assessment task pro forma€¦ · web viewcomplete the safe work method statement (swms) relating...
Post on 17-May-2020
5 Views
Preview:
TRANSCRIPT
Macquarie Park RTO 90222
Competency Assessment TaskCourse Name Furniture Making Pathways
Cluster B
Cluster Name Occasional Table
Qualification Code MSF20516
Qualification Name So A Certificate II in Furniture Making Pathways
Units of Competency
MSFGN2001 Make measurements and calculations1 Identify appropriate measurements and equipment2 Perform measurements3 Perform calculations4 Record measurements and calculations as required5 Recognise routine and non-routine problemsMSFFP2001 Undertake a basic furniture making project1. Research furnishing materials and components2 Develop a furnishing-based project3 Determine drawing requirements4 Create project drawings5 Plan the manufacture of the product6. Manufacture the product7. Complete work requirementsMSFFP2004 Apply domestic surface coatings1 Determine job requirements2 Plan and prepare for work3 Prepare for application of surface coatings4 Apply surface coatings5 Check work area and maintain equipmentMSFFP2005 Join materials used in furnishing1 Determine job requirements2 Plan and prepare for work3 Lay out and prepare materials4 Join materials5 Check work area and maintain equipment
Student Name
Date of Issue Due Date(s)
Pre-requisite units Nil
Student Acknowledgement is on page 2 in the task
MSF20516 FMP Cluster Task B December 2016 Page 1 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
STUDENT ACKNOWLEDGEMENT Please tick
Students must complete knowledge and skills development activities which prepare for and may contribute to assessment of competence.
I understand the requirements of the assessment task and assessment methods.
I understand what is being assessed and can perform the tasks described in this assessment.
I have been provided with information about RPL, Credit Transfer and Assessment Appeals.
I have notified the assessor of any special needs to be considered
I declare that the work submitted is my own.
Student signature Date
Assessment methodPart A:Written work Part B Practical
Foundation skills
Learning Skills Reading skills
Writing Skills Oral communication skills
Numeracy Navigate the world of work
Interact with others Get the work done
Problem-solving skills Self-management Skills
Technology Skills Initiative and enterprise Skills
Planning and organising Teamwork
Nationally Consistent Collection of Data (NCCD)ASSESSOR/ TRAINER USE ONLY: Additional requirements for students with special needs and /or Education as an Additional Language/ Dialect (EALD) for the completion of this task.Please tick and explain
No assistance required
Providing support staff
Providing tutorial sessions
Altering assessment methods
Simplifying and rephrasing language
Provide additional time to complete the task
Further Assistance provided:
MSF20516 FMP Cluster Task B December 2016 Page 2 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Task OutlineAs you complete this assessment task you will be demonstrating your skills and knowledge to your assessor. The assessor may also observe your practical skills and techniques and ask you questions. Ensure in your work practices that you work safely and efficiently, check that equipment is ready for use and work with others to improve work practices.
Part A: Written Work- to be completed and handed in to your teacher before project work commences
Complete the Safe Work Method Statement (SWMS) relating to the production of your project. This must be completed before any work commences (Attachment A)
Using the Plans and Costing Lists provided .(Attachment B) you need to calculate the cost of the
Bread box, Dining table and Occasional table
Answer Questions about solid timber vs manufactured boards using the correct Materials Data Sheets ( MDS) ( Attachment C)
Produce a pictorial sketch of your Occasional table by freehand- including overall dimensions (Attachment G) after you have completed the practical components below
Part B: Practical Work
You are required to complete the following practical components using the steps to Production (attachment D)
Construct and assemble the components to the Job Plan specifications (see Attachment E).
Use specific joints indicated on the plans. ( Attachments F)
Your trainer will observe you during this process and may also ask you questions in relation to the skills activities.
While you are working you must also do the following:
a. Ensure quality assembly - squareness and accuracyb. Adhere to all safety requirements and PPEc. Use appropriate tools and machinesd. Use 3 different types of surface coatings
acrylic paint, lacquer, oil and waxes
e. Utilise finishing techniques to achieve an acceptable standard of surface preparation.
You also need to
Select the correct power tool/s -consistent with the needs of the job and in accordance with conventional work practices.
