US Army Corps of Engineers

BUILDING STRONG®And Taking Care Of People!

Arroyo SecoEcosystem RestorationIntegrated Feasibility Study

BUILDING STRONG®And Taking Care Of People!

• Study Overview• Background• Civil Works/SMART Planning Process• Schedule• Preliminary Study Objectives• Measures and Alternatives

• CEQA Overview

Meeting Objectives

BUILDING STRONG®And Taking Care Of People!

Federal – Local Partnership

U.S. Army Corps of EngineersLead Agency

Los Angeles CountyFlood Control District

Lead Local Sponsor

BUILDING STRONG®And Taking Care Of People!

Local Partnerships

Council of ArroyoSeco Agencies

BUILDING STRONG®And Taking Care Of People!

2005Partnershipbetween Corpsand LACFCD

2008PartnershipbetweenLACFCD andlocal agencies

2002Corps completesArroyo SecoWatershedReconnaissanceStudy

2011Corps completes ArroyoSeco WatershedFeasibility ScopingMeeting Documentation(Baseline Conditions)

2013Corps holdsrescoping charetteworkshop

Study Timeline

2017Corps to submitFinal Report

2014Corps holds NEPA PublicScoping Meeting(Start of 3-year Studyperiod)

2012CorpsmodernizesPlanningprocess -SMART

BUILDING STRONG®And Taking Care Of People!

ARROYO SECO ECOSYSTEMRESTORATION FEASIBILITY STUDY

BUILDING STRONG®And Taking Care Of People!

RECONNAISSANCEPHASE

REPORT

FEASIBILITYPHASE

REPORT

FINAL DESIGN

CONSTRUCTIONDOCUMENTS

CONSTRUCTION

PROJECT

OPERATION ANDMAINTENANCE

(BY LOCALSPONSOR)

Civil Works Process

CongressionalAuthorization

BUILDING STRONG®And Taking Care Of People!

6

5

4

3

2

1

In Progress

Six Step Planning Process

BUILDING STRONG®And Taking Care Of People!

SMART Process

RECONNAISSANCEPHASE

REPORT

RECONNAISSANCEPHASE

REPORT

FEASIBILITYPHASE

REPORT

FINAL DESIGN

CONSTRUCTIONDOCUMENTS

FINAL DESIGN

CONSTRUCTIONDOCUMENTS

CONSTRUCTION

PROJECT

CONSTRUCTION

PROJECT

OPERATION ANDMAINTENANCE

(BY LOCALSPONSOR)

OPERATION ANDMAINTENANCE

(BY LOCALSPONSOR)

BUILDING STRONG®And Taking Care Of People!

Milestones Date

Charette November 2013

Review Plan approved August 2014

Alternative Milestone May 2015

Tentatively Selected Plan March 2016

Agency Decision Milestone September 2016

Submit Final Report March 2017

CWRB May 2017

Signed Chief’s Report June 2017

Termination Date August 2017

Study Schedule

BUILDING STRONG®And Taking Care Of People!

• Decision document

• Includes

• Recommended action

• Cost estimate for action

• NEPA and CEQA document

• Leads to request for Congressional authorization forfunding towards design and construction

Integrated Feasibility Study Report

BUILDING STRONG®And Taking Care Of People!

12

Those restoration opportunities that are associated withwetlands, riparian and other floodplain and aquaticsystems are most appropriate for Corps involvement.

Ecosystem Restoration Fundamentals

BUILDING STRONG®And Taking Care Of People!

Almost complete loss of stream conditions (structure andfunction) that support aquatic species & their habitats.

Identified Problem

BUILDING STRONG®And Taking Care Of People!

Restore quality and quantity of aquatic, wetlands, andriparian habitats

Restore natural channel sinuosity

Improve Aquatic Habitat

Enhance Recreational Opportunities (compatible withrestoration; passive; example – nature trail, educationalsignage)

Planning Objective and Study Goals

BUILDING STRONG®And Taking Care Of People!

Maintain flood risk management function/capability of existing ArroyoSeco system

Maintain Devil’s Gate Dam flood storage capacity

Avoid Hazardous and Toxic Waste (HTW) site at Jet Propulsion Lab

Minimize impacts to transportation infrastructure such as highwaysand bridges

Minimize adverse impacts to nearby residences, especially historicand culturally significant districts and properties

Minimize impacts to existing facilities and infrastructure such asRose Bowl

Planning Constraints andConsiderations

BUILDING STRONG®And Taking Care Of People!

CHAP evaluation –Combined HabitatAssessment Protocol

Allows comparison ofquality of existinghabitat versusalternatives

Assists in selection ofthe recommendedplan

Habitat Evaluation

BUILDING STRONG®And Taking Care Of People!

