bangladesh DWASA Improved Sanitation Services Project 1997-99 WB
108. Bangladesh DPHE Redesign and Monitoring of Distribution System in Different Pourashava under “Tube-well Regeneration and Water Supply System Rehabilitation and Development in 20 Pourashavas”
1999 GoB
109. Bangladesh UNICEF Review the Cost and Design of the Water and Sanitation Facilities of School Sanitation Program
1998-99 UNICEF
110. Bangladesh DPHE Evaluation of 350 Mini Tara Hand Pumps 1998-99 UNICEF 111. Bangladesh DWASA Detail Assessment of Damage caused and
Rehabilitation required in Water Supply System of Dhaka WASA due to Recent Devastating Flood.
1999 WB
112. Bangladesh DWASA Detail Assessment of Damage caused by Recent Flood in the Sewer System of DWASA due to Recent Devastating Flood
1999 WB
113. Bangladesh DPHE Monitoring the activities UNICEF assisted Water Supply and Sanitation Project
1998-99 UNICEF
114. Bangladesh DWASA Strategy Study to Mobilize Finance and Increase Efficiency in Dhaka Water Supply and Sewerage Sector
1997-99 WB
115. Bangladesh Bangladesh Tobacco Company Ltd. (BTC)
Effluent Treatment Plant of Bangladesh Tobacco Company Ltd., Dhaka Factory
1997-98 GOB
116. Bangladesh DPHE Conducting an Consultancy Services for Independent Check on the Survey Tara Hand pumps
1996-97 UNICEF
117. Bangladesh DPHE Evaluation of the Performance of 50 Tara Pump Converted from Conventional Deep Set Pump
1997 UNICEF
118. Bangladesh DWASA Isolation of Zone-IV & V and Macro-metering to Determine Available Water in each Zone
1996-97 WB
119. Bangladesh DWASA Immediate Action Program (Training) to Reduce Unaccounted for Water
1994-97 WB
120. Bangladesh DPHE Feasibility Study of Water Supply, Sanitation and Drainage Project for Rajshahi Metropolitan City
1994 GoB
121. Bangladesh CAAB Detailed Survey and Investigation for Improvement of the Residential Water Supply System of CAAB, Dhaka
1993 GOB
122. Bangladesh DWASA Leak Detection and Waste Prevention Program
1988-91 WB
123. Bangladesh DPHE Study and Design of a Small Bore Sewer Pilot Project at Mymensingh
1988-89 WB
124. Bangladesh DPHE Performance Improvement Water Supply & Sanitation Project, Khulna
1988 DGIS
125. Bangladesh CAAB Detailed Design of Standby Water Supply System of Zia International Airport
1986-87 GOB
WATER RESOURCES MANAGEMENT 126. Tajikistan Agency for Land
Reclamation and Irrigation of the Republic of Tajikistan (ALRI)
TAJ Water Resources Management in Pyanj River Basin-5 Project Implementation and Monitoring Consulting Services for ALRI
2017-2021 ADB
127. Nepal
Melamchi Water Supply Board
Melamchi Water Supply Project - Design and Construction Supervision Consulting Services during Construction for Headworks and Melamchi Diversion Tunnel, Tunnel Contract MDS/DT/02 (Contract No.: MWSP/CS/01 (2015)
2015-2017 Government of Nepal
35
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 128. Tajikistan State Institute Project
Management Unit Ferghana Valley Water Resources Management Project, Tajikistan
Technical Support for Development of Feasibility Report for Flood Controlling Measures on Flood Channel Tebalaisai Above the City of Kulyab for its Protection
2015-2016 IDA
129. Uzbeistan ADB Project Preparatory Consultant for the Sustainable Hydropower Project (Sub-consultancy)
2017-2018 ADB
130. Tajikistan State Institution Project Management Unit Ferghana Valley Water Resources Management Project, Tajikistan
Development of a comprehensive framework for the introduction of River Basin Management to Tajikistan and Support to Local Authorities in the Project Area, Responsible for the Operation and Management of Irrigation and Drainage Schemes
2011 European Union
131. Afghanistan Ministry of Energy & Water (MEW), Afghanistan
Dahla Dam Project ("Arghandab Irrigation Rehabilitation Project") in Afghanistan (Sub-consultancy)
2009-12 CIDA
132. Afghanistan ARDS under Ministry of Energy & Water
Detailed Survey and Design of Small and Medium Dams and Related Structures (Sub-consultancy)
2010-11 Govt. of Afghanistan
133. Tajikistan Ministry of Water Resources and Land Reclamation (MWRLR)
Khatlon Province Flood Risk Management Project [ADB LOAN NO. 40046]
2008-12 ADB
134. Tajikistan MWRLR Strengthening Embankment along Pyanj River under Irrigation Rehabilitation Project
2006 ADB
135. Tajikistan MWRLR Consultancy Services for Management, Design, Monitoring and Supervision of Irrigation Rehabilitation Project ADB LOAN NO. 2124-TAJ (SF)
2006-12 ADB
136. Tajikistan Project Management Unit (PMU), FVWRMP
Design of Works and Installations for Rehabilitation of Irrigation and Drainage Systems and for Strengthening of Reservoir Embankments under Ferghana Valley Water Resources Management Project
2008-09 IDA
137. Afghanistan Ministry of Energy and Water (MEW), AFG
Golbahar Storage Dam Project, Social Survey, Environmental Assessment and Economic Feasibility Study
2008-09 MEW
138. Yemen Ministry of Agriculture and Irrigation, Yemen
Consultancy Services for Major Works in Wadi Ahwar under 'Irrigation Improvement Project' (Sub-consultancy)
2008 IDA
139. Afghanistan Ministry of Energy & Water (MoEW)
Feasibility Study of Kelagai Storage Dam Project’
2007-08 IDA
140. Afghanistan MoEW Feasibility Study for Small and Medium Dams Project
2006-08 IDA
141. Tajikistan Ministry of Water Management & Amelioration
Construction Supervision of Dangara Valley Irrigation Project (Phase-1)
2002-05 IDB
142. Tajikistan Ministry of Water Management & Amelioration
Consultancy Services for Developing a Comprehensive Bankable Document, Detailed Engineering Design and Tender Documents for the Dangara Valley Project
2000-01 IDB
143. Bangladesh BWDB
Consultants Services for Third Party Monitoring & Evaluation of Overall Project Implementation under Coastal Embankment Improvement Project, Phase-1 (IDA Credit #5280-BD) [Contract No. CEIP-1/C2/S3]
2015-2021 IDA
144. Bangladesh BWDB
Irrigation Management Operator (IMO) for Muhuri Irrigation Project (MIP)
2016-2021 ADB
36
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 145. Bangladesh LGED
Feasibility Study and Detail Design of PSSWRSP
2014-2015 ADB
146. Bangladesh BWDB
Consultancy Services for Management, Design & Supervision and Other Related Services for Haor Flood Management and Livelihood Improvement Project
2015-2022 JICA
147. Bangladesh BWDB and DAE Integrated Planning for Sustainable Water Management (IPSWAM) - Blue Gold Program
2013-2019 Government of the Kingdom of the Netherlands
148. Bangladesh LGED Feasibility Study and Detailed Design (FSDD) of Subprojects under the Participatory Small Scale Water Resources Sector Project in Greater Mymensingh, Sylhet and Faridpur Areas
2010-2013 Government of Japan
149. Bangladesh The JICA Expert Team JICA Project for Capacity Development of Management for UGIISustainable Water Related Infrastructure in The People's Republic of Bangladesh
2013-16 JICA
150. Bangladesh JICA Expert to BWDB
The Inventory Survey of Hydraulic Structures of Water Resources Development along the Manu River in Moulvibazar O&M Division, BWDB
2015 JICA
151. Bangladesh JICA
Preparatory Survey on Upper Meghna River Basin Watershed Management Improvement Project
2013 JICA
152. Bangladesh JICA Upper Meghna Basin Study Project 2011 JICA
153. Bangladesh JICA Primary Compaction Test of Embankment Material in Khaliajuri
2015 JICA
154. Bangladesh The JICA Expert Team (IDEA Consultants)
Geotechnical Investigation and Cross-Section Survey for Stability Assessment of Damaged Embankment
2014 JICA
155. Bangladesh The JICA Expert Team (IDEA Consultants)
Geotechnical Investigation and Topographic Survey for Detailed Embankment Design of Pilot Project
2014 JICA
156. Bangladesh ADB Innovations for More Food with Less Water - Task 2: Country and Project-Specific Recommendations and Pilot Initiatives (4572-001) -(Sub-consultancy Agreement with Lahmeyer International)
