Berwickshire High School. Presentation compiled 15 th October 2009. Why a new school?. Poor condition of existing building. Restricted circulation space. Outdated Facilities. A glimpse of the future. . Lower Ground Floor. Ground Floor. First Floor. Security. Limited control . - PowerPoint PPT Presentation

TRANSCRIPT

Berwickshire High School

Presentation compiled 15th October 2009

Why a new school?

Poor condition of existing building.

Restricted circulation space

Outdated Facilities

A glimpse of the future.

Lower Ground Floor

Ground Floor

First Floor

Security

Limited control

Tight control

Main Entrance

Observation

Improved facilities

Reduce Queues

A range of seating

Vending Machines

Drinking Water in every wing.

Vending Machines

Gymnasium with mirrored wall for dance

Fitness Room

Floodlit Synthetic Pitch

Various recreational areas

Environmentally Friendly

Cleanliness & Maintenance

Circulation Space

Recreational Areas

Photographic history of the build

The site before work commences - October 2006

Preparation for the workers village – October 2006

Ground conditioning – November 2006

Bases for the rear wings take shape – December 2006

Testing

Pile driving starts – January 2007

Shuttering and concrete pouring – February 2007

Steel erection commences – March 2007

Rapid progress – April 2007

Stairs & roofs – May 2007

Internal details start to appear – June 2007

July 2007

August 2007

March 2008

May 2008

June 2008

August 2008

September 2008

October 2008

November 2008

GALLERY

12th February 2009

Entrance

Wayfinder

Departmental Signage

Corridors

Flexible Teaching Area

Art & Design

Science

Home Economics

Assembly Hall

Changing

Boys Toilets

Staff Room

Staff Base/Store