back-end processing

Post on 13-Feb-2016

39 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Back-end Processing. André W. Gunst. April 2005. April 2005. First fringes. September 2006. July 2008. August 2008. LOFAR Signal Proc. Overview. LOFAR Back-end Processing. Technology document. Typical SKA back-end proc. SKA. “The more data you generate - PowerPoint PPT Presentation

TRANSCRIPT

4th SKADS Workshop, Lisbon, 2-3 October 2008

Back-end ProcessingBack-end Processing

André W. Gunst

4th SKADS Workshop, Lisbon, 2-3 October 2008

April 2005April 2005 April 2005April 2005

4th SKADS Workshop, Lisbon, 2-3 October 2008

First fringesFirst fringes

September 2006September 2006

4th SKADS Workshop, Lisbon, 2-3 October 2008

July 2008July 2008

4th SKADS Workshop, Lisbon, 2-3 October 2008

August 2008August 2008

4th SKADS Workshop, Lisbon, 2-3 October 2008

LOFAR Signal Proc. OverviewLOFAR Signal Proc. Overview

4th SKADS Workshop, Lisbon, 2-3 October 2008

4th SKADS Workshop, Lisbon, 2-3 October 2008

LOFAR Back-end ProcessingLOFAR Back-end Processing

4th SKADS Workshop, Lisbon, 2-3 October 2008

Technology documentTechnology document

4th SKADS Workshop, Lisbon, 2-3 October 2008

Typical SKA back-end proc.Typical SKA back-end proc.

4th SKADS Workshop, Lisbon, 2-3 October 2008

SKASKA

• “The more data you generate the more reduction is required”

• # images / astronomer ~ constant

• 10 TB/s for ~ 1000 radio astronomers 10 GB/s per astronomer to handle

4th SKADS Workshop, Lisbon, 2-3 October 2008

4th SKADS Workshop, Lisbon, 2-3 October 2008

Happy customers …Happy customers …

4th SKADS Workshop, Lisbon, 2-3 October 2008

ConclusionsConclusions

• Lots of lessons learned

• Ready to write them up

• Different technologies required in SKA

• Specific domain software will be part of the system

4th SKADS Workshop, Lisbon, 2-3 October 2008

CS010 CS001CS008 CS016

The Happy End

top related