2013-14 BWDB
157. Bangladesh ADB TA-8074 REG: Applying Remote Sensing Technology in River Basin Management
2012-2014 ADB
158. Bangladesh LGED Field Survey, Investigation and Feasibility Study (FISIS) of 5 (five) Nos. Rubber Dam
2013-2014 GoB
159. Bangladesh The JICA Study Team (Nippon Koei Co. Ltd.)
JICA Data Collection Survey on Water Resources Management in Haor Area of Bangladesh
2013 JICA
160. Bangladesh JICA Expert Feasibility Study for Capacity-Building Project for Sustainable Development of Water-Related Infrastructure Part-3
2012 JICA
161. Bangladesh JICA Expert Feasibility Study for Capacity-Building Project for Sustainable Development of Water-Related Infrastructure Part-2
2011-12 JICA
162. Bangladesh JICA Study Team Data Collection under the Project "Support to JICA Study Team for Water Resources Development Poject in Meghna Basin" (Sub-Consultancy)
2011 JICA
163. Bangladesh JICA Expert Information Research on Water Resources for Low Water Control in Bangladesh
2013 JICA
164. Bangladesh BWDB Feasibility Study of Capital Dredging and Sustainable River Management in Bangladesh.
2011-13 GoB
37
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 165. Bangladesh LGED Feasibility Study and Detailed Design
(FSDD) of Subprojects under the Participatory Small Scale Water Resources Sector Project
2011-12 ADB
166. Bangladesh BWDB, LGED & DoF Char Development and Settlement Project-IV (CDSP lV)
2011-16 Government of Netherlands & IFAD
167. Bangladesh LGED Providing Investigation & Feasibility Study of Rubber Dam under Construction of Rubber Dams in Small & Medium Rivers for Increasing of Food Production Project (Package-1)
2010-12 GoB
168. Bangladesh JICA Feasibility Study for Capacity Building Project for Sustainable Development of WaterRelated Infrastructure Part-2 & 3
2011 - 2013 JICA
169. Bangladesh BWDB Feasibility Study for Sureswar Flood Control, Drainage & Irrigation Project
2010 - 2011 GoB
170. Bangladesh BWDB Feasibility Study for Integrated Water Management Project of Gungiajuri Haor Area
Jun 2010- Mar 2011
GoB
171. Bangladesh BWDB Estuary Development Program (EDP) (under Dutch Assistance)
2007-10 GoN (Govt. of Netherlands)
172. Bangladesh BWDB Feasibility Study and Detailed Engineering for Ganges Barrage
2009-10 Government of Bangladesh (GoB)
173. Bangladesh BWDB Flood Damage Rehabilitation -2007 Works Under WMIP (Contract Package no : BWDB:S-8.1)
2009-11 IDA
174. Bangladesh BWDB Detail Engineering Design for Kurigram Irrigation Project (North Unit)
2008-09 GoB
175. Bangladesh Local Government Engineering Department (LGED)
Inventory Survey Related to Water Resources Development in Greater Mymensingh
2005 JICA
176. Bangladesh BWDB The Inventory Survey of Hydraulic Structures of Water Resources Development Schemes in Cox's bazar O & M Division BWDB
2016 JICA
177. Bangladesh IDEA Consultants Inc., Japan
Pre-feasibility Study for Drainage Improvement of Dhaka-Narayangonj-Demra (DND) Irrigation Project
2007-08 IDEA Consultants Inc., Japan
178. Bangladesh BWDB Command Area Development Project-II 2007-08 ADB
179. Bangladesh BWDB Feasibility Study for Integrated Water Resources Management of Chalan Beel Area including Halti Development Project
2005-07 GoB
180. Bangladesh Dutch Embassy Char Development and Settlement Project 2005-10 Dutch funded
181. Bangladesh Local Government Engineering Department (LGED)
Data Collection, Engineering Surveys, Feasibility Studies and Detailed Design of Small Scale Water Resources Development Sector Project (SSWRDSP)
2003 -07
ADB
182. Bangladesh BWDB Detail Design and Construction Supervision (Phase-II) of Shrimp and Aquaculture Component under Fourth Fisheries Project
2003-06 WB
183. Bangladesh BWDB FAP-21 Monitoring and BWDB Training Project
2003-05 KfW
184. Bangladesh BWDB Consultancy services for updating / upgrading feasibility study of three sub-project under group-A (Teesta irrigation project (Phase-II); Kurigram irrigation project (North Unit & South Unit)
2005 GOB
185. Bangladesh LGED Master Plan on Small Scale Water Resources Development at Union and Upazila Level
2001-05 JICA
38
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 186. Bangladesh LGED District Water Resources Assessment
under Second Small Scale Water Resources Development Sector Project – ADB Loan No. 181 BAN(SF) of LGED
2004-05 ADB
187. Bangladesh BWDB Detailed Design & Construction Supervision of Fish-Pass and Fish-Friendly Structures-Phase-II under Fourth Fisheries Project
2003-04 IDA
188. Bangladesh CARE-Bangladesh Explore the Causes of Failure of a Wave Protection Wall of FPP
2004 CARE-Bangladesh
189. Bangladesh BWDB Feasibility Study of Chandpur Comilla Integrated FCDI Project
2003-04 GoB
190. Bangladesh Kokusai Kogyo Co., Japan
Topographical Survey for the Project on Strengthening of Water Examination System
2004 JICA
191. Bangladesh JICA Topographical Survey & Hydrological Investigation (Ph-II) for Feasibility Study of the Padma Bridge
2004 JICA
192. Bangladesh JICA Geotechnical Investigation for the Feasibility Study of the Padma Bridge
2004 JICA
193. Bangladesh Nippon Koei Co. Ltd., Japan
Natural Condition Survey (Hydrology & Topography) for the Feasibility Study of Padma Bridge (Phase-I)
2003 JICA
194. Bangladesh Nippon Koei Co. of Japan Inventory Survey on Meteorological and Hydrological Observation System and Electric Communication System under feasibility Study for Improvement of Flood Forecasting and Warning System
2002-03 JICA
195. Bangladesh Nippon Koei Co. of Japan “Survey on Evacuation Condition and Awareness of Flood Victim” for the Feasibility Study for Improvement of Flood Forecasting and Warning Services in Bangladesh
2002-03 JICA
196. Bangladesh Nippon Koei Co. of Japan
The Workshop on Improvement of Flood Forecasting and Warning System in Bangladesh
2003 JICA
197. Bangladesh CDSP Feasibility Study on the Development of the Char Baggar Dona Area
2000-02 DGIS
198. Bangladesh GFA Terr Systems GmbH, Germany
Sustainable Water Management in Chittagong Hill Tracts Region
2002 Netherlands Govt.
199. Bangladesh WARPO National Water Management Plan 1998-01 WB
200. Bangladesh BWDB Feasibility Study (Phase-1) of Shrimp and Coastal Aquaculture Project
2001 WB
201. Bangladesh BWDB Feasibility Study (Phase-I) of Fish-Pass and Fish-Friendly Structures under Fourth Fisheries Project
2001 WB
202. Bangladesh BWDB Study on Options for Ganges Dependent Area (GDA) Project
2001 WB
203. Bangladesh DAE A Study on the Impact of Polder Rehabilitation on the NIAPWMP
2000 IFAD
204. Bangladesh CARE, Bangladesh Development of Design Manual for Structural Flood Proofing Measures
2000 USAID
205. Bangladesh BWDB Gorai River Restoration Project 1999-00 DGIS
206. Bangladesh WARPO North-East Regional Water Management Project (FAP-6)
1991-00 CIDA
207. Bangladesh BWDB Feasibility Study for Re-Excavation of Betna River and Branch Khal
2000 GOB
208. Bangladesh WARPO Ghutail Revetment Test Structure under FAP 21 - Bank Protection Project
1999-00 KfW, Germany & AFD, France
209. Bangladesh BWDB Preparation of O&M Manual of Teesta Barrage and its Canal Head Regulator
1998-99 GOB
210. Bangladesh WARPO Bank Protection and River Training/AFPM Pilot Project (FAP 21/22)
1991-99 KfW, CCCE
39
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 211. Bangladesh BWDB Evaluation of Drainage and Flood Control-II
Project 1988-99 WB
212. Bangladesh WARPO Training Program for the River Survey Project FAP-24
1998-99 EEC
213. Bangladesh WARPO Kalni Kushiyara Pilot Dredging Project under North-East Regional Water Management Project (FAP-6)
1994-99 CIDA
214. Bangladesh Ministry of Shipping BIWTA
Assessment and Verification of 1998 Flood Damages of BIWTA and BIWTC
1998 IDA
215. Bangladesh BWDB BWDB Systems Rehabilitation Project 1990-98 DGIS 216. Bangladesh BWDB Feasibility Study of Baral Basin
Development Project 1996-97 GOB
217. Bangladesh BWDB O&M Strengthening of the Second Bhola Irrigation Project
1995-97 ADB
218. Bangladesh JICA Study of Narayanganj - Narsinghdi Flood Protection and Irrigation Project
1996-97 OECF
219. Bangladesh WARPO Bahadurabad Revetment Test Structure under FAP 21 - Bank Protection Project
1995-97 KfW, Germany & AFD, France
220. Bangladesh WARPO & BWDB Compartmentalization Pilot Project (CPP/FAP 20)-Phase I
1991-96 DGIS, Netherlands; KFW, Germany
221. Bangladesh BWDB Second Small Scale Flood Control Drainage and Irrigation (SSFCDI) Project
1994-96 CIDA, IDA
222. Bangladesh WARPO River Survey Project FAP24: Management Unit
1993-96 EEC
223. Bangladesh BWDB Pre-feasibility Study of Second Small Scale Flood Control Drainage and Irrigation Project
1988-93 CIDA, IDA
224. Bangladesh BWDB Flood Damage Restoration Project 1987-93 WB 225. Bangladesh CPA & MPA Mathematical Model Study of Pashur-Sibsa
