PFRC MEETING #4 - AGENDA
7:00 Welcome/Introductions
7:05 Project Overview and Schedule
7:10 Preliminary Site Design
7:30 Conceptual Floor Plans
7:50 Preliminary Building Design
8:10 Committee Discussion
8:35 Public Comment
8:50 Next Steps / Adjourn
2
PROJECT OVERVIEWAND SCHEDULE
3
PFRC: PRINCIPLES OF CIVIC DESIGN
Civic Values Siting and Orientation
Building Form Building Details and Materials
4
PROJECT SCHEDULE
Note: This is the preliminary project schedule and is subject to modification as the project continues
5
PRELIMINARY SITE DESIGN
6
TRIANGLE OF OPPORTUNITY
7
Fire Station 8
Gateway ParkLangston-Brown
Community Center
SITE PLAN
8
Dumpster Enclosure
Enclosed Utility Yard
Bus Stop with BenchFirefighter Bench
History/Legacy Plaza
Fuel Dispensers
Note: This is the preliminary project design and is subject to modification as the project continues
SITE PLAN – TURNING ANALYSIS
9Note: This is the preliminary project design and is subject to modification as the project continues
Western Sight Line
Eastern Sight Line
Largest Apparatus – RescueInside Turn: 18 ft 0 inCurb to Curb: 34 ft 4 inWall to wall 38 ft 11 in
SITE PLAN – LANDSCAPING
10
Raised planters with shrubs and ornamental grasses
Bioretention Area with canopy trees and shrubs
Canopy trees where possible otherwise smaller trees
Shrubs shielding mechanical yard from neighbors
Existing tree to remain if possible
Canopy Trees
Shrubs adjacent to sidewalk within sight lines
Canopy Trees along Culpeper St
Note: This is the preliminary project design and is subject to modification as the project continues
11
PLAZA PLAN
Low Seating Wall with Date Stones
Virtue Words on Building
Main Building Entrance
Reconstructed Hicks House Stone Wall
History Pathway from Porch to Porch
Gathering Spaces
Flagpoles
Note: This is the preliminary project design and is subject to modification as the project continues
PLAZA DESIGN
12
PLACEHOLDER LANDSCAPING
PLAZA DESIGN
13
PLACEHOLDER LANDSCAPING
CONCEPTUAL FLOOR PLANS
14
15
CONCEPTUAL FIRST FLOOR PLAN
Note: This is the preliminary project design and is subject to modification as the project continues
CULPEPER STREET
LEE HIGHWAY
LEGEND
OPERATIONS
PUBLIC AREAS
LIVING SPACES
ADMINISTRATION
BUNK AREAS
CIRCULATIONSUPPORT
16
CONCEPTUAL SECOND FLOOR PLAN
Note: This is the preliminary project design and is subject to modification as the project continues
CULPEPER STREET
LEE HIGHWAY
LEGEND
OPERATIONS
PUBLIC AREAS
LIVING SPACES
ADMINISTRATION
BUNK AREAS
CIRCULATIONSUPPORT
17
CONCEPTUAL THIRD FLOOR PLAN
Note: This is the preliminary project design and is subject to modification as the project continues
CULPEPER STREET
LEE HIGHWAY
LEGEND
OPERATIONS
PUBLIC AREAS
LIVING SPACES
ADMINISTRATION
BUNK AREAS
CIRCULATIONSUPPORT
FLOOR PLAN – HISTORY/LEGACY
18
Opportunities:
• Historic Assignment Board
• Dynamic Display
(Oral History, Photo Slideshow, etc.)
• Display Cases
• First Due Map with Historic Hall’s Hill Wall Outline
PRELIMINARY BUILDING DESIGN
19
MASSING CONCEPT 1
20
View from N Culpeper St and Lee HighwayPLACEHOLDER LANDSCAPING
MASSING CONCEPT 1
21
View from Lee Highway looking West PLACEHOLDER LANDSCAPING
MASSING CONCEPT 1
22
View from Rear Apron PLACEHOLDER LANDSCAPING
MASSING CONCEPT 1
23
View from N Culpeper St looking South
PLACEHOLDER LANDSCAPING
MASSING CONCEPT 1 – MATERIALS
24
PLACEHOLDER LANDSCAPING
COMMITTEE DISCUSSION
25
PUBLIC COMMENT
26
NEXT STEPS
27
NEXT STEPS
DES Project Manager:Richard Pinskey(703) 228-3988Rpinskey@arlingtonva.us
Public Meeting dates and Past Presentations:https://projects.arlingtonva.us/projects/replacing-fire-station-no-8/
Next PFRC Meeting (Tenative):November 26, 2019, 7 p.m. at Langston Brown Community Center