Tools need to be visually checked for serviceability and safety in accordance with WHS requirements,
You must report any faults in this equipment to your trainer.
MSF20516 FMP Cluster Task B December 2016 Page 3 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment ASAFE WORK METHOD STATEMENT (SWMS)
Referring to the Risk Assessment Matrix on the following page complete the following Safe Work Method Statement
Work Activity Potential Risk Hazards Pre-Risk
Risk Hazard Controls Post Risk
Cutting timber as per cutting list
Sanding and finishing
Producing joints using power tools
Clamping / cramping
Manual handling
MSF20516 FMP Cluster Task B December 2016 Page 4 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment A Continued RISK ASSESSMENT MATRIX
MSF20516 FMP Cluster Task B December 2016 Page 5 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment B Student Name: ________________________________
MATERIAL PRICE LISTMaterial Cross –sectional dimension Cost per linear metreRadiata Pine 190 x 19 $ 8.45Radiata Pine 140 x 19 $ 6.32Radiata Pine 140 x 12 $ 4.75Radiata Pine 70 x 70 $10.38Radiata Pine 42 x 42 $ 5.43Radiata Pine 19 x 19 $ 1.80Radiata Pine 70 x 12 $ 3.10Plywood 4mm sheet 2400 x 1200 $12.50m²
QuestionsMake Measurements and Calculations
1. Identify faults that could occur during measurement
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________
2. Discuss what you must do to avoid or correct these faults___________________________________________________________________________________________
___________________________________________________________________________________________
______________________________________________________________________________
3. What measuring issues did you experience during construction of your Occasional Table?
___________________________________________________________________________________________
___________________________________________________________________________________________
_______________________________________________________________________________
4. Who should you report problems to when in the workplace?___________________________________________________________________________________________
___________________________________________________________________________________________
_______________________________________________________________________________
MSF20516 FMP Cluster Task B December 2016 Page 6 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment B ContinuedComplete the costing tables for the two products in the plans illustrated below. Use the Price List provided. Drawing is NOT TO SCALE
BREAD BOX
Item Material Length Number of
lengths
Total Linear metres
Price per linear metre
Cost per item
Sides Radiata Pine
Top Radiata Pine
Base Radiata Pine
Back Plywood
Total cost
MSF20516 FMP Cluster Task B December 2016 Page 7 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment B Continued
DINING TABLE
NOT TO SCALE
Item Material Length Number of
lengths
Total Linear metres
Price per
linear metre
Cost of item
Table Top Radiata Pine
Legs Radiata Pine
End Rails Radiata Pine
Side Rails Radiata Pine
Total cost
MSF20516 FMP Cluster Task B December 2016 Page 8 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment B ContinuedUse the Costing sheet below to estimate the cost of the Occasional table.
Costing Sheet
Item Material Length Number of lengths
Total Linear metres
Cost per linear metre
TOTAL
Legs Radiate pineSide Rails Radiate pineFront Rails Radiata PineBack Rail Radiata PineTop Radiate pineCleats Radiate pineDrawer Runners
Radiata PineRadiate pine
42x19 =19x19 =
Drawer front Radiate pineDrawer sides Radiate pineDrawer back Radiate pineDrawer base PlywoodBrass knob Supplied
Labour Jobs performed
Time Taken
Hourly rate Totals
Cabinet Maker Cutting and assembly
2 hours45 mins
$23.45
Wood machinist Turning drawer and legs
1 hour30 mins
$42.52
Furniture Finisher Applying Finish 1 hour $ 18.67Comments: Costs ( material and Labour
Wastage and overheads(+15%)Total Cost (excl GST)Total GST (+10%)
Total Cost (incl) GST
MSF20516 FMP Cluster Task B December 2016 Page 9 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment B Continued
CUTTING LIST - OCCASIONAL TABLE. Complete the table below – by interpreting the drawings supplied by writing the number of parts required to complete the occasional table.
Component Length Width Thickness No Of Material Remarks
Legs 400 42 42 Radiata Pine Legs tapered to 25x25 from below rail.
Side Rails 336 100 19 Radiata Pine 10mm deep haunched tenon each end.