River System and Karnaphuli River Entrance
1990-92 DANIDA
226. Bangladesh Flood Plan Co-ordination Organization
North Central Regional Study (FAP 3) 1991-92 CIDA
227. Bangladesh BWDB Meghna River Bank Protection Short Term Study (FAP - 9B)
1990-92 WB
228. Bangladesh BWDB Feasibility Study of the Second Bhola Irrigation Project
1991 ADB
229. Bangladesh BWDB Implementation of Revised Water Rate Act Study, 1990
1990-91 DGIS
230. Bangladesh BWDB Small Scale Irrigation Sector Project (SSISP)
1988-90 EEC
231. Bangladesh BWDB Operation & Maintenance Plan for EIP Programme
1990 DGIS
232. Bangladesh BIWTA Reassessment of BIWTA Marine Workshop 1990 NORAD 233. Bangladesh BWDB Haor Development Project 1989 CIDA
234. Bangladesh BWDB Pre-feasibility Study for Flood Control in Bangladesh
1989 EEC, French
235. Bangladesh BWDB Fourth Evaluation of EIPs Project 1988 DGIS, SIDA
236. Bangladesh LGED Small Catchment Rainfall Runoff Study 1986-87 ODA (UK)
ROAD / BRIDGE, RAILWAY SECTOR 237. Afghanistan Ministry of Public Works,
Afghanistan Construction Supervision of Fayzabad-Behrak Road Project
2012-14 Govt. of Afghanistan
238. Afghanistan Ministry of Public Works, Afghanistan
Capacity Building to Ministry of Public Works - Transport Network Development Investment Program, Tranche 1
2014-15 Asian Development Bank (ADB)
239. Afghanistan ARDS under Ministry of Public Works
Supervision Consultancy for Construction of Road between Jabul Saraj – Sourbi (50 KM) [Jabul – Nijrab]
2010-2016 ADB
240. Kazakhstan Committee for Roads, Ministry of Transport and Communications
CAREC Transport Corridor I (Taraz-Korday Section) Investment Program; CSP-1 Project Management Consultant
2009-2013 ADB
241. Afghanistan The Ministry of Public Works (MPW)
Detailed Engineering Design, Procurement Assistance, Project Management and
2007-2013 IDB
40
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY Construction Supervision Consultancy Services of Andkhoy-Aquina Road, Con-II
242. Afghanistan The Ministry of Public Works (MPW)
Consultancy Services for Detailed Engineering Design, Procurement Assistance, Project Management and Construction Supervision of Doshi-Pol E Khomri Road , Con-I
2007-2016 IDB
243. Tajikistan Ministry of Transport, Republic of Tajikistan
Institutional and Policy Support to the Transport Sector, Tajikistan
2004 ADB
244. Albania IDB Structural Configuration of Buna Bridge and Cost Comparison Between Early Designed Multispan Bridge and Proposed New Bridge Schemes with Movable Span in Albania
2005-06 IDB
245. Tajikistan Ministry of Transport, Republic of Tajikistan
Dushanbe-Kyrgyz Border Road Rehabilitation Project (Phase-II)
2005 ADB
246. Bangladesh Dhaka South City Corporation
Detailed Feasibility Study for Construction of Common Utility Tunnel in the Primary Roads of Dhaka South City Corporation Area (App. 6 Km)
2016 Dhaka South City Corporation
247. Bangladesh LGED
Consultancy Services for Screening and Feasibility Study of Route Options Connecting Chittagong, Bangladesh and NE Border Area, and Survey, Detail Design of Road Connecting Thegamukh and Highway to Chittagong under Bangladesh Trade and Transport Studies RETF Project (BTTSRP), Contract Package No. MOS-S4.
2015 GoB
248. Bangladesh Tokyo Electric Power Services Co. Ltd (TEPSCO)
Consulting Services for Planning and Design on Access Road for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh (JICA Study)
2013 JICA
249. Bangladesh LGED Integrated Performance Audit Consultant (IPAC) of Second Rural Transport Improvement Project (RTIP-II)
2014-18 World Bank
250. Bangladesh Ministry of Communication
TA 7840-BAN: Road Safety Improvement Programs
2013 ADB
251. Bangladesh Bangladesh Bridge Authority, Setu Bhaban, Dhaka
Feasibility Study (a) for construction of Bridge at ferry location at 70th km on Labukhali-Dumki-Bogra-Dashmina-Golachipa-Amragachi Road (Z8806) (b) for Construction of Bridge At ferry location at 53rd km on Barishal - Jhalokathi - Bhandaria-Pirojpur Road (R-870) over the river Kocha & (c) for construction of Bridge at ferry location at 8th km on Rahmatpur-Babuganj-Muladi-Hizlakok Road (Z8034)
2011-12 GoB
252. Bangladesh Dhaka Transport Coordination Board (DTCB)
Development of the BRT and Corridor Restructuring Implementation Study and Preliminary Design work for the Uttara - Mohakhali - Ramna - Sadarghat Corridor in Dhaka.
2011-13 IDA
253. Bangladesh DTCB
Dhaka bus network and regulatory reform implementation study and design work
2011-13 World Bank
254. Bangladesh Asian Development Bank (ADB)
Greater Dhaka Sustainable Urban Transport Corridor TA Nº: 7415
Jul’10-Apr’11
ADB
255. Bangladesh Local Government Engineering Department (LGED)
Carrying out Performance and Financial Auditing (FA) under ADB assisted "Emergency Flood Damage Rehabilitation Project" 2004. (Part: A Rural Infrastructure & Part E: Municipal Infrastructure)
2006-07 ADB
256. Bangladesh Roads and Highway Department (RHD)
Carrying out Performance and Financial Auditing (FA) under ADB assisted
2005-07 ADB
41
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY "Emergency Flood Damage Rehabilitation Project" 2004. (Part: B Roads) ADB
257. Bangladesh Bangladesh Railway JBIC Special Assistance for Project Implementation (SAPI) for Dhaka-Chittagong Railway Development Project
2008 JBIC
258. Bangladesh Bangladesh Railway JBIC Special Assistance for Project Formation (SAPROF) for Dhaka-Chittagongn Trunk Railway Transportation Capacity Enhancement Project
2006 JBIC
259. Bangladesh Department (RHD) Rehabilitation and Privatization of Eight Ferry Services in Patuakhali and Barguna
2001-03 DANIDA
260. Bangladesh Bangladesh Railway ADB TA : Organizational Reform of Bangladesh Railways (Phase-III)
2002-03 ADB
261. Bangladesh RHD Carrying out Performance and Financial Auditing (FA) of 4 ADB Funded Road Transport Project in Bangladesh.
2007-10 ADB
262. Bangladesh Bangladesh Railway ADB TA : Regional Traffic Enhancement Project, Bangladesh Railway
2002 ADB
LAND-USE PLANNING AND INFRASTRUCTURE DEVELOPMENT 263.
Tanzania City Director, Mbeya City Council, Mbeya, Tanzania
Provision of Construction Supervision Consultancy Services for Urban Infrastructure Development in Mbeya City under The Tanzania Strategic Cities Project (TSCP)
2011-14 International Development Association (IDA)
264. Papua New Guinea
Korea Engineering Consultants Corp. (KECC), Korea
Consulting Services for Construction Supervision Lae Tidal Basin Project, Phase-I
2012-14 ADB
265.
Uzbekistan “Qishloq Qurilish Invest” LLC
Construction of Modern Rural Houses (Phase 1) Technical Review of the Constructed Houses and Associated Infrastructures (access and internal roads, access and internal water supply system) in Samarkand, Tashkent and Fergana Regions Istisn’a Agreement (UZB-0075)
2017 IDB
266. Bangladesh LGED
Management Design and Supervision (MDS) Consultancy Services (Package No. UGIIP-III-AF/MDS/02)
2017-2021 ADB
267.
Bangladesh LGED
City Region Economic Development Investment Program (City Region Development Project - II), CRDP - II for Preparation, Design and Supervision (PDS) Consultancy Services
2017-2020 ADB
268.
Bangladesh JICA Project Team
The Logistic Condition Survey at Land Ports for The Data Collection Survey on Matarbari Port Development in the People's Republic of Bangladesh
2017 JICA
269. Bangladesh Hifab International AB
TA-9160 BAN: Preparing Information Technology Parks for Employment and Innovation
2017 ADB
270. Bangladesh
Bangladesh Economic Zones Authority (BEZA)
Pre-Feasibility Study of Bogra and Natore Economic Zone
2017-2018 GoB
271.
Bangladesh Bangladesh Economic Zones Authority (BEZA)
Support to Capacity Building of Bangladesh Economic Zones Authority (under Private Sector Development Support Project) - (IDA Credit No. 4866-BD, DFID Grant No. TF 099730)
2016 World Bank
272. Bangladesh
Local Govt. Engineering Department (LGED)
TA 39295-032 BAN: Preparing Urban Governance and Infrastructure Improvement (UGIIP-III)
2013-2015 ADB
273.
Bangladesh Local Govt. Engineering Department (LGED)
Preparation of Action Area Plan for Gazipur City Corporation under Preparation of Action Area Plan for Narayangonj and Gazipur City Corporation
2015-2017 GoB
42
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 274.
Bangladesh Conservator of Forests, Wildlife and Nature Conservation Circle
Design, Estimate and Supervision of Construction for the Bangabandhu Sheikh Mujib Safari Park, Gazipur, Bangladesh
2013-2014 GoB
275. Bangladesh LGED
Preparation of Master Plan for Kishoreganj Paurashava Under District Towns Infrastructure Development Project
2013-2014 GoB
276. Bangladesh LGED
Preparation of Municipal Development Programs (Western Part: Rajshahi, Rangpur, Khulna and Barisal Divisions)
2012 IDA
277.