Study Location

BUILDING STRONG®And Taking Care Of People!

Arroyo Seco Watershed

BUILDING STRONG®And Taking Care Of People!

StudyReaches

BUILDING STRONG®And Taking Care Of People!

Reach 1

BUILDING STRONG®And Taking Care Of People!

Reach 2

BUILDING STRONG®And Taking Care Of People!

Reach 3

BUILDING STRONG®And Taking Care Of People!

Reach 4

BUILDING STRONG®And Taking Care Of People!

Reach 5

BUILDING STRONG®And Taking Care Of People!

Reach 6

BUILDING STRONG®And Taking Care Of People!

Reach 7

BUILDING STRONG®And Taking Care Of People!

Reach 8

BUILDING STRONG®And Taking Care Of People!

No Action: Under this alternative, the Corps wouldtake no action to restore any ecosystem functions orvalues within the Arroyo Seco study area.

Focused Array of Alternatives(Under Evaluation)

BUILDING STRONG®And Taking Care Of People!

Parallel Natural System: Low-Flow Channel

Focused Array of Alternatives(Under Evaluation)

BUILDING STRONG®And Taking Care Of People!

Parallel Natural System: RCB Culverts with low-flowchannel

Focused Array of Alternatives(Under Evaluation)

BUILDING STRONG®And Taking Care Of People!

Notched Side-Walls with low-flow channel

Focused Array of Alternatives(Under Evaluation)

BUILDING STRONG®And Taking Care Of People!

Floodplain Benching

Focused Array of Alternatives(Under Evaluation)

BUILDING STRONG®And Taking Care Of People!

Sheet-pile Bank Protection with Floodplain Benching

Focused Array of Alternatives(Under Evaluation)

BUILDING STRONG®And Taking Care Of People!

34

California Environmental Quality Act(CEQA)

BUILDING STRONG®And Taking Care Of People!

35

CEQA Environmental Impact Report(EIR) Process

BUILDING STRONG®And Taking Care Of People!

Notice of Preparation (NOP) and scoping meeting

Draft EIR

45-day review and comment period

Public meeting

Public Participation

BUILDING STRONG®And Taking Care Of People!

Tentatively Selected Plan March 2016

Draft Study/EIS/EIRDocument• 45 day Public Review

Period• Public Meeting

June – July 2016

Agency Decision Milestone September 2016

Milestones Date

Charette November 2013

Review Plan approved August 2014

Alternative Milestone May 2015

Tentatively Selected Plan March 2016

Agency Decision Milestone September 2016

Submit Final Report March 2017

CWRB May 2017

Signed Chief’s Report June 2017

Termination Date August 2017

Schedule

BUILDING STRONG®And Taking Care Of People!

Tentatively Selected Plan March 2016

Draft Study/EIS/EIRDocument• 45 day Public Review

Period• Public Meeting

June – July 2016

Agency Decision Milestone September 2016

Schedule

BUILDING STRONG®And Taking Care Of People!

Aesthetics

Agriculture and ForestryResources

Air Quality

Biological Resources

Cultural Resources

Geology & Soils

Greenhouse Gas Emissions

Hazards & HazardousMaterials

Cumulative Impacts

Hydrology & Water Quality

Land Use & Planning

Mineral Resources

Noise

Population & Housing

Public Services

Recreation

Traffic & Transportation

Utilities & Service Systems

Mandatory Findings ofSignificance

Issues to be Analyzed

BUILDING STRONG®And Taking Care Of People!

40

Public ParticipationNOP and Scoping Meeting

NOP can be downloaded here: goo.gl/XEhAKp

Fill out comment response forms

Limit oral comments to three minutes

BUILDING STRONG®And Taking Care Of People!

County of Los Angeles Department of Public Works

Watershed Management Division, 11th Floor

Attention: Mr. Patrick Goodfellow

900 South Fremont Avenue

Alhambra, CA 91803

or by email to: pgoodfellow@dpw.lacounty.gov

Submit comments by May 23, 2015

Public ParticipationWritten Comments

BUILDING STRONG®And Taking Care Of People!

Questions

U.S. ArmyCorps of Engineers

Los Angeles CountyFlood Control District

Priyanka Wadhawan915 Wilshire Blvd, Suite 980Los Angeles, CA 90017(213) 452-3802Priyanka.wadhawan@usace.army.mi

Patrick Goodfellow900 S. Fremont AvenueAlhambra, CA 91803(626) 458-7034pgoodfellow@dpw.lacounty.gov

For more information on the Study:

top related