Front Rails 316 42 19 Radiata Pine 2 x 10 dowels each end.
Back Rail 316 100 19 Radiata Pine 3 x 10 dowels each end.
Top 440 440 19 Radiata Pine 3 x 140 x16 boards biscuit joined together.
Drawer Runners 316 42 42 Hardwood 19x19 screwed to 42x 19
Drawer Front 315 60 19 Radiata Pine 9x19mm rebates each end.
Drawer Back 303 50 12 Radiata Pine Finish flush with top of groove.
Drawer Sides 367 60 12 Radiata Pine 6 x 12 rebate rear end.
Drawer Bottom 360 297 3 3 Ply Groove into bottom of drawer.
MSF20516 FMP Cluster Task B December 2016 Page 10 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment CComplete the following questions about the advantages of Manufactured Boards versus Solid Radiata Pine timber. Select from the following list of characteristics and list them in the correct columns for each
Large sheet sizes are readily available Cost effective Strong in ALL directions Need to allow for movement of timber Stable flat product Strong in ONE direction
Manufactured Boards Solid Radiata Pine Timber
Material Data Sheet (MDS) – Complete the following table referring to the appropriate MDS. (Your teacher will issue these to you or you could research these on the internet.)
1st aid information Firefighting informationUrethane lacquer
Water based lacquer
Oil finish
Wax finish
MSF20516 FMP Cluster Task B December 2016 Page 11 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment D
OCCASIONAL TABLE – STEPS IN PRODUCTION.
Cut legs to length.
Mark out for and cut mortise slots and dowel holes.
Mark out and cut tapers on legs.
Cut rails to length.
Mark out and cut tenons in side rails.
Mark out and drill dowel holes in front and back rails.
Clean up components prior to assembly.
Assemble legs and rails.
Cut and assemble drawer runners.
Cut and fit cleats to affix top.
Mark out and cut components for the top.
Mark out and cut widening joints for top.
Glue up top.
Cut to length drawer components.
Mark out and cut rebate joints for drawers.
Assemble drawers.
Rebate for bottom of drawer.
Fit drawer bottom.
Clean up and finish project.
NB: Attachments F -Drawings of the table follow
MSF20516 FMP Cluster Task B December 2016 Page 12 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
MSF20516 FMP Cluster Task B December 2016 Page 13 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
MSF20516 FMP Cluster Task B December 2016 Page 14 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
MSF20516 FMP Cluster Task B December 2016 Page 15 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
MSF20516 FMP Cluster Task B December 2016 Page 16 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
MSF20516 FMP Cluster Task B December 2016 Page 17 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
Attachment G Student Name_______________________________________________
Freehand draw a pictorial sketch of your Occasional table - including overall dimensions:
MSF20516 FMP Cluster Task B December 2016 Page 18 of 19 Public Schools NSW, Macquarie Park RTO 90222
Macquarie Park RTO 90222
ASSESSOR FEEDBACK TO STUDENTSAssessor’s Name Cluster B
Student Name Date
Units of competency being assessed for Assessment Outcome
MSFGN2001Make measurements and calculations
Competent Not yet competentIf NYC - Refer to shaded section below
MSFFP2001 Undertake a basic furniture making projectMSFFP2004 Apply domestic surface coatingsMSFFP2005 Join materials used in furnishingIf you have been deemed NOT YET COMPETENT the following further action is required:MSFGN2001Make measurements and calculations
Date of Reassessment /Date CompetentMSFFP2001 Undertake a
basic furniture making projectMSFFP2004 Apply domestic surface coatingsMSFFP2005 Join materials used in furnishingAssessor general comment:
I declare that I have conducted a fair, valid, reliable and flexible assessment with this student and have provided appropriate feedbackAssessor Signature Date
Assessors: the completed student assessment task and assessor feedback sheets must be scanned and uploaded to QMS.Student Feedback (to be completed after student receives assessor feedback)Tick only one I agree with the outcome of this assessment I do not agree with this assessment outcome and will speak with assessor re: appeals processWhat did I learn from this Task?
Student Signature Date
MSF20516 FMP Cluster Task B December 2016 Page 19 of 19 Public Schools NSW, Macquarie Park RTO 90222
top related