Bangladesh LGED
Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project – Package No.: 02 (Two) – Mymensingh
Mar’2008-Mar’2010
GoB
278.
Bangladesh AECOM Asia Co. Ltd.
ADB's TA project "TA-7902-BAN: Climate Resilient Infrastructure Improvement in Coastal Zone Project-1"
2012 ADB
279. Bangladesh JICA Traffic Count Survey (Haor Area) 2010-2011 JICA
280. Bangladesh LGED Sustainable Rural Infrastructure Improvement Project
Apr-Aug, 2010
ADB
281. Bangladesh LGED Technical Assistance under Market Infrastructure Development Project in Charland Region (MIDPCR)
2008-2013 GoB
282. Bangladesh RAJUK Preparation of Detailed Area Plan for Airport-Demra Bypass and its influenced Area (Location-6)
1999-2007 GoB
283. Bangladesh PKSF Impact Evaluation Study of "Financial Services for the Poorest Project"
2007 GoB
284. Bangladesh Power Cell Generation Support Framework and Financing Strategy to Implement Least Cost Inv
2007 Ministry of Power, Energy
285. Bangladesh RAJUK
Consultancy Services for Reviewing Land-use Plan, Preparation of Various Detailed Infrastructure and Utility Plans, Detailed Design of Associated Elements for Jhilmil Residential Town Project
2006-2007 GOB
286. Bangladesh RAJUK Consulting Services for Planning and Designing of Various Infrastructural and Utility Plans and Components with Ancillary Works for Purbachal New Town Project
2006-2007
GOB
287. Bangladesh Monirampur Pourashava Authority
Preparation of Landuse / Master Plan for Monirampur Pourashava
1998-1999 GoB
288. Bangladesh Bangladesh Railway
Preparation of Land use Plan for the Railway Land at Chittagong
1998-1999 GOB
289. Bangladesh LGED Urban Governance & Infrastructure Improvement Project (UGIIP) – Governance Project Development (GDP) Component
2004-2005 ADB
290. Bangladesh ADB Supporting Urban Governance Reform (ADB TA No. 4005 BAN)
2004-2005 ADB
291. Bangladesh JICA Study Team Topographic and Bathymetric Survey of Padma River and River Bank and Approach Road along The Proposed Alignment of the Padma Bridge site at Mawa-Janjira and Sub-Soil Investigation under Padma Bridge Feasibility Project (Phase-II)
2004 JICA
292. Bangladesh Rupali Bank Ltd. Enterprise Growth and Bank Strengthening Project, Financial Advisor For Rupali Bank Limited, Project Id No: P 081969 Component: Valuation of Collaterals (Mortgaged assets) of Rupali Bank Ltd.
2004 ADB
293. Bangladesh Ministry of Land/GOB Computerization of land record management and administration Project
1997-2002 GOB/MOL
43
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 294. Bangladesh Rajdhani Unnayan
Kartripakkha (RAJUK)
Preparation of Detailed Area Plan, DND North
1999-2001 GoB
295. Bangladesh RAJUK Preparation of Detailed Area Plan, Airport-Demra bypass Area
1999-2001 GoB
296. Bangladesh Ministry of Chittagong Hill Tracts Affairs (MCHTA)
Chittagong Hill Tracts Regional Development Plan
2000-2001 ADB
297. Bangladesh ADB Poverty Impact Study and Land Acquisition and Resettlement Plan for the Proposed Gas Sector Development Project, Bangladesh
2000 ADB
298. Bangladesh Ministry of Land Land Administration Reform Project 1998-00 IDA & ADB 299. Bangladesh Char Development &
Settlement Project (CDSP) Need Assessment and Preparation of Proposal to Modernize Land Records and Processes for Strengthening Capacity of DC, TNO and AC (Land) Office, CDSP
1999-00 The Netherlands
300. Bangladesh DLRS Modernization of Land Administration Project (Phase-II)
1997-98 ADB
301. Bangladesh Finance Division, Ministry of Finance, Govt. of Bangladesh
Financial Advisor for Rupali Bank Ltd. under Enterprise Growth and Bank Modernization Project
2004-05 WB
PORT, HARBOUR AND INLAND WATER WAY
302. Bangladesh BIWTA Inland Waterway Dredging Feasibility Study Bangladesh Trade and Transport Facilitation Studies RETF Project (BIWTA Component)
2016 World Bank
303. Bangladesh Power Cell Technical Advisory to carry out Site Study and Basis of Design for the proposed Onshore LNG Import and Regasification Terminal at Moheshkhali, Bangladesh (Phase-I) (Sub-Consultancy)
2017 IFC
304. Bangladesh Payra Port Authority
Detailed Techno Feasibility Study and Conceptual Master Planning at Payra Port (Einvironmental and Social Assessment)
2015 British Fund
305. Bangladesh GTCL Environmental Impact Assessment (EIA) in favour of Offshore LNG Floating Storage and Regasification Unit (FSRU) Terminal permanently moored at Island / Finger Jetty Activities Project at Maheshkhali area under Cox's Bazar District
2012-13 GoB
306. Bangladesh Eastern Refinery Ltd. Offshore & Onshore EIA Studies for Installation of A Single Point Mooring & Pipeline System)
2011-12 IDA & GOB
307. Bangladesh Chittagong Port Authority (CPA)
Construction of a Container Terminal at New Mooring, Chittagong, Bangladesh
2004-2005 CPA’s own fund.
308. Bangladesh Mongla Port Authority
Environmental & Social Impact Assessment to Support Feasibility Study for Improvement of Navigability of Mongla Port
2003-04 GoB
309. Bangladesh BIWTA Master Plan for Inland Water Ways Study 1998-89 DGIS
310. Bangladesh Ministry of Shipping BIWTA, BIWTC
Assessment and Verification of 1998 Flood Damages of BIWTA and BIWTC
1998 IDA
311. Bangladesh Ministry of Shipping Design and Coordination Consultancy for Implementation of the Third Inland Water Transport Project
1997-99 IDA
312. Bangladesh Royal Danish Embassy Review of Inland Water Transport Sector 1996 DANIDA
313. Bangladesh CPA & MPA Mathematical Model Study of Pashur-Sibsa River System and Karnaphuli River Entrance
1990-92 DANIDA
BUILDING 314. Tajikistan Ministry of Education,
Republic of Tajikistan Design and Detailed Engineering for the National Testing Center in Dushanbe
2011-13 IDA
315. Tajikistan Ministry of Education, Republic of Tajikistan
Consultancy Services for Completion of Construction and Provision of Equipment for Three Secondary Schools in Tajikistan
2004-06
SFD
44
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 316. Tajikistan Ministry of Education,
Republic of Tajikistan Reconstruction and Completion of Comprehensive Secondary Schools Project
2000-03 IDB
317. Tajikistan Ministry of Education, General Construction Division, Republic of Tajikistan
Consultancy Services for Construction and Equipment for School Project, Phase-II
Aug 2009 - Jun 2012
SFD
318. Azerbaijan Social Fund for Development of IDPs (SFDI)
Accurate Engineering Surveying, Designing, Supervision and Monitoring under the Project “Construction of Social Infrastructure Facilities for IDPs in Azerbaijan”
2007-2009 IDB
319. Georgia Municipal Development Fund (MDF) of Georgia
Construction Management and Supervision Services for Rehabilitation Works for IDP Housing for Six (6) Former Hospital Buildings and Partial Rehabilitation Works for Twenty two (22) Collective Centers for IDP Durable Housing
2014 USAID
320. Bangladesh IMC Worldwide Ltd.
Design and Site Supervision Services for the Fael Khair School-cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR (Survey & Design and Supervision of Scouts Training Centre Cum Cyclone Shelter and Survey & Design of 2 Replacement Shelters (Z3-669 & Z3-659) - Ref. Project No.: BD1-0046
2017-2020 IDB
321. Bangladesh Bangladesh Forest Department (BFD)
Design, Supervision & Monitoring Consultancy for Field Infrastructure under Climate Resilient Participatory Afforestation and Reforestation Project
2015-2017 World Bank
322. Bangladesh Grontmij GmbH Technical Evaluation of GIZ Office Premises 2015 GiZ - German Development Coorporation
323. Bangladesh Asian Development Bank Urban Primary Health Care Sector Development Project (ADB TA-7655)
2011-12 ADB
324. Bangladesh Yachiyo Engineering Co., Ltd (YEC), Japan
Construction Supervision for DCC Workshop, under the Programme for Improvement of Solid Waste management In Dhaka City Toward Low Carbon Society in The People's Republic of Bangladesh
2009-10 JICS
325. Bangladesh
IMC Worldwide Ltd.
