Bethel Park High Schoolet e a g Sc ooBethel Park, PA

Weekly Progress SlideshowWeekly Progress SlideshowDecember 24, 2010,

Metal Siding DeliveredMetal Siding Delivered

Site Grading Around AuditoriumSite Grading Around Auditorium

Building Tented for Temporary HHeat

Roofing Materials StagedRoofing Materials Staged

Academic Wing West WindowsAcademic Wing West Windows

Electrical WorkElectrical Work

Duct Staged and InstalledDuct Staged and Installed

Masonry AuditoriumMasonry Auditorium

Brick Academic WingBrick Academic Wing

Topping Walls Admin WingTopping Walls Admin Wing

Gas Line Piped & Heaters StagedGas Line Piped & Heaters Staged

Cleaning Up In All AreasCleaning Up In All Areas

Academic Wing Carpentry C iContinues

CHILI COOK-OFF!CHILI COOK OFF!

Massaro CM will be challenging the other primes on the Bethelthe other primes on the Bethel

Park Job to a chili cook off January 12th. For details contact y

Chuck DeRitocderito@massarocms.com@

412-831-1024

Scheduled Work for Next Few Weeks:Scheduled Work for Next Few Weeks:• Roof Curbs (Areas D, E, F, & G)• Installing Interior and Exterior Metal Studs• Window & Door Framing• Masonry Block Walls• Punch Windows (Area B)

B i k V E t i W ll (A A B & C)• Brick Veneer Exterior Walls (Areas A, B & C)• Ext. Sheathing & Spray Foam Insulation (Area H)

Fireproofing Str ct ral Steel• Fireproofing Structural Steel• Aluminum Roofing Panels (Area E)• MEP Rough in’s across the site• MEP Rough-in s across the site.