Survey, Design and Documentation for School cum Cyclone Shelter - Z3-669 as replacement of site Z2-407 under Package 13 and Scout Training Centre cum Cyclone Shelter under Fael Khair Program
2016 IDB
326. Bangladesh
IDB Site Supervision Services for Fael Khair School-Cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR
2011-14 IDB
327. Bangladesh
IMC Worldwide Ltd. Site Supervision Services for The Fael Khair School-Cum-Cyclone Shelters Program for the Victims of the Cyclone SIDR (Supervision of Construction Packages 11 & 12)
2014-16 IDB
328. Bangladesh
Yachiyo Engineering Co., Ltd (YEC), Japan
Construction Supervision for DNCC Warehouse under the Programme for Improvement of Solid Waste Management in Dhaka City Toward Low Carbon Society in the People's Republic of Bangladesh
2013-14 JICA
329. Bangladesh
Ministry of Food & Disaster Management of the GoB
Construction of a Concrete Grain Silo at Mongla Port with Facilities (50,000 MT Capacity)
2011-14 Japan Debt Cancellation Fund (JDCF)
330. Bangladesh Japan International Co-oparation Agency (JICA)
Construction of Solid Waste Management (SWM) Office at Word No. 56, 63,69 & 76
2008 JICA & Dhaka City Corporation (DCC)
45
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 331. Bangladesh Japan International Co-
oparation Agency (JICA) Construction and Renovation of Solid Waste Management (SWM) Office at Word No. 5,7,9, 42 , 49,50,53
2009 JICA & DCC
332. Bangladesh United Nations Development Programme (UNDP)
Civil Works Construction Supervision Consultants (CSC) Services for Construction of Core Family shelter Phase-II
2009-10 UNDP
333. Bangladesh Yachiyo Engineering Co. Ltd., Japan
The Programme for Construction of Multipurpose Cyclone Shelters In The Area Affected By The Cyclone SIDR (Survey, Investigation and Design)
2008 JICA
334. Bangladesh Yachiyo Engineering Co. Ltd., Japan
The Programme for Construction Of Multipurpose Cyclone Shelters in the Area Affected by the Cyclone SIDR (Construction Supervision & Defect Liability Inspection)
2008 -2010 JICA
335. Bangladesh CBSMC Shopping, Commercial & Islamic Centre at Chawk Bazar
2002-03 CBSMC
336. Bangladesh DOF Preparation of Plan, designs, estimates, supervision and soil testing of civil works at different places of coastal area division
1998-00 IDA & ADB
337. Bangladesh Style Apartment Ltd. Style Aspire, An Apartment Complex 1997-00 Style Apartment Ltd.
338. Bangladesh BETS Planning, Detail Design, Cost Estimating & Construction Supervision of BETS Centre
1995-99 BETS
339. Bangladesh Directorate of Family Planning, GoB
Repair/renovation of Clinic building and construction of MO/FWV quarter at 18 MCWCs
1997-99 UNFPA
340. Bangladesh DCC Supervision of Construction of Dholaikhal Pump Station (Credit TA VI, 2393 BD)
1996-97 WB
341. Bangladesh Style Apartment Ltd. Feasibility Study and Preliminary Design of City View Apartment cum Shopping Centre
1996-97 City View Apartment Ltd.
342. Bangladesh Directorate of Family Planning
Assessment of Repair/Renovation of 8 Maternal and Child Welfare Centres (MCWC)
1996 UNFPA
343. Bangladesh T & T Board Preparation of Master Plan, Detail Design & Construction Supervision of Telephone & Telegraph Exchange Building
1984-89 GOB
344. Bangladesh Biman Bangladesh Detail Design and Construction Supervision of Biman Poultry Complex, Phase-I&II
1978-79 GOB
ENERGY AND POWER SECTOR
345. Afghanistan Ministry of Energy and Water, Afghanistan
Farah Rud Irrigation and Hydropower Project
2006-07 Govt. of Afghanistan
346. Tajikistan Ministry of Energy, Tajikistan
Construction of Mini Hydro Power Plants in Rural Areas of Tajikistan
2005-07 IDB
347. Pakistan Govt. of Pakistan Feasibility Study of Turkmenistan-Afghanistan-Pakistan Natural Gas Pipeline Project II, ADB TA-6153-REG
2004 ADB
348. Bangladesh Dhaka Power Distribution Company Limited (DPDC)
GIS (Geographical Information System) Based Distribution Network System and Preparation of a 20 Years Master Plan for DPDC
2017-2018 GoB
349. Bangladesh BPDB ADB TA-8839 BAN: Study on Energy Security (48277-004)
2015-16 ADB
350. Bangladesh ICF Consulting India Private Limited
Gas Market Assessment – Bangladesh
2017 ICF
351. Bangladesh Tokyo Electric Power Services Company (TEPSCO)
Consulting Services for Execution Survey of Natural Condition for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project
2014-15 JICA
352. Bangladesh GTCL Rehabilitation and Expansion of Existing Supervisory Control and Data Acquisition
2014-17 JICA
46
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY (SCADA) System of National Gas Grid under GTCL (Component B of Bheramara Combined Cycle Power Plant Development Project)
353. Bangladesh Sylhet Gas Fields Ltd (SGFL)
Drillstem Testing and Production Testing Services with equipment for Drilling of 1 appraisal cum development oil/gas well (KTL-7) at Kailashtilla structure of SGFL
2014-15 GoB
354. Bangladesh GTCL Installation of Natural Gas Compressor Stations at Ashuganj and Elenga
2012-14
GoB
355. Bangladesh CPTI Agency Agreement with CPTI International Inc.
2011-13 CPTI
356. Bangladesh HTSPE Limited, UK Evaluate the Rural Maintenance Programme (RMP-Phase-III)
2008 HTSPE Limited, UK
357. Bangladesh BGFCL Drill Stem Testing-Group: A (drilling of one new well at Bakhrabad gas field). Group: A (Workover / Recompletion of Two Nos. Existing Well at Bakhrabad gas field)
2010 GOB
358. Bangladesh Sylhet Gas Field Ltd. Drill Stem Testing & Production Testing Services for Kailashtilla Gas Field Well # 5&6
2006 GOB
359. Bangladesh PGCB Construction of 230KV Transmission Lines and Substations under West Zone Power System Development Project
2004-07 ADB
360. Bangladesh BPDB Detailed Feasibility Study & Environment Impact Assessment of Haripur 150MW CCPP Project
2005-06 GOB
361. Bangladesh Nexant, USA TA # 4379-BAN: Power Sector Development Program II
2005 ADB
362. Bangladesh Wood Mackenzie Consulting Services for Preparation/Development of Gas Sector Master Plan and Strategy for Bangladesh
2005 WB
363. Bangladesh USAID Improved Performance of Bangladesh’s Energy Sector (Individual Contract)
2002-04 USAID
364. Bangladesh SUMMIT Industrial & Mercantile Corporation
Topographical and Bathymetric Surveys and Geotechnical Investigations of the Project Site for 450 MW Combined Cycle Power Plant at Sirajganj
2004 Private
365. Bangladesh BPDB Corporatization of Ashuganj Power Station (ADB TA Project), Phase-I & II
2001- 03 ADB
366. Bangladesh PA Consulting Services Inc.
Improved Performance of Bangladesh Energy Sector
2002-03 World Bank
367. Bangladesh BPDB Meter Reading & Other Operational Activities of Sales & Distribution Division 1,2,3 under BPDB, Khulna
1999-00 GOB
368. Bangladesh BPDB Identification, Verification, Valuation & Recording of Fixed Assets and Stores of all Unit under Regional Accounting Office (RAO), Chittagong Electric Supply, BPDB, Chittagong
2000 BPDB
369. Bangladesh BPDB Identification, Verification, Valuation & Recording of Fixed Assets and Stores of all Unit Offices under the payment jurisdiction of Regional Accounting Office (RAO), Sikalbaha Power Station, BPDB, Shikalbaha
2000 BPDB
370. Bangladesh PGCB Resettlement Action Plan (RAP) for Hasnabad-Amin Bazar (Savar)-Tongi (50 km) and Haripur-Meghnaghat (10 km) 230 kV Transmission line project under Dhaka Power System upgrade project.
1999 GOB, ADB
47
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 371. Bangladesh Petrobangla Fourth Natural Gas Development Project 1997-98 ADB
372. Bangladesh Petrobangla Safety and Efficiency Improvement in Bangladesh Gas Sector
1995-96 ADB
373. Bangladesh Bangladesh Oil, Gas and Mineral Development Corporation
The Maddhapara Hard Rock Mining Project 1989 OECF
ENVIRONMENT 374. Bangladesh JICA Survey Team
(PADECO Co. Ltd.) Environmental Impact Assessment (EIA) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh
2017-2018 JICA
375. Bangladesh JICA Project Team Strategic Environmental Assessment (SEA) under JICA Data Collection Survey on the Matarbari Port Development in Bangladesh
2017 JICA
376. Bangladesh JICA Survey Team (PADECO Co. Ltd.)
Resettlement Action Plan (RAP) under JICA Preparatory Survey for the Matarbari Port Development in Bangladesh
2017-2018 JICA
377. Bangladesh Haor Infrastructure and Livelihood Improvement Project (HILIP), LGED
Environmental Impact Assessment (EIA) for HILIP Project Areas Compaising 28 Haor Upzilas of 5 Districts
2013-14 GoB
378. Bangladesh Acorn International Scoping Environmental and Social Aspects: Liquefied Natural Gas Floating Storage and Regasification Unit and import terminal infrastructure, Moheshkhali Island, Bangladesh
2016 IDA
379. Bangladesh Tokyo Electric Power Services Co. Ltd (TEPSCO)
Planning and Design on Access Road for Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh (JICA Study)
2013 JICA
380. Bangladesh Oriental Consultants Co, Ltd.
Environmental Impact Assessment (EIA) and Abbreviated Resettlement Action Plan (ARAP) Studies for Selected Gas Transmission Pipeline Projects of GTCL under the Preparatory Survey on the Natural Gas Efficiency Project in the Peoples Republic of Bangladesh.
2013-14 JICA
381. Bangladesh IPFF Project Cell, Bangladesh Bank
Consulting Services for Engagement of Environment Monitoring Consultant for Investment Promotion and Financing Facility (IPFF) Project under Package # S19 (A1)
2014-15 World Bank
382. Bangladesh Bangladesh Technosity Limited (BTL)
Conducting Environmental and Social Impact Assessment (ESIA) of Kaliakoir High Tech Park
2016 BTL
383. Bangladesh Acorn International
Regulatory Review for Liquefied Natural Gas Floating Storage and Regasification Unit and import terminal infrastructure, Moheshkhali Island, Bangladesh
12/2015 Acorn International
384. Bangladesh Sylhet Gas Fields Ltd. Conduct Integrated Environmental Impact Assessment (EIA) Study for (a) 5000 BPD capacity Condensate Fractionation Plant (CFP) with Catalytic Reforming Unit (CRU) and (b) 1500 BPD capacity Catalytic Reforming Unit (CRU) at Rashidpur to convert Petrol into Octane at Kamaichera, near Railway Station at Upazilla-Bahubol, District-Hobigonj.
2012 SGFL
385. Bangladesh Sylhet Gas Fields Ltd. Environmental Management Plan (EMP) Study for 10 (Ten) Existing Plans of Sylhet Gas Fields Limited.
2012 GoB
386. Bangladesh Gas Transmission Company Limited (GTCL)
Environmental Impact Assessment (EIA) of Offshore LNG Floating Storage and Re-gasification Unit (FSRU) moored at STL
2017 GoB
48
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY (Submerged Turret Loading) Project,
Maheshkhali, Cox’s Bazar
387. Bangladesh GTCL Environmental Impact Assessment (EIA) in favour of Offshore LNG Floating Storage and Regasification Unit (FSRU) Terminal permanently moored at Island / Finger Jetty Activities Project at Maheshkhali area under Cox's Bazar District
2012-13 GoB
388. Bangladesh GTCL Environmental Impact Assessment (EIA) study along the selected route of the proposed Gas transmission pipeline from Jalalabad to Danua via Bibiyana
2011-12 GoB
389. Bangladesh GTCL Environmental Impact Assessment (EIA) study along the selected route of the proposed Gas transmission pipeline from Moheshkhali to Anowara
2011-12 GoB
390. Bangladesh Bangladesh Agricultural Development Corporation (BADC)
Agro-Environmental Impact Assessment (AEIA) and Determination of Water Logged Area of South of the Padma River (Faridpur, Rajbai and Gopalgonj Districts)
2011 GoB
391. Bangladesh Eastern Refinery Ltd. Onshore Surveys (FEED & PMC for Installation of a SPM and Pipeline System)
2011-2013 IDB
392. Bangladesh Eastern Refinery Ltd. Offshore & Onshore EIA studies for installation of a Single Point Mooring & Pipeline System
2011-2013 IDA & GOB
393. Bangladesh BAPEX Environmental Impact Assessment of Sundalpur Gas/Oil Exploration.
2011 GOB
394. Bangladesh Sylhet Gas Field Ltd. (SGFL)
Environmental Management Plan (EMP) Study for Drilling of Wellsat Kailashtilla Gas Fields Well no 3 & 4
2007-08
GOB
395. Bangladesh DWASA Environmental Management Framework (Package DS-5)
2007 IDA
396. Bangladesh TULLOW Bangladesh Ltd.
Provision of Additional Environmental Monitoring Services
2010-ongoing
TULLOW
397. Bangladesh TULLOW Bangladesh Ltd.
Environmental Monitoring Services of TBL at Bangora, Comilla.
2010 TULLOW
398. Bangladesh TULLOW Bangladesh Ltd.
Conducting EIA for Gopalnagar to Bangora Gas Gathering Pipeline
2008 TULLOW
399. Bangladesh Titas Gas Transmission and Distribution Co. Ltd. (TGTDCL)
Seminar (Foreign Training), Environmental & Safety Issues in Pipeline Design and Construction
2007 TGTDCL
400. Bangladesh Lafarge Surma Cement Limited.
Monitoring of Environmental and Social Performance of Lafarge Surma Cement
2006-10 Lafarge Surma Cement Limited.
401. Bangladesh Ontario Centre for Environmental Technology Advancement (OCETA)
Bangladesh Environmental Technology, Verification-Support to Arsenic Mitigation (BETV-SAM) Project
2006 CIDA
402. Bangladesh NIPPON KOEI CO., LTD Rendering Services for Data collection for the JBIC Environmental Profile Study in the Republic of Bangladesh
2006 JBIC
403. Bangladesh PGCL Environmental Impact Assessment (EIA) for Construction of Gas Distribution Network at Rajshahi City and its Adjoining Areas
2006 GoB
404. Bangladesh GTCL IEE, EIA and RP for Construction of Bheramara-Khulna (165Km.) Gas Transmission Pipeline
2006 GoB
405. Bangladesh BGFCL Procurement of Environmental Services for Drilling and Workover/Recompletion of 8 wells at Titas and Bakhrabad gas fields and Installation of Gas Process Plants at Titas Gas field
2006 GoB
406. Bangladesh GTCL IEE and EIA, RP of Bonpara-Rajshahi (50 Km) Gas Transmission Pipeline - Group B
2004 GoB
49
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 407. Bangladesh GTCL Preparation of IEE, EIA, RP report on
West Bank of Jamuna Bridge- Nalka- Hatikamrul- Bonpara- Ishwardi- Bheramara Gas Transmission Pipeline Project (Group-A) and Bonpara-Rajshahi Gas Transmission Pipeline Project (Group-B)
2004-05 GOB
408. Bangladesh BSCIC Conduct “Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) of Central Effluent Treatment Plant (CETP) and other Industrial Installations in the Proposed Tannery Estate, Dhaka
2005 GOB
409. Bangladesh UNOCAL Baseline Environmental Study on Seismic Program at Block 12 Area
2004 UNOCAL
410. Bangladesh UNOCAL Environmental Impact Assessment - Moulavi Bazar Development (Group-1 & Group-2)
2003-04 UNOCAL
411. Bangladesh GTCL IEE, EIA & RP on Ashugonj-Monohordi Gas Transmission Pipeline
2003-04 WB
412. Bangladesh GTCL IEE, EIA & RP of Proposed Nalka-Bogra Gas Transmission Pipeline
2003-04 WB
413. Bangladesh GTCL IEE, EIA & RP of Proposed Monohordi-Elenga-East Bank of Jamuna Bridge Gas Transmission Pipeline
2003-04 WB
414. Bangladesh AQMP, DOE Diesel Engine Maintenance Improvement Clinics
2004 IDA
415. Bangladesh Shell Hydrocarbons Holdings B.V. (SHH)
Initial Environmental Examination (IEE) & Environmental and Social Assessment (ESA) For Blocks 5 & 10
2003 SHH
416. Bangladesh Shell Hydrocarbons Holdings B.V. (SHH)
Environmental Impact Assessment (EIA) and Baseline Study (BLS) of Blocks 5 & 10
2003 (SHH)
417. Bangladesh JBIC JBIC Chittagong Study 2003 JBIC
418. Bangladesh OCETA Environmental Technology Verification-Arsenic Mitigation Program-Field Testing of AM Technologies (ETV-AM Field Testing)
2003 CIDA
419. Bangladesh Titas Gas T&D Co. Ltd. Environment and Social Impact Assessment of Bangabandhu Bridge Approach Road Gas Pipeline Project
2001-02 GOB
420. Bangladesh BAPEX Environmental Impact Assessment (EIA) for Installation of a Gas Process Plant, Condensate Fractionation Plant and 10 Km. 10 Inch dia Gas Pipeline Project at Fenchuganj Gas Field
2001-02 GOB
421. Bangladesh LGED Study for Rural Development Focusing on Flood Proofing in Bangladesh, 2001
2001-02 JICA
422. Bangladesh TGTDCL Environmental and Social Impact Assessment for Construction of Gas Pipeline and other Installations under Dhaka Clean Fuel Project (TGTDCL Part)
2002 ADB
423. Bangladesh WB Promotion of Environmental Management Systems (EMS: ISO 14001) Project
2000-01 UNDP
424. Bangladesh Shell Bangladesh Report on the Massive Death of Marine Turtles
2000-01 Shell Bangladesh
425. Bangladesh Rural Power Company
(RPC)
EIA Study of Mymensingh Combined Cycle Gas Turbine Power Plant Conversion Project
2001 KFW
426. Bangladesh MARUBENI EIA study of Meghnaghat Combined Cycle Gas Turbine Power Plant (Phase II) Project
2001 GoB
427. Bangladesh Bangladesh Road Transport Corporation
Urban Transport and Environmental Improvement Project
2001 ADB
428. Bangladesh Shell Bangladesh Exploration &
Social Impact Assessment (SIA) of Magnama-1, Block-16, Offshore Kutubdia
2000-01 Shell Bangladesh
50
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY Development B.V. Island
429. Bangladesh Shell Bangladesh Air Quality Test in Dhaka City (Lead Sampling)
2000-01 Shell Bangladesh
430. Bangladesh Okland Oil Company Environmental Monitoring of EIA for Reju-1, Offshore Exploration Drilling Well in Block 17
1999-00 Okland Oil Company
431. Bangladesh Petrobangla Consultancy Services for Development of an Environment and Safety Management System in Petrobangla
1997-00 Government of Bangladesh
432. Bangladesh Shell Bangladesh Exploration & Development B.V.
Social Impact Assessment of Block 15 (SANDWIP) & Stakeholder Identification of Block 5 & 10 (Bhola & Sundarban)
2000 Shell Bangladesh
433. Bangladesh Shell Bangladesh Exploration & Development B.V.
Environmental Impact Assessment (EIA) for 3D Seismic (4C/3D) Acquisition over Sangu Field in Block 16
2000 Shell Bangladesh
434. Bangladesh Hussain Chemical Complex
Initial Environmental Examination (IEE) on Granular Single Super Phosphate of Hussain Chemical Complex
2000 Private Financed
435. Bangladesh UNDP Environmental Impact Assessment (EIA) on the Industrial Activities (Tanneries and Other Industries) at Hazaribag Area
2000 UNDP
436. Bangladesh CWASA Preparation of IEE, EIA and EMP for Proposed Madunaghat Surface Water Treatment Plant of CWASA
1999 GOB
437. Bangladesh GTCL Implementation of Environmental and Social Management Plan for Gas Supply to Western Zone (Elenga to Baghabari) Project
1999 GTCL
438. Bangladesh Okland Oil Company EIA for Reju-1 Offshore Exploration Drilling Well in Block 17
1999 Okland Oil Company
439. Bangladesh Occidental IEE & EIA of Jalalabad Well Cluster Pad (Well# 5)
1998-99 Occidental
440. Bangladesh PGCB Environmental Impact Assessment for Hasnabad-Amin Bazar (Savar)-Tongi (50 km) and Haripur-Meghnaghat (10 km) 230 kV Transmission line project under Dhaka Power System upgrade project
1999 ADB
441. Bangladesh Ministry of Env. & Forest Ecological Survey Project 1998-99 GOB
442. Bangladesh GTCL Environmental Safety and Social Impact Assessment (ESSA) for Gas Supply to Western Zone Project
1998 WB
443. Bangladesh Occidental Hillside Improvement Programme – Reconnaissance Survey for Jalalabad Gas Field at Drill Pads, Access Roads, Gas Treatment Plant Site
1998 Occidental
444. Bangladesh Cairn Energy PLC Post EIA for Halda Drilling Operations 1998 Cairn Energy PLC
445. Bangladesh Occidental Environmental Impact Assessment for 2D/3D Seismic Survey
1998 Occidental
446. Bangladesh Mott MacDonald (UK) Mott Ewbank Preece (UK)
IEE and EIA of Haripur Barge Mounted Power Station
1998 Mott MacDonald
447. Bangladesh DOE Coastal and Wetland Biodiversity Management Project
1998 GEF
448. Bangladesh DOE
The Socio-Economic Survey for the Coastal and Wetland Biodiversity Management (CWBM) Project
1998 GEF
449. Bangladesh BTC Effluent Treatment Plant of Bangladesh Tobacco Co. Ltd. Dhaka Factory
1997-98 BTC
450. Bangladesh JICA/NJS Environmental Impact Assessment (EIA) for North Dhaka Sewerage
1997 JICA
451. Bangladesh DWASA Initial Environmental Examination (IEE) of North Dhaka Sewerage
1997 JICA
452. Bangladesh DCC Preliminary Environmental Impact Assessment for Gulshan Banani Lake Development
1997 GOB
51
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 453. Bangladesh Bangladesh Fertilizers &
Agrochemicals Ltd. Initial Environmental Examination (IEE) of Fertilizers and Agro-chemicals Project
1995 Private Financed
454. Bangladesh ADB Socio-Environmental Assessment of Meghna Dhonagoda Irrigation Project
1994 ADB
ECONOMIC & SOCIAL STUDIES, HRD & INSTITUTIONAL DEVELOPMENT 455. Tajikistan Tax Committee
The Government of the Republic of Tajikistan
Consultancy services on Strengthening Human Capital and Institutional Capacity
2009 IDA
456. Bangladesh LGED Consultancy Services for Operational Audit Under Municipal Governance and Services Project (MGSP) Contract Package No.: MGSP/PMU/S-14
2017 IDA
457.
Bangladesh LGED
Contract for Governance Improvement and Capacity Development (GICD) Consulting Services under Northern Bangladesh Integrated Development Project (NOBIDEP)
2015-2019 JICA
458.
Bangladesh LGED
Resource Mapping of Selecting Beels through PRA and Professional Documentation, Mapping and Printing under Beel Development Activities of HFMLIP (RM 01 – RM 04)
2016 JICA
459.
Bangladesh IMED, Ministry of Planning
Conducting Evaluation Study on the Completed Project titled "Secondary Towns Integrated Flood Protection (Phase-2)" Project - BWDB part
2016 GoB
460. Bangladesh KfW
Final Technical Inspection of Financial Cooperation Projects - Field Visits to SRIIP, RIIP and CRDP projects
2017 KfW
461. Bangladesh LGED-SSWRD (JICA) Baseline Study for Impact Assessment of Small Scale Water Resources Development Project in Greater Mymensingh, Sylhet and Faridpur Areas.
2010-12 JICA
462. Bangladesh Ministry of Labor and Employment (MOLE)
Consulting Services for Conducting Baseline Survey under Northern Areas Reduction of Poverty Initiative (NARI) Project (Contract Package # MOLE-S11)
2014-16 World Bank
463. Bangladesh Dept. of Livestock Services, Krishi khamar Sharak, Farmgate, Dhaka-1215, Bangladesh
Monitoring & Evaluation-Base Line Survey, Mid-term Evaluation & End of Project Evaluation (S-9), Avian Influenza Preparedness and Response Project
2011-12 GoB/WB/IDA
464. Bangladesh Social Development Foundation (SDF)
Baseline Survey of SIPP Additional Financial and SIPP-II
Sep 2009 –Aug 2010
IDA
465. Bangladesh SRIIP, LGED Socio-economic Baseline Survey for SRIIP-3 May 2010 – Jul 2010
ADB
466. Bangladesh Bangladesh Garment Manufacturers & Exporters Association (BGMEA)
Study on the present Power Supply Situation and Its Impacts on the Readymade Garment Sector in Bangladesh
Jul 2008 – Feb 2009
Gtz
467. Bangladesh LGED, GRDIRDP Hiring Professionals / consultants to execute soft components under Greater Rajshahi District Integrated Rural Development project (GRDIRDP)
Apr 2010 IDA
468. Bangladesh LGED Participatory Rural Appraisal (PRA) for Proposed Sub-projects under Participatory Small Scale Water Resources Sector Project (PSSWRSP)
2011-2014 GoB
469. Bangladesh ADB Consumer Survey for Performance Evaluation of Third Natural Gas Development Project & Ninth Power Project
May 2009-Jun 2009
ADB
470. Bangladesh Social Development Foundation (SDF)
Consulting Services on Preparation of Environmental and Social Safeguard Framework
Sep 2009 – Feb 2010
WB
52
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 471. Bangladesh UNDP Baseline Survey of the Urban Partnerships
for Poverty Reduction Project (UPPR) 2010 IDA & GoB
472. Bangladesh International Labour Organisation (ILO)
Research study on “The Informal Sector of Employment in Bangladesh, and how this sector could be Mobilized to Eliminate Worst Forms of Child Labour and Increase Job Opportunities”
2005 ILO
473. Bangladesh DFID Support for Rural Livelihoods Programme in Bangladesh
2003-06 DFID
474. Bangladesh Rural Electrification Board (REB)
Socio-economic Monitoring and Impact Evaluation of Rural Electrification and Renewable Energy Program in Bangladesh
2004-05 World Bank
475. Bangladesh LGED Second Small Scale Water Resources Development Sector Project for Forming, Establishing functioning WMCAs and Assist LCS Activities
2003-05 ADB
476. Bangladesh Japan Engineering Co. Study on Multipurpose Cyclone Shelter Project in Feni, Cox’s Bazar, Chittagong
2003 JICA
477. Bangladesh CARE, Bangladesh Consultancy Services to Conduct “Socio-economic Baseline Survey” for the BUILD Component under the Integrated Food Security Program (IFSP) of CARE-Bangladesh
2002 USAID
478. Bangladesh World Bank Assessment of Procurement Management Capacity and Its Institutionalization
2006 World Bank
479. Bangladesh DAE Baseline Survey /Participatory Rural Appraisal (PRA)/ for Agricultural Development Support to Adivashi and Char land Areas for SAIP of DAE
2001 IFAD
480. Bangladesh LGED Performance and Financial Audit Services (PFAS) on Emergency Flood Damage Rehabilitation Project
2006-07 ADB
481. Bangladesh LGED The Third Rural Infrastructure Development Project (Institutional Support)
1999-03 ADB, SIDA, IFAD & OECF
482. Bangladesh Rural Electrification Board (REB)
Socio-Economic Monitoring and Impact Evaluation of Rural Electrification and Renewable Energy Program in Bangladesh under Bangladesh Rural Electrification and Renewable Energy Development Project
2004-05 IDA
483. Bangladesh BWDB Tarail - Pachuria Flood Control, Drainage and Irrigation Project, Phase-I
1998 GOB
484. Bangladesh BWDB Khulna - Jessore Drainage Rehabilitation Project (Beneficiary Participation)
1995-98 ADB
AGRICULTURE & LIVESTOCK 485. Bangladesh Ministry of Agriculture
(MoA) through BADC Consultancy Services for Design, Management and Supervision of the Enhancing Quality Seed Supply Project
2012-16 IDB
486. Bangladesh IAPP, Ministry of Agriculture
Consulting Services for Impact Assessment of Integrated Agricultural Productivity Project (IAPP)
2016
GoB
487. Bangladesh Project Coordination Unit (PCU), BARC Complex
National Agricultural Technology Project (NATP): Phase-1, Concurrent Monitoring & Evaluation
2012-13 IDA
488. Bangladesh Agriculture Extension Component (AEC)
Mid-Term Evaluation of the Agricultural Extension Component, ASPS-II
2011 DANIDA
489. Bangladesh Department of Livestock Services
Assessment of Impact of Smallholder Livestock Development Project (SLDP 2) in Five Southern Districts, Bangladesh
2006 DANIDA
490. Bangladesh Department of Agricultural Extension (DAE)
Conducting Participatory Rural Appraisal (PRA) in Integrated Agriculture Development Project in Greater Sylhet District Including Orange and Pineapple Development
2004 GOB
491. Bangladesh FAO Conducting Survey for Collection of Field Level data for NOPOEST and LIFE Projects
2004 IFAD
53
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 492. Bangladesh BADC Expansion of Irrigation Through Utilization
of Surface Water by Double Lifting (1st Phase)
2001-04 GOB
493. Bangladesh ADIP, DAE Evaluation of Participating NGO of Agriculture Diversification and Intensification Project
2004 IFAD
494. Bangladesh European Commission (EC) Brussels, Belgium
Strengthening of Livestock Information Services (SLIS), Mid Term Review Mission
2002 ADB
495. Bangladesh SANYU Consultant Inc. Japan
JICA Study for Rural Development Focusing on Flood Proofing (Survey on Agriculture and Water use), 2001
2001 JICA
496. Bangladesh DAE Netrakona Integrated Agricultural Production and Water Management Project (Component : On-farm research)
1997-99 IFAD
497. Bangladesh DAE A special study on Potentials and Constraints of Oilseeds Production in Netrokona
1999 IFAD
498. Bangladesh BWDB Khulna - Jessore Drainage Rehabilitation Project (Component : Agricultural Development)
1995-98 ADB
499. Bangladesh Begum Gulchemonara Welfare Trust
Pre-feasibility Study of Patiya-Chandanaish- Satkania-Lohagara Integrated Flood Control, Irrigation and Rural Development Project
1997 Begum Gulchemonara Welfare Trust
INFORMATION MANAGEMENT SECTOR 500. Tajikistan PMU, Municipal
Infrastructure Development Project
Preparation of Service Delivery Development Program and Management Improvement Program
2007-2009 WB
501. Tajikistan Barki Tojik (Tajik Electricity Board)
TA 3601-TAJ Introduction of International Accounting Standards at Barki Tojik
2001-02 ADB
502. Bangladesh Power Cell
ICT Roadmap for the Power Sector in Bangladesh. (Sub-consultancy)
2016-2017 IDA
503. Bangladesh Directorate General of Food, Ministry of Food
Development of Food Grain Movement Manual, Least Cost Route, Stock in Transit, Movement Programming Software and Reviewing of Godown and Transit Loss
2014-15 GoB
504. Bangladesh Ministry of Science and ICT
Establishment of South Asia Sub-regional Economic Cooperation (SASEC) Information Highway Project (Bangladesh Part)
May’11 to-date
ADB
505. Bangladesh Asian Development Bank
TA-7604 BAN: Supporting Governance Management Project for Directorate of Land Records and Surveys (DLRS)
08 Oct’12 to 31 Dec’15
ADB
506. Bangladesh Ministry of Local Government, Rural Development & Cooperatives
Developing a National Management Information System (MIS) for Water Supply and Sanitation in Bangladesh
2010-11 GOB
507. Bangladesh Bangladesh Bureau of Statistics (BBS)
Digital Information System Project 2012-13 GoB
508. Bangladesh PCI, Japan Management Information Acquisition under the Project Solid Waste Management in Dhaka City
2004 JICA
509. Bangladesh Textile Strategic Unit, Ministry of Textile
Consulting Services on Preparation of Annual MIS Report for 2000-01 & 2001-02 and Development of Database for Textile Sub-sector from 1972-73 to 2001-02
2002 IDA
510. Bangladesh Petrobangla Installation of Local Area Network (LAN) Facilities in Petrobangla Head Office
2002 DFID
511. Bangladesh DLRS Computer Based Khatian & Map Printing System Modernisation Project (Pilot-1)
1995-01 GOB
512. Bangladesh DLRS Computer Based Khatian & Map Printing System Modernisation Project (Pilot-2)
1998-99 GOB
54
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 513. Bangladesh BTTB Digital Data Network of Bangladesh
Telegraph & Telephone Board (BTTB)
1999 GOB
514. Bangladesh (NMIDP), DAE Installation of NMIC Software at 55 district
offices of the DAE & Related Training
1998 EEC
515. Bangladesh NMIDP Database Management System Software
for National Minor Irrigation Census (NMIC)
1997 CEC
CAD, GIS & MODELING 516. Bangladesh LGED
GIS Based Property and Infrastructure Asset Management Systems (GIS-PIAMS) Consultancy Services under Municipal Governance and Services Project (MGSP): Contract Package No.: S-06
2017-2018 IDA
517. Bangladesh Chittagong Development Authority (CDA)
Development of Web Based GIS Application System for Land Use Map of Chittagong Metropolitan Master Plan Area
2015-2016 GoB
518. Bangladesh BAPEX Establishment of X, Y, Z Coordinates in Companyganj Area, Comilla
2002-03 BAPEX
519. Bangladesh DLRS Computer Based Digital Mapping and Khatian Printing System (Pilot-1) and Hardware Maintenance Project
1995-02 GOB
520. Bangladesh Ministry of Env. & Forest Preparation of GIS Based Ecological Maps 2000 GOB
521. Bangladesh Bangladesh Railway Preparation of Land use Plan for the Railway Land at Chittagong
1998-99 GOB
522. Bangladesh Mott MacDonald Preparation of Point Elevation Digital Coverage Maps for Cyclone Shelter Preparatory Study
1997 Mott MacDonald
EDUCATION AND TRAINING SECTOR 523. Tajikistan Barki Tojik (Tajik
Electricity Board), Republic of Tajikistan
TA 3601-TAJ Introduction of International Accounting Standards at Barki Tojik
2001-02 ADB
524. Cambodia National Bank of Cambodia
A diagnostic assessment of the Cambodian Payment and Settlement System, and the project to upgrade Information Technology in the National Bank of Cambodia (TA 4835-CAM: Preparing the Financial Sector Development Program)
2007 ADB
525. Tajikistan Ministry of Education, Republic of Tajikistan
Consultancy Services for the ADB Loan No. 2053-TAJ (SF): Education Sector Reform Project
2006 -09 ADB
526. Tajikistan PMU, Farm Privatization Support Project, Tajikistan
Training Program on “Micro Credit” for Tajik Participants
2005 WB
527. Tajikistan Foreign Investment and International Financial Institutions Department, National Bank of Tajikistan (NBT)
“Assistance in Formulating Courses Based on Banking Services” under Capacity Building Technical Assistance
2005-06 IDB
528. Bangladesh Canadian Petroleum Training Institute (CPTI)
GTCL Professional Executive Training Program
2011 CPTI
529. Bangladesh Primary Stipend Education Project
Mid-Term Evaluation/Assessment of Primary Stipend Education Project (PESP)
06/2011-09/2011
GoB
530. Bangladesh Primary and Mass Education Division (PMED)
ADB, TA, Primary Education Sector Development Program (PESDP)
02/2010-08/2010
ADB
531. Bangladesh Directorate of Primary Education
Study on Comprehensive Assessment / Evaluation of the Primary Education Stipend Project (PESP)
2006 GOB
532. Bangladesh Victoria University, Australia
BETS – Victoria Program 1999-04 Victoria University, Australia
533. Bangladesh Directorate of Primary Education
Impact Study on C-in-Ed Training of PTT under the Directorate of Primary Education of PMED
2003 IDA
55
SL COUNTRY EXECUTING AGENCY PROJECT PERIOD FUNDING
AGENCY 534. Bangladesh Australian Youth
Ambassadors for Development Program, Australia
Australian Youth Ambassador for Development Program (AYADP) – in-Country Management for Bangladesh (ICM 04/06/01B)
2001-03 AUSAID
535. Bangladesh Bureau of Manpower Employment & Training
Survey of In-plant Training-a Component of National Vocational Training System Reform (UNDP/ILO Project BGD93/010)
1994 UNDP/ILO
56
BETS Consulting Services Ltd. (BETS)
House No. 10, Road No. 135, Gulshan-1, Dhaka-1212, Bangladesh
Phone: 880 2 9889923-4, 9861529-32 Fax: 880 2 9889967 E-mail: bets@betsbd.com Web: www.betsbd.com
top related